Job Procedure for Remote Visual Inspection
by Video Scope
AMENDMENT RECORD
1. SCOPE 04
2. PURPOSE 04
3. REFERENCE DOCUMENTS 04
4. PERSONNEL QUALIFICATION 04
5. RESPONSIBILITIES 05
6. TOOL AND EQUIPMENTS 05
7. DETAILED ACTIVITIES 08
8. SAFETY 09
9. DOCUMENTATION 09
10. SAMPLE REPORT FORMAT 10
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 2 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
AMENDMENT RECORD
Section / Name
Revision Date of
Checklist Amendment Details
No. Amendment Reviewed Approved
Amended
03 13.06.2021 Sec 9 Confined Space and Vipin Shetty Ganesh Babu M
Working at Height
Omitted
02 22.11.2018 Sec 10 Report format changed Vipin Shetty Ganesh Babu M
Sec 10 Vipin
01 18.11.2018 Report format changed Ganesh Babu M
Shetty
Prakriti
00 25.11.2017 Initial Issue Ganesh Babu M
Samanta
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 3 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
1. SCOPE
This method statement gives you guidelines to perform remote visual inspection of tubing
using bore scope cameras.
2. Purpose
This method statement is to ensure that Bore scope inspection of tubing’s are carried out
safely, efficiently in accordance with good working practice, Client Specifications.
3. Reference Documents
The following documents were used in these method statements should be carefully reviewed
by the inspectors/inspection engineers prior to performing inspection. All references should
be the latest issued revision or edition.
Ø ASNT-SNT-TC-1A-2011&2016: Recommended Practice for Personnel
Qualification and Certification in Non-destructive Testing.
Ø ASME Sec V-2017 Article 9-Standard Specification for Visual Inspection
Ø Tubing’s general arrangements/Layout and construction drawing.
Ø Visual Inspection acceptance criteria as per client requirement.
Ø Bore scope/Video scope Equipment Manual.
4. Personnel Qualification
Personnel performing Examination shall have vision, with correction if necessary, to enable
to read Jaeger Type No. 1 Standard Chart at a distance of not less than 300mm, and
differentiate the contrast between the colors or shades of gray, and records of such vision test
shall be maintained by Aries. Vision tests shall be conducted annually and be current during
examination.
Personnel performing Remote visual examination using this Procedure shall be qualified to a
minimum of ASNT NDT VT Level II or Hands on Trained and certified in Equipment
Operation.
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 4 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
5. Responsibilities
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 5 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 6 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 7 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
7. Detailed activities
1. Ensure the all approved procedures, Drawings and documents are circulated among the
concerned personnel’s involved in the works.
2. Bore scope equipment’s shall be brought to site in dismantled condition then will be
shifted inside the client facility manually or by crane to the designated area provided by
client.
3. Make sure that to follow proper manual handling techniques while loading and offloading
of Equipment’s
4. All cables and probes should be organized properly tied and arranged.
5. Follow permits to work w.r.t site requirement.
6. Conduct tool box talk on a daily basis.
7. Check the equipment condition including the calibration
8. While working at height mobilize the equipment with crane - Follow the control measures
as per the Bore scope risk assessment - RA 50
9. Connect probe with the equipment in the proper socket. Refer equipment manual
10. Earth the machine properly. Refer equipment manual
11. Select the suitable probe tip and measuring tip at the cable end.
12. Switch on the main power supply. – Risk of electrical shock shall be avoided by proper
control measures mentioned in the risk assessment. All technicians shall undergo training
on electrical safety. Use appropriate hand glow
13. Check the sensitivity using Measurement verification block.
14. Insert the probe shaft throughout the tube length.
15. Start video recording and save the data while pulling the probe.
16. Turn off equipment after usage.
17. After completed the job dismantle the equipment and demobilize care fully
b. Post inspection
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 8 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
8. SAFETY
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 9 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
9. DOCUMENTATION
9.1. Report of Examination
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 10 of 11
Job Procedure for Remote Visual Inspection
by Video Scope
Doc. Ref.: ARIES /VI- GEN-09 Job Procedure for Remote Visual Inspection Video Scope | Rev No:3 | Date: 13.06.2021 Page 11 of 11