This document contains a list of 67 standards from TOTAL S.A. related to engineering, construction, operations, and equipment for oil and gas projects. The standards cover topics such as earthworks, foundations, corrosion protection, environmental impact assessment, cost estimating, production operations, equipment manufacturing specifications, rotating equipment, and more. Each standard is identified by a reference number, title, year published, and the organization.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
455 views32 pages
Total
This document contains a list of 67 standards from TOTAL S.A. related to engineering, construction, operations, and equipment for oil and gas projects. The standards cover topics such as earthworks, foundations, corrosion protection, environmental impact assessment, cost estimating, production operations, equipment manufacturing specifications, rotating equipment, and more. Each standard is identified by a reference number, title, year published, and the organization.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32
Standards Manager Web Standards List
TOTAL-Total S.A.
Id Number Title Year Organization Page
1 GS EP CIV 101 GENERAL EARTHWORKS 2019 TOTAL 2 GS EP CIV 500 SPECIAL FOUNDATIONS FOR ONSHORE STRUCTURES 2019 TOTAL 3 GS EP COR DESIGN OF CATHODIC PROTECTION OF OFFSHORE STRUCTURES 2019 TOTAL 100 4 GS EP COR SUPPLY OF SACRIFICIAL ANODES 2019 TOTAL 201 5 GS EP COR DESIGN OF CATHODIC PROTECTION OF OFFSHORE FLOATING STRUCTURES 2019 TOTAL 103 6 GS EP COR CHEMICAL TREATMENTS FOR CORROSION CONTROL: ENGINEERING AND CONSTRUCTION 2019 TOTAL 163 REQUIREMENTS 7 GS EP COR Corrosion Inhibitor treatments: Design and operational philosophy 2019 TOTAL 164 8 GS EP COR EXTERNAL PROTECTION OF PIPING AND EQUIPMENT BY THERMAL SPRAY COATING 2019 TOTAL 355 9 GS EP COR EXTERNAL PROTECTION OF OFFSHORE AND COASTAL STRUCTURES AND EQUIPMENT BY PAINTING 2019 TOTAL 350 10 GS EP ENV Environmental impact assessment of E&P activities 2019 TOTAL 120 11 GS EP EST 001 Documents necessary for Cost Estimating at the end of a FEED or a Basic Engineering 2019 TOTAL 12 GS EP EXP 153 REQUIREMENTS FOR PRODUCTION OPERATING MANUALS 2019 TOTAL 13 GS EP EXP 201 OPERATIONS PREPARATION DURING PROJECT - MAINTAINABILITY & INSPECTABILITY CRITERIA 2019 TOTAL 14 GS EP EXP 757 Design of an Operator Training Simulator 2019 TOTAL 15 GS EP FP 330 MANUFACTURING SPECIFICATION FOR NEW SEAMLESS OCTG CARBON & LOW ALLOY MATERIAL 2019 TOTAL 16 GS EP FP 331 SEAMLESS CARBON AND LOW ALLOY OCTG PIPES PURCHASED FROM STOCK 2019 TOTAL 17 GS EP FP 332 SPECIFICATION FOR SURFACE WELLHEAD & CHRISTMAS TREE MANUFACTURING 2019 TOTAL 18 GS EP FP 333 SPECIFICATION FOR DOWNHOLE COMPLETION EQUIPMENT MANUFACTURING 2019 TOTAL 19 GS EP FP 334 SPECIFICATION FOR WELL SCREENS MANUFACTURING 2019 TOTAL 20 GS EP FP 335 Specification for new seamless OCTG in corrosion-resistant material Manufacturing 2019 TOTAL 21 GS EP EXP 311 PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS 2019 TOTAL 22 GS EP EXP 403 PRODUCTION AVAILABILITY STUDIES OF OIL AND GAS FACILITIES 2019 TOTAL 23 GS EP FP 337 MANUFACTURE OF OCTG CROSSOVERS 2019 TOTAL 24 GS EP FP 410 SUBSEA WELLHEAD AND GUIDANCE SYSTEM 2019 TOTAL 25 GS EP FP 411 SUBSEA HORIZONTAL CHRISTMAS TREE SYSTEM 2019 TOTAL 26 GS EP FP 441 Subsea WCE specifications & tests 2019 TOTAL 27 GS EP GEO ONSHORE GEOTECHNICAL SOIL SURVEY 2019 TOTAL 102 28 GS EP GEO GIS REQUIREMENTS FOR ENGINEERING SITE SURVEYS AND STUDIES 2019 TOTAL 401 29 GS EP GEO Seismic Hazard Assessment for Onshore Structures 2019 TOTAL 602 30 GS EP GPY Marine gravity and magnetic on 2/3D seismic acquisitions 2019 TOTAL 301 31 GS EP ICS 001 2D CAD Layouts 2019 TOTAL 32 GS EP ICS 003 Numbering of wells, facilities, equipment and documents at project definition phase 2019 TOTAL 33 GS EP ICS 004 3D CAD Models 2019 TOTAL 34 GS EP ICS 005 3D CAD Model Administration & Catalogues 2019 TOTAL 35 GS EP INS 158 I/O Assignment Principles 2019 TOTAL 36 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION TURBOGENERATOR 2019 TOTAL 010 37 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION DIESEL ENGINE DRIVEN EMERGENCY GENERATOR 2019 TOTAL 011 38 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION DIESEL ENGINE DRIVEN ESSENTIAL GENERATOR 2019 TOTAL 012 39 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION GAS ENGINE DRIVEN GENERATOR 2019 TOTAL 013 40 GS EP MEC Rotating Machine Package Specification - Diesel Engine Driven Emergency Generator for Onshore applications 2019 TOTAL 014 41 GS EP MEC Rotating Machine Package Specification - Gas Engine Driven Emergency Generator for Onshore applications 2019 TOTAL 015 42 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP 2019 TOTAL 020 43 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION MOTOPUMP 2019 TOTAL 021 44 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION FIRE FIGHTING DIESEL DRIVEN VERTICAL PUMP 2019 TOTAL 022 45 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION FIRE FIGHTING DIESEL ELECTRIC DRIVEN PUMP 2019 TOTAL 024 46 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION FIRE FIGHTING ELECTRIC DRIVEN HORIZONTAL PUMP 2019 TOTAL 025 47 GS EP MEC Rotating Machine Package Specification - Motopump without separate lube oil system 2019 TOTAL 026 48 GS EP MEC Rotating Machine Package Specification _ Hydraulic Driven Submerged Pump with Hydraulic Power Unit (HPU) for 2019 TOTAL 027 Offshore applications 49 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION POSITIVE DISPLACEMENT MOTOPUMP ACCORDING TO 2019 TOTAL 028 API STANDARD 674 50 GS EP MEC Rotating Machine Package Specification - Fire Fighting Diesel Driven Horizontal Pump for Onshore applications 2019 TOTAL 029 51 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR 2019 TOTAL 030 52 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR 2019 TOTAL 031 53 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION GAS ENGINE OR ELECTRICAL MOTOR DRIVEN 2019 TOTAL 032 RECIPROCATING COMPRESSOR 54 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION AIR COMPRESSOR AND AIR DRYER 2019 TOTAL 033 55 GS EP MEC Rotating Machine Package Specification _ Process Gas Screw Compressor 2019 TOTAL 034 56 GS EP MEC Rotating Machine Package Specification _ Expander Compressor 2019 TOTAL 035 57 GS EP MEC Rotating Machine Package Specification _ Integrated Motocompressor 2019 TOTAL 036 58 GS EP MEC Rotating Machine Package Specification _ Submerged Sea Water Lift Electric Pump Package for Offshore applications 2019 TOTAL 040 59 GS EP MEC GAS TURBINES FOR THE PETROLEUM, CHEMICAL AND GAS INDUSTRY SERVICES ACCORDING TO API 2019 TOTAL 212 STANDARD 616 60 GS EP LSO 201 TOWING FLOATING UNIT 2019 TOTAL 61 GS EP MEC Petroleum, Petrochemical, and Natural Gas Industries _ Steam Turbines _ Special-purpose Applications according to API 2019 TOTAL 215 Standard 612 62 GS EP MEC SPECIAL PURPOSE GEAR UNITS FOR PETROLEUM, CHEMICAL AND GAS SERVICE INDUSTRIES 2019 TOTAL 242 ACCORDING TO API STANDARD 613 63 GS EP MEC SUPPLY OF AXIAL AND CENTRIFUGAL COMPRESSORS AND EXPANDER-COMPRESSORS FOR 2019 TOTAL 251 PETROLEUM, CHEMICAL AND GAS INDUSTRY SERVICES ACCORDING TO API STANDARD 617 64 GS EP MEC ANTI SURGE SYSTEM FOR CENTRIFUGAL AND AXIAL COMPRESSORS 2019 TOTAL 253 65 GS EP MEC SUPPLY OF MECHANICAL SEAL ACCORDING TO API STANDARD 682 2019 TOTAL 270 66 GS EP MEC CENTRIFUGAL PUMPS FOR THE PETROLEUM, CHEMICAL AND GAS INDUSTRY SERVICES ACCORDING TO 2019 TOTAL 271 API STANDARD 610 67 GS EP PJC 701 DOCUMENT IDENTIFICATION & NUMBERING AT PROJECT EXECUTION AND FIELD OPERATIONS PHASES 2019 TOTAL 68 GS EP PJC 702 REQUIREMENTS FOR ELECTRONIC DOCUMENTS AT PROJECT EXECUTION AND FIELD OPERATIONS 2019 TOTAL PHASES 69 GS EP PLR 001 DOCUMENTATION REQUIREMENTS 2019 TOTAL 70 GS EP PLR 100 SUBMARINE PIPELINE SYSTEMS 2019 TOTAL 71 GS EP PLR 109 DESIGN, FABRICATION AND TESTING OF SUBMARINE UNBOUNDED FLEXIBLE PIPES AND RISERS 2019 TOTAL 72 GS EP PLR 152 Hybrid Riser Systems 2019 TOTAL 73 GS EP PLR 206 Specification for coiled line pipe manufacturing to API SPEC 5LCP 2019 TOTAL 74 GS EP PLR 207 CRA Clad or Lined Steel Pipe manufacturing for pipeline applications 2019 TOTAL 75 GS EP PLR 208 Duplex and Super-Duplex Stainless Steel Pipe Manufacturing for Pipeline Applications 2019 TOTAL 76 GS EP PLR 401 INSTALLATION OF SUBMARINE PIPELINES 2019 TOTAL 77 GS EP PLR 410 CONCRETE COATING FOR SUBMARINE PIPELINES 2019 TOTAL 78 GS EP PLR 426 Site welding of carbon steel and CRA pipelines (sweet and sour service, onshore and offshore) according to DNVGL-ST- 2019 TOTAL F101 79 GS EP PVV Welding of piping and pressure containing equipment 2019 TOTAL 610 80 GS EP STR 001 WEIGHT MONITORING AND WEIGHING OFFSHORE UNITS 2019 TOTAL 81 GS EP STR 110 Structure Integrity Management System Requirements 2019 TOTAL 82 GS EP STR 601 FLOATING UNIT INTEGRITY MANAGEMENT SYSTEM REQUIREMENTS 2019 TOTAL 83 GS EP TEL 121 POINT TO MULTIPOINT RADIO NETWORK 2019 TOTAL 84 GS EP TEL 181 Access Control System 2019 TOTAL 85 GS EP TEL 182 POB, E-Mustering and E-Tracking 2019 TOTAL 86 GS EP TEL 140 PUBLIC ADDRESS AND GENERAL ALARM (PAGA) 2018 TOTAL 87 GS EP STR 655 REQUIREMENTS FOR CONVERSION OF A TANKER INTO A F(P)SO 2018 TOTAL 88 GS EP STR 710 Onshore Blast Resistant Buildings 2018 TOTAL 89 GS EP TEL 002 TELECOM SHUTDOWN PHILOSOPHY 2018 TOTAL 90 GS GR HSE Vehicle Specification and Equipment 2018 TOTAL 404 91 GS EP STR 631 CALM BUOY TERMINALS 2018 TOTAL 92 GS EP STR 632 Shallow Water CALM buoy 2018 TOTAL 93 GS EP STR 401 LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES 2018 TOTAL 94 GS EP STR 301 FABRICATION OF OFFSHORE STEEL STRUCTURES 2018 TOTAL 95 GS EP STR 500 Onshore Structure _ General 2018 TOTAL 96 GS EP STR 510 Onshore Steel Structure _ Design 2018 TOTAL 97 GS EP STR 520 Onshore Steel Structure _ Material and Fabrication 2018 TOTAL 98 GS EP STR 201 MATERIALS FOR OFFSHORE STEEL STRUCTURES 2018 TOTAL 99 GS EP STR 203 FORGED MATERIALS FOR STEEL STRUCTURES 2018 TOTAL 100 GS EP PVV SKID MOUNTED UNITS FOR CHEMICAL PRODUCTS INJECTION SYSTEMS 2018 TOTAL 814 101 GS EP PVV Waste Heat Recovery Unit 2018 TOTAL 511 102 GS EP SPS 001 DESIGN PHILOSOPHY AND REQUIREMENTS FOR SUBSEA STATIONS 2018 TOTAL 103 GS EP