Schedule Machine Installation FP 3

The document provides a schedule for equipment pickup, transportation, installation, and commissioning for various packaging equipment. It includes pickup dates from different locations, estimated times of departure and arrival in Jakarta, dates for onsite installation work including manpower needs, expected installation durations, and start dates for commissioning.

Uploaded by

hardidwi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views14 pages

Schedule Machine Installation FP 3

The document provides a schedule for equipment pickup, transportation, installation, and commissioning for various packaging equipment. It includes pickup dates from different locations, estimated times of departure and arrival in Jakarta, dates for onsite installation work including manpower needs, expected installation durations, and start dates for commissioning.

Uploaded by

hardidwi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

ETA

EQUIPMENT PICK UP ETD ATD


JAKARTA

BATIK DESTRAPPER 18-May-22 14-Jul-22 19-Aug-22


DEPALLETIZER 15-Jun-22 30-Jun-22 5-Aug-22
EMPTY CAN INSPECTION 5-May-22 10-May-22 5-Jun-22 15-Jul-22
DRYER AFTER STERILIZER 5-May-22 10-May-22 5-Jun-22 15-Jul-22
POST STERILIZER INSPECTION 5-May-22 10-May-22 5-Jun-22 15-Jul-22
CONVEYOR ready 25-Jun-22 15-Jul-22
CAN TWISTER 5-May-22 10-May-22 5-Jun-22 15-Jul-22
DRYER AFTER SLEEVER 5-May-22 10-May-22 5-Jun-22 15-Jul-22
CASE PACKER 5-Apr-22 12-Apr-22 13-Apr-22 17-May-22
PALLETIZER 14-Jun-22 20-Jun-22 25-Jul-22
UTILITY
SPARK DEPALLETIZER week 30 week 31 week 36
EMPTY CAN INSPECTION 5-May-22 10-May-22 5-Jun-22 15-Jul-22
DRYER AFTER STERILIZER 5-May-22 10-May-22 5-Jun-22 15-Jul-22
POST STERILIZER INSPECTION 5-May-22 10-May-22 5-Jun-22 15-Jul-22
CONVEYOR ready 13-Jun-22 13-Jun-22 25-Jun-22
CAN TWISTER 5-May-22 10-May-22 5-Jun-22 15-Jul-22
DRYER AFTER SLEEVER 5-May-22 10-May-22 5-Jun-22 15-Jul-22
CASE PACKER 5-Apr-22 12-Apr-22 13-Apr-22 17-May-22
PALLETIZER 14-Jun-22 20-Jun-22 25-Jul-22
UTILITY

ETA
EQUIPMENT PICK UP ETD ATD
JAKARTA
JBT
BATIK FILLER BATIK 2-Jun-22 4-Jun-22 6-Jun-22 11-Jul-22
CAN CONVEYOR 26-May-22 22-Jun-22 15-Jul-22
POST FILLER INSPECTION 6-May-22 14-May-22 16-May-22 19-Jun-22
CAN RINSER 26-May-22 22-Jun-22 15-Jul-22
CAN DRYER 26-May-22 22-Jun-22 15-Jul-22
CAN WASHER 26-May-22 22-Jun-22 15-Jul-22
LID FEEDER 6-May-22 14-May-22 16-May-22 19-Jun-22
UTILITY
SPARK FILLER SPARK 21-Jul-22 2-Aug-22 12-Sep-22
CAN CONVEYOR 26-May-22 22-Jun-22 15-Jul-22
POST FILLER INSPECTION 6-May-22 14-May-22 16-May-22 19-Jun-22
CAN RINSER 26-May-22 22-Jun-22 15-Jul-22
CAN DRYER 26-May-22 22-Jun-22 15-Jul-22
CAN WASHER 26-May-22 22-Jun-22 15-Jul-22
LID FEEDER 6-May-22 14-May-22 16-May-22 19-Jun-22
UTILITY

ETA
EQUIPMENT PICK UP ETD ATD
JAKARTA

SLEEVER BATIK DONE DONE 1-Jan-22 DONE


SLEEVER SPARK 10-Jun-22 19-Jun-22 24-Jun-22
CHECK WEIGHER 9-Mar-22
ATA MAN POWER MAN POWER START DURATION START
ONSITE
JAKARTA SIDEL NESTLE INSTALLATION (days) COMMISSIONING

MEC ELEC MEC ELEC


26-Aug-22 29-Aug-22 6 12-Sep-22
12-Aug-22 15-Aug-22 14 NO TEST
22-Jul-22 1-Aug-22 5
22-Jul-22 5-Aug-22 5
22-Jul-22 1-Aug-22 5
22-Aug-22
22-Jul-22 25-Jul-22 18
22-Jul-22 1-Aug-22 5
22-Jul-22 5-Aug-22 5
17-May-22 23-May-22 11-Jul-22 6 22-Aug-22
1-Aug-22 4-Aug-22 17 24-Aug-22
11-Jul-22 12
week 37 TBC
22-Jul-22 15-Aug-22 5
22-Jul-22 1-Aug-22 5
22-Jul-22 15-Aug-22 6
29-Aug-22
2-Jul-22 8-Aug-22 18
22-Jul-22 15-Aug-22 6
22-Jul-22 1-Aug-22 5
17-May-22 23-May-22 19-Jul-22 6 8-Aug-22
1-Aug-22 20-Aug-22 14 5-Sep-22
27-Jun-22 12

