Lifting Permit

1) This document is a lifting permit for a solar power project that provides details of the planned lift including the sub-contractor, crane details, load information, lift location and timing. 2) It outlines safety requirements that must be met like using proper PPE, completing inspections of the crane and rigging, ensuring the crane is set up safely on level ground with outriggers, and barricading the lift area. 3) The permit requires sign off from the sub-contractor, contractor, owner and others to confirm the lift plan and safety checks were completed and the area was left safe after the lift.

Uploaded by

Marc Ivo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
444 views2 pages

Lifting Permit

1) This document is a lifting permit for a solar power project that provides details of the planned lift including the sub-contractor, crane details, load information, lift location and timing. 2) It outlines safety requirements that must be met like using proper PPE, completing inspections of the crane and rigging, ensuring the crane is set up safely on level ground with outriggers, and barricading the lift area. 3) The permit requires sign off from the sub-contractor, contractor, owner and others to confirm the lift plan and safety checks were completed and the area was left safe after the lift.

Uploaded by

Marc Ivo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

133 MVDC LAL - L0 SOLAR POWER PROJECT

Lifting Permit
Sub - Contractor Date

Responsible Person Crane Model

Description of Load Boom Length

Weight of Load Jib Length

Total Erection Load Maximum Radius

Movement Planned

Detailed Location:

Est Time Start

Est Time Finish

Weight Lift Details


Estimated

Actual

Comments / Corrective
Lifting Description Points Yes NO
Action
Operator wearing Personnel Protective Equipment(Hard Hat,
Safety Shoes etc.)
Risk assessment / Plan completed for lift
Emergency response pre-planning complete and resources
available .e.g., Fire Extinguisher, spillage kit etc.
Authorized/qualified crane operator (Third Party Operator Cert.)

Crane has current periodic inspection (T P I )

Daily crane inspection completed


All slings, ropes, and other rigging have current periodic
inspection
Pre-use inspection of slings, ropes, and other rigging completed

Smooth solid foundation in the crane set-up area with no


deviations. Underground installations considered and not
impacted
Outriggers extended as far as possible, on level, firm ground
with supports (mats) installed where required
Tires completely off ground when outriggers used

NAREDCO.ELE.PTW 0002 REV1.0 Page 1


Area completely barricaded to remove personnel from around
crane and lift area (including lift area)
All necessary clearances evaluated including e.g., overhead
power lines
All actions of the Risk Assessment in place and clearly
communicated
All applicable items on the permit have been answered “YES” and communicated to all personnel
involved with the lift.
Section 1 Sub-Contractor : On behalf of the company named above, I hereby accept receipt of this permit and
undertake to carry out the work specified, in accordance with site safety rules, PC HSE Rules and any other
applicable regulations.
Name Sign Date/Time
Section II Contractor : Named above is hereby authorized to carry out the work specified in this Permit.
Name Sign Date/Time
Section III OE : I confirm the work-related equipment, tackles and supportive documents are competent and fit for the
related work.
Name Sign Date/Time
Section IV Owner : The work specified in this permit has been completed and the area has been left in a safe
condition. The equipment provided for this work has been removed from the work site.
Name Sign Date/Time

• Copies of Crane Inspections, Crane Operator Certificate, Rigger Certificate and all related
Documents are to be included with this Lift Permit.

Objectives :

a) Personnel to maintain safer distance when lifting operation in progress.


b) None of the personnel to come below the immediate lift area and carry out works when lifting
in progress.
c) Barricade the area away from radius of lifting equipment and provide sign board.
d) Make lifting plan(If necessary) and permit prior to lifting and follow lifting operation permit
system.
e) Competent person must be assigned for all lifting activities.
f) Two tag lines must be provided during lifting on all occasion.
g) Visible “edge line” contact between rigger and crane operator should be maintained on all
occasion.
h) All lifting accessories should be inspected before lifting.
i) Use proper PPE while working at height.
j) The crane must have valid certification through third party.
k) Only one signal man should give signal at a time.
l) Hand off from pinch point when setting the material or container.
m) Outrigger pad must provide on both paved and unpaved areas.
n) Sling should be protected with softener at sharp edge.
o) Formal assessment of the weight to be lifted must be established prior to lift.
Comments:
1.
2.
3.
4.
5.

NAREDCO.ELE.PTW 0002 REV1.0 Page 2