SPS 018 SUBSEA MULTIPHASE FLOW METER 2018 TOTAL 104 GS EP SPS 048 Subsea Bolted Connections 2018 TOTAL 105 GS EP PLR 403 INSTALLATION OF ONSHORE PIPELINES 2018 TOTAL 106 GS EP PLR 310 PIPELINE COMPOSITE REPAIR SYSTEMS 2018 TOTAL 107 GS EP PLR 205 Carbon steel, pipe manufacturing for pipeline applications according to API SPEC 5L and DNVGL-ST-F101 2018 TOTAL 108 GS EP PLR 104 ONSHORE PIPELINE SYSTEMS 2018 TOTAL 109 GS EP PLR 406 STORAGE AND TRANSPORTATION OF LINE PIPES 2018 TOTAL 110 GS EP PLR 501 HYDROSTATIC TESTING OF PIPELINES 2018 TOTAL 111 GS EP PVV PIPING MATERIAL CLASSES 2018 TOTAL 112 112 GS EP PVV VALVES IN CRYOGENIC SERVICE 2018 TOTAL 150 113 GS EP PVV Valves for high temperature service 2018 TOTAL 151 114 GS EP PVV Ball Valves according to API SPEC 6D or API SPEC 6A 2018 TOTAL 154 115 GS EP PVV Gate, Globe and Check Valves 2018 TOTAL 155 116 GS EP PVV Axial Valves & Axial Flow Check Valves according to API SPEC 6D or API SPEC 6A 2018 TOTAL 156 117 GS EP PVV Butterfly Valves 2018 TOTAL 157 118 GS EP PVV Material and special process for valves (MDS & manufacturing processes) 2018 TOTAL 158 119 GS EP LSO 410 MANNED UNDERWATER OPERATIONS 2018 TOTAL 120 GS EP INS 140 Instrumentation for monitoring packages 2018 TOTAL 121 GS EP LSO 140 TECHNICAL SPECIFICATIONS FOR CHARTERED CORPORATE AEROPLANES 2018 TOTAL 122 GS EP LSO 141 TECHNICAL SPECIFICATION FOR HELICOPTER 2018 TOTAL 123 GS EP INS 120 CONTROL AND CHOKE VALVES 2018 TOTAL 124 GS EP INS 121 Choke valves 2018 TOTAL 125 GS EP INS 101 INSTRUMENTATION ENGINEERING, SUPPLY AND CONSTRUCTION GENERAL REQUIREMENTS 2018 TOTAL 126 GS EP INF 001 Geographic Information Systems technical architecture 2018 TOTAL 127 GS EP GPA Offshore seismic surveys _ Requirements for vessels and marine operations 2018 TOTAL 001 128 GS EP FP 414 Completion / Work Over (C/WO) System for Subsea Vertical Christmas Tree 2018 TOTAL 129 GS EP GEO NEAR-SURFACE 2D HIGH-RESOLUTION SEISMIC REFLECTION GEOPHYSICAL SURVEY ONSHORE 2018 TOTAL 217 130 GS EP GEO OFFSHORE GEOPHYSICAL SURVEYS 2018 TOTAL 201 131 GS EP EXP 407 IDENTIFICATION OF SAFETY CRITICAL ELEMENTS 2018 TOTAL 132 GS EP EXP 135 FULL CONTROL OF WELLS (FCW) SPECIFICATION 2018 TOTAL 133 GS EP EXP 103 PRE-COMMISSIONING AND COMMISSIONING ENGINEERING 2018 TOTAL 134 GS EP COR INTERNAL CORROSION AND EROSION-CORROSION MONITORING: DESIGN AND INSTALLATION 2018 TOTAL 161 135 GS EP COR CORROSION CONTROL ON PRODUCTION FACILITIES: FIELD OPERATIONS 2018 TOTAL 002 136 GS EP CIV 300 REINFORCED AND PRESTRESSED CONCRETE 2018 TOTAL 137 GS EP CIV 401 MINIMUM REQUIREMENTS FOR BUILDING DESIGN AND CONSTRUCTION 2018 TOTAL 138 GS EP CIV 407 Onshore Permanent Accommodation Base and associated facilities 2018 TOTAL 139 GS EP CIV 500 SPECIAL FOUNDATIONS FOR ONSHORE STRUCTURES 2018 TOTAL 140 GS EP COR DESIGN OF INTERNAL CATHODIC PROTECTION OF EQUIPMENT AND STORAGE TANKS 2017 TOTAL 101 141 GS EP COR DESIGN OF CATHODIC PROTECTION OF SEALINE BY SACRIFICIAL ANODES 2017 TOTAL 102 142 GS EP COR CORROSION CONTROL ON PRODUCTION FACILITIES: DESIGN AND CONSTRUCTION 2017 TOTAL 001 143 GS EP COR Material selection for oil and gas production systems 2017 TOTAL 005 144 GS EP COR DESIGN AND APPLICATION OF PASSIVE FIRE PROTECTION COATINGS 2017 TOTAL 353 145 GS EP COR EXTERNAL PROTECTION OF ONSHORE STRUCTURES AND EQUIPMENT BY PAINTING 2017 TOTAL 354 146 GS EP COR CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND TOPSIDE APPLICATIONS 2017 TOTAL 356 147 GS EP COR INSTALLATION OF ANODES ON SUBMERGED PIPELINES 2017 TOTAL 401 148 GS EP COR DESIGN OF JACKET CATHODIC PROTECTION RETROFIT SYSTEMS 2017 TOTAL 402 149 GS EP EXP 105 PRE-COMMISSIONING EXECUTION 2017 TOTAL 150 GS EP EXP 107 COMMISSIONING EXECUTION 2017 TOTAL 151 GS EP EXP 101 PRE-COMMISSIONING AND COMMISSIONING SPECIFICATION 2017 TOTAL 152 GS EP ENV Environmental Baseline and Monitoring Studies: Offshore and Nearshore Sites 2017 TOTAL 112 153 GS EP EXP 207 INSTALLATION DESCRIPTION STRUCTURE 2017 TOTAL 154 GS EP EXP 213 MINIMUM MAINTENANCE REQUIREMENTS 2017 TOTAL 155 GS EP COR CONTROL BY ELECTRICAL MEASUREMENTS OF CATHODIC PROTECTION OF SUBMERGED PIPELINES 2017 TOTAL 502 156 GS EP COR Thermal insulation (hot and dual services) 2017 TOTAL 771 157 GS EP COR Thermal insulation (cold service) 2017 TOTAL 772 158 GS EP DEV Asset Objects Tagging 2017 TOTAL 001 159 GS EP DEV Reference Data Library 2017 TOTAL 002 160 GS EP ECP 103 PROCESS SIZING CRITERIA 2017 TOTAL 161 GS EP ECP 105 PROCESS DOCUMENTS TO BE PREPARED DURING ENGINEERING PHASE 2017 TOTAL 162 GS EP EXP 405 STANDARD RELIABILITY DATA REPORT 2017 TOTAL 163 GS EP FP 336 Conductor, riser, casing and tubing connection qualification requirements 2017 TOTAL 164 GS EP GIN 007 Loading geophysical data into a geoscience study 2017 TOTAL 165 GS EP GPY Land Magnetotelluric acquisition 2017 TOTAL 304 166 GS EP GSR Preparing and managing Geoscience and Reservoir field activities 2017 TOTAL 013 167 GS EP GIN 301 GEOGRAPHICAL INFORMATION SHARED DATA SPECIFICATIONS 2017 TOTAL 168 GS EP GEO GIS Requirements for Infrastructure Data Management 2017 TOTAL 404 169 GS EP GEO METEOROLOGICAL AND OCEANOGRAPHIC SURVEY 2017 TOTAL 501 170 GS EP GEO MONITORING OF METOCEAN CONDITIONS FOR OFFSHORE UNITS 2017 TOTAL 505 171 GS EP GEO METEOROLOGICAL AND OCEANOGRAPHIC FORECASTING 2017 TOTAL 506 172 GS EP GEO Marine Glider Operation 2017 TOTAL 508 173 GS EP INS 910 Typical Instrument Systems Interfaces Schematics 2017 TOTAL 174 GS EP LSO 306 SELECTION AND OPERATION OF DYNAMICALLY POSITIONED VESSELS 2017 TOTAL 175 GS EP MEC SPECIAL PURPOSE COUPLINGS FOR PETROLEUM, CHEMICAL, AND GAS INDUSTRY SERVICES 2017 TOTAL 240 ACCORDING TO API STANDARD 671 176 GS EP MEC MULTI-PHASE PUMPS 2017 TOTAL 275 177 GS EP PVV CLEANING OF PIPING AND VESSELS 2017 TOTAL 175 178 GS EP PVV PIPING STRESS ANALYSIS 2017 TOTAL 107 179 GS EP MEC Form-wound Squirrel-Cage Induction Motors _ 500 Horsepower and Larger according to API Standard 541 2017 TOTAL 541 180 GS EP SPS 047 AUV Spread Minimum Requirements 2017 TOTAL 181 GS EP SPS 029 METALLIC MATERIALS FOR SUBSEA PRODUCTION FACILITIES 2017 TOTAL 182 GS EP SAF 351 ESCAPE, EVACUATION AND RESCUE FROM FIXED INSTALLATIONS 2017 TOTAL 183 GS EP PVV Fire Tube Boilers 2017 TOTAL 521 184 GS EP PVV Water Tube Boilers 2017 TOTAL 522 185 GS EP PVV Flare Tips 2017 TOTAL 551 186 GS EP PVV PLATE AND FRAME HEAT EXCHANGER 2017 TOTAL 412 187 GS EP PVV SPRING HANGERS AND SUPPORTS 2017 TOTAL 149 188 GS EP SAF 260 DESIGN OF HIGH INTEGRITY PROTECTION SYSTEMS (HIPS) 2017 TOTAL 189 GS EP STR 004 RISER / UMBILICAL PULLING RIG, PULLING AND MOORING WINCHES 2017 TOTAL 190 GS EP TEL 161 NETWORK FOR INFORMATION, COMMUNICATION AND ENTERTAINMENT (NICE) 2017 TOTAL 191 GS EP TEL 170 DESIGN AND INSTALLATION OF COMMUNICATIONS NETWORK 2017 TOTAL 192 GS EP TEL 111 DESIGN AND INSTALLATION OF AN IP TELEPHONY SYSTEM 2017 TOTAL 193 GS EP TEL 141 Perimeter Intrusion Detection System 2017 TOTAL 194 GS EP STR 433 Structural design of skirted foundations and suction anchors 2016 TOTAL 195 GS EP TEC 260 HIPS Design, Implementation and Life cycle 2016 TOTAL 196 GS EP TEC 007 Obsolescence and Lifetime Cycle Management 2016 TOTAL 197 GS EP TEL 160 CLOSED-CIRCUIT TELEVISION (CCTV) 2016 TOTAL 198 GS EP TEL 410 INSTALLATION RULES 2016 TOTAL 199 GS EP TEL 413 DESIGN AND INSTALLATION OF TELECOM MAST TELECOM REQUIREMENTS 2016 TOTAL 200 GS EP TEL 414 TELECOMMUNICATION CABLES 2016 TOTAL 201 GS EP STR 005 LIFTING APPLIANCES OTHER THAN CRANES AND WINCHES 2016 TOTAL 202 GS EP STR 006 REQUIREMENTS FOR THE DESIGN, FABRICATION AND TESTING OF OVERHEAD TRAVELLING CRANES 2016 TOTAL 203 GS EP STR 102 DESIGN OF OFFSHORE TOPSIDE STRUCTURE 2016 TOTAL 204 GS EP STR 108 Requirements for evaluation of finite elements analysis and results 2016 TOTAL 205 GS EP STR 204 Subsea structures: Carbon Steel Material and Fabrication 2016 TOTAL 206 GS EP STR 202 CAST MATERIALS FOR STEEL STRUCTURES 2016 TOTAL 207 GS EP STR 106 ASSESSMENT OF EXISTING FIXED OFFSHORE STEEL PLATFORMS 2016 TOTAL 208 GS EP STR 651 GENERAL PRINCIPLES FOR A F(P)SO DESIGN 2016 TOTAL 209 GS EP STR 652 F(P)SO - STEEL HULL DESIGN REQUIREMENTS 2016 TOTAL 210 GS EP STR 653 F(P)SO - HULL FABRICATION REQUIREMENTS 2016 TOTAL 211 GS EP STR 602 F(P)SO - REQUIREMENTS FOR THE CERTIFICATION OF COMPLIANCE WITH INTERNATIONAL MARITIME 2016 TOTAL CONVENTIONS 212 GS EP SAF 261 EMERGENCY SHUTDOWN AND EMERGENCY DE-PRESSURISATION (ESD & EDP) 2016 TOTAL 213 GS EP SAF 312 FIRE AND GAS DETECTION SYSTEMS 2016 TOTAL 214 GS EP PVV PROCEDURE FOR SHOP HYDRAULIC TESTS OF SHELL AND TUBE HEAT EXCHANGERS 2016 TOTAL 441 215 GS EP SAF 021 LAYOUT 2016 TOTAL 216 GS EP SAF 050 Fire and Gas System and Fire Extinguishing System for Packaged Rotating Machinery Enclosures 2016 TOTAL 217 GS EP SAF 216 AREA CLASSIFICATION 2016 TOTAL 218 GS EP PVV DESIGN AND CONSTRUCTION OF LARGE LPG STORAGE TANKS 2016 TOTAL 315 219 GS EP PVV Piping and Pressure vessel equipment specification for Rotating Machines Packages 2016 TOTAL 821 220 GS EP RES 101 Core and plugs preparation and preservation for Dean Stark measurements 2016 TOTAL 221 GS EP PVV Phased Array Inspection (PAUT) 2016 TOTAL 631 222 GS EP PVV Composite repairs for metallic pipeworks and pressure vessels 2016 TOTAL 711 223 GS EP SAF 228 LIQUID DRAINAGE 2016 TOTAL 224 GS EP SAF 253 IMPACTED AREA, RESTRICTED AREA AND FIRE ZONES 2016 TOTAL 225 GS EP SPS 002 DESIGN OF SUBSEA STRUCTURES 2016 TOTAL 226 GS EP SPS 031 Chemical Injection Throttling Valves 2016 TOTAL 227 GS EP SPS 019 SUBSEA PRODUCTION CONTROL SYSTEM 2016 TOTAL 228 GS EP SPS 038 Subsea Structures design & fabrication 2016 TOTAL 229 GS EP SPS 034 Well Jumper Design 2016 TOTAL 230 GS EP PJC 703 CONTRACTOR FINAL DOCUMENTATION REQUIREMENTS 2016 TOTAL 231 GS EP MEC ROTATING MACHINES PACKAGES INSTALLATION REQUIREMENTS 2016 TOTAL 292 232 GS EP MEC NOISE AND VIBRATION OF ROTATING MACHINE PACKAGES 2016 TOTAL 300 233 GS EP PLR 151 DESIGN OF STEEL CATENARY RISER SYSTEM 2016 TOTAL 234 GS EP PLR 160 DESIGN, FABRICATION AND TESTING OF SUBSEA UMBILICALS 2016 TOTAL 235 GS EP PLR 405 DESIGN AND INSTALLATION OF HOT TAPPING ON SUBSEA PIPELINES 2016 TOTAL 236 GS EP PLR 241 FABRICATION OF SUPER DUPLEX STAINLESS STEEL SMALL BORE TUBES FOR UMBILICAL 2016 