M4M 30 - User - Manual
M4M 30 - User - Manual
M4M 30 - User - Manual
M4M 30
M4M 30-M
User manual
Table of Contents
1. General information............................................................................................. 5
1.1.Use and storage of the manual..............................................................................5
1.2.Copyright...................................................................................................................5
1.3.Liability disclaimer...................................................................................................5
1.4.General safety warnings.........................................................................................5
1.5.Cyber Security Disclaimer.......................................................................................6
2. Packaging contents.............................................................................................. 7
3. Technical characteristics.....................................................................................8
3.1.Description of the device.......................................................................................8
3.2.Product Marking.......................................................................................................8
3.3.Main functionalities.................................................................................................9
3.4.Versions...................................................................................................................10
3.5.Overall dimensions................................................................................................10
3.6.Technical data......................................................................................................... 11
4. Measurement method........................................................................................ 16
4.1.Vector registration method................................................................................. 16
5. Installation........................................................................................................... 17
5.1.Assembly M4M 30.................................................................................................. 17
5.2.Disassembly M4M 30............................................................................................18
5.3.Disassembly M4M 30:...........................................................................................18
5.4.Wiring diagrams..................................................................................................... 19
6. Access to device.................................................................................................25
6.1.Homepage...............................................................................................................25
6.2.Navigation symbols ..............................................................................................26
6.3.Notification icons..................................................................................................26
6.4.Overview of menu pages.....................................................................................27
6.5.Data entry................................................................................................................28
6.6.Favourite page...................................................................................................... 30
8. Configuration...................................................................................................... 37
8.1.Unit...........................................................................................................................37
8.2.Installation............................................................................................................. 42
8.3.Historicals.............................................................................................................. 45
8.4.Input / output .......................................................................................................55
8.5.Alarms..................................................................................................................... 58
8.6.Complex alarms.....................................................................................................59
8.7.Tariffs....................................................................................................................... 60
8.8.Communication......................................................................................................62
8.9.Other settings....................................................................................................... 65
9. Data Reading.......................................................................................................68
9.1.Realtime.................................................................................................................. 69
9.2.Energy..................................................................................................................... 70
9.3.Power Quality ........................................................................................................72
9.4.Average....................................................................................................................73
9.5.Min Value ................................................................................................................74
9.6.Max Value ...............................................................................................................75
9.7.I/O.............................................................................................................................76
9.8.Notifications ..........................................................................................................77
9.9.Power outages.......................................................................................................79
9.10.Timers ................................................................................................................... 80
10. Historicals.......................................................................................................... 81
10.1.Load profile............................................................................................................81
10.2.Max/min demand.................................................................................................82
10.3.Energy Snapshots................................................................................................82
10.4.Energy Trend........................................................................................................ 83
11. Graphs................................................................................................................84
11.1.Realtime................................................................................................................. 85
11.2.Waveforms............................................................................................................ 86
11.3.Harmonics............................................................................................................. 88
11.4.Phasors.................................................................................................................. 90
12. Maintenance...................................................................................................... 91
M4M 30 NETWORK ANALYZER USER MANUAL 5
1. General information
Carefully read this manual and adhere to the indications described prior to using the device.
This manual contains all of the safety information, the technical aspects and the operations necessary to
ensure the correct use of the device and maintain it in safe conditions.
1.2.Copyright
The copyright of this manual is the property of ABB S.p.A.
This manual contains texts, designs and illustrations of a technical nature which must not be disclosed or
transmitted to third parties, even partially, without the written authorisation of ABB S.p.A.
1.3.Liability disclaimer
The information contained in this document is subject to change without notice and cannot be
considered as an obligation by ABB S.p.A. ABB S.p.A. is not liable for any errors that may appear in this
document. ABB S.p.A. is not liable under any circumstances for any direct, indirect, special, incidental or
consequential damage of any kind that may arise from using this document. ABB S.p.A. is also not liable
for incidental or consequential damage that may arise from using the software or hardware mentioned in
this document.
Use the suitable personal protection devices and adhere to the current regulations governing electrical
safety.
• This device must be installed exclusively by qualified personnel who have read all of the information relative
to the installation.
• Check that the voltage supply and measurement are compatible with the range permitted by the device.
