1 Purpose
2 Prerequisites
2.1 System Access
2.2 Roles
2.3 Master Data, Organizational Data, and Other Data
2.4 Additional Manual Configuration
2.5 Business Conditions
3 Preliminary Steps
3.1 Maintain Customer-Material Info Record (Optional)
3.2 Set Initial Stock for Material
3.3 Create Condition Records (Optional)
4 Overview Table
5 Test Procedures
5.1 Create Sales Scheduling Agreement
5.2 Maintain Planning Delivery Schedule Instruction (Optional)
5.3 Check Incoming Delivery Schedules in AIF (Message Dashboard) - EDI relevant
5.4 Update Scheduling Agreement for Forecast Delivery Schedule Manually (Optional)
5.5 Update Scheduling Agreement for JIT Delivery Schedule Manually (Optional)
5.6 Generate Planning Delivery Schedule (Optional)
5.7 Check Planning Delivery Schedule (Optional)
5.8 Create Delivery
5.9 Execute Picking
5.10 Post Goods Issue
5.11 Send Advance Shipping Notice- EDI Relevant (Optional)
5.12 Check Advanced Shipping Notice in AIF (Message Dashboard) - EDI Relevant (Optional)
5.13 Create Preliminary Billing Document (Optional)
5.14 Create Billing Document
5.15 Send Invoice – EDI Relevant
5.16 Check Invoice in AIF (Message Dashboard) - EDI relevant
6 Appendix
6.1 Process Integration
6.2 Preceding Processes
6.3 Succeeding Processes
The sales scheduling agreement is an outline agreement between the buyer and supplier. Forecast and JIT (Just-in-Time) delivery schedules are sent via EDI. These delivery schedules contain the de -
livery dates and quantities. The whole communication is based on cumulative quantities between buyer and supplier.
Planning delivery schedules can be generated to smooth the demand handed over to production.
The shipping specialist creates deliveries based on open quantities in the delivery outbound monitor.
After the completion of picking, the shipping specialist posts goods issue. This posting is the actual recording of the physical quantity that is being shipped to the customer.
With the goods issue posting, revenue is recognized and cost of goods sold is recorded in Financial Accounting.
Advanced shipping notifications are sent via EDI to the buyer.
Once goods are delivered, you can invoice the delivery. An EDI invoice message is sent to the buyer.
This document provides a detailed procedure for testing this scope item after solution activation, reflecting the predefined scope of the solution. Each process step, report, or item is covered in its
own section, providing the system interactions (test steps) in a table view. Steps that are not in scope of the process but are needed for testing are marked accordingly. Project-specific steps must be
added.
Note Values in this test script (decimal notation, date formats, and so on) are presented in U.S. standard notation. If your test system is set up to use a different notation, enter values as appropri -
ate.
This section summarizes all the prerequisites for conducting the test in terms of systems, users, master data, organizational data, other test data and business conditions.
System Details
System Accessible via SAP Fiori launchpad. Your system administrator provides you with the URL to access the various apps assigned to your role.
2.2 Roles
Create business roles using the following business role templates delivered by SAP and assign them to your individual test users.
Alternatively, if available, you can use the following spaces delivered by SAP. You create a space with pages containing predefined essential apps and assign it to the business role. You then assign
this business role to your individual users.
For more information, refer to How to Create a Business Role for the Administrator in the product assistance for SAP S/4HANA Cloud.
Name (Role Template) ID (Role Template) Name (Launchpad Space) ID (Launchpad Space)
Material Planner - External Procurement SAP_BR_MATL_PLNR_EXT_PROC Material Planner - External Procurement SAP_BR_MATL_PLNR_EXT_PROC
Material TG11 Trading Good for Reg. Trading (MRP planning) See sections Business Conditions and Preliminary Steps.
no Serial no.; no batch
Sold-to Party 11100003 Domestic Customer GB 3 Payment Card Data in Business Partner.
One-time payment card customer.
Distribution Channel 10
Division 00
For more information on creating master data objects, see the following Master Data Scripts (MDS)
BNZ - Create New Open MM You have completed the step described in the Create New Open MM Posting Period (BNZ) master data script. Additionally, ensure that posting period is up to date. You need Buyer sys-
Posting Period tem to fetch the POs for sales order creation and to check whether the whole process flow is working.
Purpose
This process shows you how to maintain the customer-material info record to run through this scope item.
Note If the customer-masterial info record already exist, or you want to maintain the customer material manually when creating the scheduling agreement, please skip the step.