TOTAL 237 GS EP PLR 244 Fabrication of Duplex & Super-Duplex Stainless Steel Seamless Hot Bend for Pipeline 2016 TOTAL 238 GS EP PLR 245 Fabrication of Super Duplex Stainless steel Small bore seam welded tubes for umbilical 2016 TOTAL 239 GS EP PLR 423 Welding of Super-Duplex Stainless Steel Small Bore Tube for Umbilical 2016 TOTAL 240 GS EP POS 002 SUBSEA POSITIONING WORKS 2016 TOTAL 241 GS EP POS 003 ONSHORE LAND SURVEYING AND POSITIONING WORKS 2016 TOTAL 242 GS EP PVV GASKETS FOR PIPING AND VESSELS 2016 TOTAL 147 243 GS EP PVV GLASS - REINFORCED PLASTIC EPOXY RESIN PIPING MATERIALS (TUBES AND ACCESSORIES) 2016 TOTAL 148 244 GS EP PVV DESIGN AND ERECTION OF GLASS REINFORCED PLASTIC (GRP) WITH EPOXY RESINS PIPING SYSTEM 2016 TOTAL 178 245 GS EP PVV DESIGN AND FABRICATION OF PRESSURE VESSELS ACCORDING TO ASME VIII 2016 TOTAL 211 246 GS EP PVV DESIGN AND FABRICATION OF PRESSURE VESSELS ACCORDING TO BSI PD 5500 2016 TOTAL 212 247 GS EP PVV STEEL PIPING FABRICATION 2016 TOTAL 171 248 GS EP LSO 202 PERSONNEL TRANSFER BETWEEN WATERCRAFTS AND BETWEEN WATERCRAFTS AND OFFSHORE 2016 TOTAL STRUCTURES 249 GS EP LSO 115 HELIDECK SPECIFICATIONS 2016 TOTAL 250 GS EP LSO 119 Aviation Operations Specifications 2016 TOTAL 251 GS EP INS 100 Overall Instrumentation Philosophy 2016 TOTAL 252 GS EP INS 138 Electric Actuators for On/Off Valves 2016 TOTAL 253 GS EP INS 135 CYBER SECURITY REQUIREMENTS FOR DESIGN AND SUPPLY OF ICSS AND PACKAGE SYSTEMS 2016 TOTAL 254 GS EP INS 125 SAFETY RELIEF VALVES AND RUPTURE DISCS 2016 TOTAL 255 GS EP INS 104 DESIGN OF GENERATION AND DISTRIBUTION OF INSTRUMENT AIR OR GAS 2016 TOTAL 256 GS EP GEO Tsunami hazard assessment on coastal facilities 2016 TOTAL 507 257 GS EP GEO COMPREHENSIVE EVALUATION OF METOCEAN CONDITIONS 2016 TOTAL 504 258 GS EP GIN 303 CARTOGRAPHY AND GEO-REFERENCED DATA MANAGEMENT FOR GEOSCIENCES 2016 TOTAL 259 GS EP GIN 304 Geosciences GIS Data Standard - Requirements for GIS studies 2016 TOTAL 260 GS EP GIN 305 Indexing of corporate technical documents 2016 TOTAL 261 GS EP GEO GEOTECHNICAL DATA AND FOUNDATION DESIGN CONSIDERATIONS FOR SUBSEA PRODUCTION 2016 TOTAL 701 SYSTEMS AND PIPELINES 262 GS EP GEO REQUIREMENTS FOR DESIGN AND INSTALLATION OF SKIRTED FOUNDATIONS AND SUCTION ANCHORS 2016 TOTAL 702 263 GS EP GEO REQUIREMENTS FOR DESIGN AND INSTALLATION OF DRAG ANCHORS AND ANCHOR PILES FOR 2016 TOTAL 703 OFFSHORE FLOATING STRUCTURES 264 GS EP GSR Sampling and inorganic analysis of waters from aquifers and hydrocarbon reservoirs 2016 TOTAL 101 265 GS EP GIN 103 TOTAL'S STANDARD FOR GEOSCIENCES PDF DOCUMENT PROCESSING 2016 TOTAL 266 GS EP GIN 308 Indexing and storing physical well and fields samples 2016 TOTAL 267 GS EP GIN 309 Indexing and preservation of well logs and well seismics 2016 TOTAL 268 GS EP ECP 101 GLYCOL PACKAGE UNIT 2016 TOTAL 269 GS EP ENV Preliminary assessment of environmental and health risks related to chronic emissions on operated sites 2016 TOTAL 055 270 GS EP COR CONTROL OF CATHODIC PROTECTION OF SUBMERGED FIXED STRUCTURES 2016 TOTAL 501 271 GS EP COR EXTERNAL PROTECTION OF STRUCTURES AND EQUIPMENT BY PAINTING MAINTENANCE WORKS 2016 TOTAL 450 272 GS EP COR MATERIALS FOR SOUR SERVICE (UPSTREAM APPLICATIONS) SPECIFICATION FOR DESIGN 2016 TOTAL 170 273 GS EP COR Composite/Syntactic foam used for buoyancy modules for permanent subsea applications 2016 TOTAL 232 274 GS EP COR Risers coatings 2016 TOTAL 233 275 GS EP COR FRICTION-REDUCTION INTERNAL COATINGS FOR PIPELINES TRANSPORTING NON-CORROSIVE GASES 2016 TOTAL 250 276 GS EP COR INTERNAL COATING OF WATER INJECTION PIPELINES 2016 TOTAL 251 277 GS EP COR LIMITING FLOW VELOCITIES CALCULATIONS FOR EROSION CORROSION PURPOSE 2016 TOTAL 004 278 GS EP CIV 501 Execution of Dredging and Rock Dumping Works 2016 TOTAL 279 GS EP COR MONITORING SYSTEMS FOR CATHODIC PROTECTION OF OFFSHORE STRUCTURES 2016 TOTAL 202 280 GS EP COR MONOLITHIC INSULATING JOINTS 2016 TOTAL 210 281 GS EP CIV 201 DESIGN AND CONSTRUCTION OF ROADS AND STABILIZED AREAS 2016 TOTAL 282 GS EP CIV 203 DESIGN OF HARBOUR 2016 TOTAL 283 GS EP CIV 102 DREDGING AND FILLING UP 2016 TOTAL 284 GS EP CIV 103 FENCES 2015 TOTAL 285 GS EP CIV 204 DESIGN OF AIRPORTS AND HELICOPTERS AREAS 2015 TOTAL 286 GS EP CIV 202 DRAINAGE AND UNDERGROUND NETWORKS 2015 TOTAL 287 GS EP CIV 402 DESIGN AND CONSTRUCTION OF OIL FIELD LABORATORY ON PRODUCTION INSTALLATIONS 2015 TOTAL 288 GS EP COR THREE LAYER POLYETHYLENE EXTERNAL COATING FOR PIPELINES 2015 TOTAL 220 289 GS EP COR THREE LAYER POLYPROPYLENE EXTERNAL COATING FOR PIPELINES 2015 TOTAL 221 290 GS EP COR FUSION BONDED EPOXY (FBE) EXTERNAL COATING FOR PIPELINES 2015 TOTAL 222 291 GS EP COR POLYETHYLENE AND POLYPROPYLENE COATINGS FOR BENDS AND FITTINGS 2015 TOTAL 225 292 GS EP COR MATERIALS FOR THERMAL INSULATION OF PIPELINE, PIPING AND SUBSEA COMPONENTS 2015 TOTAL 226 293 GS EP COR Multi-layer Glass Syntactic PP coating for wet thermal insulation of subsea pipes 2015 TOTAL 227 294 GS EP CIV 650 Floating Concrete Structure 2015 TOTAL 295 GS EP COR CHEMICAL TREATMENTS FOR CORROSION CONTROL: ENGINEERING AND CONSTRUCTION 2015 TOTAL 163 REQUIREMENTS 296 GS EP COR CORROSION AND COATINGS INTEGRITY INVENTORY FOR OFFSHORE INSTALLATIONS 2015 TOTAL 451 297 GS EP COR EXTERNAL FIELD JOINT COATINGS OF PIPELINES 2015 TOTAL 420 298 GS EP EXP 131 DESIGN AND INSTALLATION OF PROCESS DATA SERVER 2015 TOTAL 299 GS EP EXP 217 REQUIREMENTS TO VENDORS SUPPLIERS AND EPC'S FOR SPARE PARTS 2015 TOTAL 300 GS EP EXP 203 MAINTENANCE AND INSPECTION DOCUMENTATION PREPARATION DURING PROJECT PHASE 2015 TOTAL 301 GS EP EXP 137 OCWR SPECIFICATION 2015 TOTAL 302 GS EP EXP 139 Alarm Management 2015 TOTAL 303 GS EP EXP 159 PIPELINE MANAGEMENT SYSTEM 2015 TOTAL 304 GS EP ENV Environmental Baseline and Monitoring Studies: Onshore Sites 2015 TOTAL 111 305 GS EP COR PHYSICAL AND CHEMICAL TREATMENT OF HYDROSTATIC TEST WATER 2015 TOTAL 560 306 GS EP ENV Deep well disposal 2015 TOTAL 270 307 GS EP ENV Landfill design and operation for E&P sites 2015 TOTAL 421 308 GS EP ENV GIS deliverables for HSE 2015 TOTAL 501 309 GS EP ECP 107 Energy Efficiency calculations 2015 TOTAL 310 GS EP ENV Environmental requirements for projects design and E&P activities 2015 TOTAL 001 311 GS EP ENV Environmental specification for onshore pipeline construction 2015 TOTAL 011 312 GS EP GLG Biostratigraphical studies 2015 TOTAL 201 313 GS EP GLG Quantitative Mineralogical analysis 2015 TOTAL 203 314 GS EP GIN 122 DELIVERABLES AND DELIVERY PROCEDURES FOR SURFACE SEISMIC ACQUISITION AND PROCESSING 2015 TOTAL DATA 315 GS EP GPA SEISMIC HSE FOR LAND ACTIVITIES 2015 TOTAL 202 316 GS EP GPA SEISMIC HSE FOR SHALLOW WATER AND TRANSITION ZONE ACTIVITIES 2015 TOTAL 203 317 GS EP INS 000 MINIMUM CONTRACTOR DOCUMENT REQUIREMENTS 2015 TOTAL 318 GS EP GIN 307 Unique identifier and seismic data indexing 2015 TOTAL 319 GS EP GEO Seismic Hazard Assessment for Offshore Structures 2015 TOTAL 601 320 GS EP EXP 501 EQUIPMENT AND PIPING NUMBERING 2015 TOTAL 321 GS EP FP 338 MANUFACTURING SPECIFICATION FOR NEW WELDED PIPE FOR CONDUCTOR PIPE APPLICATION 2015 TOTAL 322 GS EP FP 339 WELDING OF CONNECTORS TO CONDUCTOR PIPE 2015 TOTAL 323 GS EP FP 370 INSPECTOR QUALIFICATION & APPROVAL PROCESS 2015 TOTAL 324 GS EP GEO GEOPHYSICAL SURVEY FOR THE INSTALLATION AND/OR THE INSPECTION OF OFFSHORE STRUCTURES 2015 TOTAL 202 AND PIPELINES 325 GS EP GEO GEOPHYSICAL SURVEY FOR OFFSHORE PIPELINE INSPECTION 2015 TOTAL 203 326 GS EP GEO GEOPHYSICAL DEBRIS SURVEY 2015 TOTAL 204 327 GS EP GEO Seabed Sampling for geochemical, heat flow and biostratigraphic analysis - SGE 2015 TOTAL 206 328 GS EP GEO ROV Seabed Survey 2015 TOTAL 207 329 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY CROSS HOLE GEOPHYSICAL SURVEY 2015 TOTAL 210 330 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY SEISMIC REFRACTION GEOPHYSICAL SURVEY 2015 TOTAL 211 331 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY MULTICHANNEL SURFACE WAVES GEOPHYSICAL SURVEY 2015 TOTAL 212 332 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY - MICRO-GRAVITY GEOPHYSICAL SURVEY 2015 TOTAL 213 333 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY - ELECTRIC GEOPHYSICAL SURVEY 2015 TOTAL 214 334 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY - ELECTRO-MAGNETIC GEOPHYSICAL SURVEY 2015 TOTAL 216 335 GS EP GEO REQUIREMENTS FOR OFFSHORE SURVEY VESSELS 2015 TOTAL 110 336 GS EP GEO OFFSHORE GEOTECHNICAL SOIL SURVEY 2015 TOTAL 101 337 GS EP FP 412 WORKOVER SUBSEA COMPLETION SYSTEMS FOR HORIZONTAL TREE 2015 TOTAL 338 GS EP INS 106 Instrument Installation 2015 TOTAL 339 GS EP INS 108 INSTRUMENTATION FOR THE DESIGN OF PLANT ROOMS AND CONTROL ROOMS 2015 TOTAL 340 GS EP INS 109 Instrument cabinets 2015 TOTAL 341 GS EP INS 111 DESIGN AND SUPPLY OF LIQUID CUSTODY TRANSFER METERING UNITS 2015 TOTAL 342 GS EP INS 112 DESIGN AND SUPPLY OF GAS CUSTODY TRANSFER METERING UNITS 2015 TOTAL 343 GS EP INS 114 Instrument Tubing and Fittings 2015 TOTAL 344 GS EP INS 115 Instrument Earthing 2015 TOTAL 345 GS EP INS 116 Instrument Cables 2015 TOTAL 346 GS EP INS 131 STANDARD FUNCTIONS AND FUNCTIONAL ANALYSIS DEVELOPMENT REQUIREMENTS 2015 TOTAL 347 GS EP INS 137 ON/OFF VALVE CONTROL PANELS AND ACTUATORS FUNCTIONAL AND CONSTRUCTION 2015 TOTAL REQUIREMENTS 348 GS EP INS 102 INSTRUMENTATION IDENTIFICATION 2015 TOTAL 349 GS EP INS 103 INSTRUMENT DATABASE MANAGEMENT 2015 TOTAL 350 GS EP INS 196 INPUT AND OUTPUT STANDARD FUNCTIONS 2015 TOTAL 351 GS EP INS 197 PROCESS STANDARD FUNCTIONS 2015 TOTAL 352 GS EP INS 141 Analysers 2015 TOTAL 353 GS EP INS 143 Fire and Gas Detectors and Associated Detection Systems 2015 TOTAL 354 GS EP INS 146 DESIGN OF GENERATION AND DISTRIBUTION OF HYDRAULIC ENERGY 2015 TOTAL 355 GS EP INS 147 DESIGN AND SUPPLY OF WELLHEAD CONTROL PANELS 2015 TOTAL 356 GS EP INS 150 DESIGN METHOD FOR SYSTEM CONFIGURATION - STANDARD FUNCTIONS 2015 TOTAL 357 GS EP INS 156 Human Machine Interfaces (HMI) 2015 TOTAL 358 GS EP LSO 130 FIXED WINGS PERSONNEL SPECIFICATION 2015 TOTAL 359 GS EP LSO 131 HELICOPTERS PERSONNEL SPECIFICATION 2015 TOTAL 360 GS EP LSO 112 TRAINING FOR HLO "HELICOPTER LANDING OFFICER" PERSONNEL 2015 TOTAL 361 GS EP LSO 203 TERMINAL PILOTS _ TERMINAL TUG