CVBC-SC-Weekly Report No. 43

This weekly report from a construction supervision consultant provides the status of submitted documents for review related to electrical works for beach club projects. Of the 35 documents submitted by the contractor Islam Kabbani Partners, 27 were accepted with comments, 2 were accepted without comments, 4 required revision and resubmission, and 2 had no status reported. The documents covered lighting designs, diagrams and layouts for pools, outdoor areas and emergency systems. Review times for all submissions were within 3 days.

Uploaded by

Eleazar Saclolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views10 pages

CVBC-SC-Weekly Report No. 43

This weekly report from a construction supervision consultant provides the status of submitted documents for review related to electrical works for beach club projects. Of the 35 documents submitted by the contractor Islam Kabbani Partners, 27 were accepted with comments, 2 were accepted without comments, 4 required revision and resubmission, and 2 had no status reported. The documents covered lighting designs, diagrams and layouts for pools, outdoor areas and emergency systems. Review times for all submissions were within 3 days.

Uploaded by

Eleazar Saclolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Supervision Consultant Weekly

Report
Construction Supervision Consultancy Services
for Beach Clubs

R03-C07B01
SC Weekly Report No. 43

From 09th December 2022 – 15th December 2022

ARCHIRODON PRIORITY
SAUD CONSULT WEEKLY PROJECT STATUS REPORT AS OF

15 DECEMBER 2022

Design and Build of Coastal Village Beach Clubs

NOTICE TO PROCEED (NTP) 01 January 2022


ORIGINAL END OF CONTRACT (EOC) 16 Months from NTP
CONTRACTORS R03-C07B01 ISLAM KABBANI PARTNERS

1. REVIEWED SUBMITTAL FOR BEACH CLUBS:

Review Time
S.# TRSDC DOCUMENT NO. DOCUMENT TITLE APPROVAL STATUS
(Days)
R03-C07B01-1KP-01-ZZ-DWG- 3
1 OUTDOOR LIGHTING ELEVATIONS Accepted with Comments
EL-10004-DWG
R03-C07B01-IKP-01-GF-SDW- Electrical service ground floor lighting layout 3
2 Accepted with Comments
EL-10101-DWG overall
R03-C07B01-IKP-01-GF-SDW- Electrical service ground floor lighting layout 3
3 None
EL-10102-DWG Part 01
R03-C07B01-IKP-01-GF-SDW- Electrical service ground floor lighting layout 3
4 Accepted with Comments
EL-10103-DWG Part 02
R03-C07B01-IKP-01-GF-SDW- Electrical service ground floor lighting layout 3
5 Accepted with Comments
EL-10104-DWG Part 03
ELECTRICAL SERVICES-GROUND FLOOR 3
R03-C07B01-IKP-01-GF-SDW-
6 EMERGENCY LIGHTING LAYOUT Accepted with Comments
EL-10201-DWG
OVERALL
R03-C07B01-IKP-01-GF-SDW- ELECTRICAL SERVICES-GROUND FLOOR 3
7 Accepted with Comments
EL-10202-DWG EMERGENCY LIGHTING LAYOUT PART 01
R03-C07B01-IKP-01-GF-SDW- ELECTRICAL SERVICES-GROUND FLOOR 3
8 Accepted with Comments
EL-10203-DWG EMERGENCY LIGHTING LAYOUT PART 02
R03-C07B01-IKP-01-GF-SDW- ELECTRICAL SERVICES-GROUND FLOOR 3
9 Accepted with Comments
EL-10204-DWG EMERGENCY LIGHTING LAYOUT PART 03
R03-C07B01-IKP-01-GF-SDW- 3
10 MAIN SWIMMING POOL , CABLE BOOK Accepted with Comments
EL-70003-DWG
R03-C07B01-IKP-01-GF-SDW- MAIN SWIMMING POOL PLAN VIEW - 3
11 Accepted with Comments
EL-70004-DWG ELECTRICAL LAYOUT
R03-C07B01-IKP-01-GF-SDW- MAIN SWIMMING POOL ENLARGED PLAN 3
12 Accepted with Comments
EL-70005-DWG - ELECTRICAL LAYOUT
R03-C07B01-IKP-01-GF-SDW- MAIN SWIMMING POOL , TECHNICAL 3
13 Accepted with Comments
EL-70006-DWG ROOM PLAN - CABLE TRAY
R03-C07B01-IKP-01-GF-SDW- MAIN SWIMMING POOL TECHNICAL 3
14 Accepted with Comments
