Malikia Resort | Atef.
Siam
F&B Consultancy Proposal
Thursday, February 24, 2022 1
Services
Concept
Development
Human
+ Menu Capital
Feasibility engineering Management
Study
Supervision Operations
of Designs SOPs
2
Overview
• Atef.Siam as F&B Consultant will provide "Malikia Resort" with F&B technical consultancy to ensure
a proper startup phase and a smooth on going operation overcoming the existing challenges.
• Objective
• Provide Training on Service Quality development and execution
Solution
• Atef.Siam will Support "Malikia Resort" to reach the full know-how of the scientific and practical
The highest level of standard service
Our Proposal
• Giving "Malikia Resort“`s hospitality staff (1 month training – 8 Sessions) To apply the concept of
standard service procedures & 1 month to monitoring and correction
• This Scope will highlight the roles and obligations of Atef.Siam and "Malikia Resort" . It will set
the timeframe and deliverables of the phases necessary to achieve the project objectives, and the
general conditions to complete the project.
3
Menus and Recipes Engineering
Covers different Asian cuisines - Steak grill - seafood
• Items
• Recipes/ingredients
• Direct cost
• Prices
• Suppliers list
• Kitchen Equipment and tools required
4
Standard Operating Procedures (SOPs)
1- Kitchen Procedures
FOOD SAFETY & HYGIENE SYSTEM PROCEDURES
HACCAP SYSTEM
2- Delivery Procedures
3-Purchasing Procedures
4-Inventory Procedures
5-Maintenance Procedures
6-Security Procedures
5
Standard Operating Procedures (SOPs)
8- Service Areas Periodical Cleaning Procedures
9-Service Area Procedures
• General Job Guidelines And Responsibilities
• Server Opening Procedures
• Server Closing Procedures
THE GUEST
• How to handle Many Different Types Of Guests
QUALITY CONTROL
• Things to look for before leaving the kitchen:
TABLE INTRODUCTION
• Ordering Procedures
• Cooking Times & Handling Timing Problems
6
PERSONAL APPEARANCE
• Uniform
• Dining Room Dress Code
SUGGESTIVE SELLING
CLOSING OUT A TABLE
• Presenting the Check
• The Farewell
• Methods of Payment
• Handling Cash
SANITATION
SAFETY
All interactions with guest & staff will be according to the
standards specified in server manual.
SOPs will be delivered and fine tuning will be done according
to the actual work after the soft opening.
7
Monitoring and correction
Auditing visits
Service assessment
Correction actions
Service Quality Reports
Granting certificates to override the training course for each
employee
Key success factor for project deliverables according to
schedule is having the venue ready with signing the
Agreement. Payment in due dates is a key success factor in
order to ensure smooth progress.
Legal formulation of the company to own the project need
to be done in parallel to the technical aspects of the project.
8
Pricing & Deliverables Time Line
- Menus and Recipes Engineering
- Standard Operating Procedures (SOPs)
- Implementation
• Price :100,000 LE
• Deliverable on : 2 months
Agreement
• Meeting for • Deliverables
discussion • Signing • 50% Due
• 50% Down payment
Approval on
Payment
Handover
Proposal
*In case an invoice is required, 14% of total amount will added to the above mentioned price. 9
Terms & Conditions
• All information released by "Malikia Resort" in the process of completing
this proposal or project will be handled as Strictly Confidential.
• In case the "Malikia Resort" decides to delay or put the project on hold,
then Atef.Siam will be paid for all the services that it has delivered.
• In case of any delay of deliverables from Atef.Siam side, the "Malikia
Resort" has the right to deduct 20% of the total amount.
• If you are in agreement with the above terms and conditions, work on this
assignment will commence as soon as we receive the first payment and
your signed copy of this document. This offer remains valid through 15
days, If you do not accept our offer by then, this proposal is not binding to
us, unless we agree, in writing, to extend the offer.
10
Disclaimer: The price listed above is an estimate for the service discussed. The
summary is not a warranty of final price. Estimates are subject to change if projects
specifications are changed or costs for outsourced services change before a contract
is executed.
Presented By Conditions Accepted
Atef.Siam Ms. Maha ElMalik
-----------------------------------
-----------------------------------
DATE___/_____/____
DATE___/_____/____
11