MASTER: QUALIFICATION, CERTIFICATION AND TRAINING 2015 TOTAL 362 GS EP LSO 204 MARINE BERTHING AIDS FOR COASTAL AND OFFSHORE TERMINALS 2015 TOTAL 363 GS EP LSO 205 TANKER LOADING AND OFFLOADING MARINE PROCEDURES 2015 TOTAL 364 GS EP LSO 206 ELECTRONIC SURVEILLANCE AIDS 2015 TOTAL 365 GS EP LSO 207 NOTICES TO MARINERS AND RESTRICTED NAVIGATION ZONE 2015 TOTAL 366 GS EP MEC LUBRICATION, SHAFT SEALING, AND OIL CONTROL SYSTEMS AND AUXILIARIES ACCORDING TO ISO 2015 TOTAL 281 10438 / API STANDARD 614 367 GS EP MEC SUPPLY OF CENTRIFUGAL PUMP CLASS II ACCORDING TO ISO 5199 2015 TOTAL 273 368 GS EP MEC Supply of Rotary-type Positive Displacement Compressors for Petroleum, Petrochemical and Natural Gas Industries 2015 TOTAL 254 according to ISO 10440-1 / API Standard 619 369 GS EP MEC PACKAGED RECIPROCATING COMPRESSORS FOR OIL AND GAS PRODUCTION SERVICES ACCORDING TO 2015 TOTAL 261 ISO 13631 370 GS EP MEC FUEL TREATMENT UNITS 2015 TOTAL 214 371 GS EP PVV HOT TAPPING 2015 TOTAL 172 372 GS EP PVV PNEUMATIC TESTING OF ABOVE GROUND PIPING SYSTEMS 2015 TOTAL 173 373 GS EP PVV DESIGN AND FABRICATION OF METALLIC VERTICAL STORAGE TANKS 2015 TOTAL 312 374 GS EP PVV DESIGN AND CONSTRUCTION OF LARGE LNG STORAGE TANKS (DOUBLE WALLED METALLIC TYPE) 2015 TOTAL 314 375 GS EP PVV LIST OF PRESSURE VESSELS DOCUMENTS TO BE SUPPLIED TO TOTAL 2015 TOTAL 201 376 GS EP PVV STANDARD DRAWINGS FOR ACCESSORIES AND EQUIPMENT OF VESSELS 2015 TOTAL 202 377 GS EP PVV DESIGN AND FABRICATION OF METALLIC PIPING SUPPORTS - STANDARD FOR PIPING SUPPORTS 2015 TOTAL 119 378 GS EP PVV PIPING DESIGN SPECIFICATION 2015 TOTAL 111 379 GS EP PLR 502 PRECOMMISSIONING OF GAS PIPELINES 2015 TOTAL 380 GS EP POS 001 OFFSHORE SURFACE POSITIONING WORKS 2015 TOTAL 381 GS EP PLR 431 Real time radioscopy inspection 2015 TOTAL 382 GS EP POS 007 AIRBORNE LASER SCANNING SURVEY (LIDAR) 2015 TOTAL 383 GS EP POS 008 AERIAL PHOTOGRAMMETRIC SURVEY 2015 TOTAL 384 GS EP POS 009 POSITIONING REPRESENTATIVES 2015 TOTAL 385 GS EP PVV CORRESPONDENCE BETWEEN ELF AND TOTAL PIPING MATERIAL CLASSES 2015 TOTAL 001 386 GS EP PVV LIST OF PIPING DOCUMENTS TO BE SUPPLIED TO TOTAL 2015 TOTAL 101 387 GS EP PLR 425 Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104 2015 TOTAL 388 GS EP PLR 320 High Density Polyethylene (HDPE) _ PE 100 Pipelines _ Design, Manufacturing, Construction and Integrity Management 2015 TOTAL 389 GS EP PLR 321 Glass Reinforced Epoxy (GRE) Pipelines - Design, Manufacturing, Construction and Integrity Management 2015 TOTAL 390 GS EP PLR 322 Reinforced Thermoplastic Polyethylene pipes for Pipelines _ Design, Manufacturing, Construction and Integrity 2015 TOTAL Management 391 GS EP PLR 227 Carbon Steel Flanges, Branch Outlet Fittings and Forged Components for Pipelines 2015 TOTAL 392 GS EP PLR 228 Carbon steel tees for pipelines 2015 TOTAL 393 GS EP PLR 110 DESIGN, FABRICATION AND TESTING OF SUBMARINE BONDED FLEXIBLE PIPES FOR DEEPWATER 2015 TOTAL TERMINALS 394 GS EP MED HYGIENE IN BASES AND LIVING QUARTERS 2015 TOTAL 062 395 GS EP MED SPECIFIC RISKS: CLINICAL AND THERAPEUTIC ELEMENTS 2015 TOTAL 063 396 GS EP PJC 302 WORKS STATUS METHODOLOGY 2015 TOTAL 397 GS EP SPS 035 Material specification for Duplex 22Cr and Super Duplex 25Cr Stainless Steel subsea equipments 2015 TOTAL 398 GS EP SPS 036 Welding of pressure and non pressure containing equipment for subsea applications 2015 TOTAL 399 GS EP SPS 037 Welding of Duplex 22Cr and Super Duplex 25Cr Stainless Steel for subsea equipments 2015 TOTAL 400 GS EP SPS 141 Subsea Power Transformers 2015 TOTAL 401 GS EP SPS 023 CLEANING AND FLUSHING OF HYDRAULIC SYSTEMS 2015 TOTAL 402 GS EP SPS 024 SUBSEA MECHANICAL QUARTER TURN ACTUATOR (MANUALLY OPERATED GEARBOX) 2015 TOTAL 403 GS EP SPS 025 SUBSEA HYDRAULIC SPRING RETURN QUARTER TURN ACTUATORS 2015 TOTAL 404 GS EP SPS 027 WOROV SPREAD MINIMUM REQUIREMENTS 2015 TOTAL 405 GS EP SPS 028 OBSOLESCENCE MANAGEMENT PLAN FOR SUBSEA PRODUCTION CONTROL SYSTEM 2015 TOTAL 406 GS EP SPS 032 Power Connectors, Penetrators and Jumper assemblies with rated voltage from 3 kV to 30 kV 2015 TOTAL 407 GS EP SPS 033 Subsea Intervention Tooling 2015 TOTAL 408 GS EP SPS 030 OBSERVATION ROV SPREAD MINIMUM REQUIREMENTS 2015 TOTAL 409 GS EP SPS 004 SUBSEA MANIFOLD SYSTEM GATE VALVES 2015 TOTAL 410 GS EP SPS 006 SERVICE VALVES IN SUBSEA STATIONS 2015 TOTAL 411 GS EP SPS 008 THERMAL INSULATION OF SUBSEA STATIONS 2015 TOTAL 412 GS EP SPS 009 CORROSION PROTECTION OF SUBSEA STATIONS 2015 TOTAL 413 GS EP SPS 010 PRESERVATION REQUIREMENTS FOR SUBSEA PACKAGE 2015 TOTAL 414 GS EP SPS 012 DOCUMENTATION REQUIREMENTS FOR SUBSEA STATIONS 2015 TOTAL 415 GS EP SPS 016 SUBSEA INSERT CHOKES AND ASSOCIATED RUNNING AND RETRIEVAL TOOLS 2015 TOTAL 416 GS EP SAF 334 FOAM FIRE EXTINGUISHING SYSTEMS 2015 TOTAL 417 GS EP SAF 337 PASSIVE FIRE PROTECTION: BASIS OF DESIGN 2015 TOTAL 418 GS EP SAF 341 LOCATION AND PROTECTION OF ONSHORE HYDROCARBON STORAGE 2015 TOTAL 419 GS EP SAF 361 SIL assignment 2015 TOTAL 420 GS EP SAF 521 Safety specific requirements for LNG onshore liquefaction plants and export 2015 TOTAL 421 GS EP SDV Social Baseline Study 2015 TOTAL 101 422 GS EP SDV Social Impact Assessment 2015 TOTAL 102 423 GS EP SDV Human Rights Impact Assessment (HRIA) 2015 TOTAL 103 424 GS EP PVV DIATOM EARTH PRE-COAT FILTERS 2015 TOTAL 811 425 GS EP PVV SKID MOUNTED FLOTATION UNITS 2015 TOTAL 812 426 GS EP PVV SKID MOUNTED UNITS FOR STATIC EQUIPMENT 2015 TOTAL 813 427 GS EP RES 301 Instructions for expedition of pressurised fluids 2015 TOTAL 428 GS EP RES 302 Instructions for expedition of fluids samples at atmospheric conditions and in small tank volumes 2015 TOTAL 429 GS EP PVV STANDARDS FOR EXCHANGER ACCESSORIES AND EQUIPMENT 2015 TOTAL 402 430 GS EP PVV SHELL AND TUBE HEAT EXCHANGERS 2015 TOTAL 411 431 GS EP PVV DOUBLE PIPE HEAT EXCHANGERS 2015 TOTAL 414 432 GS EP PVV DESIGN AND FABRICATION OF AIR COOLER 2015 TOTAL 415 433 GS EP SAF 221 SAFETY RULES FOR BUILDINGS 2015 TOTAL 434 GS EP SAF 222 SAFETY REQUIREMENTS FOR TURBINES, DIESEL ENGINES, GAS ENGINES AND PROCESS UNITS IN 2015 TOTAL SHELTERED OR ENCLOSED AREAS 435 GS EP SAF 227 SAFETY RULES FOR FIRED HEATERS 2015 TOTAL 436 GS EP SAF 041 TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY 2015 TOTAL 437 GS EP SAF 321 FIRE PUMP STATIONS AND FIRE WATER MAINS 2015 TOTAL 438 GS EP SAF 322 FIXED FIRE WATER SYSTEMS 2015 TOTAL 439 GS EP SAF 331 CARBON DIOXIDE FIXED FIRE EXTINGUISHING SYSTEMS 2015 TOTAL 440 GS EP SAF 262 PRESSURE PROTECTION RELIEF AND HYDROCARBON DISPOSAL SYSTEMS 2015 TOTAL 441 GS EP SAF 311 RULES FOR THE SELECTION OF FIRE-FIGHTING SYSTEMS 2015 TOTAL 442 GS EP STR 603 Hull and Mooring monitoring 2015 TOTAL 443 GS EP STR 611 DETERMINATION OF THE LOCATION OF AN OFFSHORE TERMINAL 2015 TOTAL 444 GS EP STR 304 FABRICATION OF WELDED PLATE GIRDERS (W.P.G.) 2015 TOTAL 445 GS EP STR 402 ANCHORAGE FOR SUPPORT VESSEL ON AN OFFSHORE SITE 2015 TOTAL 446 GS EP STR 403 ACCEPTABLE CRITERIA OF A SUPPORT VESSEL FOR OFFSHORE WORKS 2015 TOTAL 447 GS EP STR 404 MARINE ASPECTS FOR LOAD-OUT, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES 2015 TOTAL 448 GS EP STR 431 INSTALLATION OF PILES FOR OFFSHORE STEEL STRUCTURES. DRIVEN PILES 2015 TOTAL 449 GS EP STR 432 INSTALLATION OF PILES FOR OFFSHORE STEEL STRUCTURES DRILLED AND GROUTED PILES 2015 TOTAL 450 GS EP STR 107 OFFSHORE STRUCTURES DECOMMISSIONING 2015 TOTAL 451 GS EP STR 103 DESIGN AND FABRICATION OF SKIDS AND EQUIPMENT SUPPORTING STRUCTURES 2015 TOTAL 452 GS EP STR 104 DESIGN AND FABRICATION OF TECHNICAL CUBICLES FOR OFFSHORE OIL INSTALLATIONS 2015 TOTAL 453 GS EP STR 105 BOAT LANDINGS AND BUMPERS 2015 TOTAL 454 GS EP STR 100 OFFSHORE STEEL STRUCTURES - GENERAL 2015 TOTAL 455 GS EP STR 101 DESIGN OF OFFSHORE JACKET AND SUBSEA STRUCTURES 2015 TOTAL 456 GS EP TEL 700 TELECOMMUNICATIONS ENGINEERING SERVICES 2015 TOTAL 457 GS EP TEL 120 POINT TO POINT MICROWAVE LINKS 2015 TOTAL 458 GS EP TEL 150 DESIGN, SUPPLY AND INSTALLATION OF SATELLITE TELECOMMUNICATION SYSTEMS 2015 TOTAL 459 GS EP TEL 130 MARINE AND AIR/GROUND RADIO LINKS 2015 TOTAL 460 GS EP TEL 133 TRUNKED RADIO NETWORKS 2015 TOTAL 461 GS EP TEL 190 DESIGN AND INSTALLATION OF OFFSHORE OPTICAL FIBRES BASED TELECOMMUNICATIONS 2015 TOTAL 462 GS EP TEL 191 TELECOM FIBRE OPTIC SYSTEMS DESIGN 2015 TOTAL 463 GS EP STR 204 Subsea structures: Carbon Steel Material and Fabrication 2013 TOTAL 464 GS EP TEC 260 HIPS Design, Implementation and Life cycle 2012 TOTAL 465 GS EP TEC 007 Obsolescence and Lifetime Cycle Management 2012 TOTAL 466 GS EP PLR 431 Real time radioscopy inspection 2012 TOTAL 467 GS EP POS 004 THE USE OF DIFFERENTIAL GLOBAL NAVIGATION SATELLITE SYSTEM 2012 TOTAL 468 GS EP TEL 414 TELECOMMUNICATION CABLES 2012 TOTAL 0 469 GS EP STR 661 FPSO - DESIGN REQUIREMENTS FOR MOORING AND ANCHORING SYSTEMS 2012 TOTAL 0 470 GS EP STR 901 DESIGN RULES AND CONSTRUCTION STANDARDS FOR ANCILLARY STRUCTURES OF OFFSHORE 2012 TOTAL 0 INSTALLATIONS 471 GS EP STR 902 PULTRUTED FIRE RESISTANT FIBRE REINFORCED PLASTIC FLOOR GRATING 2012 TOTAL 0 472 GS EP TEL 002 TELECOM SHUTDOWN PHILOSOPHY 2012 TOTAL 0 473 GS EP TEL 111 DESIGN AND INSTALLATION OF AN IP TELEPHONY SYSTEM 2012 TOTAL 0 474 GS EP TEL 133 TRUNKED RADIO NETWORKS 2012 TOTAL 0 475 GS EP TEL 140 PUBLIC ADDRESS AND GENERAL ALARM (PAGA) 2012 TOTAL 0 476 GS EP TEL 160 CLOSED-CIRCUIT TELEVISION (CCTV) 2012 TOTAL 0 477 GS EP TEL 161 NETWORK FOR INFORMATION, COMMUNICATION AND ENTERTAINMENT (NICE) 2012 TOTAL 0 478 GS EP TEL 170 DESIGN AND INSTALLATION OF COMMUNICATIONS NETWORK 2012 TOTAL 0 479 GS EP TEL 180 ENGINEERING AND INSTALLATION OF TELECOMMUNICATION NETWORK PRE-CABLING 2012 TOTAL 0 480 GS EP TEL 190 DESIGN AND INSTALLATION OF OFFSHORE OPTICAL FIBRES BASED TELECOMMUNICATIONS 2012 TOTAL 0 481 GS EP TEL 410 INSTALLATION RULES 2012 TOTAL 0 482 GS EP SPS 027 WOROV SPREAD MINIMUM REQUIREMENTS 2012 TOTAL 0 483 GS EP SPS 028 OBSOLESCENCE MANAGEMENT PLAN FOR SUBSEA PRODUCTION CONTROL SYSTEM 2012 TOTAL 0 484 GS EP SPS 029 METALLIC MATERIALS FOR SUBSEA PRODUCTION FACILITIES 2012 TOTAL 0 485 GS EP SPS 030 OBSERVATION ROV SPREAD MINIMUM REQUIREMENTS 2012 TOTAL 0 486 GS EP STR 001 WEIGHT MONITORING AND WEIGHING OFFSHORE UNITS 2012 TOTAL 0 487 GS EP STR 