The document summarizes sludge generation and filter press capacity details. It states that 943.27 kg/hr of total waste sludge is generated with a consistency of 3.00%. The sludge quantity is 31.44 m3/hr. The filter press operates for 20 hrs/day. It has 30 chambers with a capacity of 160 lts each. One cycle takes 152.66 minutes. The filter press has a capacity of 2400 kg/batch and can process 1402.63 kg/hr of feed solids over 7.86 batches per day requiring 1 filter press.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0%(1)0% found this document useful (1 vote)
256 views2 pages
Filter Press
The document summarizes sludge generation and filter press capacity details. It states that 943.27 kg/hr of total waste sludge is generated with a consistency of 3.00%. The sludge quantity is 31.44 m3/hr. The filter press operates for 20 hrs/day. It has 30 chambers with a capacity of 160 lts each. One cycle takes 152.66 minutes. The filter press has a capacity of 2400 kg/batch and can process 1402.63 kg/hr of feed solids over 7.86 batches per day requiring 1 filter press.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2
Sludge Genration and filter press Capacity
Sludge consitancy % 3.00
Total waste sludge genrated from kg/hr 943.27 Due to Suspended Particle kg/hr - Due To Lime Kg/hr - Due to PAC Kg/hr - Sludge quantity m3/hr 31.44 Operating Hr of Filter Press Hr/day 20.00
Filter press capacity
Sludge Consitancy at outlet of Filter press % 50.00 No of Chamber in the filter press nos 30.00 Sludge cake holding capacity of one chamber lts 160.00 Time laps for one cycle of filter press Minuts 152.66 Feed flow m3/hr 46.75 Feed flow consitency % 3.00 Feed solid rate Kg/hr 1402.63 Solid Holding capacity of filter press/Batch Kg/Batch 2400.00 Feed time Minuts 102.66 Desludging time Minuts 20.00 Cleaning and Placing the filter press Minuts 15.00 Mislanious Time Minuts 15.00 Feeding rate / batch % of total batch time 67.25% 67.25%
Number of operational Minutes per filter press Minutes/day 968.40
Number of Operational Batch per day Batch/Day 7.86