Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
289 views
10 pages
Method Statement - Reconstruction
Uploaded by
hilmi masnon
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save METHOD STATEMENT - RECONSTRUCTION For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
289 views
10 pages
Method Statement - Reconstruction
Uploaded by
hilmi masnon
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save METHOD STATEMENT - RECONSTRUCTION For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save METHOD STATEMENT - RECONSTRUCTION For Later
You are on page 1
/ 10
Search
Fullscreen
SAFWA GLOBAL VENTURE (M) SDN. BHD. TECHNICAL AND ENGINEERING DEPARTMENT METHOD STATEMENT FOR RECONSTRUCTION | SGVMSB-TED-MST-01-02 | 1} 01.10.2020 ccc Ee oe tr eels |LULLAIL BIN MD SAPI Execute Director SaR79 Globai Venture (M) Sén. Ghd] 7, That WOTEEPT Senior Engineer | Manager Executive Director| | SAFWA GLOBAL VENTURE (M) SDN BHD | METHOD STATEMENT | PAVEMENT - RECONSTRUCTION | 1.0 20 3.0 40 OBJECTIVE ‘This Work Method Statement is to outline the apply and lay pavement for the road reconstruction consisting of geotechnical works, improving the drainage system, ‘sub-base of granular material, road base of crusher run, asphaltic concrete binder ‘course and asphaltic concrete wearing course. SCOPE This method statement shall apply for all reconstruction works. The intention of this, work method statement is to give general guideline for the roadwork construction, Details of the procedures contained herein may be modified based upon actual ground condition and site requirements. REFERENCE IKRISP/2008 Specification Section 4 Inspection checklist for roadworks Construction drawing and specifications ‘+ JKR Inspection and Testing Plan (ITP) Edition 2020 MACHINERY & EQUIPMENT * Diamond Cutter Excavator / Backhoe Tipper Lorries Back Pusher Vibratory Roller Tyre Roller Tandem Roller Paving Set © Levelling Instrument © Thermometer5.0 Ref No. SGVMS8-TED-MST-01-02 T SAFWA GLOBAL VENTURE (M) SDN BHD METHOD STATEMENT { PAVEMENT - RECONSTRUCTION | MATERIAL © Sand ‘+ Crusher run / crushed aggregate roadbase. ‘+ Asphaltic Concrete Binder Course AC 20/28 Asphaltic Concrete Wearing Course AC 14 Bituminous Prime Coat Bituminous Tack Coat Geotextile Corrugated pipe for subsoil drain. PROCEDURES 61 Soil Investigation Works 6.1.1 Tocarry out preliminary test, DCP to investigation the profile of road. 6.2 Excavation Works 6.2.1 Demareation on-site shall be carried out to determine the extend of repair area. Visible and non-visible obstruction shall be identified before works execution at site. 62,2 Joint survey on existing pavement shall be carried out road shall be carried out prior to the commencement of excavation works. Edges on every excavation area (joint of old pavement) shall be cut using diamond cutter. 6.2.3. Excavation work shall be done with care and work shall be monitor by a dedicated supervisor to avoid being exposed to any underground utilities. 6.2.4 Deeping measuarement shall be taken during execute work to control the depth of excavation. 6.2.5 Milling and excavate out the existing asphalt and road base layers to a required depth or as shown in drawing. 6.2.6 _In the event of inclement weather a “drainage channel" cut through the shoulder to prevent ponding on the excavated surface. Revision Date : 01.10.2020,SAFWA GLOBAL VENTURE (M) SDN BHD METHOD STATEMENT 6.3 Sub Base 63.1 6.3.2 6.3.3 63.4 63.5 PAVEMENT - RECONSTRUCTION The sub base material shall be hard, durable and clean from water. It shall be granular material and shall be free from organic material, clay balls, and any other deleterious substances. The materials will be delivered to the site by tipper lorries and spread and leveled by means of a back pusher for the full width of the pavement. The material shall be filed and compacted to the required thickness as. specified in the drawing/specification. Compaction of the sub base layer shall be carried out by using vibrating roller to achieve relative dry density as per specification. The final surface of granular sub base layer shall be regulated and trimmed by back pusher to the required level and cross fall within the specified vertical tolerances. Compaction work will be done using roller ‘compactor. Field Density Test (FDT) or CBR Test on the subgrade shall be carried out according to the specification. 