002 CRANE FOR FIXED OFFSHORE INSTALLATIONS SUPPLEMENTS TO API SPEC 2C 6TH EDITION 2012 TOTAL 0 488 GS EP STR 003 CRANE FOR FLOATING OFFSHORE INSTALLATIONS SUPPLEMENTS TO API SPEC 2C 6TH EDITION 2012 TOTAL 0 489 GS EP STR 004 RISER / UMBILICAL PULLING RIG, PULLING AND MOORING WINCHES 2012 TOTAL 0 490 GS EP STR 005 LIFTING APPLIANCES OTHER THAN CRANES AND WINCHES 2012 TOTAL 0 491 GS EP STR 006 REQUIREMENTS FOR THE DESIGN, FABRICATION AND TESTING OF OVERHEAD TRAVELLING CRANES 2012 TOTAL 0 492 GS EP STR 100 OFFSHORE STEEL STRUCTURES - GENERAL 2012 TOTAL 0 493 GS EP STR 101 DESIGN OF OFFSHORE JACKET AND SUBSEA STRUCTURES 2012 TOTAL 0 494 GS EP STR 102 DESIGN OF OFFSHORE TOPSIDE STRUCTURE 2012 TOTAL 0 495 GS EP STR 103 DESIGN AND FABRICATION OF SKIDS AND EQUIPMENT SUPPORTING STRUCTURES 2012 TOTAL 0 496 GS EP STR 106 ASSESSMENT OF EXISTING FIXED OFFSHORE STEEL PLATFORMS 2012 TOTAL 0 497 GS EP STR 107 OFFSHORE STRUCTURES DECOMMISSIONING 2012 TOTAL 0 498 GS EP STR 201 MATERIALS FOR OFFSHORE STEEL STRUCTURES 2012 TOTAL 0 499 GS EP STR 202 CAST MATERIALS FOR STEEL STRUCTURES 2012 TOTAL 0 500 GS EP STR 203 FORGED MATERIALS FOR STEEL STRUCTURES 2012 TOTAL 0 501 GS EP STR 301 FABRICATION OF OFFSHORE STEEL STRUCTURES 2012 TOTAL 0 502 GS EP STR 304 FABRICATION OF WELDED PLATE GIRDERS (W.P.G.) 2012 TOTAL 0 503 GS EP STR 401 LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES 2012 TOTAL 0 504 GS EP STR 431 INSTALLATION OF PILES FOR OFFSHORE STEEL STRUCTURES. DRIVEN PILES 2012 TOTAL 0 505 GS EP STR 601 FLOATING UNIT INTEGRITY MANAGEMENT SYSTEM REQUIREMENTS 2012 TOTAL 0 506 GS EP STR 602 F(P)SO - REQUIREMENTS FOR THE CERTIFICATION OF COMPLIANCE WITH INTERNATIONAL MARITIME 2012 TOTAL 0 CONVENTIONS 507 GS EP STR 631 CALM BUOY TERMINALS 2012 TOTAL 0 508 GS EP STR 651 GENERAL PRINCIPLES FOR A F(P)SO DESIGN 2012 TOTAL 0 509 GS EP STR 652 F(P)SO - STEEL HULL DESIGN REQUIREMENTS 2012 TOTAL 0 510 GS EP STR 653 F(P)SO - HULL FABRICATION REQUIREMENTS 2012 TOTAL 0 511 GS EP PLR 100 SUBMARINE PIPELINE SYSTEMS 2012 TOTAL 0 512 GS EP PLR 102 DESIGN OF SUBMARINE PIPELINES AS PER API RP 1111 AND ASME B31.4/31.8 2012 TOTAL 0 513 GS EP PLR 103 DESIGN OF SUBMARINE PIPELINES AS PER DNV-OS-F101 2012 TOTAL 0 514 GS EP PLR 104 ONSHORE PIPELINE SYSTEMS 2012 TOTAL 0 515 GS EP PLR 105 DESIGN OF SUBMARINE PIPELINES AS PER ISO 13623 2012 TOTAL 0 516 GS EP PLR 106 DESIGN OF ONSHORE PIPELINES AS PER ISO 13623 2012 TOTAL 0 517 GS EP PLR 109 DESIGN, FABRICATION AND TESTING OF SUBMARINE UNBOUNDED FLEXIBLE PIPES AND RISERS 2012 TOTAL 0 518 GS EP PLR 110 DESIGN, FABRICATION AND TESTING OF SUBMARINE BONDED FLEXIBLE PIPES FOR DEEPWATER 2012 TOTAL 0 TERMINALS 519 GS EP ENV Environmental Baseline and Monitoring Studies: Onshore Sites 2012 TOTAL 0 111 520 GS EP ENV Environmental Baseline and Monitoring Studies: Offshore and Nearshore Sites 2012 TOTAL 0 112 521 GS EP ENV GIS deliverables for HSE 2012 TOTAL 0 501 522 GS EP INS 146 DESIGN OF GENERATION AND DISTRIBUTION OF HYDRAULIC ENERGY 2012 TOTAL 0 523 GS EP PLR 160 DESIGN, FABRICATION AND TESTING OF SUBSEA UMBILICALS 2012 TOTAL 0 524 GS EP PLR 201 FABRICATION OF SEAMLESS PIPES FOR PIPELINES (SWEET SERVICE) 2012 TOTAL 0 525 GS EP PLR 202 FABRICATION OF LONGITUDINALLY SUBMERGED ARC WELDED PIPES FOR PIPELINES (SWEET SERVICE) 2012 TOTAL 0 526 GS EP PLR 211 FABRICATION OF SEAMLESS PIPES FOR PIPELINES (MILD, INTERMEDIATE AND SEVERE SOUR SERVICE) 2012 TOTAL 0 527 GS EP PLR 212 FABRICATION OF LONGITUDINALLY SUBMERGED ARC WELDED PIPES FOR PIPELINES (MILD, 2012 TOTAL 0 INTERMEDIATE AND SEVERE SOUR SERVICE) 528 GS EP PLR 221 FABRICATION OF HOT BENDS FOR PIPELINES (SWEET SERVICE) 2012 TOTAL 0 529 GS EP PLR 222 CARBON STEEL FLANGES AND BRANCH OUTLET FITTINGS AND FORGED COMPONENTS FOR PIPELINES 2012 TOTAL 0 (SWEET SERVICE) 530 GS EP PLR 406 STORAGE AND TRANSPORTATION OF LINE PIPES 2012 TOTAL 0 531 GS EP PLR 410 CONCRETE COATING FOR SUBMARINE PIPELINES 2012 TOTAL 0 532 GS EP PLR 420 SITE WELDING OF CARBON STEEL PIPELINES TO API 1104 AND DNV-OS-F101 (SWEET SERVICE) 2012 TOTAL 0 533 GS EP PLR 421 SITE WELDING OF CARBON STEEL PIPELINES TO API 1104 AND DNV-OS-F101 (MILD, INTERMEDIATE AND 2012 TOTAL 0 SEVERE SOUR SERVICE) 534 GS EP PLR 422 WELDING OF DUPLEX AND SUPER DUPLEX STAINLESS STEEL PIPELINES & RISERS 2012 TOTAL 0 535 GS EP PLR 430 AUTOMATED ULTRASONIC TESTING (AUT) OF PIPELINE GIRTH WELDS 2012 TOTAL 0 536 GS EP PLR 501 HYDROSTATIC TESTING OF PIPELINES 2012 TOTAL 0 537 GS EP PLR 502 PRECOMMISSIONING OF GAS PIPELINES 2012 TOTAL 0 538 GS EP POS 001 OFFSHORE SURFACE POSITIONING WORKS 2012 TOTAL 0 539 GS EP POS 002 SUBSEA POSITIONING WORKS 2012 TOTAL 0 540 GS EP POS 003 ONSHORE LAND SURVEYING AND POSITIONING WORKS 2012 TOTAL 0 541 GS EP POS 004 THE USE OF DIFFERENTIAL GLOBAL NAVIGATION SATELLITE SYSTEM 2012 TOTAL 0 542 GS EP PLR 241 FABRICATION OF SUPER DUPLEX STAINLESS STEEL SMALL BORE TUBES FOR UMBILICAL 2012 TOTAL 0 543 GS EP PLR 242 FABRICATION OF DUPLEX & SUPER DUPLEX STAINLESS STEEL IN SEAMLESS PIPES FOR PIPELINES IN 2012 TOTAL 0 SWEET SERVICE 544 GS EP PLR 310 PIPELINE COMPOSITE REPAIR SYSTEMS 2012 TOTAL 0 545 GS EP PLR 401 INSTALLATION OF SUBMARINE PIPELINES 2012 TOTAL 0 546 GS EP PLR 403 INSTALLATION OF ONSHORE PIPELINES 2012 TOTAL 0 547 GS EP PLR 231 INDUCTION BENDS FOR PIPELINES (MILD, INTERMEDIATE AND SEVERE SOUR SERVICE) 2012 TOTAL 0 548 GS EP PLR 232 CARBON STEEL FLANGES AND BRANCH OUTLET FITTINGS AND FORGED COMPONENTS FOR PIPELINES 2012 TOTAL 0 (MILD, INTERMEDIATE AND SEVERE SOUR SERVICE) 549 GS EP PVV PIPING HOOK-UP STANDARDS 2012 TOTAL 0 102 550 GS EP PVV PIPING STRESS ANALYSIS 2012 TOTAL 0 107 551 GS EP PVV PIPING DESIGN SPECIFICATION 2012 TOTAL 0 111 552 GS EP PVV PIPING MATERIAL CLASSES 2012 TOTAL 0 112 553 GS EP POS 009 POSITIONING REPRESENTATIVES 2012 TOTAL 0 554 GS EP PVV GENERAL SPECIFICATION CATALOGUE 2012 TOTAL 0 000 555 GS EP PVV CORRESPONDENCE BETWEEN ELF AND TOTAL PIPING MATERIAL CLASSES 2012 TOTAL 0 001 556 GS EP PVV DESIGN AND FABRICATION OF METALLIC PIPING SUPPORTS - STANDARD FOR PIPING SUPPORTS 2012 TOTAL 0 119 557 GS EP PVV VALVES 2012 TOTAL 0 142 558 GS EP PVV METALLIC PIPES 2012 TOTAL 0 143 559 GS EP PVV FITTINGS 2012 TOTAL 0 144 560 GS EP PVV FLANGES 2012 TOTAL 0 145 561 GS EP PVV VALVES IN CRYOGENIC SERVICE 2012 TOTAL 0 150 562 GS EP PVV STEEL PIPING FABRICATION 2012 TOTAL 0 171 563 GS EP PVV GLASS - REINFORCED PLASTIC EPOXY RESIN PIPING MATERIALS (TUBES AND ACCESSORIES) 2012 TOTAL 0 148 564 GS EP PVV DESIGN AND ERECTION OF GLASS REINFORCED PLASTIC (GRP) WITH EPOXY RESINS PIPING SYSTEM 2012 TOTAL 0 178 565 GS EP PVV DESIGN AND FABRICATION OF PRESSURE VESSELS ACCORDING TO ASME VIII 2012 TOTAL 0 211 566 GS EP PVV DESIGN AND FABRICATION OF PRESSURE VESSELS ACCORDING TO BSI PD 5500 2012 TOTAL 0 212 567 GS EP PVV DESIGN AND FABRICATION OF METALLIC VERTICAL STORAGE TANKS 2012 TOTAL 0 312 568 GS EP PVV SHELL AND TUBE HEAT EXCHANGERS 2012 TOTAL 0 411 569 GS EP PVV PLATE AND FRAME HEAT EXCHANGER 2012 TOTAL 0 412 570 GS EP PVV DESIGN AND FABRICATION OF AIR COOLER 2012 TOTAL 0 415 571 GS EP PVV PIPING AND EQUIPMENT SUBJECT TO SEVERE SOUR SERVICE. METALLURGICAL AND WELDING 2012 TOTAL 0 612 REQUIREMENTS 572 GS EP PVV WELDING OF DUPLEX AND SUPERDUPLEX STAINLESS STEEL 2012 TOTAL 0 614 573 GS EP PVV PIPING COMPONENTS IN MATERIAL 2 _ CR-1% MO 2012 TOTAL 0 621 574 GS EP PVV PIPING AND EQUIPMENT SUBJECT TO INTERMEDIATE SOUR SERVICE. METALLURGICAL AND WELDING 2012 TOTAL 0 622 REQUIREMENTS 575 GS EP PVV TOFD INSPECTION 2012 TOTAL 0 630 576 GS EP PVV PIPING OR PRESSURE VESSEL COMPONENTS IN DUPLEX AND SUPERDUPLEX STAINLESS STEE 2012 TOTAL 0 619 577 GS EP SAF 222 SAFETY REQUIREMENTS FOR TURBINES, DIESEL ENGINES, GAS ENGINES AND PROCESS UNITS IN 2012 TOTAL 0 SHELTERED OR ENCLOSED AREAS 578 GS EP SAF 226 COMPLETED WELLS SAFETY SYSTEMS AND SAFETY RULES 2012 TOTAL 0 579 GS EP SAF 227 SAFETY RULES FOR FIRED HEATERS 2012 TOTAL 0 580 GS EP SAF 228 LIQUID DRAINAGE 2012 TOTAL 0 581 GS EP SAF 253 IMPACTED AREA, RESTRICTED AREA AND FIRE ZONES 2012 TOTAL 0 582 GS EP SAF 260 DESIGN OF HIGH INTEGRITY PROTECTION SYSTEMS (HIPS) 2012 TOTAL 0 583 GS EP SAF 261 EMERGENCY SHUTDOWN AND EMERGENCY DE-PRESSURISATION (ESD & EDP) 2012 TOTAL 0 584 GS EP SAF 262 PRESSURE PROTECTION RELIEF AND HYDROCARBON DISPOSAL SYSTEMS 2012 TOTAL 0 585 GS EP PVV SKID MOUNTED FLOTATION UNITS 2012 TOTAL 0 812 586 GS EP PVV SKID MOUNTED UNITS FOR STATIC EQUIPMENT 2012 TOTAL 0 813 587 GS EP PVV SKID MOUNTED UNITS FOR CHEMICAL PRODUCTS INJECTION SYSTEMS 2012 TOTAL 0 814 588 GS EP SAF 041 TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY 2012 TOTAL 0 589 GS EP SAF 216 AREA CLASSIFICATION 2012 TOTAL 0 590 GS EP SAF 337 PASSIVE FIRE PROTECTION: BASIS OF DESIGN 2012 TOTAL 0 591 GS EP SAF 351 ESCAPE, EVACUATION AND RESCUE FROM FIXED INSTALLATIONS 2012 TOTAL 0 592 GS EP SAF 371 EMERGENCY CONTROL FACILITIES 2012 TOTAL 0 593 GS EP SPS 001 DESIGN PHILOSOPHY AND REQUIREMENTS FOR SUBSEA STATIONS 2012 TOTAL 0 594 GS EP SPS 002 DESIGN OF SUBSEA STRUCTURES 2012 TOTAL 0 595 GS EP SPS 004 SUBSEA MANIFOLD SYSTEM GATE VALVES 2012 TOTAL 0 596 GS EP SPS 005 SUBSEA BALL VALVES 2012 TOTAL 0 597 GS EP SPS 006 SERVICE VALVES IN SUBSEA STATIONS 2012 TOTAL 0 598 GS EP SPS 007 TIE-IN SYSTEMS 2012 TOTAL 0 599 GS EP SPS 008 THERMAL INSULATION OF SUBSEA STATIONS 2012 TOTAL 0 600 GS EP SPS 009 CORROSION PROTECTION OF SUBSEA STATIONS 2012 TOTAL 0 601 GS EP SPS 010 PRESERVATION REQUIREMENTS FOR SUBSEA PACKAGE 2012 TOTAL 0 602 GS EP SPS 011 MECHANICAL COMPLETION OF SUBSEA STATIONS 2012 TOTAL 0 603 GS EP SPS 015 SUBSEA GATE VALVES AND ACTUATORS IN SUBSEA XMAS-TREE SYSTEMS 2012 TOTAL 0 604 GS EP SPS 016 SUBSEA INSERT CHOKES AND ASSOCIATED RUNNING AND RETRIEVAL TOOLS 2012 TOTAL 0 605 GS EP SPS 018 SUBSEA MULTIPHASE FLOW METER 2012 TOTAL 0 606 GS EP SPS 019 SUBSEA PRODUCTION CONTROL SYSTEM 2012 TOTAL 0 607 GS EP SPS 021 SUBSEA MATEABLE ELECTRICAL/OPTICAL CONNECTORS 2012 TOTAL 0 608 GS EP SPS 023 CLEANING AND FLUSHING OF HYDRAULIC SYSTEMS 2012 TOTAL 0 609 GS EP CIV 401 MINIMUM REQUIREMENTS FOR BUILDING DESIGN AND CONSTRUCTION 2012 TOTAL 0 610 GS EP CIV 500 SPECIAL FOUNDATIONS FOR ONSHORE STRUCTURES 2012 TOTAL 0 611 GS EP COR CORROSION CONTROL ON PRODUCTION FACILITIES: DESIGN AND CONSTRUCTION 