Marwave Shipmanagement
TRAINING REPORTING FORM
Pi2
Please fill in accordingly: Tick mark
‘Name/Rank of Trainer
Training on board: Capt. Prateek Yadav / Sanjani Kumar
(all Trainers names to be inserted) ue
Training in Office:
NAME: [MT GHIBLI [Date of joining: 12-Apr-22
FTrainee’s Name: _ |CAPT. NARESH NAFREY Key No’
[Rank/Rating: [Master [Purpose of training” ‘SOPEP / SMPEP FAMILIARIZATION
DATE [TOPICS DEDICATED
13-Apr-22] THE FOLLOEING TOPICS DISCUSSED:
(1) INTRODUCTION TO SOPEP
(2) INTRODUCTION TO SMPEP
(3) REGULATIONS AND REQUIREMENTS
(4) POLLUTION EMERGENCY PLAN
(5) LIST OF NATIONAL CONTACT POINTS
(6) BEST PRACTICES
(7) POLLUTION EQUIPMENT - LOCATION AND IT'S USE
(8) REPORTING - INTIAL FOLLOW UP AND FINAL REPORT TO BE MADE AND SENT.
|) SAFETY FIRST - CORRECT PPE MUST BE WORN BY ALL CREW
[Training Tools used (CDs, Literature, Powerpoint presentations, etc):
q
Trainee's Signature: L Ch. Engineer's Signature: oa
Trainer's Signature: he Master's Signature:
= S
ean
Promotion: YES / NO (delete as appropriate)
|
* In case of Promotion Master/Chief Engineer must give his approval
Revision N*1
Date: 31-05-18
Contoied by: OPAMarwave Shipmanagement Pi2
TRAINING REPORTING FORM.
Please fill in accordingly: Tick mark Name/Rank of Trainer
Training on board: (Pant Prateek Yadav /Sanjani Kumar
{all Trainers names to be inserted)
Training in Office’
NAME: MT GHIBLI [Date of joining: 12-Apr-22
[Trainee’s Name: _[SHAILESH Key No:
[Rank / Rating AB [Purpose of training* ‘SOPEP / SMPEP FAMILIARIZATION
DATE [TOPICS DEDICATED
13-Apr-22] THE FOLLOEING TOPICS DISCUSSED
(1) INTRODUCTION To SOPEP
(2) INTRODUCTION TO SMPEP.
(3) REGULATIONS AND REQUIREMENTS
(4) POLLUTION EMERGENCY PLAN
(5) LIST OF NATIONAL CONTACT POINTS
(6) BEST PRACTICES
(7) POLLUTION EQUIPMENT - LOCATION AND IT'S USE
(8) REPORTING - INTIAL FOLLOW UP AND FINAL REPORT TO BE MADE AND SENT.
(9) SAFETY FIRST - CORRECT PPE MUST BE WORN BY ALL CREW
Training Tools used (CDs, Literature, Powerpoint presentations, etc.)
Trainee’ sane: Bg Ch. Engineer's se
Trainer's Signature: 1) Master's Signature: <4
Promotion: YES / NO (delete as appropriate)
* In case of Promotion Master/Chief Engineer must give his approval
Form NY: Pr2 Revision N* 1
“ie: Training Reporting Form Date: 31-05-18
Reference: SMS Chapter 2 Contraled by: DPA