6.4 Laying Road Base Material 6.4.1 6.42 643 Ref No, : SGVMSB-TED-MST.01.02 ee ‘The crusher run road base to be placed on top of the sub base shall consisting of crushed aggregate laid in layers each of thickness not ‘exceeding 200mm and to give the specified total compacted thickness and width, correct line and levels as requirement/specified in the BQ. ‘The material shall be crushed rock of hard durable particles or fragments of rock crushed to the correct size, well graded and lie within the following ‘grading limits specified in the specification. Care shall be taken to prevent segregation of the material into the coarse and fine fractions. The compaction not less than 95% of the maximum dry density determined in the JKR/SPJ/2008-S4.65 Ret No: SCVMSB-TED-MST-01-02 SAFWA GLOBAL VENTURE (M) SDN BHD | METHOD STATEMENT PAVEMENT - RECONSTRUCTION | Bituminous Prime Coat and Tack Coat 6.5.1 6.5.2 65.3 65.4 656 Asphaltic Concrete Bir 661 66.1.1 6.6.2 6.6.2.1 An approve bituminous prime coat shall be applied to the top of the completed crusher run base course before laying the asphaltic concrete binder course. Bituminous prime coat work shall only be carried out in dry and warm weather when the surface is essentially dry. Immediately prior to applying the bituminous prime coat, the surface shall be swept using a power broom followed by @ compressed air blower to keep surface clean. The bituminous shall be applied by means of a distributor at suitable rates but shall be in the range 0.5 to 1.0 litre/sq.m.The temperature of bitumen emulsion $S1K shall be maintained in the range 25° C to 45 ° The prime coat shali be sprayed well in advance and leave for 24 hours for curing. Prior to applying the bituminous tack coat, the surface to be treated shall be clean and dry. Notwithstanding any earlier approval of this surface, any damage to it or deterioration of it shall be made good before bituminous tack coat is applied. Bituminous tack coat material shall be rapid-setting cationic bitumen emulsion of grade RS-1K. The rates of application shall be in the range 0.25 to 0.56 lliters/sq.m. The temperature shall be maintained in the range 25° C to 45 °C during spraying operations. ‘Spraying will be performed for the whole surface that will be covered with wearing course. \der Course, AC 20 or AC 28 AC 20 or AC 28 mix will follow the approved mix design and trial mix. The aggregates shall be surface dry and shall be mixed at an appropriate temperature. The mixed material as delivered to the laying site shall be between 140 degrees Celsius to 160 degrees Celsius. Laying Procedure Work shall commence on site upon approval and acceptance of the road base. | Revision Ne, 00 ——— |~ 1] SAFWA GLOBAL VENTURE (M) SDN BHD CT 6.6.2.2 6.6.2.3 6.6.2.4 6.6.2.5 6.6.26 6.6.2.7 METHOD STATEMENT PAVEMENT - RECONSTRUCTION I The surface to receive the asphaltic concrete binder course shall be free of all damage, loose materials and standing water by sweeping. Any damage to or deterioration of it shall be made good before asphaltic concrete paving work is commenced. Prime coat of approved bitumen emulsion shall be applied as per Specification on the prepared surface prior to lay of the asphaltic binder course. The approved asphaltic concrete binder course shall be delivered to site by tipper trucks. To prevent the loss of heat, the mixture shall covered by tarpaulin. The temperature of asphaltic concrete shall be not less than 120°C. Rolling shall not be continued when the temperature of asphaltic concrete has decreased to 80°C or lower. The asphaltic concrete binder course shall be laid by @ paver in single layer. The thickness shall be conform to the specification required, Compaction shall be carried out using the specified equivalent type of compactors. Rolling shall always commence from the lower to the higher side of the carriageway. In any areas inaccessible to the rollers, proper compaction shail be cried out using vibrating plate compactors or other suitable means. ‘The surface of asphaltic concrete binder course shall be finished to the line and grade as required by the Drawings (if any) or to the specification. 