2012 TOTAL 0 001 612 GS EP COR CORROSION CONTROL ON PRODUCTION FACILITIES: FIELD OPERATIONS 2012 TOTAL 0 002 613 GS EP COR LIMITING FLOW VELOCITIES CALCULATIONS FOR EROSION CORROSION PURPOSE 2012 TOTAL 0 004 614 GS EP COR DESIGN OF CATHODIC PROTECTION OF OFFSHORE STRUCTURES 2012 TOTAL 0 100 615 GS EP COR DESIGN OF INTERNAL CATHODIC PROTECTION OF EQUIPMENT AND STORAGE TANKS 2012 TOTAL 0 101 616 GS EP COR DESIGN OF CATHODIC PROTECTION OF SEALINE BY SACRIFICIAL ANODES 2012 TOTAL 0 102 617 GS EP COR DESIGN OF CATHODIC PROTECTION OF OFFSHORE FLOATING STRUCTURES 2012 TOTAL 0 103 618 GS EP COR EXTERNAL CATHODIC PROTECTION OF BURIED PIPELINES 2012 TOTAL 0 110 619 GS EP COR EXTERNAL CATHODIC PROTECTION OF ONSHORE FACILITIES 2012 TOTAL 0 111 620 GS EP COR EXTERNAL CATHODIC PROTECTION OF ONSHORE DEEP WELL CASING 2012 TOTAL 0 112 621 GS EP COR INTERNAL CORROSION AND EROSION-CORROSION MONITORING: DESIGN AND INSTALLATION 2012 TOTAL 0 161 622 GS EP COR MATERIALS FOR SOUR SERVICE (UPSTREAM APPLICATIONS) SPECIFICATION FOR DESIGN 2012 TOTAL 0 170 623 GS EP COR SUPPLY OF SACRIFICIAL ANODES 2012 TOTAL 0 201 624 GS EP COR MONITORING SYSTEMS FOR CATHODIC PROTECTION OF OFFSHORE STRUCTURES 2012 TOTAL 0 202 625 GS EP COR MONOLITHIC INSULATING JOINTS 2012 TOTAL 0 210 626 GS EP COR THREE LAYER POLYETHYLENE EXTERNAL COATING FOR PIPELINES 2012 TOTAL 0 220 627 GS EP COR THREE LAYER POLYPROPYLENE EXTERNAL COATING FOR PIPELINES 2012 TOTAL 0 221 628 GS EP COR FUSION BONDED EPOXY (FBE) EXTERNAL COATING FOR PIPELINES 2012 TOTAL 0 222 629 GS EP ELE 013 ELECTRICAL REQUIREMENTS FOR GENERATING UNITS 2012 TOTAL 0 630 GS EP ELE 021 ELECTRICAL DESIGN CRITERIA FOR FLOATING UNITS 2012 TOTAL 0 631 GS EP ELE 031 DESIGN OF EARTHING AND BONDING SYSTEMS 2012 TOTAL 0 632 GS EP ELE 051 DESIGN AND INSTALLATION OF LIGHTNING PROTECTION 2012 TOTAL 0 633 GS EP ELE 061 MINIMUM REQUIREMENTS FOR HV & LV CABLE SIZING 2012 TOTAL 0 634 GS EP ELE 079 ELECTRICAL APPARATUS FOR POTENTIALLY EXPLOSIVE GAS ATMOSPHERES 2012 TOTAL 0 635 GS EP ELE 081 LIGHTING 2012 TOTAL 0 636 GS EP ELE 091 MINIMUM CONTRACTOR DOCUMENT REQUIREMENTS 2012 TOTAL 0 637 GS EP ELE 111 INDUCTION MOTORS 2012 TOTAL 0 638 GS EP ELE 113 AC GENERATORS 2012 TOTAL 0 639 GS EP ELE 114 HV SYNCHRONOUS MOTORS 2012 TOTAL 0 640 GS EP ELE 121 HV VARIABLE SPEED DRIVE SYSTEMS 2012 TOTAL 0 641 GS EP ELE 122 LV VARIABLE SPEED DRIVE SYSTEMS FOR ESP 2012 TOTAL 0 642 GS EP ELE 131 HIGH VOLTAGE SWITCHGEAR AND CONTROLGEAR 2012 TOTAL 0 643 GS EP ELE 133 G.I.S. HIGH VOLTAGE SWITCHGEAR AND CONTROLGEAR 2012 TOTAL 0 644 GS EP ELE 135 LOW VOLTAGE SWITCHGEAR ASSEMBLY 2012 TOTAL 0 645 GS EP ELE 137 DISTRIBUTION BOARDS 2012 TOTAL 0 646 GS EP ELE 141 POWER TRANSFORMERS 2012 TOTAL 0 647 GS EP ELE 151 DC UNINTERRUPTIBLE POWER SYSTEMS (UPS) 2012 TOTAL 0 648 GS EP ELE 152 AC UNINTERRUPTIBLE POWER SYSTEMS (UPS) 2012 TOTAL 0 649 GS EP ELE 161 ELECTRICAL CABLES 2012 TOTAL 0 650 GS EP ELE 190 NEUTRAL EARTHING RESISTOR 2012 TOTAL 0 651 GS EP ELE 211 ELECTRICAL CABIN CONSTRUCTION AND EQUIPMENT 2012 TOTAL 0 652 GS EP ELE 221 ELECTRICAL CONTROL SYSTEM (ECS) 2012 TOTAL 0 653 GS EP ELE 251 CLOSED CYCLE VAPOUR TURBOGENERATOR (CCVT) 2012 TOTAL 0 654 GS EP ELE 261 SOLAR POWER SYSTEM 2012 TOTAL 0 655 GS EP ELE 311 CABLE TRAYS/LADDERS 2012 TOTAL 0 656 GS EP ELE 321 NAVIGATIONAL AIDS SYSTEM 2012 TOTAL 0 657 GS EP ELE 331 TAPE TRACE HEATING 2012 TOTAL 0 658 GS EP ELE 364 ELECTRICAL INSTALLATIONS 2012 TOTAL 0 659 GS EP ELE 374 CONSTRUCTION SITE ELECTRICAL INSTALLATIONS 2012 TOTAL 0 660 GS EP COR EXTERNAL PROTECTION OF ONSHORE STRUCTURES AND EQUIPMENT BY PAINTING 2012 TOTAL 0 354 661 GS EP COR EXTERNAL PROTECTION OF PIPING AND EQUIPMENT BY THERMAL SPRAY COATING 2012 TOTAL 0 355 662 GS EP COR CORROSION PROTECTION OF FASTENERS FOR SUBSEA AND TOPSIDE APPLICATIONS 2012 TOTAL 0 356 663 GS EP COR INSTALLATION OF ANODES ON SUBMERGED PIPELINES 2012 TOTAL 0 401 664 GS EP COR DESIGN OF JACKET CATHODIC PROTECTION RETROFIT SYSTEMS 2012 TOTAL 0 402 665 GS EP COR EXTERNAL FIELD JOINT COATINGS OF PIPELINES 2012 TOTAL 0 420 666 GS EP COR EXTERNAL PROTECTION OF STRUCTURES AND EQUIPMENT BY PAINTING MAINTENANCE WORKS 2012 TOTAL 0 450 667 GS EP COR CORROSION AND COATINGS INTEGRITY INVENTORY FOR OFFSHORE INSTALLATIONS 2012 TOTAL 0 451 668 GS EP COR CONTROL OF CATHODIC PROTECTION OF SUBMERGED FIXED STRUCTURES 2012 TOTAL 0 501 669 GS EP COR CONTROL BY ELECTRICAL MEASUREMENTS OF CATHODIC PROTECTION OF SUBMERGED PIPELINES 2012 TOTAL 0 502 670 GS EP COR PHYSICAL AND CHEMICAL TREATMENT OF HYDROSTATIC TEST WATER 2012 TOTAL 0 560 671 GS EP COR TECHNICAL ASSESSMENT OF CATHODIC PROTECTION EQUIPMENT MANUFACTURERS 2012 TOTAL 0 900 672 GS EP COR TECHNICAL ASSESSMENT OF COATING PLANTS 2012 TOTAL 0 901 673 GS EP ECI 002 DRAWINGS AND SYMBOLS PRINCIPLES OF PRESENTATION AT PROJECT DEFINITION PHASE 2012 TOTAL 0 674 GS EP ECI 003 NUMBERING OF WELLS, FACILITIES, EQUIPMENT AND DOCUMENTS AT PROJECT DEFINITION PHASE 2012 TOTAL 0 675 GS EP ECP 101 GLYCOL PACKAGE UNIT 2012 TOTAL 0 676 GS EP ECP 103 PROCESS SIZING CRITERIA 2012 TOTAL 0 677 GS EP ECP 105 PROCESS DOCUMENTS TO BE PREPARED DURING ENGINEERING PHASE 2012 TOTAL 0 678 GS EP ELE 001 ELECTRICAL DESIGN CRITERIA 2012 TOTAL 0 679 GS EP COR MATERIALS FOR THERMAL INSULATION OF PIPELINE, PIPING AND SUBSEA COMPONENTS 2012 TOTAL 0 226 680 GS EP COR EXTERNAL LAMINATED GLASS FIBRE/RESIN BASED COATING FOR RISERS OF SEA LINE 2012 TOTAL 0 230 681 GS EP COR EXTERNAL ELASTOMER BASED COATING FOR RISERS OF SEA LINE 2012 TOTAL 0 231 682 GS EP COR FRICTION-REDUCTION INTERNAL COATINGS FOR PIPELINES TRANSPORTING NON-CORROSIVE GASES 2012 TOTAL 0 250 683 GS EP COR INTERNAL COATING OF WATER INJECTION PIPELINES 2012 TOTAL 0 251 684 GS EP COR EXTERNAL PROTECTION OF OFFSHORE AND COASTAL STRUCTURES AND EQUIPMENT BY PAINTING 2012 TOTAL 0 350 685 GS EP COR EXTERNAL PROTECTION OF STRUCTURES AND EQUIPMENT BY PAINTING FLOATING STRUCTURES 2012 TOTAL 0 351 686 GS EP COR INTERNAL PROTECTION OF EQUIPMENT BY PAINTING 2012 TOTAL 0 352 687 GS EP ELE 460 ENGINEERING STUDIES 2012 TOTAL 0 688 GS EP ELE 765 SUBSEA CABLES 2012 TOTAL 0 689 GS EP ELE 931 TECHNICAL ASSESSMENT OF HIGH VOLTAGE SWITCHGEAR ASSEMBLY MANUFACTURERS 2012 TOTAL 0 690 GS EP ELE 935 TECHNICAL ASSESSMENT OF LOW VOLTAGE SWITCHGEAR ASSEMBLY MANUFACTURERS 2012 TOTAL 0 691 GS EP ELE 941 TECHNICAL ASSESSMENT OF POWER TRANSFORMERS MANUFACTURERS 2012 TOTAL 0 692 GS EP ELE 961 TECHNICAL ASSESSMENT OF ELECTRICAL CABLES MANUFACTURERS 2012 TOTAL 0 693 GS EP EXP 101 PRE-COMMISSIONING AND COMMISSIONING SPECIFICATION 2012 TOTAL 0 694 GS EP EXP 103 PRE-COMMISSIONING AND COMMISSIONING ENGINEERING 2012 TOTAL 0 695 GS EP EXP 105 PRE-COMMISSIONING EXECUTION 2012 TOTAL 0 696 GS EP EXP 107 COMMISSIONING EXECUTION 2012 TOTAL 0 697 GS EP EXP 131 DESIGN AND INSTALLATION OF PROCESS DATA SERVER 2012 TOTAL 0 698 GS EP EXP 135 FULL CONTROL OF WELLS (FCW) SPECIFICATION 2012 TOTAL 0 699 GS EP EXP 311 PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS 2012 TOTAL 0 700 GS EP EXP 403 PRODUCTION AVAILABILITY STUDIES OF OIL AND GAS FACILITIES 2012 TOTAL 0 701 GS EP EXP 405 STANDARD RELIABILITY DATA REPORT 2012 TOTAL 0 702 GS EP EXP 407 IDENTIFICATION OF SAFETY CRITICAL ELEMENTS 2012 TOTAL 0 703 GS EP EXP 501 EQUIPMENT AND PIPING NUMBERING 2012 TOTAL 0 704 GS EP FP 262 ORGANIZATION AND SAFETY DURING STIMULATION OPERATIONS 2012 TOTAL 0 705 GS EP FP 330 MANUFACTURING SPECIFICATION FOR NEW SEAMLESS OCTG CARBON & LOW ALLOY MATERIAL 2012 TOTAL 0 706 GS EP FP 331 SEAMLESS CARBON AND LOW ALLOY OCTG PIPES PURCHASED FROM STOCK 2012 TOTAL 0 707 GS EP FP 332 SPECIFICATION FOR SURFACE WELLHEAD & CHRISTMAS TREE MANUFACTURING 2012 TOTAL 0 708 GS EP FP 333 SPECIFICATION FOR DOWNHOLE COMPLETION EQUIPMENT MANUFACTURING 2012 TOTAL 0 709 GS EP FP 334 SPECIFICATION FOR WELL SCREENS MANUFACTURING 2012 TOTAL 0 710 GS EP FP 337 MANUFACTURE OF OCTG CROSSOVERS 2012 TOTAL 0 711 GS EP FP 338 MANUFACTURING SPECIFICATION FOR NEW WELDED PIPE FOR CONDUCTOR PIPE APPLICATION 2012 TOTAL 0 712 GS EP FP 339 WELDING OF CONNECTORS TO CONDUCTOR PIPE 2012 TOTAL 0 713 GS EP FP 350 MILL INSPECTION ACTIVITIES OF NEW SEAMLESS OCTG 2012 TOTAL 0 714 GS EP FP 351 EX-STOCK OCTG INSPECTION ACTIVITIES 2012 TOTAL 0 715 GS EP FP 370 INSPECTOR QUALIFICATION & APPROVAL PROCESS 2012 TOTAL 0 716 GS EP FP 410 SUBSEA WELLHEAD AND GUIDANCE SYSTEM 2012 TOTAL 0 717 GS EP FP 411 SUBSEA HORIZONTAL CHRISTMAS TREE SYSTEM 2012 TOTAL 0 718 GS EP FP 412 WORKOVER SUBSEA COMPLETION SYSTEMS FOR HORIZONTAL TREE 2012 TOTAL 0 719 GS EP FP 413 SUBSEA VERTICAL DUAL BORE CHRISTMAS TREE 2012 TOTAL 0 720 GS EP GEO OFFSHORE GEOTECHNICAL SOIL SURVEY 2012 TOTAL 0 101 721 GS EP GEO ONSHORE GEOTECHNICAL SOIL SURVEY 2012 TOTAL 0 102 722 GS EP GEO REQUIREMENTS FOR OFFSHORE SURVEY VESSELS 2012 TOTAL 0 110 723 GS EP EXP 205 REQUIREMENTS TO MIE TEAM FOR SPARE PARTS 2012 TOTAL 0 724 GS EP EXP 207 INSTALLATION DESCRIPTION STRUCTURE 2012 TOTAL 0 725 GS EP EXP 213 MINIMUM MAINTENANCE REQUIREMENTS 2012 TOTAL 0 726 GS EP EXP 217 REQUIREMENTS TO VENDORS SUPPLIERS AND EPC'S FOR SPARE PARTS 2012 TOTAL 0 727 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY CROSS HOLE GEOPHYSICAL SURVEY 2012 TOTAL 0 210 728 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY SEISMIC REFRACTION GEOPHYSICAL SURVEY 2012 TOTAL 0 211 729 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY MULTICHANNEL SURFACE WAVES GEOPHYSICAL SURVEY 2012 TOTAL 0 212 730 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY - MICRO-GRAVITY GEOPHYSICAL SURVEY 2012 TOTAL 0 213 731 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY - ELECTRIC GEOPHYSICAL SURVEY 2012 TOTAL 0 214 732 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY - RADAR GEOPHYSICAL SURVEY 2012 TOTAL 0 215 733 GS EP GEO ONSHORE GEOPHYSICAL SITE SURVEY - ELECTRO-MAGNETIC GEOPHYSICAL SURVEY 2012 TOTAL 0 216 734 GS EP GEO NEAR-SURFACE 2D HIGH-RESOLUTION SEISMIC REFLECTION GEOPHYSICAL SURVEY ONSHORE 2012 TOTAL 0 217 735 GS EP GEO GIS REQUIREMENTS FOR ENGINEERING SITE SURVEYS AND STUDIES 2012 TOTAL 0 401 736 GS EP GEO GIS REQUIREMENTS FOR FIELD DEVELOPMENT PROJECT 2012 TOTAL 0 402 737 GS EP GEO METEOROLOGICAL AND OCEANOGRAPHIC SURVEY 2012 TOTAL 0 501 738 GS EP GEO MONITORING OF METOCEAN CONDITIONS