This document outlines the manpower and equipment breakdown for a 3-month project to install skyroofs and solar panels at the Isuzu AutopRT Manufacturing Corporation facility. It involves 7 staff members for project management and administration and 37 operation workers including installers, welders, and helpers. The project also requires various tools such as electric jigsaws, drills, wrenches, and electrical equipment to complete the installation work over the 3 month period.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
320 views2 pages
Manpower Loading Sample
This document outlines the manpower and equipment breakdown for a 3-month project to install skyroofs and solar panels at the Isuzu AutopRT Manufacturing Corporation facility. It involves 7 staff members for project management and administration and 37 operation workers including installers, welders, and helpers. The project also requires various tools such as electric jigsaws, drills, wrenches, and electrical equipment to complete the installation work over the 3 month period.