Resume Ashim Dasgupta
Resume Ashim Dasgupta
Resume Ashim Dasgupta
Personal Details
Work Experience
Construction Manager.
Petrofac International UEA -LLC. Sharjah -
November 2018 to November 2020
With Petrofac International UEA -LLC. Sharjah -
Project Title: INTERGRATED GAS SURFACE FSCILITIES FOR – Raageshwari Deep Gas Field Development
Project.( E.P.C - Contracts)
Client: VEDANTA – CAIRN OIL & GAS FIELD. BARMER –RAJASTHAN - INDIA.
Period; From - 20th -November -2018 to 19th November -2020.
Role : Construction Manager.
Responsibilities:
• Overseeing the project Construction activity and day to day Co-ordination with Head quarter , Client
and Site Planning to achive the Project schedule in time.
• Review the project in – depth to schedule deliverables and estimate costs.
• Oversee all onsite and offsite constructions to monitor compliance with building and sefty regulations.
• Overseeing all onsite & offsite constructions Activitys, to monitor complaines with building and saftety
regulations.
• Coordinate and direct construction workers and subcontractors.
Review theweekly progress and work force reports and corelates data for reason a daily basis / Meet
contractual conditions of performances.
Construction Manager
Zillion Infraproject Pvt. Ltd. New- Delhi. - New Delhi - India.
January 2015 to February 2018
With ZILLION INFRAPROJECT PVT. LTD. - New Delhi - India
Responsibilities:
Overseeing the administration of the site during the Construction cycle including, Technical, Financial
and
Clint satisfaction of their Fabrication and Erection of Steel and allied structures Project day to day basis.
Project Title: Bhilai Steel Plant Project - (Expansion).
Client: BHEL.
Role: Constriction Manager.
Period: 15th January -2015 To 29TH May -2017.
Responsibilities:
• Accountable for the development, Co - Ordination and execution of Planning, Design and Construction
– activities and personnel, Under my direction on day to day Basis.
• Developing procedures for monitoring the Progression of Planning, Designand Construction Phases.
• Preparing reports for Company Managements and the Client including project adherence and progress.
• Attending weekly review, monthly and other Progress meeting held at Site as and when required.
Responsibilities:
• Overseeing the administration of the Site during the Construction Cycle, including Technical, Financial
and Client satisfaction.
• Accountable for the development, Coordination and Execution of the Planning, Design and Construction
activities and
Personnel, under my direction on day to day basis.
• Preparing reports for Company Management and the Client including Project adherence and Progress.
• Involved in excitation and monitoring time to time planning ,for piping and equipment erection
(Rotating & Static) of gas sweetening section unit ( 0722) where the feed gas containing up to 23.4 mole
% H2S.and 9.7 mole% CO2, Enters the gas sweetening at 66.4 barge. The sour enters the H.P Absorber.
Operates at 66 barges at its top tray.
• There was scope of 1.2 Lacks inch dia piping job was involve and heavy structure work with 54 engineers
and staff 1700 manpower’s.
• Attending weekly review, Monthly and others Progress meeting held at the Site as and when required.
Responsibilities :
• Lead in execution and monitoring day-to-day planning, critical site problems related to site activities
of Tank age Works, two Nos of Flares assemble, Riser assemble, and erection works, monitoring of all
types of related Process Piping for both of the Flares of RFCC & CDU Unites, which was marks Tallest
(205 Meters) of such Structure in the Entire Middle East.
• Planning and Erection of (rotating & Statics Equipment’s) , Storage Tanks, Heavy Equipment’s’ such
as Knock – Out Drums, Air Coolers, Flare –Gas Recovery System , Flares - Drums, All Risers, and Different
types of Pumps.
• Responsible for the safe execution of construction, by all the personnel on site.
• Attend weekly review , monthly and others progress meetings held at the site and when required.
• Lead and manage a team of Engineering and Inspectors, on the Site.
• Monitor the Contractors’ progress and prepare the Site on a Monthly basis to the Client.
Responsibilities:
.(i). Developing procedures for monitoring the Progression of Planning, Design and Construction phases.
(ii) .Involved in monitoring and execution of Storage -Tanks ( for R.O. Building ), and various type of Piping
Work including GRE Piping for their EPC Project., Erection of all types of Plant such Pipe for Deferens
Plants lick Steam, Oil & Gas, Piping for R O Building and Pipe Racks etc.
(iii) Worked around seven months as a Q.C Representative of Dodsal to handover the area-after
inspection.
.(iv) Monitored and Managed a group of Execution Systems Pkgs, for Final Inspection of the works with
Consultant and Clients for monitor final inspection of the works Recommend, acceptance of Completed
works to Client of PDO after receiving the from
The Consultant.