Procedure
Test Step # Test Step Name Instruction Expected Result Pass / Fail / Comment
1 Log On Log on to the SAP Fiori launchpad as an Internal Sales Representa- The SAP Fiori launchpad displays.
tive
3 Access the Creation of Customer Material Choose Create. The Customer Material screen displays.
4 Enter Basic Customer-Material Information Value Map- Make the following entries: Basic customer-material information is main-
pings ● Customer: 11100003 tained.
● Product: TG11
● Sales Organization: 1110
● Distribution Channel: 10
● Customer Material Description: RM129
Purpose
This process shows you how to enable materials in stock to run through this scope item.
Procedure
2 Access the App Open Post Goods Movement (MIGO). The Goods Receipt Other screen displays.
Note It will be displayed this way only if it was your last transaction. So the action for the
user should be to select the Reference Document for MIGO Transaction Other field.
3 Enter the Movement Type Select the following options and then choose Enter.
● Goods Receipt - Executable Action in Transaction
MIGO
● Other - Reference Document for MIGO Transaction
4 Make Entry in the Goods Receipt Under Goods Receipt Other Screen: Material tab, make
Other Screen: Material Tab the following entry and choose Enter.
● Material: <Material Number>
5 Make Entry in the Goods Receipt Under Goods Receipt Other Screen: Quantity tab, make
Other Screen: Quantity Tab the following entry and choose Enter.
● Qty in Unit of Entry: <Quantity in UOM>
● Unit of Entry: <PC>
6 Make Entry in the Goods Receipt Under Goods Receipt Other Screen: Where tab, make the
Other Screen: Where Tab following entry and choose Enter.
● Movement Type: 561- Receipt per ini-
tial en-try of stock balances into
use
● Plant: <Plant>
● Storage Location: <Storage Location>
7 Make Entry in the Goods Receipt Under Goods Receipt Other Screen: Batch tab, make the Only relevant for batch-relevant materials.
Other Screen: Batch Tab following entry and choose Enter.
● Date of Manufacture: <Current Date or a
past date>
Purpose
In case you have finetuned the access sequence of SAP pre-shipped condition types, the relative condition records should be created accordingly.
You can find general information on how to create master data objects in the following Master Data Scripts (MDS) :
Table 2: Master Data Script Reference
Master Data ID Description
This scope item consists of several process steps provided in the following table.
Note If your system administrator has enabled spaces and pages on the SAP Fiori launchpad, the homepage will only contain the essential apps for performing the typical tasks of a business
role.
You can find all other apps not included on the homepage using the search bar.
If you want to personalize the homepage and include the hidden apps, navigate to your user profile and choose App Finder.
Create Sales Scheduling Agreement [page ] 12 Internal Sales Representa- Manage Sales Scheduling Agreements (F3515) Create scheduling agreement.
tive
Maintain Planning Delivery Schedule Instruction Internal Sales Representa- Change Sales Scheduling Agreements (VA32) Maintain planning delivery schedule instruction.
(Optional) [page ] 14 tive
Check Incoming Delivery Schedules in AIF (Mes- Configuration Expert - Message Dashboard - SAP Application Interface Frame- The message (Forecast Delivery Schedule and/or JIT Delivery Schedule) is
sage Dashboard) - EDI relevant [page ] 15 Business Network Integra- work (/AIFX/WDA_MSG_MONITOR) checked in dashboard.
tion
Update Scheduling Agreement for Forecast Deliv- Internal Sales Representa- Change Sales Scheduling Agreements (VA32) Manually maintain the forecast delivery schedule.
ery Schedule Manually (Optional) [page ] 16 tive
Update Scheduling Agreement for JIT Delivery Internal Sales Representa- Change Sales Scheduling Agreements (VA32) Manually maintain the JIT delivery schedule.
Schedule Manually (Optional) [page ] 17 tive
Generate Planning Delivery Schedule (Optional) Internal Sales Representa- Change Sales Scheduling Agreements (VA32) Manully generate planning delivery schedule.
[page ] 18 tive
Check Planning Delivery Schedule (Optional) Internal Sales Representa- Display Sales Scheduling Agreements (VA33) Check planning delivery schedule.
[page ] 19 tive
#unique_19 Material Planner - External Monitor Material Coverage (Deprecated) - Net / Individ-
Procurement ual Segments (F2101)
Create Delivery [page ] 20 Shipping Specialist My Sales Order Schedule Lines - Due for Delivery Outbound delivery is created.
