0% found this document useful (0 votes)
76 views2 pages

Annexure For MCB RCCB Rcbo

This document contains a customer request form for testing circuit breakers and other switchgear equipment at the Central Power Research Institute's Switchgear Testing & Development Station in Bhopal. [1] It requests information about the customer and sample, including name, address, type of equipment, ratings, test requirements, and any special instructions. [2] The form documents the equipment's technical specifications, such as voltage and current ratings, number of poles, terminals, and operating mechanisms. [3] It also addresses testing standards, evaluation criteria, sealing details if previously tested, and confirms the customer has read and agrees to the testing terms and conditions.

Uploaded by

prince sisodia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views2 pages

Annexure For MCB RCCB Rcbo

This document contains a customer request form for testing circuit breakers and other switchgear equipment at the Central Power Research Institute's Switchgear Testing & Development Station in Bhopal. [1] It requests information about the customer and sample, including name, address, type of equipment, ratings, test requirements, and any special instructions. [2] The form documents the equipment's technical specifications, such as voltage and current ratings, number of poles, terminals, and operating mechanisms. [3] It also addresses testing standards, evaluation criteria, sealing details if previously tested, and confirms the customer has read and agrees to the testing terms and conditions.

Uploaded by

prince sisodia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CENTRAL POWER RESEARCH INSTITUTE

SWITCHGEAR TESTING & DEVELOPMENT STATION


BHOPAL
Format No. : F-2/5 Issue No. : 03 Date of Issue : 26-12-2017
Revision No. : 00 Date of Revision : --
ANNEXURE TO CUSTOMER REQUEST FORM FOR TEST ON
ACB/MCCB/MCB/RCCB/RCBO
1.Name & address of the customer:

2. Sample to be tested:
3. Type:
4. Designation:
5. Serial No.: No. of samples:
6. Sample code No. (To be filled by CPRI):STDS

Condition of samples submitted: New / After test (Please Specify)


Drawing Nos.:

9. RATINGS OF THE SAMPLE TO BE TESTED


Rated Voltages Utilization category:
Operational Voltage Ue S.C. making capacity in kA:
Insulation Voltage Ui Service S.C. breaking capacity in kA:
Impulse Voltage Uimp Ultimate S.C. breaking capacity in kA:
Rated operational current Rated short-time withstand current (Icw)
Conventional free air thermal current Equipments is suitable for isolation: Yes / No
Conventional enclosed thermal current Circuit breaker is Withdrable / Fixed / Plugin
No. of poles: 1 / 2 / 3 / 4 Degree of protection
No. of breaks/pole: 1 / 2 / 3 / 4 Material Group
Terminals : Marked / Unmarked Rated frequency: 50 Hz or 50Hz/60Hz
Rated short time current: Thermal ………..kArms for…….…s, Dynamic (peak)………
kApk SCPD details:

Details of releases Tripping Time


Releases: Fixed / Adjustable At 1.45 In
Type: Over current Short Circuit At 2.0 In
Current rating: At 2.5 In
Maximum rating: At any other current
Minimum rating: Reference Temperature
For MCB
Maximum I2t in A²s: ×103 Grid Distance in
mm: Energy limiting class: 1 / 2 /3
For RCCB
Rated tripping current Rated residual operating current
(I∆n)

Rated residual making breaking capacity Rated conditional short-circuit current


(I∆m) (Inc)
Rated making breaking capacity (Im) Rated conditional residual S.C. current
RCCB/RCBOis functionally: dependent on line voltage /independent of line voltage

10. Operating mechanism details: Type Volt Power


a) Closing
b) Tripping
c) Charging
Page 1 of 2
CENTRAL POWER RESEARCH INSTITUTE
SWITCHGEAR TESTING & DEVELOPMENT STATION
BHOPAL

DETAILS OF TEST REQUIRED:


Test to be conducted:

11.2Test in accordance with standard &clause No.:

11.3Specific Instructions (if any): for mounting and connection: As per standard / Other (Specify)

11.4Customer’s requirement(if any):

11.5Deviations from standard (if any)

11.6Criteria for Evaluation: As per standard / Other (Specify)

11.7Whether equipment sealed by Electricity board, utilities etc.?Yes/No If yes, please furnish the details of Sealing

Sealing details as specified by customer are inspected & found to be intact/ not intact.

Signature of Test Engineer


(Present at the time of verification of seals)
11.8Any Other Information:

I/We have read & understood the terms and condition for testing at CPRI and agree to the
conditions stipulated there in.

Customer’s Signature Date:


Mobile :
Email:

Name & Signature of Test Engineer / Test in Charge


Page 2 of 2

You might also like