FOR OFFSHORE UNITS 2012 TOTAL 0 505 739 GS EP GEO METEOROLOGICAL AND OCEANOGRAPHIC FORECASTING 2012 TOTAL 0 506 740 GS EP GEO TECHNICAL ASSESSMENT OF METOCEAN SURVEYS PROVIDERS 2012 TOTAL 0 511 741 GS EP GEO TECHNICAL ASSESSMENT FOR METOCEAN FORECASTING PROVIDERS 2012 TOTAL 0 516 742 GS EP GEO GEOPHYSICAL SURVEY FOR THE INSTALLATION AND/OR THE INSPECTION OF OFFSHORE STRUCTURES 2012 TOTAL 0 202 AND PIPELINES 743 GS EP GEO REQUIREMENTS FOR DESIGN AND INSTALLATION OF SKIRTED FOUNDATIONS AND SUCTION ANCHORS 2012 TOTAL 0 702 744 GS EP GIN 103 TOTAL'S STANDARD FOR GEOSCIENCES PDF DOCUMENT PROCESSING 2012 TOTAL 0 745 GS EP GIN 121 SEISMIC DATA IDENTIFIERS, NAMING CONVENTIONS FOR TOPOGRAPHIC AND NAVIGATION DATA 2012 TOTAL 0 FILES 746 GS EP GIN 122 DELIVERABLES AND DELIVERY PROCEDURES FOR SURFACE SEISMIC ACQUISITION AND PROCESSING 2012 TOTAL 0 DATA 747 GS EP GIN 201 DATA MANAGEMENT OF GEOSCIENCES PROJECTS: PROJECT NAMING 2012 TOTAL 0 748 GS EP GIN 202 DENOMINATION OF SEISMIC SURVEYS, LEASES, HORIZONS, FAULTS, AND OTHER COMPONENTS 2012 TOTAL 0 749 GS EP GIN 301 GEOGRAPHICAL INFORMATION SHARED DATA SPECIFICATIONS 2012 TOTAL 0 750 GS EP GIN 303 CARTOGRAPHY AND GEO-REFERENCED DATA MANAGEMENT FOR GEOSCIENCES 2012 TOTAL 0 751 GS EP HVA FAN UNIT(S) 2012 TOTAL 0 205 752 GS EP HVA AIR CONDITIONING UNIT(S) (ACU) AND ASSOCIATED AIR COOLED CONDENSER(S) (ACC) 2012 TOTAL 0 206 753 GS EP HVA ELECTRICAL HEATER(S) 2012 TOTAL 0 211 754 GS EP HVA FIRE DAMPER(S) PNEUMATICALLY ACTUATED 2012 TOTAL 0 212 755 GS EP HVA FIRE DAMPER(S) ELECTRICALLY ACTUATED 2012 TOTAL 0 213 756 GS EP HVA SOUND ATTENUATORS 2012 TOTAL 0 217 757 GS EP GPA SEISMIC HSE FOR MARINE ACTIVITIES 2012 TOTAL 0 201 758 GS EP GPA SEISMIC HSE FOR LAND ACTIVITIES 2012 TOTAL 0 202 759 GS EP GPA SEISMIC HSE FOR SHALLOW WATER AND TRANSITION ZONE ACTIVITIES 2012 TOTAL 0 203 760 GS EP GSR INSTRUCTIONS FOR EXPEDITION OF PRESSURISED FLUIDS 2012 TOTAL 0 002 761 GS EP GSR INSTRUCTIONS FOR EXPEDITION OF FLUID SAMPLES AT ATMOSPHERIC CONDITIONS AND IN SMALL 2012 TOTAL 0 003 TANK VOLUMES 762 GS EP HVA LIST OF HVAC SPECIFICATIONS 2012 TOTAL 0 000 763 GS EP HVA SHUT-OFF DAMPERS 2012 TOTAL 0 220 764 GS EP HVA PRESSURE RELIEF DAMPERS 2012 TOTAL 0 221 765 GS EP HVA TYPICALS HVAC P&ID - D&ID 2012 TOTAL 0 830 766 GS EP INS 000 MINIMUM CONTRACTOR DOCUMENT REQUIREMENTS 2012 TOTAL 0 767 GS EP INS 101 INSTRUMENTATION ENGINEERING, SUPPLY AND CONSTRUCTION GENERAL REQUIREMENTS 2012 TOTAL 0 768 GS EP INS 102 INSTRUMENTATION IDENTIFICATION 2012 TOTAL 0 769 GS EP INS 103 INSTRUMENT DATABASE MANAGEMENT 2012 TOTAL 0 770 GS EP INS 104 DESIGN OF GENERATION AND DISTRIBUTION OF INSTRUMENT AIR OR GAS 2012 TOTAL 0 771 GS EP INS 107 DESIGN AND INSTALLATION OF INSTRUMENTATION LINKS 2012 TOTAL 0 772 GS EP INS 108 INSTRUMENTATION FOR THE DESIGN OF PLANT ROOMS AND CONTROL ROOMS 2012 TOTAL 0 773 GS EP INS 110 INSTRUMENTATION FOR PACKAGE UNITS 2012 TOTAL 0 774 GS EP INS 111 DESIGN AND SUPPLY OF LIQUID CUSTODY TRANSFER METERING UNITS 2012 TOTAL 0 775 GS EP INS 112 DESIGN AND SUPPLY OF GAS CUSTODY TRANSFER METERING UNITS 2012 TOTAL 0 776 GS EP INS 120 CONTROL AND CHOKE VALVES 2012 TOTAL 0 777 GS EP INS 125 SAFETY RELIEF VALVES AND RUPTURE DISCS 2012 TOTAL 0 778 GS EP INS 131 STANDARD FUNCTIONS AND FUNCTIONAL ANALYSIS DEVELOPMENT REQUIREMENTS 2012 TOTAL 0 779 GS EP INS 134 DESIGN AND SUPPLY OF INTEGRATED CONTROL AND SAFETY SYSTEM 2012 TOTAL 0 780 GS EP INS 135 CYBER SECURITY REQUIREMENTS FOR DESIGN AND SUPPLY OF ICSS AND PACKAGE SYSTEMS 2012 TOTAL 0 781 GS EP INS 137 ON/OFF VALVE CONTROL PANELS AND ACTUATORS FUNCTIONAL AND CONSTRUCTION 2012 TOTAL 0 REQUIREMENTS 782 GS EP INS 146 DESIGN OF GENERATION AND DISTRIBUTION OF HYDRAULIC ENERGY 2012 TOTAL 0 783 GS EP INS 147 DESIGN AND SUPPLY OF WELLHEAD CONTROL PANELS 2012 TOTAL 0 784 GS EP INS 150 DESIGN METHOD FOR SYSTEM CONFIGURATION - STANDARD FUNCTIONS 2012 TOTAL 0 785 GS EP INS 196 INPUT AND OUTPUT STANDARD FUNCTIONS 2012 TOTAL 0 786 GS EP INS 197 PROCESS STANDARD FUNCTIONS 2012 TOTAL 0 787 GS EP INS 198 SAFETY AND FIRE & GAS STANDARD FUNCTIONS 2012 TOTAL 0 788 GS EP INS 700 TECHNICAL ASSESSMENT OF CONTROL VALVES MANUFACTURERS 2012 TOTAL 0 789 GS EP INS 701 TECHNICAL ASSESSMENT OF ON-OFF ACTUATORS MANUFACTURERS 2012 TOTAL 0 790 GS EP INS 900 INSTRUMENT HOOK-UP DIAGRAMS 2012 TOTAL 0 791 GS EP LSO 110 ENVIRONMENTAL EFFECTS CONSIDERATIONS FOR HELIDECKS 2012 TOTAL 0 792 GS EP LSO 112 TRAINING FOR HLO "HELICOPTER LANDING OFFICER" PERSONNEL 2012 TOTAL 0 793 GS EP LSO 115 HELIDECK SPECIFICATIONS 2012 TOTAL 0 794 GS EP LSO 130 FIXED WINGS PERSONNEL SPECIFICATION 2012 TOTAL 0 795 GS EP LSO 131 HELICOPTERS PERSONNEL SPECIFICATION 2012 TOTAL 0 796 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION TURBOGENERATOR 2012 TOTAL 0 010 797 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION DIESEL ENGINE DRIVEN EMERGENCY GENERATOR 2012 TOTAL 0 011 798 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION DIESEL ENGINE DRIVEN ESSENTIAL GENERATOR 2012 TOTAL 0 012 799 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION GAS ENGINE DRIVEN GENERATOR 2012 TOTAL 0 013 800 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP 2012 TOTAL 0 020 801 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION MOTOPUMP 2012 TOTAL 0 021 802 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION FIRE FIGHTING DIESEL DRIVEN VERTICAL PUMP 2012 TOTAL 0 022 803 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION FIRE FIGHTING DIESEL HYDRAULIC DRIVEN PUMP 2012 TOTAL 0 023 804 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION FIRE FIGHTING DIESEL ELECTRIC DRIVEN PUMP 2012 TOTAL 0 024 805 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION FIRE FIGHTING ELECTRIC DRIVEN HORIZONTAL PUMP 2012 TOTAL 0 025 806 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION POSITIVE DISPLACEMENT MOTOPUMP ACCORDING TO 2012 TOTAL 0 028 API STANDARD 674 807 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR 2012 TOTAL 0 030 808 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR 2012 TOTAL 0 031 809 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION GAS ENGINE OR ELECTRICAL MOTOR DRIVEN 2012 TOTAL 0 032 RECIPROCATING COMPRESSOR 810 GS EP MEC ROTATING MACHINE PACKAGE SPECIFICATION AIR COMPRESSOR AND AIR DRYER 2012 TOTAL 0 033 811 GS EP MEC DRIVER POWER SIZING 2012 TOTAL 0 101 812 GS EP MEC GAS TURBINES FOR THE PETROLEUM, CHEMICAL AND GAS INDUSTRY SERVICES ACCORDING TO API 2012 TOTAL 0 212 STANDARD 616 813 GS EP MEC FUEL TREATMENT UNITS 2012 TOTAL 0 214 814 GS EP MEC SPECIAL PURPOSE COUPLINGS FOR PETROLEUM, CHEMICAL, AND GAS INDUSTRY SERVICES 2012 TOTAL 0 240 ACCORDING TO API STANDARD 671 815 GS EP MEC SPECIAL PURPOSE GEAR UNITS FOR PETROLEUM, CHEMICAL AND GAS SERVICE INDUSTRIES 2012 TOTAL 0 242 ACCORDING TO API STANDARD 613 816 GS EP MEC SUPPLY OF AXIAL AND CENTRIFUGAL COMPRESSORS AND EXPANDER-COMPRESSORS FOR 2012 TOTAL 0 251 PETROLEUM, CHEMICAL AND GAS INDUSTRY SERVICES ACCORDING TO API STANDARD 617 817 GS EP MEC ANTI SURGE SYSTEM FOR CENTRIFUGAL AND AXIAL COMPRESSORS 2012 TOTAL 0 253 818 GS EP MEC PACKAGED RECIPROCATING COMPRESSORS FOR OIL AND GAS PRODUCTION SERVICES ACCORDING TO 2012 TOTAL 0 261 ISO 13631 819 GS EP MEC SUPPLY OF MECHANICAL SEAL ACCORDING TO API STANDARD 682 2012 TOTAL 0 270 820 GS EP MEC CENTRIFUGAL PUMPS FOR THE PETROLEUM, CHEMICAL AND GAS INDUSTRY SERVICES ACCORDING TO 2012 TOTAL 0 271 API STANDARD 610 821 GS EP MEC SUPPLY OF CENTRIFUGAL PUMP CLASS II ACCORDING TO ISO 5199 2012 TOTAL 0 273 822 GS EP MEC MULTI-PHASE PUMPS 2012 TOTAL 0 275 823 GS EP MEC LUBRICATION, SHAFT SEALING, AND OIL CONTROL SYSTEMS AND AUXILIARIES ACCORDING TO ISO 2012 TOTAL 0 281 10438 / API STANDARD 614 824 GS EP MEC ROTATING MACHINES PACKAGES INSTALLATION REQUIREMENTS 2012 TOTAL 0 292 825 GS EP MEC NOISE AND VIBRATION OF ROTATING MACHINE PACKAGES 2012 TOTAL 0 300 826 GS EP MEC TECHNICAL INFORMATION ANALYSIS FORM: CENTRIFUGAL PUMP 2012 TOTAL 0 901 827 GS EP MEC TECHNICAL INFORMATION ANALYSIS FORM: PACKAGED RECIPROCATING COMPRESSOR 2012 TOTAL 0 903 828 GS EP HVA HVAC BASIS OF DESIGN 2012 TOTAL 0 100 829 GS EP HVA AIR HANDLING UNIT(S) (AHU) 2012 TOTAL 0 202 830 GS EP HVA CHILLED WATER UNIT(S) (WATER COOLED - SCREW COMPRESSORS) 2012 TOTAL 0 231 831 GS EP HVA CHILLED WATER UNIT(S) (AIR COOLED - SCREW COMPRESSORS) 2012 TOTAL 0 234 832 GS EP HVA FIRE DAMPER(S) INSTALLATION 2012 TOTAL 0 402 833 GS EP HVA HVAC EQUIPMENT FACTORY COMPLIANCE TESTS 2012 TOTAL 0 410 834 GS EP HVA HVAC PLANT ROOM(S) 2012 TOTAL 0 301 835 GS EP HVA TERMINOLOGY, DEFINITIONS, ABBREVIATIONS 2012 TOTAL 0 801 836 GS EP HVA DOCUMENTS TO BE SUPPLIED FOR BASIC ENGINEERING AND DETAILED ENGINEERING 2012 TOTAL 0 802 837 GS EP LSO 203 TERMINAL PILOTS _ TERMINAL TUG MASTER: QUALIFICATION, CERTIFICATION AND TRAINING 2012 TOTAL 0 838 GS EP LSO 207 NOTICES TO MARINERS AND RESTRICTED NAVIGATION ZONE 2012 TOTAL 0 839 GS EP LSO 209 LIFE JACKETS & IMMERSION SUITS SPECIFICATIONS 2012 TOTAL 0 840 GS EP LSO 141 TECHNICAL SPECIFICATION FOR HELICOPTER 2012 TOTAL 0 841 GS EP LSO 201 TOWING FLOATING UNIT 2012 TOTAL 0 842 GS EP PJC 501 REQUIREMENTS FOR CONTRACTOR QUALITY MANAGEMENT 2012 TOTAL 0 843 GS EP PJC 502 REQUIREMENTS FOR CONTRACTOR CRITICALITY RATING OF A UNIT 2012 TOTAL 0 844 GS EP PJC 503 REQUIREMENTS FOR CONTRACTOR QUALITY SURVEILLANCE 2012 TOTAL 0 845 GS EP PJC 701 DOCUMENT IDENTIFICATION & NUMBERING AT PROJECT EXECUTION AND FIELD OPERATIONS PHASES 2012 TOTAL 0 846 GS EP PJC 702 REQUIREMENTS FOR ELECTRONIC DOCUMENTS AT PROJECT EXECUTION AND FIELD OPERATIONS 2012 TOTAL 0 PHASES 847 GS EP PJC 703 CONTRACTOR FINAL DOCUMENTATION REQUIREMENTS 2012 TOTAL 0 848 GS EP PLR 001 DOCUMENTATION REQUIREMENTS 2012 TOTAL 0 849 GS EP ENV Environmental requirements for projects design and E&P activities 2011 TOTAL 0 001 850 GS EP LSO 202 PERSONNEL TRANSFER BETWEEN WATERCRAFTS AND BETWEEN WATERCRAFTS AND OFFSHORE 2011 TOTAL 0 STRUCTURES 851 GS EP LSO 306 SELECTION AND OPERATION OF DYNAMICALLY POSITIONED VESSELS 2011 TOTAL 0 852 GS EP LSO 204 MARINE BERTHING AIDS FOR COASTAL AND OFFSHORE TERMINALS 2011 TOTAL 0 853 GS EP LSO 205 TANKER LOADING AND OFFLOADING MARINE PROCEDURES 2011 TOTAL 0 854 GS EP LSO 206 ELECTRONIC SURVEILLANCE AIDS 2011 TOTAL 0 855 