(VL10E)
Execute Picking [page ] 21 Shipping Specialist Outbound Deliveries for Picking (VL06P) The picking process involves taking goods from a storage location and stag-
ing the right quantity in a picking area where the goods are prepared for ship-
ping.
Post Goods Issue [page ] 23 Shipping Specialist Outbound Deliveries for Goods Issue (VL06G) An advanced shipping notification is sent to the Buyer system.
Send Advance Shipping Notice- EDI Relevant (Optional) [page ] 24 ASN is automatically sent to the Buyer system.
Check Advanced Shipping Notice in AIF (Message Configuration Expert - Message Dashboard - SAP Application Interface Frame- The message (ASN) is checked in dashboard.
Dashboard) - EDI Relevant (Optional) [page ] 24 Business Network Integra- work (/AIFX/WDA_MSG_MONITOR)
tion
Create Preliminary Billing Document (Optional) Billing Clerk Create Preliminary Billing Documents (F2876) The system generates an invoice for sales document automatically.
[page ] 25
Create Billing Document [page ] 27 Billing Clerk Create Billing Documents (F0798) Invoice is created and sent from the SAP S/4HANA system (supplier side) to
the buyer system.
Send Invoice – EDI Relevant [page ] 28 Supplier Invoice is automatically sent to the buyer system.
Check Invoice in AIF (Message Dashboard) - EDI Configuration Expert - Message Dashboard - SAP Application Interface Frame- The message (Invoice) is checked in dashboard.
relevant [page ] 29 Business Network Integra- work (/AIFX/WDA_MSG_MONITOR)
tion
This section describes procedures for each process step that belongs to this scope item.
The Enterprise Search function provides a central entry point for finding business objects in your company from different sources using a single search request. You can search for objects such as:
apps, factsheets for business objects. From the data found, you can go directly to the respective apps and factsheets to display, edit the data or find related objects.
How to access and check a factsheet:
1. Log on to the SAP Fiori launchpad as a respective user, for example, Internal Sales Representative.
2. Access theEnterprise Search Bar by choosing the magnifying glass button in the upper right corner.
3. The Enterprise Search bar displays two filter fields next to the search button: All dropdown menu and a search field. Enter your Search Criteria and choose the business object type, for example,
from the dropdown menu select Sales Scheduling Agreements, and enter a Sales Scheduling Agreement order number in the search field and choose Search, the Sales Scheduling Agreement is listed.
4. Choose the Sales Scheduling Agreement number link. The system navigates to the factsheet screen and sales order related information is integrated and summarized in one Fiori page. You can get
detailed data by choosing the corresponding links.
There are factsheets available for the following objects (visible depending on the assigned role):
• Sales order
• Quotation
• Sales Scheduling Agreement
• Billing document
• Credit Memo
• Debit Memo
• Customer 360 Fact sheet
Purpose
1 Log On Log on to the SAP Fiori launchpad as an Internal Sales Representative. The SAP Fiori launchpad
displays.
3 Navigate to Create Scheduling Agree- On the Manage Sales Scheduling Agreements screen, choose Create Scheduling Agreements.
ment Screen
4 Enter Data On the Create Scheduling Agreements screen, make the following entries and choose Continue:
● Sched. Agreemt Type: choose from LZ,
● Sales Organization: 1110
● Distribution Channel: 10
● Division: 00
5 Enter Scheduling Agreement Details On the Create Sched. Agr. w/Rel: Overview screen, make the following entries:
● Sold-To Party: 11100003
● Ship-To Party: 11100003
● Customer Reference: Purchase scheduling agreement number from customer
● Material Number: TG11
● Customer Material: RM129
Purpose
This process step shows you how to maintain planning delivery schedule instruction.
Note The step is only relevant that if you want to create planning delivery schedule according to forecast delivery schedule. Planning delivery schedule only relevant to the forecast delivery
schedule based on week or Month.
Procedure
1 Log On Log on to the SAP Fiori launchpad as an Internal Sales Representative. The SAP Fiori launchpad dis-
plays.
