3 Hours / 70 Marks: Seat No
3 Hours / 70 Marks: Seat No
3 Hours / 70 Marks: Seat No
22566
3 Hours / 70 Marks Seat No.
15 minutes extra for each hour
Marks
(c) State the different fuel handling system in steam power plants.
(d) State the need of Waste Heat recovery in Thermal Power Plants.
(a) Explain with neat sketch general layout of hydro-electric power plant.
[1 of 2] P.T.O.
22566 [2 of 2]
3. Attempt any THREE of the following : 12
(a) Discuss in brief, the maintenance of Diesel Power Plant.
(b) Explain Control System of Power Plant.
(c) Explain the term ‘Trigeneration’.
(d) Compare between Boiler Water Reactor (BWR) & Pressurized Water Reactor
(PWR).
_______________