0% found this document useful (0 votes)
228 views

F-PD-01 Process Flow Diagram

The document is a process flow diagram for an unnamed part. It outlines the key steps in the production process which are: 1) Incoming inspection of raw materials, 2) Raw material storage, 3) Cold forging, 4) Thread rolling and inspection, 5) Final inspection of products, 6) Packing and storage of finished goods for dispatch. It also lists the processing, quality inspections, movements between operations, and storages/dispatch points.

Uploaded by

Trivesh Sharma
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
228 views

F-PD-01 Process Flow Diagram

The document is a process flow diagram for an unnamed part. It outlines the key steps in the production process which are: 1) Incoming inspection of raw materials, 2) Raw material storage, 3) Cold forging, 4) Thread rolling and inspection, 5) Final inspection of products, 6) Packing and storage of finished goods for dispatch. It also lists the processing, quality inspections, movements between operations, and storages/dispatch points.

Uploaded by

Trivesh Sharma
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

EFF.DT:-01.09.

2022 REV NO:-00 FORMAT NO- F/PD/01

shilka enterprises
PROCESS FLOW DIAGRAM
PART NAME

PART NO. PROTO TYPE SUPPLIER NAME:- PLANT LOCATION:-


DRAWING NO PRELIMINARY
DOC.NO:-
PRODUCT GRADE PRODUCTION CONFIRMATION DEPARTMENT
ISSUED BY NAME & SIGN. OF SQR NAME & SIGN. OF SPOC PRODUCTION ENGINEERING
COMPONENTS PARTS SOURCING LIST
10
Process Flow S.NO. DRG. NO. PART NAME/PROCESS MATERIAL/SPACIFICATION SOURCE SUB-SUPPLIER NAME
Incoming Inspection of R.M
10 BOP IN
(I.D RM Tags & Colour Coding)

1 ---

20 RM Storage
(Maintain FIFO in RM)

30 30 Cold Forging
(Set-Up Approval / Hourly Insp.)

40 40 Thread Rolling & Inspection


(Set-Up Approval / Hourly Insp.)

50
50 Final Inspection of Products
(Follow-Up STD & Dock Audit)

60 Packing & Storage of Finish


60 Good & Dispatch

PROCESSING QUALITY INSPECTION

MOVE OPERATION CUM INSP.

STORAGE /
DISPATCH
PROCESS ORDER CHANGE DESCRIPTION CHANGE
ISSUE NO. ISSUE DATE ISSUED BY APPROVED BY
LEVEL

You might also like