Project Title: Rajasthan Atomic Power Project Kota – 5 & 6 (Primary Piping & Equipment Erection Project)
Client: Nuclear Power Corporation of India Limited, Kota, Rajasthan. ( N P C I L )
Role: Deputy Construction Manager
Period: March -2003 to March -2009
Responsibilities:
• Carried out execution day-to-day planning, critical site problems with relating to 220MW x 2 Units as
well as labours with Construction Manager (Site -In -Charge).
• Attended serious job meeting with senior persons such as Project Director & Chief Construction
Engineer of client to execute the job at site of RAPP – Kota.
• Monitored quality of works by Contractors and quality of Materials used on site,
• Lead and Managed a Execution team of Engineers and Inspectors on the our Nuclear Project.
• Involved in all execution and planning for the ongoing all piping Fabrication and Erection (2.60 lacs inch
-dia & 2.85 lacks inch meter), Equipment erection such as Steam Generator (110 MT x 2 nos.), Shutdown
Pump, PCP, Moderator Pump and various Exchangers etc of Reactor Building # 5 & 6. of 650 MT
• Controlled activities of 50 Engineers / Supervisor & 450+ workers.
• Attended all weekly review, monthly and progress meeting held at site with Client - RAPP,
Responsibilities:
• Assisted in planning and project monitoring execution, quality control, Co- ordination and Liaison with
client for Bill certification and Certification of Sub-Contractor bill and procurement of materials
• Independently handling the of pipe Lying & civil work of 26.510 K.M. and concrete 21,000 M3, Hydro
test and Commissioning work (for segment 04 area)
Highlight:
• Awarded Certificate by BWSSB , for good execution of work.
Area- In -Charge,
Dodsal Engineering & Construction Private Limited, Bombay, INDIA, - Jamnagar, Gujarat
May 1999 to January 2000
Project Title: Reliance Petroleum Ltd / Refinery Project (Jamnagar)
Consultant Client: A.B.B. &Bechtel France (India) Ltd./ Reliance Petroleum Ltd.
Role: Area In charge - Crud ll Complex.
Period: May -1999 to Jan -2000
Title: Crude II Complex.
Responsibilities:
• Assisted in execution and Planning for ongoing project at Reliance Petroleum Limited, Jamnagar –
Assisting day to day planning solving critical problems relating to job as well as labor. I was looking after
the total work force of 900 people which include 30 engineers.
• Carried out Total piping and equipment erection in Carbon steel and alloy steel approximately 1.90,000-
inchDía of piping and 460 MT of equipment installation including 28 Nos. of various pumps installation
& commissioning.
• Overseeing the administration of the Area – Crud II during the Construction Cycle including, Technical,
Financial and Client satisfaction.
• Responsible for the safe execution of construction, by all personnel on site.
• Preparation reports for Companies and the Client indicating Project adherence and progress.
Senior Supervisor - (Mechanical)
Dodsal Engineering & Construction Private Limited, Bombay, INDIA, - Jamnagar, Gujarat. - Jamnagar,
Gujarat
December 1997 to May 1999
Project Title: Essar Oil Limited, Piping & Civil work of Tank-Farm (Jamnagar)
Consultant Client: A.B.B. / TATA Consulting Engineers
Role: Piping Project - In- Charge:
Period: Dec-1997 to May-1999
Responsibilities:
• Ensured effective planning and project monitoring for Tank age Work, CIVIL –work for TANK- PIT- AREA’S
and PIPING FABRICATION AND ERECTION FOR TANK-FARM where 1,50,000 Inch-dia of piping, work and
approximately 550 workers was working with 15 Engineers.
• Accountable for the development for, Co –ordinating and execution of the planning, design, and
Construction Activities and personnel under my direction on a day to day basis.
• Developing procedure monitoring the Progression of Planning, Design and Construction Phases.
• Attended weekly review, monthly, and other progressive meetings held at site as and when required.
Responsibilities:
• Carried out execution of Piping equipment- erection, Piping Fabrication and Erection for their expansion
project of their G.S.U / C.F.U and G.D.U unit of O.N.G.C. In addition, I would like to state that I had worked
on their very Prestigious Project site of O.N.G.C., Hazira gas processing complex under M/s Hyundai Heavy
Industries Co. In this Project I had the responsibility of total piping, fabrication & erection work at G.S.U.
and G.D.U / C.F.U. (1.85 lacs inch dia and 3.60-inch meter and 665 MT of Equipment Erection) where
approx 350 workers and 2 Engineers was involved under my supervision.
Highlight:
• Awarded by M/s Hyundai Heavy Industries Co. For Excellence performance.
Project In-charge.