3 Choose Scheduling Agreement On the Change Scheduling Agreements screen, make the following entries and choose Enter:
● Scheduling Agreement: <Created in previous step>
4 Navigate to Item level On the Change Sched.Agr.w/ Rel.XXXXXXXX: Overview screen, choose the Item line, and choose Display Item
Details
5 Enter Planning Delivery Schedule Instruci- On the Change Sched.Agr.w/ Rel.XXXXXXXX: Item Data screen, choose Call Control Parameter and make the
ton following entries:
● PlanDS instruction: SAP1
Purpose
The forecast delivery schedule or JIT delivery schedule has been created and released from Buyer System and send via EDI to the Supplier. They are automatically processed if no error occurs. This
process step shows you how to check the message status.
Prerequisites
The forecast delivery schedule or JIT delivery schedule has been created and released from Buyer System.
This step is only relevant to EDI relevant delivery schedules.
Procedure
1 Log On Log on to the SAP Fiori launchpad as a Configuration Expert - Business Network Integration.
2 Access the App Open Message Dashboard - SAP Application Interface Framework (/AIFX/WDA_MSG_MONITOR).
3 Choose Date And Namespace/Inter- On the Interface Monitor screen, choose correct time period entries and choose Search.
face Choose the line of /SDSAR, Inbound Scheduling Agreement Processing and choose All Messages.
4 Check Detail Messages On the Monitoring and Error Handling screen, expend the messages in the left side of the screen, and choose the corresponding scheduling
agreement number in Buyer system.
Double choose the message to see the detail information on the right side of the screen.
Test Administration
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Purpose
This process step shows you how to manually create the forecast delivery schedule in predefined scheduling agreement.
Procedure
3 Choose Scheduling Agreement On the Change Scheduling Agreements screen, make the following entries and choose Enter:
● Scheduling Agreement: <Created in previous step>
4 Choose Forecast Delivery Schedule On the Change Sched.Agr.w/ Rel. XXXXXXXX: Overview screen, choose the line Item and choose Fore. DlSch.
5 Enter the Forecast Delivery Schedule On the Change Sched.Agr.w/ Rel. XXXXXXXX: Item Data screen, make the following entries and choose Enter.
● Dlv. Schedule: 0 (Del.sched.no. must be different from the previous one, so in case of existings ones choose previous no. +1)
● Dlv. Sched. Date: <Today>
● Date Type: W
● Date: <Today>
● Order Quantity: <6>
Create similar entries for next 3 weeks.
5.5 Update Scheduling Agreement for JIT Delivery Schedule Manually (Optional)
Test Administration
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Purpose
This process step shows you how to manually create the JIT delivery schedule in predefined scheduling agreement.
Note JIT delivery schedule is an optional step. How schedule lines are handled in MRP is depending on the predefined settings. In this scenario following settings are predefined: within the JIT
delivery schedule horizon the JIT delivery schedule is relevant for MRP, and delivery-outside the JIT delivery horizon the forecast delivery schedule is relevant for MRP and delivery.
Procedure
1 Log On Log on to the SAP Fiori launchpad as an Internal Sales Representative. The SAP Fiori launchpad displays.
3 Choose Scheduling Agreement On the Change Scheduling Agreements screen, make the following entries and choose Enter:
● Scheduling Agreement: <Created in previous step>
4 Choose JIT Delivery Schedule On the Change Sched.Agr.w/ Rel. XXXXXXXX: Overview screen, choose the line Item and choose JIT DlSch.
5 Enter the Forecast Delivery Schedule On the Change Sched.Agr.w/ Rel. XXXXXXXX: Item Data screen, make the following entries and choose En-
ter.
● DIv.schedule:99
● Dlv. sched.date: <Today>
● JIT hor.: <Today-1>
● Order Quantity: 2
Add additional schedule lines and choose Enter.
● Order Quantity: 3
● Order Quantity: 4
Test Administration
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Purpose
This process step shows you how to generate plannig delivery schedule manually.
Planning delivery schedule instruction has been set. Forecast delivery schedule has been created manully with date type week or month. For delivery schedule generated via EDI, planning delivey
schedule will generate automatically.
Procedure
3 Choose Scheduling Agreement On the Change Scheduling Agreements screen, make the following entries and choose Enter:
● Scheduling Agreement: <Created in previous step>
4 Navigate to Item level On the Change Sched.Agr.w/ Rel.XXXXXXXX: Overviewscreen, choose the Item line, and choose Display Item Details.
5 Enter Planning Delivery Schedule Instruci- On the Change Sched.Agr.w/ Rel.XXXXXXXX: Item Datascreen, choose Planning Delivery Schedule, and choose Generate
ton plan. Dlv.sched.
Test Administration
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
This optional process step shows you how to check plannig delivery schedule.
