PROPOSED LIGHT
FITTING (IP65) TO 7500
REQUIREMENTS
200
1000 1000 PROPOSED LIGHT M.S. ’C’ CHANNEL RAFTER (R1)
FITTING (IP65) TO LIGHT FITTING TO M&E SPECS PROPOSED LIGHT
M&E SPECIFICATION FITTING (IP65) TO NEW OG BOX (IP54)
CONCEALED M.S. RHS POST (C1) M&E SPECIFICATION LOCATION SHALL BE SUBJECTED
PVC CABLE
TO SITE CONDITIONS AND SP
1000
IN 25mm
–2692
POWERGRID’S APPROVAL
HEAVY DUTY
–2388
UPVC PIPE
2300
2170 NOTICE BOARD WITH ALUM. FRAME
150mm ABOVE
450 (BENCH)
GROUND)
450
ALUM. BENCH
FFL
EARTH PIT EARTH PIT
300 2700
H
HOT DIP
-
GALVANISED COVER
CONCEALED
BONDING DETAILS TO JUNCTION BOX EARTH ROD CLAMP
ROOF SPECIALIST’S INCLUSIVE OF LIGHTNING
REQUIREMENTS PROTECTION EARTH LABEL
50
GROUND LEVEL
B-BOND
PROPOSED LIGHT FITTING
(IP65) TO M&E SPECIFICATION
M8 ALUMINIUM COPPER BOLT
CONCRETE HAUNCH TO STEEL SUPPORT POST
ALL AROUND
BONDING TO STRUCTURE CONCEALED PVC CABLE
COLUMN (MIN. 150mm ABOVE IN 25mm HEAVY DUTY 25mm x 3mm COPPER TAPE
–2692
LTA Endorsement :
GROUND)SEE DETAIL ’2’
–2534
UPVC PIPE
–2388
2300
ALUMINIUM OR
CONCEALED JUNCTION BOX
STEEL SUPPORT POST
FOR CABLE CONNECTION
COUPLING
SEE DETAIL ’3’ 300
50mm HEAVY DUTY UPVC
PIPE C/W 25mm X 3mm
COPPER CONDUCTOR TAPE EARTH ROD
N.)
200 (MI
450
H
EARTH
-
PIT (min. 2 Nos. 1.8m LENGTH,
ROAD 16mm DIA COPPER) SECTION H-H Project Title :