0% found this document useful (0 votes)
70 views

ADC Part 9

This document provides specifications for roofing and railing materials and installation. It specifies minimum thicknesses for aluminum honeycomb roof panels and stainless steel railings. Installation details are also included, such as bonding and clamping methods for roof panels, concrete surface preparation, and engineering details for support posts, fascias, and bearing plates. Measurements and material types are given for railings, with requirements for spacing of flat bars and rods.

Uploaded by

Maung PDD
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

ADC Part 9

This document provides specifications for roofing and railing materials and installation. It specifies minimum thicknesses for aluminum honeycomb roof panels and stainless steel railings. Installation details are also included, such as bonding and clamping methods for roof panels, concrete surface preparation, and engineering details for support posts, fascias, and bearing plates. Measurements and material types are given for railings, with requirements for spacing of flat bars and rods.

Uploaded by

Maung PDD
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

APPLICABLE RANGE 2700 TO 3600

VARIES DEPEND ON SITE


RAILING TO
300 VARIES DEPEND ON SITE 300
300 VARIES DEPEND ON SITE 300
ENGR’S DETAIL
MIN. 10mm THK. ALUM. HONEYCOMB ROOF
PANEL COMPLETE WITH MIN. 1 mm THK
TOP PANEL TO SO’S APPROVAL

BI-METALLIC BOND/CLAMP AND


MIN. 10mm THK. ALUM. HONEY
BONDING DETAILS TOCOMB
NEWROOF PANELROOF
COMPLETE SPECIALIST ALUMINIUM CONDUCTOR TAPE
WITH MIN. 1mm THK. TOP PANEL
REQUIREMENT. CONTRACTOR TO ENSURE
TO SO’S APPROVAL BOLTED ON BEARING PLATE.
CONVENTIONAL BALLAST
TO SPECIFICATION THAT BONDED IN ACCORDANCE TO LATEST SS 555. CONCRETE SURFACE PAINTED OVER
LIGHT FITTING TO COMPLY
WITH THE AUTHORITY’S TO PREVENT ALUMINIUM TAPE
SPECIFICATIONS
TO HAVE DIRECT CONTACT
M.S. ’C’ CHANNEL RAFTER TO ENGR’S DETAIL
WITH CONCRETE SURFACE
M.S. ANGLE ROOF FASCIA TO ENGR’S DETAIL

M.S. SUPPORT POST TO ENGR’S DETAIL

ELECTRICAL CABLE CONCEALED IN PVC


FLEXIBLE CONDUIT IN SUPPORT POST
MIN.40
N.2100

NEW 45mm S.S. RAILNG COMPLETE WITH


S.S. FLAT BAR AT REGULAR INTERVAL AND NEW 45mm S.S. RAILNG AND 12mm THK MS BEARING
MI

HARDRAIL COMPLETE WITH


S.S. ROD AT NOT MORE THAN 100mm CLEAR
25 x 3mm ALUMINIUM TAPE
S.S. FLAT BAR AT REGULAR PLATE WITH 90 ANGLE
INTERVAL AND S.S. ROD AT
BOND TO SUPPORT POST.
NOT MORE THAN 100mm CLEAR
WITH BOLTS/NUTS TO
CONTRACTOR TO ENSURE THAT THE NEW ENGR’S DETAIL
NEW 25mm x 3 mm
1100

N.2100
LIGHTNING PROTECTION SYSTEM FOR
ALUMINIUM TAPE

MI
THE NEW COVERED POB AND RAILING ARE
EQ EQ EXISTING POB DECK EQ EQ
ELECTRICALLY CONTINUOUS.
FFL (REFER TO DETAIL 1)

1100
DETAIL 1

800
EXISTING PLANTING TROUGHS N.T.S.
FFL

EXISTING POB STAIRCASE


& COLUMN

HOT DIP
GALVANISED COVER

EARTH ROD CLAMP


TYPICAL SECTION OF POB STAIRCASE INCLUSIVE OF LIGHTNING
TO VERIFY ON SITE FOR ACTUAL WIDTH OF STAIRCASE
50mm HEAVY PROTECTION EARTH LABEL
REFER TO SECTION OF POB DECK FOR ANNOTATION
DUTY UPVC PIPES 50
SCALE 1:20