GS EP EXP 159 PIPELINE MANAGEMENT SYSTEM 2011 TOTAL 0 856 GS EP SAF 221 SAFETY RULES FOR BUILDINGS 2011 TOTAL 0 857 GS EP SAF 312 FIRE AND GAS DETECTION SYSTEMS 2011 TOTAL 0 858 GS EP SAF 321 FIRE PUMP STATIONS AND FIRE WATER MAINS 2011 TOTAL 0 859 GS EP SAF 322 FIXED FIRE WATER SYSTEMS 2011 TOTAL 0 860 GS EP SAF 331 CARBON DIOXIDE FIXED FIRE EXTINGUISHING SYSTEMS 2011 TOTAL 0 861 GS EP POS 007 AIRBORNE LASER SCANNING SURVEY (LIDAR) 2011 TOTAL 0 862 GS EP POS 008 AERIAL PHOTOGRAMMETRIC SURVEY 2011 TOTAL 0 863 GS EP ENV Landfill design and operation for E&P sites 2011 TOTAL 0 421 864 GS EP TEL 411 ACCESS CONTROL SYSTEMS 2011 TOTAL 0 865 GS EP TEL 413 DESIGN AND INSTALLATION OF TELECOM MAST TELECOM REQUIREMENTS 2011 TOTAL 0 866 GS EP TEL 183 DESIGN AND INSTALLATION OF POB, E-MUSTERING AND E-TRACKING 2011 TOTAL 0 867 GS EP TEL 700 TELECOMMUNICATIONS ENGINEERING SERVICES 2011 TOTAL 0 868 GS EP TEL 130 MARINE AND AIR/GROUND RADIO LINKS 2011 TOTAL 0 869 GS EP PVV BOLTING FOR PIPING 2011 TOTAL 0 146 870 GS EP TEL 710 TELECOM EQUIPMENT NUMBERING 2009 TOTAL 0 871 GS EP TEL 191 TELECOM FIBRE OPTIC SYSTEMS DESIGN 2009 TOTAL 0 872 GS EP TEL 120 POINT TO POINT MICROWAVE LINKS 2009 TOTAL 0 873 GS EP TEL 121 POINT TO MULTIPOINT RADIO NETWORK 2009 TOTAL 0 874 GS EP TEL 110 DESIGN AND INSTALLATION OF PBX 2009 TOTAL 0 875 GS EP PLR 151 DESIGN OF STEEL CATENARY RISER SYSTEM 2009 TOTAL 0 876 GS EP PVV GASKETS FOR PIPING AND VESSELS 2009 TOTAL 0 147 877 GS EP SAF 332 WATER MIST AND GASEOUS FIXED FIRE EXTINGUISHING SYSTEMS 2009 TOTAL 0 878 GS EP PVV IN-SERVICE INSPECTION FOR HIC/SSCC CHECKS ON PRESSURE VESSELS 2009 TOTAL 0 929 879 GS EP SAF 021 LAYOUT 2009 TOTAL 0 880 GS EP SAF 380 SAFETY ENGINEERING REQUIREMENTS FOR AN F(P)SO 2009 TOTAL 0 881 GS EP PVV FABRICATION OF ALLOY UNS 06625 GRADE 1 MATERIALS 2009 TOTAL 0 618 882 GS EP SPS 025 SUBSEA HYDRAULIC SPRING RETURN QUARTER TURN ACTUATORS 2009 TOTAL 0 883 GS EP SPS 012 DOCUMENTATION REQUIREMENTS FOR SUBSEA STATIONS 2009 TOTAL 0 884 GS EP SAF 311 RULES FOR THE SELECTION OF FIRE-FIGHTING SYSTEMS 2009 TOTAL 0 885 GS EP PVV SPECIFICATION FOR FABRICATION AND WELDING OF PIPING SYSTEMS IN CUPRONICKEL AND 2009 TOTAL 0 620 ASSOCIATED MATERIALS 886 GS EP PVV THERMAL INSULATION (CYCLIC SERVICE) 2009 TOTAL 0 773 887 GS EP PVV DIATOM EARTH PRE-COAT FILTERS 2009 TOTAL 0 811 888 GS EP PVV THERMAL INSULATION (HOT SERVICE) 2009 TOTAL 0 771 889 GS EP PVV WELDING OF PRESSURE CONTAINING PIPING AND EQUIPMENT 2009 TOTAL 0 611 890 GS EP PVV DOUBLE PIPE HEAT EXCHANGERS 2009 TOTAL 0 414 891 GS EP PVV DESIGN AND CONSTRUCTION OF LARGE LNG STORAGE TANKS (DOUBLE WALLED METALLIC TYPE) 2009 TOTAL 0 314 892 GS EP PVV DESIGN AND CONSTRUCTION OF LARGE LPG STORAGE TANKS 2009 TOTAL 0 315 893 GS EP EXP 201 OPERATIONS PREPARATION DURING PROJECT - MAINTAINABILITY & INSPECTABILITY CRITERIA 2009 TOTAL 0 894 GS EP EXP 203 MAINTENANCE AND INSPECTION DOCUMENTATION PREPARATION DURING PROJECT PHASE 2009 TOTAL 0 895 GS EP COR POLYETHYLENE AND POLYPROPYLENE COATINGS FOR BENDS AND FITTINGS 2009 TOTAL 0 225 896 GS EP EXP 221 DATA FORMATS FOR UNISUP/SALSA PM LOADING 2009 TOTAL 0 897 GS EP GEO COMPREHENSIVE EVALUATION OF METOCEAN CONDITIONS 2009 TOTAL 0 504 898 GS EP GEO OFFSHORE GEOPHYSICAL SURVEYS 2009 TOTAL 0 201 899 GS EP COR DESIGN AND APPLICATION OF PASSIVE FIRE PROTECTION COATINGS 2009 TOTAL 0 353 900 GS EP ELE 011 ELECTRICAL REQUIREMENTS FOR PACKAGED UNITS 2009 TOTAL 0 901 GS EP COR CHEMICAL TREATMENTS FOR CORROSION CONTROL: ENGINEERING AND CONSTRUCTION 2009 TOTAL 0 163 REQUIREMENTS 902 GS EP COR MATERIAL SELECTION AND CORROSION CONTROL FOR SEA WATER LIFT PUMP AND WATER 2009 TOTAL 0 104 DISCHARGE CAISSONS 903 GS EP HVA MARKING OF HVAC PIPING AND DUCTING 2009 TOTAL 0 460 904 GS EP LSO 410 MANNED UNDERWATER OPERATIONS 2009 TOTAL 0 905 GS EP HVA SHUT-OFF DAMPER ELECTRICAL ACTUATOR(S) 2009 TOTAL 0 290 906 GS EP MED ONSITE MEDICAL STRUCTURES 2009 TOTAL 0 060 907 GS EP MED MEDICAL SUPPORT FOR E&P SITES 2009 TOTAL 0 061 908 GS EP MED HYGIENE IN BASES AND LIVING QUARTERS 2009 TOTAL 0 062 909 GS EP MED SPECIFIC RISKS: CLINICAL AND THERAPEUTIC ELEMENTS 2009 TOTAL 0 063 910 GS EP HVA BALANCING DAMPERS 2009 TOTAL 0 222 911 GS EP HVA KITCHEN HOOD(S) 2009 TOTAL 0 223 912 GS EP HVA SELECTION OF STAINLESS STEEL GRADE FOR HVAC EQUIPMENT 2009 TOTAL 0 010 913 GS EP HVA COALESCER FILTER(S) 2009 TOTAL 0 218 914 GS EP HVA NON-RETURN DAMPERS 2009 TOTAL 0 219 915 GS EP GEO REQUIREMENTS FOR DESIGN AND INSTALLATION OF DRAG ANCHORS AND ANCHOR PILES FOR 2009 TOTAL 0 703 OFFSHORE FLOATING STRUCTURES 916 GS EP GEO GEOPHYSICAL SURVEY FOR OFFSHORE PIPELINE INSPECTION 2009 TOTAL 0 203 917 GS EP GEO GEOPHYSICAL DEBRIS SURVEY 2009 TOTAL 0 204 918 GS EP GEO GEOTECHNICAL DATA AND FOUNDATION DESIGN CONSIDERATIONS FOR SUBSEA PRODUCTION 2009 TOTAL 0 701 SYSTEMS AND PIPELINES 919 GS EP SAF 332 WATER MIST AND GASEOUS FIXED FIRE EXTINGUISHING SYSTEMS 2009 TOTAL 920 GS EP PJC 401 HEALTH, SAFETY AND ENVIRONMENT ON CONSTRUCTION AND INSTALLATION SITES 2008 TOTAL 0 921 GS EP HVA DUCTWORK NUMBERING RULES 2008 TOTAL 0 461 922 GS EP HVA HVAC EQUIPMENT NUMBERING RULES 2008 TOTAL 0 462 923 GS EP HVA BALANCING VALVES FOR HVAC INSTALLATIONS 2008 TOTAL 0 236 924 GS EP HVA ANTI-BLAST DAMPER(S) 2008 TOTAL 0 204 925 GS EP HVA SYMBOLS FOR P&ID AND D&ID 2008 TOTAL 0 803 926 GS EP COR BITUMINOUS HOT APPLIED EXTERNAL PIPELINE COATINGS 2008 TOTAL 0 223 927 GS EP COR BOILER WATER TREATMENT 2008 TOTAL 0 003 928 GS EP CIV 402 DESIGN AND CONSTRUCTION OF OIL FIELD LABORATORY ON PRODUCTION INSTALLATIONS 2008 TOTAL 0 929 GS EP CIV 103 FENCES 2008 TOTAL 0 930 GS EP CIV 201 DESIGN AND CONSTRUCTION OF ROADS AND STABILIZED AREAS 2008 TOTAL 0 931 GS EP CIV 202 DRAINAGE AND UNDERGROUND NETWORKS 2008 TOTAL 0 932 GS EP CIV 203 DESIGN OF HARBOUR 2008 TOTAL 0 933 GS EP CIV 101 GENERAL EARTHWORKS 2008 TOTAL 0 934 GS EP CIV 300 REINFORCED AND PRESTRESSED CONCRETE 2008 TOTAL 0 935 GS EP CIV 301 DESIGN OF REINFORCED AND PRESTRESSED CONCRETE 2008 TOTAL 0 936 GS EP ELE 451 THIRD PARTY INSPECTION INDEPENDENT VERIFICATION OF ELECTRICAL FACILITIES 2008 TOTAL 0 937 GS EP EXP 137 OCWR SPECIFICATION 2008 TOTAL 0 938 GS EP PVV CLEANING OF PIPING AND VESSELS 2008 TOTAL 0 175 939 GS EP PVV THERMAL INSULATION (COLD SERVICE) 2008 TOTAL 0 772 940 GS EP SPS 022 ENVIRONMENTAL TESTING OF SUBSEA ELECTRONICS 2008 TOTAL 0 941 GS EP SPS 003 FOUNDATION DESIGN CONSIDERATIONS FOR SUBSEA STATIONS 2008 TOTAL 0 942 GS EP PVV HOT TAPPING 2008 TOTAL 0 172 943 GS EP PLR 233 CARBON STEEL TEES FOR PIPELINES (MILD, INTERMEDIATE AND SEVERE SOUR SERVICE) 2008 TOTAL 0 944 GS EP PLR 404 INSTALLATION OF STEEL PIPELINE BY HORIZONTAL DIRECTIONAL DRILLING 2008 TOTAL 0 945 GS EP PLR 002 ORGANIZATION OF THE DESIGN WORKS 2008 TOTAL 0 946 GS EP PLR 223 CARBON STEEL TEES FOR PIPELINES (SWEET SERVICE) 2008 TOTAL 0 947 GS EP TEL 150 DESIGN, SUPPLY AND INSTALLATION OF SATELLITE TELECOMMUNICATION SYSTEMS 2008 TOTAL 0 948 GS EP PLR 405 DESIGN AND INSTALLATION OF HOT TAPPING ON SUBSEA PIPELINES 2008 TOTAL 0 949 GS EP STR 655 REQUIREMENTS FOR CONVERSION OF A TANKER INTO A F(P)SO 2008 TOTAL 0 950 GS EP STR 611 DETERMINATION OF THE LOCATION OF AN OFFSHORE TERMINAL 2008 TOTAL 0 951 GS EP STR 432 INSTALLATION OF PILES FOR OFFSHORE STEEL STRUCTURES DRILLED AND GROUTED PILES 2008 TOTAL 0 952 GS EP STR 402 ANCHORAGE FOR SUPPORT VESSEL ON AN OFFSHORE SITE 2008 TOTAL 0 953 GS EP STR 104 DESIGN AND FABRICATION OF TECHNICAL CUBICLES FOR OFFSHORE OIL INSTALLATIONS 2008 TOTAL 0 954 GS EP STR 105 BOAT LANDINGS AND BUMPERS 2008 TOTAL 0 955 GS EP ENV Environmental impact assessment of E&P activities 2007 TOTAL 0 120 956 GS EP EXP 157 OPERATOR TRAINING SIMULATOR 2007 TOTAL 0 957 GS EP CIV 403 TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE) 2007 TOTAL 0 958 GS EP CIV 405 PLUMBING AND SANITARY FOR ONSHORE AND OFFSHORE INSTALLATIONS 2007 TOTAL 0 959 GS EP CIV 406 THERMAL AND ACOUSTIC INSULATION 2007 TOTAL 0 960 GS EP HVA DUCTS AND ACCESSORIES FOR HVAC SYSTEMS 2007 TOTAL 0 400 961 GS EP LSO 140 TECHNICAL SPECIFICATIONS FOR CHARTERED CORPORATE AEROPLANES 2007 TOTAL 0 962 GS EP EXP 153 REQUIREMENTS FOR PRODUCTION OPERATING MANUALS 2006 TOTAL 0 963 GS EP PLR 111 SUBMARINE BUNDLES 2006 TOTAL 0 964 GS EP PVV VALVES MATERIALS REQUIREMENTS FOR USE IN SOUR SERVICE 2006 TOTAL 0 613 965 GS EP PVV WELDING OF UNS 31254 ALLOY 2005 TOTAL 0 615 966 GS EP PVV WELDING OF TITANIUM PIPE AND FITTINGS 2005 TOTAL 0 616 967 GS EP PVV WELDING OF 3 1/2 % NICKEL STEEL 2005 TOTAL 0 617 968 GS EP PVV STANDARDS FOR EXCHANGER ACCESSORIES AND EQUIPMENT 2005 TOTAL 0 402 969 GS EP PVV PROCEDURE FOR SHOP HYDRAULIC TESTS OF SHELL AND TUBE HEAT EXCHANGERS 2005 TOTAL 0 441 970 GS EP SAF 341 LOCATION AND PROTECTION OF ONSHORE HYDROCARBON STORAGE 2005 TOTAL 0 971 GS EP SAF 334 FOAM FIRE EXTINGUISHING SYSTEMS 2005 TOTAL 0 972 GS EP SPS 024 SUBSEA MECHANICAL QUARTER TURN ACTUATOR (MANUALLY OPERATED GEARBOX) 2005 TOTAL 0 973 GS EP ENV Deep well disposal 2005 TOTAL 0 270 974 GS EP PVV BLOCK MODELS 2005 TOTAL 0 113 975 GS EP PVV DESIGN MODELS 2005 TOTAL 0 114 976 GS EP PVV 3D ELECTRONIC MODELS 2005 TOTAL 0 115 977 GS EP PVV MODEL REVIEW CHECK LIST 2005 TOTAL 0 116 978 GS EP PVV PNEUMATIC TESTING OF ABOVE GROUND PIPING SYSTEMS 2005 TOTAL 0 173 979 GS EP PVV LIST OF PRESSURE VESSELS DOCUMENTS TO BE SUPPLIED TO TOTAL 2005 TOTAL 0 201 980 GS EP PVV STANDARD DRAWINGS FOR ACCESSORIES AND EQUIPMENT OF VESSELS 2005 TOTAL 0 202 981 GS EP PVV SPRING HANGERS AND SUPPORTS 2005 TOTAL 0 149 982 GS EP PVV LIST OF PIPING DOCUMENTS TO BE SUPPLIED TO TOTAL 2005 TOTAL 0 101 983 GS EP STR 403 ACCEPTABLE CRITERIA OF A SUPPORT VESSEL FOR OFFSHORE WORKS 2005 TOTAL 0 984 GS EP STR 404 MARINE ASPECTS FOR LOAD-OUT, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES 2005 TOTAL 0 985 GS EP CIV 102 DREDGING AND FILLING UP 2005 TOTAL 0 986 GS EP CIV 204 DESIGN OF AIRPORTS AND HELICOPTERS AREAS 2005 TOTAL 0 987 GS EP ENV Environmental specification for onshore pipeline construction 2005 TOTAL 0 011 988 GS EP PJC 301 HOOK-UP ORGANIZATION AND PREPARATION 2005 TOTAL 0 989 GS EP PJC 302 WORKS STATUS METHODOLOGY 2005 TOTAL 0 990 GS EP GLG GWD : GAS WHILE DRILLING ACQUISITION AND INTERPRETATION 2003 TOTAL 0 301 991 GS EP POS 006 0 TOTAL 0