Prerequisite
Procedure
3 Choose Scheduling Agreement On the Display Scheduling Agreements screen, make the following entries and choose Enter:
● Scheduling Agreement: <Created in previous step>
4 Navigate to Item level On the Display Sched.Agr.w/ Rel.XXXXXXXX: Overview screen, choose the item line, and choose Display Item De-
tails.
5 Enter Planning Delivery Schedule Instruciton On the Display Sched.Agr.w/ Rel.XXXXXXXX: Item Data screen, choose Planning Delivery Schedule.
Test Administration
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
This process step shows you how to log on to the SAP S/4HANA system to create an outbound delivery for the previously received delivery schedule (scheduling agreement).
Procedure
2 Access the App Open My Sales Order Schedule Lines - Due for Delivery (VL10E). The Sales Order Schedule Lines screen
displays.
3 Search Scheduling Agree- On the Sales Order Schedule Lines screen, make the following entries and choose Continue:
ment ● Shipping Point: 1110
● Selection Date: <Shipping date>
● CalcRuleDefltDlvCrDt: <Blank>
On the Sales Orders tab:
● SD Document: <Scheduling Agreement number created previously>
Choose Execute.
4 Create Delivery On the Activities Due for Shipping “Sales Order Schedule Lines” screen, choose Sales Sched. Agr. No. created in previ-
ous step, and choose Dialog.
5 Save Delivery Choose Save, make a note of the delivery number. Creation of a delivery is triggered.
Test Administration
Purpose
The picking process involves taking goods from a storage location and staging the right quantity in a picking area where the goods are prepared for shipping. This process step shows you how to pick
deliveries, if the items is not relevant for picking please exclude this step execution : Example Consignment
Procedure
Test Step # Test Step Name Instruction Expected Result Pass / Fail / Com-
ment
3 Enter Shipping Point Make the following entries, and choose Execute.
● Shipping Point: 1110
● Select Only Picking Without WM option
● Picking Date: <Current Date +1>
4 Choose Delivery On the Day’s Workload for Picking screen, choose the Delivery document created in previous step, and choose Change Outbound De-
liveries.
5 Enter Picked Quan- On the Delivery XXXXXXX Change: Overview screen, go to the Picking tab and enter quantity equal to delivery Qty in Picked Qty
tity field for picking related item(s).
Test Administration
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Purpose
This process step shows you how to post goods issues for delivery in the SAP S/4HANA system (supplier side).
Procedure
2 Access the App Open Outbound Deliveries for Goods Issue (VL06G).
3 Open Outbound Delivery On the Outbound Deliveries for Goods Issue screen, make the following entries and choose Execute.
Monitor ● Shipping Point: 1110
● Pland Gds Mvmnt Date: <Current Date + 1>
4 Choose Outbound Delivery On the Goods issue for Outbound Deliveries to be Posted screen, choose the outbound delivery document created in previous step, and
choose Change Outbound Deliveries.
5 Post Good Issue On the Delivery XXXXXXXX Change: Overview screen, choose Post Goods Issue. The goods issue is
posted.
Purpose
This process step shows you how ASN is sent to the Buyer system.
Prerequisites
Goods issue must have been posted in the SAP S/4HANA system (supplier side).
This step is only relevant to EDI relevant deliveries schedules.
Procedure
5.12 Check Advanced Shipping Notice in AIF (Message Dashboard) - EDI Relevant (Optional)
Purpose
The advanced shipping notification is sent via EDI to the Customer. They are automatically processed if no error occurs. This process step shows you how to check the message status.
The outbound delivery has been created and goods issue has been posted.
Procedure
1 Log On Log on to the SAP Fiori launchpad as a Configuration Expert - Business Network Integration.
2 Access the App Open Message Dashboard - SAP Application Interface Framework (/AIFX/WDA_MSG_MONITOR).
3 Choose Date and Namespace/Interface On the Interface Monitor screen, choose correct time period entries and choose Search. In the Result List, choose the line of /LEEDI
and choose All Messages.
4 Check Detail Messages On the Monitoring and Error Handling screen, expend the messages in the left side of the screen, and choose the corresponding deliver-
ing number.
Double choose the message to see the detail information on the right side of the screen.
Test Administration
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
In this activity, the billing clerk creates preliminary billing documents based on these billing due list items, adjusts view settings and filters to customize your experience.