25mm x 3mm GROUND LEVEL


ALUMINIUM TAPE
STAINLESS STEEL
COVER PLATE
CONCRETE HAUNCH
TYPICAL SECTION OF POB DECK
ALL AROUND
ROOF EAVE TO EXTEND AT NOT MORE THAN HALF THE WIDTH OF PLANTING TROUGH

TO VERIFY ON SITE FOR ACTUAL WIDTH OF POB DECK

SCALE 1:20
25 x 3mm ALUMINIUM TAPE BI-METALLIC
CONNECTOR
REFER TO DETAIL ’2’
M.S. SUPPORT POST

150mm x 150mm TEST LINK BOX TO ENGR’S DETAIL

AT 1500mm HEIGHT FROM 45mm S.S. RAILING


TO SO’S APPROVAL

GROUND LEVEL (SURFACE MOUNT) 45mm S.S. HANDRAIL COUPLING

1100
(LATEST SS 555)
SPACING OF POSTS AT REGULAR INTERVAL TO ENGR’S DETAIL TO SO’S APPROVAL
50mm HEAVY DUTY UPVC

800
EQ EQ EQ EQ
PIPE C/W 25mm X 3mm
HEAVY DUTY UPVC PIPE 25mm x 3mm
COPPER CONDUCTOR TAPE EARTH ROD
COPPER TAPE

30
25 x 3mm COPPER TAPE ENCASED IN M.S. SUPPORT POST TO ENGR’S DETAIL
ENCASED 50mm HEAVY (min. 2 Nos. 1.8m LENGTH,
50mm HEAVY DUTY UPVC PIPE DUTY UPVC PIPES 16mm DIA COPPER)
45

45mm S.S. RAILING

EARTH PIT REFER TO DETAIL ’3’


100

(TOTAL EARTH RESISTANCE <10ohms>


6mm THK S.S. FLAT BAR

GROUND LEVEL 15mm S.S. ROD AT NOT


15mm S.S. ROD AT NOT MORE THAN
100mm CLEAR TO SO’S APPROVAL
MORE THAN 100mm CLEAR
6mm THK S.S. FLAT BAR TO SO’S APPROVAL
LTA Endorsement :
1100

855

EARTHING ROD 6mm THK. S.S. FLAT BAR TO BE WELDED


TO S.S. PLATE TO ENGR’S DETAIL
6mm THK S.S. FLAT BAR

DETAIL 2 DETAIL 3
N.T.S.
100

FFL
N.T.S.
REFER TO ENGR’S DWG. FOR
MOUNTING DETAILS TYPICAL ELEVATION OF RAILING ON POB STAIRCASE
TYPICAL LIGHTNING PROTECTION SYSTEM SCALE 1:20

TYPICAL ELEVATION OF RAILING ON POB DECK


FOR NEW ROOF OVER EXISTING PEDESTRIAN SCALE 1:20

OVERHEAD BRIDGE Project Title :

SCALE 1 : 50

STANDARD INSTALLATION DETAILS

Drawing Title :

TYPICAL LIGHTNING PROTECTION SYSTEM


FOR NEW ROOF OVER EXISTING PEDESTRIAN
OVERHEAD BRIDGE

Designed Checked Approved

NURLY MALVIN HO MELVYN THONG

Scale Drawn Date

NTS JULI JULY 2007

Drawing No. : Rev.

TO AMEND TO LATEST STANDARD FOR LIGHTNING PROTECTION HADI MELVYN


ADRIAN
TAY K.C.ADRIAN CHEONG/ A
A JUNE
A 2012 DEC
CHING
2010 TAY K.C
SYSTEM. WIJAYA
HADI WIJAYA CHEONG
THONG L/ROAD/MES/SD/1011
Drawn Designed
Rev. Rev.
Date Date By Description
Description Chk’d App’d
By By CAD File Name:LROADMES-SD1011A.dgn Sheet 1 of 1 A4