This delivery note documents the delivery of documents and reports from National Contracting Co. to Technicas Reunidas for the Haradh Hawiyah Field Gas Compression Project. Items delivered include site and POD copies of schemes for panels, reports for circuit breakers, transformers, gauges and SF6 testing, and components for low voltage cabinets and voltage transformers. The delivery was received by the Technicas Reunidas in-charge.

Uploaded by

Sara th
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views3 pages

DN HD1

This delivery note documents the delivery of documents and reports from National Contracting Co. to Technicas Reunidas for the Haradh Hawiyah Field Gas Compression Project. Items delivered include site and POD copies of schemes for panels, reports for circuit breakers, transformers, gauges and SF6 testing, and components for low voltage cabinets and voltage transformers. The delivery was received by the Technicas Reunidas in-charge.

Uploaded by

Sara th
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

NATIONAL cONTRACTING CO. LTD.

NCC PROJECT: HARADH HAwIYAH FIELD GAS COMPRESSION PROJECT


CONTRACT NO # 101302554

DELIVERY NOTE
Delivery Note No. NCCTR/S20/002 10/27/2022
Date

From NCC o TECHNICAS REUNIDAS

S.
Description of Materials Unit Quantity Remarks
No.

SITECOPY LCCSCHEME FOR ALL PANELS (520-110-CP NO'S 12


SITE COPY SCHEME FOR ALL
004,005,006,007,008,009,010,011.012,013,014,VT PANELS
JUNCTION BOX)

PODCOPY LcCsCHEME FORALL PANELS(520-110-CP NO'S 12


POD COPY SCHEMES FOR ALL
004,005,006,007,008,009,010,011, 2,013,014,VTI PANELS
JUNCTION BOX)

TRANSFORMER SITE COPY& POD COPY FOR ALL TRAFO NO'S


701,702,703,704

NCC Received by TR INCHARGE


Delivered by NCC REPRESENTATVE Carried by
SATHIYASEELAX Name SATHIYASEELAN ame SYED UMAIR
Name
Signature D-auu Signature
Signature
10/27/2022 Date 10/27/2022
10/27/2022 Date
Date
NATIONAL CONTRACTING CO. LTD
PROJECT: HARADH HAWIYAH FIELD GAS COMPRESSION PROJECT
NCC cONTRACT NO # 101302554

DELIVERY NOTE
Delivery Note No. NCCITR/520/001 Date 03-12-22

NCC TECHNICAS REUNIDAS


From o

SI. Description of Materials Unit Quantity Remarks


No.

REPORTS FOR BREAKER

REPORTS FOR ES/DS INCLUDING 10KV FOR ES

REPORTS FOR CT TEST &CT SEC INJECTION

REPORTS FOR GIS BUSBAR CRM

REPORTS FOR VT &VT SEC INJECTION NO'S REPORTS FOR LCC

REPORTSFOR GAUGES &SF6DEW POINT TESTING

ALLLCC AND VT JB COMPONENTS

ALL LCC PANEL POINT TO POINT &FUNCTION CHECKLIST V

Carried by NCC Received by :TRINCHARGE


Delivered by NCC REPRESENTATIVE
Name SAYED UMAIR
Name SATHIYASEELAR Name MARIMUTHU DHANDAPAN

Signature Signature
Signature
Date 03-12-22
03-12-22 Date 03-12-22
Date
NATIONAL cONTRACTING CO. LTD.
NCC PROJECT: HARADH HAWIYAH FIELD GAS cOMPRESSION PROJECT
CONTRACT NO # 101302554

DELIVERY NOTE
Delivery Note No. NCCITR/520/003 Date 03-12-22

From NCC TECHNICAS REUNIDAS


TO

SI Description of Materials Unit Quantity Remarks


No.

REPORTS FOR TRANSFORMER


ALL TRAFO REPORTS T701/T702/T703/T704 INCLUDING SA AND NER NO'S T701/T702/T703/T704

NCC
Delivered by Carried by: NCC Received by TR
INCHARGE
Name SATHIYASEELAN Name MARIMUTHU DHANDAPAN Name SAYEDUMAIR
Signature Signature |Signature

Date 03-12-22 03-12-22 03-12-22


Date Date

rans yome test Veports ard not all S e Y - P o s

her e e testr meed to PerevmPd oi


lehase Yeehuern DY Ton->, avd punchu).
Arurv to yid vistaa
Sure
spe
eed P m
o/
Suvm

Stenclirg al Fn's SA, and ab+sA

SAt Cota

You might also like