BAR BENDING SCHEDULE

Name of structure : Civil & Structural Date:

Name of Project :
Jetty backup Area Page :11
Name of client : BPCL R/F Drawing :
Name of consultant: EIL Drg no : A872-010-83-41-05002, REV-6
Name of contractor : LTC Infrastructure Pvt. Ltd. PUMP HOUSE-C3

cutting TOTAL LENGTH


Sl No Location Bar Mkd Dia spacing No No Shape of bar
Length
8 10 12 16 20 25 28
16250
60 25 4
1 column-c3 450 16.625 66.5
1000
lap 25 4 2
2 1 8
16250
59 ,90 20 12
3 GRID-K3 300 16.49 197.88
800
lap 20 12 2
4 UPTO-19.250 0.8 19.2
420
56 TO 58 8 100 157
5 420 1.76 276.32
420
56 TO 58 8 100 157 2
6 226 1.372 430.808
80 420
56 TO 58 8 100 157 2
7 80 0.548 172.072
Total Length 879.2 217.080 74.5
Unit Weight 0.395 0.89 1.58 2.47 3.86
Total Weight (Kg.) 347.284 536.188 287.57
Total Weight (M.T.) 0.347284 0.536 0.28757