500
DRAIN PIPE
C-C COP + 134.153 8. CIRCULATION, OVERFLOW & INLET TO TANK PIPING IS uPVC PN 16.
CIRCULATION PUMP
DISCHARGE LINE
OD 63 - uPVC
SHED
7267
TANK VOLUME = 7.27 x 5.43 x 3.35 x 2 = 264.5 m3
GV: GATE VALVE
OS&Y NRV: NON RETURN VALVE
GV
ELECTRIC DRIVEN DIESEL DRIVEN CIRCULATION 80mm PRV: PRESSURE RELIEF VALVE
SERVICE / FUNCTION JOCKEY PUMP FM: FLOW METER
FIRE PUMP FIRE PUMP PUMP
CP: CONTROL PANEL
DN 150 DISCHARGE COP +128.83 C-C
440
DUTY
QUANTITY RQD.
STAND BY - 1 - - OS&Y G.V
728
OS&Y G.V TOC +126
567
250
- - - -
250
1770
STAND BY PERCENTAGE (%) 2135
961
CIRCULATION PUMP CIRCULATION PUMP
FIRE TANK SHALL COVER A DEMAND = 500 GPM FOR FIRE EVENT 2 HRS. SUCTION LINE DN 80
uPVC COP 126.30
DRAIN SUMP 1 M x DRAIN TRENCH
FIRE TANK CAPACITY = 500 / 4.4 (M3/H / GPM) x 2 HRS = 227.3 M3 1 M x 0.6 M DEPTH
TO SEDIMENTATION CHAMBER
11799
OVERFLOW PIPE OD 110 mm - uPVC
DRAIN SUMP 1 M x
1 M x 0.6 M DEPTH
45 KG FOAM
EXTINGUISHER
FUEL TANK 80 GAL
DN 80 DRAIN PIPE
2 TYP.
1000
SUCTION SUMP 45 KG FOAM
810
1 M x 1 M x 0.6 M DEPTH EXTINGUISHER
1000
1000
3350
1000
2486
EFP
4" GS TANK VENT PIPE 848
CP-1
1022
FROM TEST LINE
CIRCULATION PUMP
714
FROM CIRCULATION PUMP
OD 63 mm uPVC DN 150
OS&Y G.V 1086 CRP 518 NR.V
8000
518
CS DN 150 TEST PIPE
JFP
SHED 420
420
FROM CIRCULATION PUMP C 12/12/2022 C.DAMS C.AANM ISSUED FOR DETAILED DESIGN
OS&Y G.V OS&Y G.V
961
FROM RELIEF LINE CS DN 150 PRESSURE RELIEF PIPE CP-2
B 12/10/2022 C.DAMS C.AANM ISSUED FOR DETAILED DESIGN
1253
2809
FILLING PIPE WITH MECHANICAL FROM CIRCULATION PUMP
FLOAT VALVE OD 90 mm - uPVC
OD 63 mm uPVC REV. DATE Created by Checked by Description
2091
(TYPICAL) DFP
A-A ARAB REPUBLIC OF EGYPT - MINISTRY OF HOUSING, UTILITIES AND URBAN COMMUNITIES
300
3350
2435
4" GS TANK VENT PIPE PRV THE CONSTRUCTION AUTHORITY FOR
551
DN80
SUCTION SUMP
1 M x 1 M x 0.6 M DEPTH
DN 150 FIRE PUMPS DN 150 Project:
NASR CITY WATER PURIFICATION PLANT (NCWPP)
SUCTION PIPES 2 TYP.
OS&Y G.V 1087 170 170 517
NRV A-A (ABU OWEIKAL)
7 CS DN 150 FLOWMETER PIPE
Owner Project Consultant:
163
1135 1075
OS&Y G.V FM OS&Y G.V
MISR CONSULT
Envir. & Infrastructure Studies
72 Gamet El Dawal St. Mohandessin - Giza - Egypt
DRAIN TRENCH TeleFax : (+ 202) 37620366/377 - 37499521/527
DN 100 OVERFLOW PIPE
OVERFLOW PIPE OD 110 mm - uPVC
E-mail: [email protected] Website: www.misrconsult.com
CONTRACTOR:
TO SEDIMENTATION CHAMBER
S.A.
existing E:648180.512
existing fence
fence N:807873.306
17
+121.52
T.O.C 11
DN 100
OVERFLOW
PIPE
DN 100
SUPPLY
PIPE 2
SUCTION
1Mx1
SUMP
M x 0.6
DN 80
2 TYP.
DRAIN
PIPE
DRAIN
SUMP
1Mx
1 M x 0.6 M DEPTH
45 KG
FOAM
EXTINGUISHER
TO FIRE
NETWORK
FUEL TANK
120 GAL
36
32
Drawing Name:
1000
M DEPTH
1000
3350
1000
810
1000
1000 FROM PRESSURE
RELIEF LINE
2486
1022
FROM CIRCULATION
PUMP CIRCULATION EFP
PUMP
29
CP-1
DN 150
1086
OS&Y G.V
1079
518
RELIEF PIPE
FROM CIRCULATION NR.V
PUMP
HEADER
420 JFP
SUCTION
CIRCULATION
518
LINE PUMP
420
1
SUCTION
M x 1 M SUMP
DN 150 PRESSURE
OS&Y G.V
x 0.6 M
SUCTION
DEPTH
961 OS&Y
G.V
3350
1253
DN 150
PIPE
CP-2
HEADER
DFP
DN 150 FLOWMETER
2809
PRV
2435
2091
DN 150 DISCHARGE
551
SUCTION
DN 150 FIRE PUMPS DN 150 PRESSURE
PIPES RELIEF PIPE
2 TYP.
DN 150
170
OS&Y G.V 1087
170
517
DN 150 NRV
FLOWMETER
163
OS&Y G.V 1710 PIPE
FM
499 OS&Y
2000
DN 100 G.V
OVERFLOW
PIPE
DRAIN
TRENCH
DN 100
SUPPLY
PIPE 1
MOOR BDM
1 2
37 34
3-RT
4-RT
41
LS
EPO
- 1 RT
A.V.M02
FIRE PUMP ROOM
18
LS
O
EPO
TIP LI
16
- 2 RT
A.V.M02
TR-1 I/C1
BC
BR I/C2
TR-2
MVSG-22KV
YRETTAB
MOOR
E:647980.965
N:807791.567 E:648006.339
N:807789.060
26
existing bump
126.87300
126.84300
39 15 127.08300
127.14300 126.84500
127.18400
valve
127.16300
33
room 33
21 127.10800
127.11800
127.13900
127.14600
SECTION
A-A
14
13 20
12
12 19
126.74600
126.74200
23
E:648000.565 electric room
N:807730.989 27 30 31 24
Ramp From +124.07
22
to 126.90 E:648162.481
N:807715.241
Project NO. Company Code Area Code Line No. Document Document No. Rev. Scale Format
Type