START
ATA MAN POWER MAN POWER START
ONSITE DURATION COMMISSIONIN
JAKARTA JBT NESTLE INSTALLATION G
MEC ELEC MEC ELEC
18-Jul-22 19-Jul-22 16 12-Aug-22
22-Jul-22 25-Jul-22 21
27-Jun-22 11-Aug-22 6
22-Jul-22 25-Jul-22 21 22-Aug-22
22-Jul-22 25-Jul-22 21
22-Jul-22 25-Jul-22 21
26-Jun-22 11-Jul-22 12 26-Aug-22
4-Jul-22 12
19-Sep-22 TBC 23 TBC
22-Jul-22 25-Jul-22 33
27-Jun-22 15-Aug-22 15
22-Jul-22 25-Jul-22 33 5-Sep-22
22-Jul-22 25-Jul-22 33
5-Sep-22

22-Jul-22 25-Jul-22 33
26-Jun-22 11-Jul-22 33 9-Sep-22
4-Jul-22 12

START
ATA MAN POWER MAN POWER START
ONSITE DURATION COMMISSIONIN
JAKARTA FUJISEAL NESTLE INSTALLATION
G
MEC ELEC MEC ELEC
DONE 11-Mar-22 11-Jul-22 6 22-Aug-22
1-Jul-22 18-Jul-22 6 5-Sep-22
7-Apr-22 8-Aug-22 6 31-Aug-22
WW25 WW26 WW27 WW28
PACKAGING
MATERIAL INLINE TRIAL
NEEDED June 19 - 25 June 26 - July 02 July 03 - July 09 July 10 - 16
S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M T W

12-Sep-22

MAIN HEADER INSTALLA

31-Oct-22

MAIN HEADER INSTALLATION

PACKAGING
MATERIAL INLINE TRIAL
NEEDED

MAIN HEADER INSTALLATION


MAIN HEADER INSTALLATION

PACKAGING
MATERIAL INLINE TRIAL
NEEDED
WW28 WW29 WW30 WW31 WW32 WW33

July 10 - 16 July 17 - 23 July 24 - 30 July 31 - Aug 06 Aug 07 - 13 Aug 14 - 20


TH F SAT S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M

UTILITY
INSTALLATION
UNDER CONVEYO

MAIN HEADER INSTALLATION


ETD

MECHANICAL INSTALLATION TIE IN I/O TEST, DRY TEST

TIE IN
TIE IN
WW33 WW34 WW35 WW36 WW37

Aug 14 - 20 Aug 21-27 Aug 28 - Sep 03 Sep 04 - 10 Sep 11 - 17


T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT
TIE IN I/O TEST, DRY RUN TRIAL
TIE IN NO I/O TEST

I/O
UTILITY TEST,
I/O TEST, DRY RUN I/O TEST, DRY RUN
INSTALLATION DRY
UNDER CONVEYOR RUN WET RUN 1

I/O TEST, DRY RUN TRIAL


TIE IN I/O TEST, DRY RUN TRIAL

ETA ONSITE

UTILITY I/O TEST, DRY RUN I/O TEST, DRY RUN


INSTALLATION

I/O TEST, DRY RUN TRIAL


TIE IN I/O TEST, DRY RUN

O TEST, DRY TEST


TIE IN
TIE IN
I/O TEST, DRY RUN
TIE IN I/O TEST, DRY RUN I/O TEST, DRY RUN WET RUN BATIK 1
TIE IN
TIE IN
I/O TEST

TIE IN
TIE IN
TIE IN I/O TEST, DRY RUN
I/O TEST, DRY RUN
TIE IN
I/O TEST, DRY RUN
I/O TEST, DRY RUN

TIE IN
I/O TEST

I/O TEST, DRY RUN


I/O TEST, DRY RUN
I/O TEST, DRY RUN
BPOM AUDIT
WW38 WW39 WW40 WW41 WW42

Sept 18 -24 Sep 25 - Oct 01 Oct 02 - 08 Oct 09 -15 Oct 16 - 22


S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M T W TH

Electrical Installation I/O TEST, DRY RUN TRIAL

WET
RUN
1

ONSITE TIE IN I/O TEST, DRY RUN TRIAL

I/O
TEST,
DRY
RUN

TRIAL

I/O TEST, DRY RUN

I/O TEST, DRY RUN


I/O TEST, DRY RUN

I/O TEST
TP Validation BATIK TP Validation SPARK
WW42 WW43 WW44 WW45 WW46 WW47

Oct 16 - 22 Oct 23 - 29 Oct 30 - Nov 05 Nov 06 - 12 Nov 13 - 20 Nov 21 - 28


F SAT S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M T W TH F SAT S M T

WET RUN

TRIAL

WET RUN

WET RUN BATIK 2

O TEST, DRY RUN WET RUN SPARK


WW47

Nov 21 - 28
W TH F SAT