0% found this document useful (0 votes)
2K views2 pages

Handover Report MEP

This document is an MEP checklist that lists mechanical and electrical activities for different areas of a villa including the ground floor, first floor, roof, service block, and external work. The checklist includes activities such as wiring and light fixture installation, ductwork and unit installation, plumbing work like installing pipes, tanks and pumps, and connecting appliances. It also includes spaces for marking completion, assigning responsibilities, and adding remarks.

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views2 pages

Handover Report MEP

This document is an MEP checklist that lists mechanical and electrical activities for different areas of a villa including the ground floor, first floor, roof, service block, and external work. The checklist includes activities such as wiring and light fixture installation, ductwork and unit installation, plumbing work like installing pipes, tanks and pumps, and connecting appliances. It also includes spaces for marking completion, assigning responsibilities, and adding remarks.

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

MEP CHECKLIST VILLA NO:______________________ DATE:________________________

S.No Activity GF FF RF Remarks RA TGC Consultant Client


Electrical
1 Wiring accessories Installation
2 Light fittings installation
3 DB Dressing
4 Cable Termination
5 ONU Termination
6 Plank Cover installation
7 Isolator Installation & Termination
8 Termination for A/C unit (Final Connection)
9 Water Proof socket installation
10 Booster Pump Connection
11 Float switch installation
S.No Activity GF FF RF Remarks RA TGC Consultant Client
Mechanical
1 Sanitary ware installation
2 Sanitary ware accessories installation
3 Indoor Units installation
4 Fan installation
5 Fire fighting extinguisher & Fire Blanket installation

6 Diffuser & Louver installation


7 Water Heater final connection
8 Outdoor Units installation
9 Copper pipe installation with Final Connection
10 Roof tank installation
11 Booster Pump installation
12 Insulation of water supply pipe
13 Copper pipe insulation
14 AAV installation
15 Bib tab installation
MEP CHECKLIST VILLA NO:______________________ DATE:________________________
S.No Activity SERVICE BLOCK EXTERNAL WORK Remarks RA TGC Consultant Client
Electrical
1 Wiring accessories Installation
2 Light fittings installation
3 DB Dressing
4 Cable Termination
5 Plank Cover installation
6 Isolator Installation & Termination
7 Termination for A/C unit (Final Connection)
8 Water Proof socket installation
9 Earthing System
10 Transfer Pump termination
11 Photo cell termination
12 MDB installation & Termination
13 MDB Cable Tray installation
14 Electrical Meter GRP cabinet installation & Termination

15 Intercome Panel installatin & Termination


S.No Activity SERVICE BLOCK EXTERNAL WORK Remarks RA TGC Consultant Client
Mechanical
1 Sanitary ware installation
2 Sanitary ware accessories installation
3 Indoor Units installation
4 Fan installation
5 Fire fighting extinguisher & Fire Blanket installation

6 Diffuser & Louver installation


7 Water Heater final connection
8 Outdoor Units installation
9 Copper pipe installation with Final Connection
10 External water supply network installation
16 GRP tank installation
17 Transfer Pump installation
18 Bib tab installation
19 Water meter connection