Appendix 8 Road Assessment Checklist

This document contains a checklist for assessing access roads and wind turbine generator (WTG) pads. The checklist is intended to be completed at the beginning of a project to generally assess each road and can be used to document specific problems or for official inspections. It includes items to evaluate such as visibility, entrance conditions, emergency access, compaction, crane operation risks, weather, grading, hazards, parking, barriers, signs, and speed limits. Upon completion, the assessor and site manager sign off on the assessment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
155 views2 pages

Appendix 8 Road Assessment Checklist

This document contains a checklist for assessing access roads and wind turbine generator (WTG) pads. The checklist is intended to be completed at the beginning of a project to generally assess each road and can be used to document specific problems or for official inspections. It includes items to evaluate such as visibility, entrance conditions, emergency access, compaction, crane operation risks, weather, grading, hazards, parking, barriers, signs, and speed limits. Upon completion, the assessor and site manager sign off on the assessment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

ROAD ASSESSMENT CHECKLIST

Risk assessment checklist must be completed at the beginning of the project on each
access road for a first general assessment and can be used as a report for specific
problems, official site inspections, etc.

Project name:

Project location:

Date of assessment:
Name of Assessor:
Name or number of the main road access: Width of road access:
Name or number of the pad(s): Width of pad access:

Assessment

Access Road and Clearly visible from both directions  Partly visible  Not visible 
WTG pad Comments:

Main Road at Good  Sharp turn  Narrow  Loose gravel 


entrance: Low visibility:  Obstructions (ex.: low trees, fences):  Dirt/No gravel 

Access for Good  Fair  Poor  Room to pass other vehicles: YES  N 
Emergency Access from a different location (specify):
vehicles:
Compaction Good  Average  Low 
(surface Comments (ex. condition changes in bad weather):
condition)
Crane operation Compaction sinking risk  Safe access to/from pad with turning room 
Travel risk  Temporary power lines risk 
Lift/lower height risk 
Other risk:

Weather at the Dry  Rain  Snow  Ice 


moment where Specify season:
the assessment is Comments:
done. If weather
changes, a new
assessment must
be perform.
Grading Flat  Slight camber  High camber 
Comments:

Holes No holes  Few holes  Many holes  Can be easily filled 


Comments:

Bumps No bumps  Few bumps  Many bumps  Can be easily fixed 


Comments:

Steep hills/ None  Low rise  Steep rise 


embankments Comments:

Ditches None  Shallow  Deep  Wet  Dry 


Comments:

Road Assessment Checklist v1.0, May 2006 Page 1 of 2


Water hazards No water hazards 
(Ponds, etc) Few water hazards – specify 
Many water hazards – specify 
Comments:

Other hazards - Hazards:


Rail crossings,
narrow bridges, Comments:
low power lines,
wildlife, prone to
flood, etc

Parking for Site On approach road  On approach road shoulder  On access road 
Vehicle Blockage hazards  No blockage hazards  Other hazards eg ditch 

Max # vehicle spaces:


Comments:

Parking/Staging Room for receiving parking, turning, staging (100ft + trailers):


for receiving Location of receiving parking and offloading:
vehicles:
Barriers In place  Not yet in place 
Location where barriers are:
Location where barriers are needed:
Comments:

Warning signs In place  Not yet in place 


Location where signs are posted:
Location where signs need to be posted:
Comments:

Speed limits Speed limits are posted  No speed limits are posted 
Location where speed limits are needed:
Comments:

Completed assessment date:

Assessor/Project EHS Manager:

Site Manager signature:

Road Assessment Checklist v1.0, May 2006 Page 2 of 2