EL-70007-DWG ROOM SECTIONS - CABLE TRAY
R03-C07B01-IKP-01-GF-SDW- MAIN SWIMMING POOL ROOF LAYOUT - 3
15 Revise and Resubmit
EL-70008-DWG HEAT PUMP - CABLE TRAY
R03-C07B01-IKP-01-GF-SDW- 3
16 KID'S POOL , CABLE BOOK Accepted with Comments
EL-70009-DWG
R03-C07B01-IKP-01-GF-SDW- 3
17 PLAN VIEW - ELECTRICAL LAYOUT Accepted with Comments
EL-70010-DWG
R03-C07B01-IKP-01-GF-SDW- 3
18 KID'S POOL , ENLARGED PLAN Accepted with Comments
EL-70011-DWG
R03-C07B01-IKP-01-GF-SDW- TECHNICAL ROOM PLAN & ROOF - 3
19 Accepted with Comments
EL-70012-DWG CABLE TRAYS
R03-C07B01-IKP-01-GF-SDW- TECHNICAL ROOM SECTIONS - CABLE 3
20 Accepted with Comments
EL-70013-DWG TRAYS
ELECTRICAL SHOP DRAWING GROUND 3
R03-C07B01-IKP-01-GF-SDW-
21 FLOOR DISABLED TOILET EMERGENCY Accepted with Comments
EL-70014-DWG
SYSTEM
R03-C07B01-IKP-01-GF-SDW- 3
22 KID'S POOL LOAD SCHEDULE Revise and Resubmit
EL-70015-DWG
R03-C07B01-IKP-01-GF-SDW- KID'S POOL ELECTRICAL CONTROL 3
23 Revise and Resubmit
EL-70016-DWG DIAGRAM
R03-C07B01-IKP-01-GF-SDW- MAIN SWIMMING POOL SINGLE LINE 3
24 Accepted with Comments
EL-70017-DWG DIAGRAM
R03-C07B01-IKP-01-GF-SDW- MAIN SWIMMING POOL SINGLE LINE 3
25 Accepted with Comments
EL-70018-DWG DIAGRAM
R03-C07B01-IKP-01-GF-SDW- MAIN SWIMMING POOL ELECTRICAL 3
26 Accepted with Comments
EL-70019-DWG CONTROL DIAGRAM
R03-C07B01-IKP-01-GF-SDW- 3
27 KID'S POOL SINGLE LINE DIAGRAM Accepted with Comments
EL-70020-DWG
R03-C07B01-IKP-01-XX-SDW- EMERGENCY LIGHTING SCHEMATIC 3
28 Accepted with Comments
EL-60005-DWG LAYOUT
R03-C07B01-IKP-01-ZZ-DWG- 3
29 Lighting setting out layout Accepted with Comments
EL-10001-DWG
R03-C07B01-IKP-01-ZZ-DWG- 3
30 OUTDOOR LIGHTING DETAILS Revise and Resubmit
EL-10003-DWG
OUTDOOR GROUND FLOOR LIGHTING 3
R03-C07B01-IKP-01-ZZ-DWG-
31 SETTING OUT LAYOUT (LIGHTING Accepted with Comments
EL-10005-DWG
FIXTURE DISTRIBUTIN ONLY)
R03-C07B01-IKP-01-ZZ-SDW- 3
32 Steel cat ladder with safety Cage Revise and Resubmit
AR-50006-DWG
33 R03-C07B01-IKP-CAL-EL-0012 Outdoor lighting calculation 3 Accepted with Comments
Structural Calculation report for Pool Plant 3
34 R03-C07B01-IKP-CAL-ST-0008 Accepted with Comments
Slab using ENKOFLEX System
Load calculation of the Structural Glazed 3
35 R03-C07B01-IKP-CAL-ST-0009 Accepted with Comments
Curtain wall
Load calculation of the Structural Glazed 3
36 R03-C07B01-IKP-CAL-ST-0009 Accepted with Comments
Curtain wall
Inspection and Test Plan (ITP) for Shoring 3
37 R03-C07B01-IKP-ITP-CI-0001 Accepted with Comments
and Dewatering
Material Submittal - Warning Tape for 3
38 R03-C07B01-IKP-MAT-EL-0050 Accepted with Comments
Electrical Systems
Material Submittal - Warning Tape for 3
39 R03-C07B01-IKP-MAT-ME-0069 Accepted with Comments
Mechanical Systems
40 R03-C07B01-IKP-MTS-AR-0006 Method Statement for Curtain wall 3 Accepted with Comments
41 R03-C07B01-IKP-MTS-ME-0009 Method Statement for Air Handling Unit 3 Accepted with Comments
42 R03-C07B01-IKP-PRE-EL-0003 Outdoor Lighting Presentation 3 Accepted with Comments
43 R03-C07B01-IKP-RPT-EL-0004 OUTDOOR LIGHTING SELECTION 3 Accepted with Comments
44
45
46
REVIEW REQUESTED BY TRSDC:

S#
1

REVIEWED MATERIAL:

S.# TRSDC DOCUMENT NO. DOCUMENT TITLE STATUS


1 R03-C07B01-IKP-MAT-EL-0050 Material Submittal - Warning Tape for Electrical Systems Accepted with Comments
2 R03-C07B01-IKP-MAT-ME-0069 Material Submittal - Warning Tape for Mechanical Systems Accepted with Comments
3
4
5
6
DAILY REPORT VERIFICATION SUBMITTED BY IKP:

DWR NO REF NO. REMARKS

See SC respond in Aconex.