Procedure
1 Log On Log on to the SAP Fiori launchpad as a Billing Clerk. The SAP Fiori launchpad displays.
2 Access the App Open Create Preliminary Billing Documents (F2876). The Create Preliminary Billing Documents screen
displays.
3 Search for Billing Due List Items To enable a filter, type in a value directly to trigger autosuggest and press Enter, or use the The Sales Document is displayed in the result.
input help to choose a value.
4 Define Preliminary Billing Settings Choose Preliminary Billing Settings at the top and make the following settings:
● Set billing date and enter before creating Preliminary billing document - OFF
● Create separate preliminary billing document for each item of billing due list - OFF
● Display preliminary billing document after creation - ON
5 Adjusting Settings Choose Settings above the worklist to open the View Settings view.
Each of the three tabs (Columns, Sort, Group) lets you perform a different function.
● The Columns tab allows you to add or remove columns from the worklist.
● You can search for the names of columns using the search field.
● You can choose Move Up or Move Down to change the order of the columns in the
worklist.
Choose Restore to restore the default.
6 Select An Item to Create Preliminary Billing Select the document and choose Create The Manage Preliminary Billing Documents screen
Document displays.
7 In the Manage Preliminary Billing Docu- The preliminary billing document with ID Pxxxxxxxx has been created. The system generates a Preliminary Billing Docu-
ments App ment for billing.
8 Define Billing Settings Choose Billing Settings at the bottom and make the following settings:
● Automatically Post Billing Documents - OFF
● Display Billing Document after creation - ON
9 Select the Preliminary Billing Document to Select the Preliminary Billing Document you have created and choose Create Billing Docu- The system generates an invoice for sales document
be Invoiced ment. automatically.
Note If you finished the above steps and created both the preliminary billing document and billing document, then please skip the next step Create billing Document.
Test Administration
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Purpose
This process step shows you how to create invoices in SAP S/4HANA system.
Procedure
Test Step # Test Step Name Instruction Expected Result Pass / Fail / Comment
1 Log On Log on to the SAP Fiori launchpad as a Billing Clerk. The SAP Fiori launchpad displays.
2 Access the App Open Create Billing Documents (F0798). The Create Billing Documents screen dis-
plays.
3 Define Billing Settings Choose Billing Settings in the bottom bar, you can make the following settings:
● Set billing date and type before billing: ON
● Create separate billing document for each item of billing due list: OFF
● Automatically post billing documents: ON
● Display billing documents after creation: ON
● Choose delivery items to be billed and select quantities: OFF
4 Choose Individual Billing Docu- Select row of delivery document created previously and choose Create. The Create Billing Document screen dis-
ment plays.
5 Maintain Billing Date Choose billing type F2 Invoice and maintain billing date, for example current date, then choose OK New billing document is created.
and Save.
6 Display Billing Document The billing document appears automatically. The system generates an invoice for billing.
Financial Postings
Example
Purpose
This process step shows you how to send invoice to the Buyer system.
Billing Document must have been created in the SAP S/4HANA system (supplier side).
Procedure
Purpose
The customer invoice is sent via EDI to the Buyer. They are automatically processed if no error occurs. This process step shows you how to check the message status.
Prerequisites
Procedure
1 Log On Log on to the SAP Fiori launchpad as a Configuration Expert - Business Network Integration.
2 Access the App Open Message Dashboard - SAP Application Interface Framework (/AIFX/WDA_MSG_MONITOR).
3 Choose Date and Namespace/Inter- On the Interface Monitor screen, choose correct time period entries and choose Search. In the Result List, choose the line of /SDEDI, Out-
face bound Invoice Processing and choose All Messages.
4 Check Detail Messages On the Monitoring and Error Handling screen, expend the messages in the left side of the screen, and choose the corresponding billing num-
ber created in previous step.
Double choose the message to see the detail information on the right side of the screen.
Example Words or characters quoted from the screen. These include field names, screen titles, pushbuttons labels, menu names,
menu paths, and menu options.
Textual cross-references to other documents.
EXAMPLE Technical names of system objects. These include report names, program names, transaction codes, table names, and
key concepts of a programming language when they are surrounded by body text, for example, SELECT and IN-
CLUDE.
Example Output on the screen. This includes file and directory names and their paths, messages, names of variables and parame-
ters, source text, and names of installation, upgrade and database tools.
Example Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documenta-
tion.
<Example> Variable user entry. Angle brackets indicate that you replace these words and characters with appropriate entries to
make entries in the system.