M/s Artson Engineering Ltd, Bombay --- India. - Mumbai, Maharashtra
February 1994 to June 1996
With Artson Engineering Ltd., Bombay (Feb-1994 to Jun-1996)
Project Title: Kellogg Project– Toloja- New Bombay
Client : Kellogge – U.K. Group
Consultant: TCE - (TATA Consulting Engineering )
Role: Feb-1994 to Jun-1996
Responsibilities:
• As Project in-charge of their Tata project for Kellogg – U.K. Group, Planning and monitoring for
equipment and Piping Fabrication / Erection and plant commissioning with Kellogg U.K. group. The project
was of 1.80 lacs in dia and 4.70 lacs in meter piping & 330 MT of equipment erection.
Project Title: B.P.C.L – MAHUL, Bombay
Client: B.P.C.L.
Consultant: T.P.C.L. (Tata Project and Consulting limited)
Role :Project in-charge
Responsibilities
• Monitored B.P.C.L. Shutdown-project – MAHUL, for piping Fabrication and Erection for the above project
where about 2.25 lacs inch dia and 550-inch meters of piping job was involved. The work force strength
was of 250 and 20 Engineers
Project Title: Nestle Expansion Project, Mysore
Responsibilitie
Involved in piping Fabrication and Erection for EGRON TOWER AND WATER TREATMENT PLANT. Hydro
testing and Plant Commissioning
Project Title: Caustic Soda Plant
Client: Rayon Industries Ltd., Virval, Gujarat
Consultant: Engineers India Ltd
Role: Project in-charge
Responsibilities:
• Involved in client dealing and planning for monthly billing, site rolling for their all type of piping
Fabrication, Erection, Commissioning and Equipment erection work at their (CAUSTIC SODA PLANT) where
1.85 lacs inch dia &650-inch meter piping with 285 MT of equipment erection. The total manpower of 27
engineeres and 800 workers was involved.
Mechanical Supervisor.
Al Hammam Company. - Rahima - Ras ta nura - Saudi - Arabia -- K.S.A.
March 1989 to January 1994
With AL Hammam & COMPANY -. (RAHIMA), Saudi Arabia (K.S.A.)
From: (March-1989 to Jan-1994)
Responsibilities :
• Monitored installation and Erection of TURBINE GENERATOR of 220 MW x 4 Units. Also responsible for
piping, Fabrication, Erection and Hydro testing for Boiler and Turbine generator at Quaraysh where 2.50-
inch dia and 6.45-inch meter piping job was done successfully.
Highlight:
• Holds the distinction of being awarded by M/s MITSUBISHI HEAVY INDUS LTD. for excellence
performance
Project Title: Aramco -Diesel Engine Testing Facility - Project, Dhahran
Responsibilities:
• Worked with M/s. SAUDI ARABIAN OIL COMPANY as an In-charge for their Diesel - Engine Testing Facility
at Dhahran Aramco
• Assisted in testing and Installation of Diesel Engines, Piping Fabrication and Erection of Dynamometer.
Installation and Commissioning of Overhead Crane (40 MT), Load testing and control Board Installation
for the Diesel Engine Testing Facilities
Project Title : Saudi Arabian Oil Company in Rahima Oil Refinery ( Expansion Project).
Responsibilities
Monitored Piping Fabrication and Erection of 1.8 lacs inch dia and 620-inch meter with 50 engineers and
260 workers for their Oil refinery (Expansion Project).
Sr. Supervisor(Mechanical).
M/s Artson Engineering Ltd, - Bombay, India. - Navi Mumbai, Maharashtra
June 1988 to February 1989
With Artson Engineering Ltd., Bombay (June-1988 to Feb-1989)
Project Title: O.N.G.C. Project -C2/ C3- (Expansion) URAN
Client: O.N.G.C.
Consultant: Engineer India Limited –( E. I L )
Responsibilities:
• Served as an In-charge of piping fabrication shop. Erection and Hydrotesting of Product Pump house
& Raw water Pump, Compressor House etc. Hydrotesting and Commissioning for the same plant where
1.65 lacs inch dia and 660-inch meter piping works and 340MT equipment’s work was executed with 27
engineers and appx. 400 workers.
Supervisor Piping,
M/s. Simon Carves India Ltd. - Bombay - Hazira - Gujrat, India.
May 1982 to February 1984
With M/S SIMON CARVES INDIA Ltd. (May-1982 to Feb-1984)
Responsibilities:
Supervision of Fabrication and Erection of their all type
• of boiler Piping Blow Down Piping & Hydrotesting for Steam Line.
• Also supervision of erection and alignment of Rotary Equipment like Fin Fan Cooler, I.D.Fan, Shoot
Blower, etc.. Worked for Ammonia/Urea piping Fabrication, Erection and Commissioning.
Education