6.7 Asphaltic Concrete Wearing Course, AC 14 67.1 672 67.3.1 67.3.2 Ref No, : SGVMSE-TED-MST-01.02, ‘AC 14 mix will follow the approved design mix and trial mix. ‘The aggregates shall be surface dry and shall be mixed at an appropriate temperature. The mixed material as delivered to the laying site shall be between 140 degrees Celsius to 160 degrees Celsius. Laying procedure Work shall commence on site upon approval and acceptance of the asphaltic concrete binder course. ‘The surface to receive the asphaltic concrete wearing course shall be free of all damage, loose materials and standing water by sweeping.6733 67.3.4 6.7.3.5 6.7.3.6 67.37 67.3.8 ‘SAFWA GLOBAL VENTURE (M) SDN BHD. METHOD STATEMENT PAVEMENT - RECONSTRUCTION Tack coat of approved bitumen emulsion shall be applied as per Specifications on the prepared surface prior to lay of the asphaltic wearing course, ‘The approved asphaltic wearing course shall be delivered to site by tipper trucks. To prevent the loss of heat, the mixture shall covered by tarpaulin.The temperature of asphaltic concrete shall be not less than 120°C. Rolling shall not be continued when the temperature of asphaltic concrete has decreased to 80°C or lower. The asphaltic concrete wearing course shall be laid by a paver in single layer. The thickness shall be conform to the specification required. Compaction shall be carried out using the specified equivalent type of compactors. Rolling shall always commence from the lower to the higher side of the carriageway.In any areas inaccessible to the rollers, proper ‘compaction shall be cried out using vibrating plate compactors or other suitable means, The surface of asphaltic concrete wearing course shall be finished to the line and grade as required by the Drawings (if any) or to the specification Clause 4.5.2 JKR/SPJ/2008-S4, Key joint shall be milled as shown in the following diagram. | 2 TL A kelew uanevere jon) = —| Wi | SAFWA GLOBAL VENTURE (M) SDN BHD METHOD STATEMENT PAVEMENT - RECONSTRUCTION 6.7.3.2 Upon completion of laying and compaction, joint survey shall be carried ‘out to check for compliance with the specified requirement. 6.7.3.10 After all the above works is completed, the supervisor is to ensure that the site is to be tidied up and all excess materials are to be discarded away from the site. 68 Transporting 68.1 Bituminous materials shall be transported in clean vehicles and shall be covered over when in transit or awaiting tipping. 6.8.2 Every precaution is to be taken to avoid segregation of mixed materials and to ensure that they do not become contaminated with foreign matter. 6.8.3 In order to maintain satisfactory temperatures of materials in transit and to prevent undue loss of heat adequate precautions are to be taken to ensure that the materials are properly protected. 69 Laying 6.9.1 The mixed materials shall, as soon as possible after arrival at the laying site, be supplied continuously to the paver and laid without delay. 6.9.2 Wherever practicable, road pavement materials having bitumen as the binder shall be spread, leveled and tamped by approved self-propelled pavers capable of laying to the required width, profile, camber or cross fall. 69.3 Immediately after any course is placed and before rolling is started, the surface shall be checked and all defects and irregularities in alignment, grade or texture corrected by the additional or removal of mixture. 6.10 Compaction 6.10.1 The compaction shall be compacted as soon as possible as rolling can be effected without causing undue displacement of the mixed material, ‘Compaction shall follow the rolling pattern established during the trial lay. | Revision No. : 00 | Ret No.: SGVMSB-TED-MST-O1-62 —_———__— | Revision Date 01.10.20204 SAFWA GLOBAL VENTURE (M) SDN BHD Meimetance | METHOD STATEMENT _ PAVEMENT - RECONSTRUCTION 6.10.2 The rollers shall be fitted with beeper. 6.10.3 The materials shall be rolled in longitudinal direction fram the sides to the centre of the carriageway. 6.10.4 For compaction, two times rolls pass by non-vibrate compactor prior to two times rolls pass by vibrate compactor. The tandem roller weight is in the range 8 to 10 tonnes. 6.10.5 The pneumatic tyred roller shall be blasted to an operation weight of not less than 15 tonnes. Eight times rolls pass compaction shall be carried out by tyre roller. 6.10.6 The last compaction shall be done by non-vibrate compactor. 6.10.7 Compaction of the asphalt shall commence as soon as possible after laying and in strict accordance to the specification. The sequence of compaction by the compaction plant shall adhere to the methods adopted from the trial compaction to achieve the required compacted density. 7.0 QUALITY CONTROL 7.1 Sub Grade / Road Base Layer 7.1.1 Materials used in the preparation of formation shall be approved material as per specifications. Materials shall be checked through sampling. 