1) The document outlines the teaching and examination scheme for the course Advanced Production Engineering. It is a 3 credit course with 3 hours of lectures per week and includes theory, practical, and internal assessment components in the examination. 2) The course is divided into 4 units that cover topics such as conventional and advanced well completion systems for both onshore and offshore production, as well as onshore and offshore production systems including process flow diagrams, separation, storage, transportation and monitoring. 3) References for the course include books on computer aided petroleum production, deepwater exploration and production, offshore multiphase production operations, offshore technology and terminology, and floating production systems.

Uploaded by

patrick KOUASSI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
220 views1 page

Advanced Production Engineering

1) The document outlines the teaching and examination scheme for the course Advanced Production Engineering. It is a 3 credit course with 3 hours of lectures per week and includes theory, practical, and internal assessment components in the examination. 2) The course is divided into 4 units that cover topics such as conventional and advanced well completion systems for both onshore and offshore production, as well as onshore and offshore production systems including process flow diagrams, separation, storage, transportation and monitoring. 3) References for the course include books on computer aided petroleum production, deepwater exploration and production, offshore multiphase production operations, offshore technology and terminology, and floating production systems.

Uploaded by

patrick KOUASSI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

17MPE115 : Advanced Production Engineering

Teaching Scheme Examination Scheme


Theory Practical Total
L T P C Hrs/Week
MS ES IA LW LE/Viva Marks
3 0 0 3 3 25 50 25 - - 100

Unit 1: Hours : 9
Conventional Onshore Well Completion
Concept of Well Completion, Casing string types- Drive Pipe, Surface casing, Conductor casing, Intermediate casing,
Production liner, Tubing; Casing Head, Casing Hanger, Casing Spool, Well Head integrity- Effect of leakage in A , B and C
section, Mono Bore completion.
Unit 2: Hours: 10
Advanced (Offshore) Completion System
Introduction – Concept of Offshore well completion, Well Head and Christmas tree(Dry and Wet Type) , Tubing and Packer
Completion, Single and Dual string Completion, Material Selection, Completion equipment; Intelligent and Smart
completion; Hi-Tech Well Completion: Completion of Horizontal Wells, ERD and Multi Lateral wells, Downhole equipment
requirements.
Unit 3: Hours: 10
Onshore Production System
Well head fitting & piping, Process flow diagram (PFD) for oil gas, Process control, separation of oil, gas,& water , types of
separator, Separation mechanism. De- emulsifications & Desalination of crude. Indirect bath heater and Heater- treater.
Produced water treatment. Storage of oil and gas, Liquefied Petroleum Gases (LPG& LNG), Transportation of oil& gas and
metering systems.
Unit 4: Hours: 10
Offshore Production System
Elements of offshore production system--- Wells (Dry/Wet), well platforms/well servicing rigs, feeder subsea pipeline,
process platforms, export pipelines for oil & gas, tankers for evacuation of oil, types of offshore platform - essential
personnel, unmanned platform, process control and monitoring—RTU and SCADA system, well automation and
optimization, processing of oil, gas and produced water, water injection, Utilities.
Total Hours: 39
Texts and References:
7) Dr. Guo Boyun , Computer Aided Petroleum Production Engineering
8) Deep water Petroleum Exploration & Production-By Willium Leffler, Richard
Pattardozzi, Gordon Sterling
3. Shippen, M and Scott(2004) offshore multiphase production operation, Pennwell books.
4. Robinson,T(1992) - an introduction to offshore technology and terminology .
5. Floating Production System- By N.K. Mitra.