Permit Application Flow Chart

The permit application flow chart outlines the 4 main steps to obtain necessary permits from the Planning and Zoning Department, Building Department, and Code Enforcement/Fire Marshal. Step 1 involves submitting a development permit application to the Planning and Zoning Department. In Step 2, the application may require additional engineering reviews or approvals from boards. If approved, the applicant proceeds to Step 3 to apply for a building permit from the Building Department. Step 4 involves inspections by the Code Enforcement or Fire Marshal as applicable. The process aims to ensure projects comply with regulations at various stages before, during, and after construction.

Uploaded by

Jinkai's Vlog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
221 views1 page

Permit Application Flow Chart

The permit application flow chart outlines the 4 main steps to obtain necessary permits from the Planning and Zoning Department, Building Department, and Code Enforcement/Fire Marshal. Step 1 involves submitting a development permit application to the Planning and Zoning Department. In Step 2, the application may require additional engineering reviews or approvals from boards. If approved, the applicant proceeds to Step 3 to apply for a building permit from the Building Department. Step 4 involves inspections by the Code Enforcement or Fire Marshal as applicable. The process aims to ensure projects comply with regulations at various stages before, during, and after construction.

Uploaded by

Jinkai's Vlog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PERMIT APPLICATION FLOW CHART

Planning and Zoning Department Building Department Code Enforcement/ Fire Marshal

STEP 1 STEP 2 STEP 3 STEP 4

DEVELOPMENT (ZONING) PERMIT Development Permit Application BUILDING PERMIT COMMERCIAL PROPERTY
Denial Submit for: (Fire Marshal)
Submit Development Permit Permits are generally required for
Application (DPA) for the following any building, structural, electric, New Businesses or Sale of an
undertaking: Engineering Review HVAC, and plumbing projects. Such Existing Business - Apply for a
as: Certificate of Inspection (C of I)
• New Dwelling
Certificate of Appropriateness: • New Building or Structures
• New Construction
Historic Preservation Commission • Structural Alterations RESIDENTIAL PROPERTY
• Accessory Structures
(HPC) (Code Enforcement)
• Interior Renovations • Interior Modification
• Occupancy of Any Structure • Change in Building Use
Planning Board (PB) or Zoning Board Sale of ALL Residential Properties
• Exterior Renovations • Signs and Sign Structures
of Adjustment (ZBA) Review and Rentals – Apply of a Continuing
• Sign/awning • Retaining Walls +
Certificate of Occupancy (CCO)
• Change of use
• Subdivision IF the Borough Engineer, HPC and/or Construction begins when the Landlord Registration – ALL new
• Change in grade to property the Land Use Boards approve Construction Permit is issued. and existing rental property, change
• PODs – temporary storage proposed undertaking, the of landlord/tenants
• Cranes Development Permit Application
During Construction: Applicants are
(contingent upon any conditions) will
Zoning Officer responsible for scheduling code Inspections are required before the
be approved. Proceed to Building
Review/Determination (10 Days) official Inspections issuing of a C of I, CCO and Landlord
Department and/or Fire Marshal.
Registration.
Development Permit Application Construction Completed: Final
Approved Proceed to Building Inspection is performed and a
Department (Step 3) and/or Fire Certificate of Occupancy is issued.
Marshal (Step 4)

NOTE: Prior to Proceeding to Fire


• Go through these decision points to determine which Marshal’s Office, ensure all building
department will affect your project. permits are closed.
• Obtain all permit applications once you have a survey, plot
plans and/or building plans.
• The accuracy of your information determines the
timeframe for your application to be approved.