7.1.2 Degree of compaction not less than 95% of the maximum dry density determined in the JKR/SPJ/2008-S4. One test per 500 sq metre of each layer laid 7.1.3. The compaction shall be checked by field density test and must attain the minimum relative compaction as required by the specifications. 7.1.4 CBR value must be achieved as per required design (if have design Fequirement to follow), 7.1.5 Testing for subgrade layer is Field Density Test by Sand Replacement Method or Core Cutter Method, I Ref No, : SGUMSB-TED-MST.O1.0272 73 a Wj | SAFWA GLOBAL VENTURE (M) SDN BHD METHOD STATEMENT PAVEMENT - RECONSTRUCTION | 7.1.6 Machinery used for compaction is Vibro Roller with operating weight is 18 MT. 7.1.7 Site inspection and verification of work quality and quantities is done together with OE, subcontractor and appointed consultant, Binder / Wearing Course Layer 7.2.1 Remove all debris from site. Site shall be neat and tidy before laying of premix. 7.2.2 The paver shall be operated continuously as far as is practicable with continuous supply. 7.2.3. Compaction of the asphalt shall commence as soon as possible after laying and in strict accordance to the specification. The sequence of compaction by the compaction plant shalll adhere to the methods adopted from the trial compaction to achieve the required compacted density of 98 — 100% (Wearing course) and 95-10% (Binder course). 7.2.4 Coring sample to determine the compacted layer thickness and compacted density of binder and wearing course shall be taken. One (1) sample per 500 sq.m of mix laid, but not less than three (3) samples for the work completed in each paving session. 7.2.5 The binder and wearing course shall confirm to the specification for the thickness tolerance. 7.26 The wearing shall not be opened to any traffic within 6 hours from commencement of rolling. 7.2.7 Machinery used for compaction is tandem roller weight is in the range 8 to 10 tonnes and pneumatic tyred roller shall be blasted to an operation weight of not less than 15 tonnes. 7.28 Site inspection and verification of work quality and quantities is done together with OE, subcontractor and appointed consultant. Claim on work done shall be based on approved final measurement by appointed consultant. | Revision No. 00 | , Rel No, :SGvMSB-TEDMST-01-02 ——— Revision Date : 01.10.2020
You might also like
Asphalt Work Procedure
PDF
No ratings yet
Asphalt Work Procedure
4 pages
NGSB Method Statement - Roadwork Milling
PDF
No ratings yet
NGSB Method Statement - Roadwork Milling
8 pages
03 - Work Method Statement-Plumbing, Drainage - Sewerage
PDF
100% (2)
03 - Work Method Statement-Plumbing, Drainage - Sewerage
9 pages
Precoating of Stone Chips
PDF
No ratings yet
Precoating of Stone Chips
13 pages
Method Statement 1 PDF
PDF
No ratings yet
Method Statement 1 PDF
11 pages
Method Statement Road Work
PDF
100% (4)
Method Statement Road Work
10 pages
Method Statement (Road Works) : Jabatan Kerja Raya
PDF
No ratings yet
Method Statement (Road Works) : Jabatan Kerja Raya
11 pages
Method Statement of Soft-Landscape at Podium
PDF
100% (1)
Method Statement of Soft-Landscape at Podium
9 pages
Method Statement Widening
PDF
100% (2)
Method Statement Widening
13 pages
MOS - Flexible Pavement Rehabilitation
PDF
No ratings yet
MOS - Flexible Pavement Rehabilitation
6 pages
Asphalt Method Statement
PDF
100% (1)
Asphalt Method Statement
13 pages
Method Statement Road
PDF
No ratings yet
Method Statement Road
7 pages
Method Statement FOR Earthwork: Project
PDF
100% (1)
Method Statement FOR Earthwork: Project
6 pages
Method Statement of Road Mark
PDF
100% (1)
Method Statement of Road Mark
5 pages
Method Statement For Road and Paving Works - Work Procedure
PDF
0% (1)
Method Statement For Road and Paving Works - Work Procedure
20 pages
Method of Statement - Drainage Works
PDF
0% (1)
Method of Statement - Drainage Works
6 pages
Paving Method Statement
PDF
100% (2)
Paving Method Statement
7 pages
Construction Method Statement Format
PDF
No ratings yet
Construction Method Statement Format
29 pages
Method Statement For HV Cables Rerouting at Multi Storey Car Park Building at BWTC Complex
PDF
No ratings yet
Method Statement For HV Cables Rerouting at Multi Storey Car Park Building at BWTC Complex
5 pages
Road Works Method Statement
PDF
100% (1)
Road Works Method Statement
3 pages
J) Method Statement For Discharge of Stormwater and Rain Water
PDF
100% (1)
J) Method Statement For Discharge of Stormwater and Rain Water
4 pages
CWYC Method Statement For Excavation
PDF
100% (1)
CWYC Method Statement For Excavation