WORK INSPECTION REQUEST (WIR):

S# WIR No. REQUEST TILE STATUS


Re: WIR No. 131 Arch - Final Inspection after completion of
1 IKP03C07-WIR-000751 cementitious waterproofing coating application as per the location in Revise and Resubmit
attached highlighted drawing.
Re: WIR No. 83 Mech - Installation of Plenum box with flexible
2 IKP03C07-WIR-000750 Accepted with Comments
connection at entrance lobby as per attached highlighted drawing
Re: WIR No. 81 Mech - Installation of Pendant and Upright
3 IKP03C07-WIR-000748 sprinklers Droppers at all area except Kitchen, studio and F&B area Accepted with Comments
as per attached highlighted drawing
Re: WIR No. 120 Elec - Low voltage wires pulling for lighting system
4 IKP03C07-WIR-000756 Accepted with Comments
at Recreation room, Staff room 03 and concessionaire.
Re: WIR No. 119 Elec - pulling BELDEN 4200FE Cable for BGM
5 IKP03C07-WIR-000755 system at F&B, Staff room 10, Male & Female bathrooms, Security Accepted with Comments
room and Disabled toilet.
Re: WIR No. 118 Elec - pulling CAT6A cable for DATA & Wi-Fi at
6 IKP03C07-WIR-000754 Accepted with Comments
recreation room, staff room 03, concessionaire and studio.
Re: WIR No. 133 Arch - Insulation board + Accessories on façade of
parapet above F&B as per attached highlighted drawing..(Excluded
7 IKP03C07-WIR-000753 Accepted with Comments
the MEP points which material not available now & once this finished
another IR will be submitted)
Re: WIR No. 132 Arch - Insulation board + Accessories as per
attached highlighted drawing including columns.(Excluded the MEP
8 IKP03C07-WIR-000752 Accepted with Comments
points which material not available now & once this finished another
IR will be submitted)
Re: WIR No. 77 Mech - VCD & FD installation for supply and
9 IKP03C07-WIR-000743 Accepted with Comments
ventilation HVAC Duct as per highlighted attached drawing
Re: WIR No. 82 Mech - smoke test for HVAC Supply air duct at
10 IKP03C07-WIR-000749 recreation room ,club office and male toilet as per attached Accepted with Comments
highlighted drawing
Re: WIR No. 80 Mech - VAV installation at (Corridor &
11 IKP03C07-WIR-000747 concessionaire & recreation and studio rooms )as per attached Accepted with Comments
highlighted drawing
Re: WIR No. 76 Mech - Firefighting piping installation as per
12 IKP03C07-WIR-000742 Accepted with Comments
highlighted area
Re: WIR No. 286 Civil - Installation of PVC Waterproofing
13 IKP03C07-WIR-000745 Accepted with Comments
Membrane From Vertical. As per attached highlighted area.
Re: WIR No. 285 Rev. 01 Civil - Surface preparation for
14 IKP03C07-WIR-000724 waterproofing vertical surface of raft foundation as per attached Accepted with Comments
highlighted area.
Re: WIR No. 130 Arch - surface preparation for Cementitious water
15 IKP03C07-WIR-000740 Accepted with Comments
proofing as per the location in attached highlighted drawing.
Re: WIR No. 284 Civil - survey after tiling of club office coordinate &
16 IKP03C07-WIR-000741 Accepted with Comments
level of finish floor as per attached highlighted area.
Re: WIR No. 131 Arch - Final Inspection after completion of
17 IKP03C07-WIR-000751 cementitious waterproofing coating application as per the location in Revise and Resubmit
attached highlighted drawing.
18

OBSERVATION:
S.# TRSDC DOCUMENT NO. DOCUMENT TITLE STATUS
Installed Aluminum Frame is not as per Approved Drawing
1 0SC-OBS-000057 No. R03-C07B01-IKP-01-ZZ-SDW-AR-60011 - NA
UNACCEPTABLE
2 0SC-OBS-000058 IKK is not submitting Daily Report since 30 November 2022 NA
3
Photos

EXCAVATION FOR POOL PLANT ROOM

BEACH CLUB FRONT ELEVATION


CURTAIN WALL ALUMINUM FRAMING

TOILET TILING & GROUTING


THERMAL INSULATION AT GYM AREA

POOLS SURFACE PREPARATION


AC DUCTING ON ROOF

RAFT VERTICAL WATER PROOFING


GLASS CURTAIN WALL-DELIVERY

ETICS WORK AT GYM


FLOOR TILES AT F&B