EO Reactor Spool Installation Schedule - Rev.1

The document outlines a schedule for installing reactor spool pieces at an EO reactor site using cranes and scaffolding over multiple weeks. Key steps include: 1. Assembling a 300-ton crawler crane and preparing ground access for 5 days. 2. Removing temporary spool pieces and installing new elbow spools on reactors R-6111 and R-6121 over several days. 3. Erecting and bolting the 48-inch reactor to exchanger spools on R-6110 and R-6120 using the crawler crane. 4. Additional tasks include installing bottom spools, the 16-inch vent line, conducting inspections, and closing man

Uploaded by

Muhammed Fawaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views3 pages

EO Reactor Spool Installation Schedule - Rev.1

The document outlines a schedule for installing reactor spool pieces at an EO reactor site using cranes and scaffolding over multiple weeks. Key steps include: 1. Assembling a 300-ton crawler crane and preparing ground access for 5 days. 2. Removing temporary spool pieces and installing new elbow spools on reactors R-6111 and R-6121 over several days. 3. Erecting and bolting the 48-inch reactor to exchanger spools on R-6110 and R-6120 using the crawler crane. 4. Additional tasks include installing bottom spools, the 16-inch vent line, conducting inspections, and closing man

Uploaded by

Muhammed Fawaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

▣ (Rev.

0) EO Reactor Spool Installation Schedule


Spool 제거 / 설치 작업 Start

Sr.No Activity Item No. Crane Requirement Duration 27-Jul 28-Jul 29-Jul 30-Jul 31-Jul 1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug 7-Aug 8-Aug 9-Aug 10-Aug 11-Aug 12-Aug 13-Aug 14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 19-Aug 20-Aug

1 Crane Assembly and TUV (300ton Crawler Crane) 6 days

2 Preparation the Ground for Ramp/Access/Position (for Crawler) 3 days

R-6110/
3 Scaffolding for Unbolting of Temporary Spool 2 days
R-6120

4 Setting(Counter Weight) of Mobile Crane R-6110 100ton Mobile Crane 0.5 day

4 Unbolting/Dismantling of Temporay Spool/Elbow Spool R-6110 100ton Mobile Crane 0.5 day

5 Erection/Bolting of Elbow Spool R-6110 100ton Mobile Crane 0.5 day

R-6110/
6 Erection of 16" Vent Line and Scaffolding for Holding of Pipe 300ton Crawler Crane 1 day
R-6120

R-6110/
7 Erection of Support for 16" Vent line (4 Locations) 1 day
R-6120
300ton Crawler
Erection/Bolting of 48" Reactor to Exchanger Spool
8 R-6110 Crane 1.5 days
(Incl. Scaffolding Dismantling for Holding Pipe)
100ton Mobile Crane
9 Shifting/Setting(Counter Weight) of Mobile Crane to R-6120 R-6120 100ton Mobile Crane 0.5 day

10 Unbolting/Dismantling of Temporay Spool/Elbow Spool R-6120 100ton Mobile Crane 0.5 day

11 Erection/Bolting of Elbow Spool R-6120 100ton Mobile Crane 0.5 day


300ton Crawler
Erection/Bolting of 48" Reactor to Exchanger Spool
12 R-6120 Crane 1.5 days
(Incl. Scaffolding Dismantling for Holding Pipe)
100ton Mobile Crane
13 Preparation for Removal of Bottom Spool R-6110 Chain Block Only 1 day

14 Removal/Erection/Alignment/Bolting of Bottom Spool R-6110 Chain Block Only 2 days

15 Preparation for Removal of Bottom Spool R-6120 Chain Block Only 1 day

16 Removal/Erection/Alignment/Bolting of Bottom Spool R-6120 Chain Block Only 2 days

R-6110/
17 Bolt Torquing and Inspection for Pipe Spools (Total 8 Spools) 7 days
R-6120

R-6110/
18 Manhole Closing (Total 8 Manhole) 1 day
R-6120

R-6110/
19 Scaffolding for Piping Insulation 6 days
R-6120

R-6110/
20 Piping Insulation
R-6120
▣ (Rev.1) EO Reactor Spool Installation Schedule
Crawler Crane Positioning Start

Duration (Day shift


Sr.No Activity Item No. Start Finish 25-Jul 26-Jul 24-Aug 25-Aug 26-Aug 27-Aug 28-Aug 29-Aug 30-Aug 31-Aug 1-Sep 2-Sep 3-Sep 4-Sep 5-Sep 6-Sep 7-Sep 8-Sep 9-Sep 10-Sep 11-Sep 12-Sep 13-Sep 14-Sep 15-Sep
Only)

1 Crane Assembly and TUV (300ton Crawler Crane) 8/24/2021 8/29/2021 5 days

2 Shifting of Crane to Lifting Location (300ton Crawler) 8/30/2021 8/30/2021 4 Hrs

3 Unbolting/Dismantling for Temporay Spool E-6111 8/30/2021 8/30/2021 4 Hrs

4 Dismantling of Scaffolding(Temp. Spool ↔ Elbow Connection Point) E-6111 8/31/2021 8/31/2021 4 Hrs

5 Unbolting/Dismantling for Temporay Spool E-6121 8/31/2021 8/31/2021 4 Hrs

6 Dismantling of Scaffolding(Temp. Spool ↔ Elbow Connection Point) E-6121 8/31/2021 8/31/2021 4 Hrs

7 Unbolting/Dismantling/Reinstallation of Elbow Spool E-6121 9/1/2021 9/2/2021 1 day

8 Unbolting/Dismantling/Reinstallation of Elbow Spool E-6111 9/2/2021 9/2/2021 1 day

Crane Position and Preparation Work (Incl. Dismantling of Scaffolding for


9 R-6110 9/4/2021 9/4/2021 1 day
holding the Pipe)

10 Erection/Bolting of 48" Reactor to Exchanger Spool R-6110 9/5/2021 9/5/2021 1 day

Crane Position and Preparation Work


11 R-6120 9/6/2021 9/6/2021 1 day
(Incl. Dismantling of Scaffolding for holding the Pipe)

12 Erection/Bolting of 48" Reactor to Exchanger Spool R-6120 9/7/2021 9/7/2021 1 day

R-6110/
13 Erection of 16" Vent Line and Scaffolding for Holding of Pipe 9/8/2021 9/8/2021 1 day
R-6120

R-6110/
14 Erection of Support for 16" Vent line (4 Locations) 9/9/2021 9/9/2021 1 day
R-6120

15 Shifting of Crane to Laydown and Disassembly 9/11/2021 9/15/2021 5 days

16 Preparation for Removal of Bottom Spool R-6110 9/2/2021 9/2/2021 1 day

17 Removal/Erection/Alignment/Bolting of Bottom Spool R-6110 9/4/2021 9/5/2021 2 days

18 Preparation for Removal of Bottom Spool R-6120 9/6/2021 9/6/2021 1 day

19 Removal/Erection/Alignment/Bolting of Bottom Spool R-6120 9/7/2021 9/8/2021 2 days

Reactor
20 Bolt Torquing and Inspection for Pipe Spools (Total 8 Spools) 9/4/2021 9/11/2021 7 days
Exchanger

R-6110/
21 Manhole Closing (Total 8 Manhole) 9/12/2021 9/13/2021 2 days
R-6120

R-6110/
22 Scaffolding for Piping Insulation
R-6120

R-6110/
23 Piping Insulation
R-6120
Reactor Top Spool / Vent Line (16")

Temporary Spool / Elbow Spool

Bottom Spool