9 pages
Slope Construction Updated Rev November 2020
PDF
No ratings yet
Slope Construction Updated Rev November 2020
10 pages
Rev Description Prepared by Approved by Date Method Statement For Cold Water Services PJSB
PDF
100% (1)
Rev Description Prepared by Approved by Date Method Statement For Cold Water Services PJSB
5 pages
MS 001 - Clearing - Ruwanpura Expressway
PDF
No ratings yet
MS 001 - Clearing - Ruwanpura Expressway
14 pages
MOS Turfing
PDF
No ratings yet
MOS Turfing
9 pages
2 Method of Statement For RC Wall Between Feature Wall and Ramp - Rev 01 PDF
PDF
No ratings yet
2 Method of Statement For RC Wall Between Feature Wall and Ramp - Rev 01 PDF
3 pages
Method Statement For Road and Paving Works - Work Procedure 2024-02-12 01 - 35 - 27
PDF
100% (1)
Method Statement For Road and Paving Works - Work Procedure 2024-02-12 01 - 35 - 27
19 pages
Method Statement Roadworks Acdc Lane-Draft
PDF
No ratings yet
Method Statement Roadworks Acdc Lane-Draft
8 pages
METHOD STATEMENT - Sub-Base and Aggregate Base Course: June 2018
PDF
No ratings yet
METHOD STATEMENT - Sub-Base and Aggregate Base Course: June 2018
10 pages
Method Statement For Construction of Bridge RC Structure at BR 562-Sg. Chenderiang
PDF
100% (1)
Method Statement For Construction of Bridge RC Structure at BR 562-Sg. Chenderiang
12 pages
Method Statement For Earth Works For A Road Project
PDF
No ratings yet
Method Statement For Earth Works For A Road Project
17 pages
Method Statement - Road Marking & Road Markers: June 2018
PDF
No ratings yet
Method Statement - Road Marking & Road Markers: June 2018
9 pages
MASTER METHOD STATEMENT - Walsall
PDF
No ratings yet
MASTER METHOD STATEMENT - Walsall
24 pages
CV-0013-001 - Method Statement For Excavation and Fill Work
PDF
No ratings yet
CV-0013-001 - Method Statement For Excavation and Fill Work
11 pages
P 2014 00693 Construction Method Statement
PDF
0% (1)
P 2014 00693 Construction Method Statement
9 pages
Sewer Works STD Specification (JKR)
PDF
No ratings yet
Sewer Works STD Specification (JKR)
16 pages
Method Statement of Walkway
PDF
No ratings yet
Method Statement of Walkway
1 page
Method Statement - Drainage
PDF
No ratings yet
Method Statement - Drainage
10 pages
Method Statement and Specification
PDF
100% (1)
Method Statement and Specification
17 pages
066 - MOS - Surface Drainage
PDF
No ratings yet
066 - MOS - Surface Drainage
6 pages
Samples - Submission of Method Statement For Surface Drainage Works
PDF
100% (2)
Samples - Submission of Method Statement For Surface Drainage Works
19 pages
Client: Consultant: Contractor:: Method Statement For Sub Base and Road Base Work
PDF
No ratings yet
Client: Consultant: Contractor:: Method Statement For Sub Base and Road Base Work
11 pages
Method Statement - BOX CULVERT
PDF
100% (1)
Method Statement - BOX CULVERT
5 pages
Package B - Fourth Lane Widening
PDF
No ratings yet
Package B - Fourth Lane Widening
13 pages
Method Statement For Drainange Construction Work: Document/Drawing Number: TNEC-STSB-KLIA-CS-MS-013 Revision: A
PDF
100% (1)
Method Statement For Drainange Construction Work: Document/Drawing Number: TNEC-STSB-KLIA-CS-MS-013 Revision: A
9 pages
Method Statement
PDF
No ratings yet
Method Statement
3 pages
Concrete Pavers Method Statement-DRAFT
PDF
No ratings yet
Concrete Pavers Method Statement-DRAFT
15 pages
Method Statement For Earthwork
PDF
No ratings yet
Method Statement For Earthwork
5 pages
Method of Statement Road Drain Rock
PDF
No ratings yet
Method of Statement Road Drain Rock
6 pages
Method of Statement Road Work
PDF
No ratings yet
Method of Statement Road Work
10 pages
Method Statement - ROAD CUTTING
PDF
No ratings yet
Method Statement - ROAD CUTTING
4 pages
Water Rec
PDF
No ratings yet
Water Rec
9 pages
Ms-For Utilities Diversion Works
PDF
No ratings yet
Ms-For Utilities Diversion Works
9 pages
Method Statement For Turfing Work
PDF
100% (1)
Method Statement For Turfing Work
2 pages
Paving Method Statement
PDF
No ratings yet
Paving Method Statement
10 pages
Method of Statement For Porcelain Tiles Works
PDF
100% (1)
Method of Statement For Porcelain Tiles Works
12 pages
Method Statement For Site Investigation For Borrow Pit
PDF
No ratings yet
Method Statement For Site Investigation For Borrow Pit
2 pages
Method Statement For Grubbing Backfilling and Compaction
PDF
100% (1)
Method Statement For Grubbing Backfilling and Compaction
16 pages
Method Statement For Road Construction Works
PDF
No ratings yet
Method Statement For Road Construction Works
17 pages