PTW - AG&P Piping Works (Weekly)

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

REV 3_07-01-2022 WORK PERMIT

Single-Use Longterm Use


Control No.:
Cold Work Hot Work Confined Space Entry Excavation Critical Lifting Work
Location NPC GRF Date Issued 12/27/2022 Valid Until 1/2/2023 Work Request No.

Equipment I.D. N/A Time 0800H Time 1700H


Working Group: (Pls. Use back page for multiple contractor)
MPDSI/SPPC Group: In house Contractor: Other External Contractor:

TSD/Project Engineering N/A AG&P


(Department/Section) (Company/Department/Section) (Company/Department/Section)
Description of Activities: (Pls. use back page for more details)
PIPING, STEELWORKS, AND OTHER HOT WORK ACTIVITIES:
1. Preparation, beveling, and tack welding of 16" pipes; 2. Full welding of accepted pipe joints; 3. Inspection & testing
activities (e.g. FDT, QC); 4. Concrete cutting & chipping of box culvert area; 5. Breaking of rip rap rocks outside box culvert
area;

Important Instructions & Notes: (Pls. use back page for more details)
All activities should be per approved Method Statement (MS), and Contractor shall have a hard copy available at site.
The approved Inspection Test Plan (ITP) shall be implemented, and hold points shall be witnessed by SPPC.

Process/ Equipment Preparation Special PPE and Protective Device Additonals Documents & Attachments
(Check if Required) (Check if Required) (Check if Required)
Equipment/Line Isolation Chemical Suit Hot Work Permit
Equipment/Line Draining Fire retardant suit Confined Space Entry
Gas Venting/Purge w/ inert gas SCBA/ Air Line Excavation Work
Water sealing/Floating Full/Half Mask Respirator Critical Lifting
water flushing/ Steaming out Safety Harness Job Safety Analysis
Chemical washing/ Neutralizing Fall protection safety net SDS for Chemicals
Lockout & Tagout at local Insulated Gloves & Boots Structural design
Tagout only at local Portable Gas Detectors Rigging/Laydown plan
Equipment on test mode H2S Monitor Alternate Route plan (Road Blockage)
Others: Others: Others:

WORK APPROVAL WORK ACCEPTANCE


1. Work Permit Requested By: 1. Work Done By:
(Indicate Date of request) MA Del Mundo (Indicate Date of work completion)
Name & Signature Name & Signature
2. Work Permit Endosed By: 2. Work Inspected by:
(MPDSI/SPPC Supv or Supt) MA Del Mundo (Aux Operator)

Name & Signature Name & Signature


3. Work Permit Checked By: 3. Equipment ready for Re-energizing
(MPDSI Safety officer) (For Equipment w/ Lockout/Tagout)
Note: can be waived if cold work only

Name & Signature Name & Signature


4. Work Permit Approved By: 4. Work Accepted by:
(Ops Shift Supv on duty) (Operations Shift Supervisor)

Name & Signature Name & Signature


5. Work Permit Attachment Verified By: 5. Work Verified by:
(Operations Shift Superintendent) (Operations shift superintendent)

Name & Signature Name & Signature


Permit Cancellation: (Reason for Permit cancellation) Permit Extension Requested By:

Name & Signature


New Permit validity:
Date:
Permit Cancelled By: (MPDSI/SPPC) Time:
Indicate Date
Extension Approved By:
(Ops Shift Superintendent)

Name & Signature Name & Signature


HOT WORK PERMIT
REV 3_07-01-2022
Control No.:

Location NPC GRF Date Issued 12/27/2022 Valid Until 1/2/2023 Work Request No.
Equipment I.D. N/A Time 0800H Time 1700H -
Working Group: (Pls. Use back page for multiple contractor)
MPDSI/SPPC Group: In house Contractor: Other External Contractor:

TSD/Project Engineering N/A AG&P


(Department/Section) (Company/Department/Section) (Company/Department/Section)

Description of Activities: (Pls. use back page for more details)


PIPING, STEELWORKS, AND OTHER HOT WORK ACTIVITIES:
1. Preparation, beveling, and tack welding of 16" pipes; 2. Full welding of accepted pipe joints; 3. Inspection & testing
activities (e.g. FDT, QC); 4. Concrete cutting & chipping of box culvert area; 5. Breaking of rip rap rocks outside box culvert
area;

Important Instructions & Notes: (Pls. use back page for more details)
All activities should be per approved Method Statement (MS), and Contractor shall have a hard copy available at site.
The approved Inspection Test Plan (ITP) shall be implemented, and hold points shall be witnessed by SPPC.
Preparation Checklist
Process or Equipment Preparation Y N N/A Remarks
Equipment & lines depressurized,drained or vent-out Y
Equipment & lines Isolated and Blinded Y
Equipment & lines water flushed, steamed or Purge-out Y
Equipment & lines De-energized or Locked-out & tagged-out Y
Work group site preparation
Hotwork equipment tested, checked if good condition Y
Barricades, Tarps or Canvass installed to isolate hotwork area Y
Sewers, Holes & Combustible floors covered by blankets Y
Job site clear of trash, flammable & combustibles materials Y
Additional Fans/ Blowers to preven accumulation of combustible dust Y
Gas tanks/cylinders properly secured moved away Y
Other Work Preparation and Detailed Instruction:

Fire - Safety Protection Requirements & Special PPE


Fire - Safety Protection Requirements Y N N/A PPE Y N N/A
Fire Watch Hose Y Full sleeve Leather/ Fire retardant jacket Y
Fire Extinguisher at job site Y Welding gloves Y
Charged Fire Hose w/ Nozzle Y Face shield/ Welding mask Y
Fire retardant/ Asbestos Blankets Y Leather Apron Y
Gas Reading
Gas tested By:
Vessel or Line Internals : Indicate Date of testing
(If Possible/ accsible) O2% LEL

Name & Signature


Environment: O2% LEL
Other Safety Precautions:

Incase of fire report immedietly to the following emergency contact number.


Control Room Contact Number- Safety Office -
Security Office -

Work Permit Requested By: MPDSI Safety Personnel


(Indicate Company & Position) -
MA Del Mundo
Name & Signature Name & Signature
Permit Cancellation: (Reason for Permit cancellation) Permit Extension Requested By:

Name & Signature


New Permit validity:
Date:
Permit Cancelled By: (MPDSI/SPPC) Time:
Indicate Date Extension Approved By:
(Ops Shift Superintendent)

Name & Signature Name & Signature