• Ensure that all current and voltage supplies are disconnected prior to carrying out any controls, visual
inspections and tests on the device.
• Always assume that all circuits are under voltage until they are completely disconnected, subjected to tests
and labelled.
• Disconnect all of the power supply prior to working on the device.
• Always use a suitable voltage detection device to check that the supply is interrupted.
• Pay attention to any dangers and carefully check the work area ensuring that no instruments or foreign
objects have been left inside the compartment in which the device is housed.
• The correct use of this device depends on a correct manipulation, installation and use.hdfh
• Failure to adhere to the basic installation information can lead to injuries as well as damage to the electric
instruments or to any other product.
• NEVER connect an external fuse in by-pass.
• Disconnect all of the input and output wires before carrying out a dielectric rigidity test or an insulation test
on an instrument in which the device is installed.
• The tests carried out at a high voltage can damage the device’s electronic components.
• The device has to be installed inside a switchboard.
• Installation of M4M shall include a switch or circuit breaker for the connection of auxiliary supply and voltage
measurement. The switch or circuit breaker must be suitably located and easily reachable and must be
marked as the disconnecting device for M4M.
• Switch off circuit breaker or switch before disconnecting from the auxiliary supply and voltage
measurement or connecting to the auxiliary supply or voltage measurement.
6 M4M 30 NETWORK ANALYZER USER MANUAL
2. Packaging contents
2 3
1
M4M Calibration Certificate
July 2019
Warning! Installation by person Return to the previous page. Test
Parameter
with electrotechnical expertise Home
TestDescription
Conditions Test Description Accuracy
only. Increase or decrease the 3Ph/4W/4CT 3-phase 4-wire + 4CTs
Result
Warnung! Installation nur durch Graphs
value. Keeping pressed will
elektrotechnische Fachkraft. increase the speed of the V1 V2
3Ph/4W/3CT V3 4-wire +I13CTs
3-phase I2 I3
No. PF Results Limit
2CSG445040D0201
Avvertenza! Fare installare solo da Data
un elettricista qualificato. ls
me
Historicals Configuration 5.4.Current Transformer ratio Verification –
2.Mounting #9 230 230 230 1,5 1,5 1,5 0,5 ind. -0,01% ±0,5% Passed
Select the current transformer Ratio among Active energy (Import)
Access to device is done through touch the default ones or enter it manually.
2.1.Assembly screen. The home page is divided in four Verification –
sections:
#10 230 230 230 0,2 0,2 0,2 0,5 ind. -0,01% ±0,5% Passed
Active energy (Import)
→ Verification –
Sections Description #11 230 230→ Installation
230 → CT 6 ratio 6 6 0,5 ind. -0,01% ±0,5% Passed
Active energy (Import)
3-phase 4-wire network with 1CT Graphical representation of CT ratio L1 L2 L3
Graphs Verification –
the main parameters; #12 230 230 230 0,9 0,9 0,9 0,5 ind. -0,01% ±0,5% Passed
Data Reading Value of the main Manual 1a Active energy (Import)
parameters.
40/5 A Verification –
Gra 1
Historicals Values recorded in the
flash memory.
#13 230 230
50/5 A
230 0,15 0,15 0,15 0,5 ind.
Active energy (Import)
-0,01% ±0,5% Passed
ph Configuration Setup of the device.
ics #14 58
1b
60/5 A
58 58 6 6 6 1
Verification –
Active energy (Import)
-0,01% ±0,5% Passed
3-phase 3-wire network with 1CT
Verification –
#15 58 58 58 6 6 6 0,5 ind. -0,01% ±0,5% Passed
In case of manual entry, enter the value Active energy (Import)
5.First Commissioning of the primary with + or - and select the
secondary230
(1A or 5A).230 Verification –
#16 230 6 - 6 1 -0,01% ±0,5% Passed
Da To start to use the analyzer it is mandatory
to configure the basic setting (password,
Active energy (Import)
ta language, type of network, CT ratio and VT
CT ratio L1 L2 L3
Verification –
His Re 3-phase 3-wire network with 3CTs ratio). #17 230 230 230 0,9 - 0,9 1
Active energy (Import)
-0,01% ±0,5% Passed
adin
to g
Verification –
Passed
ric 5.1.Setting password #18 230
1
230 230 0,15
2
- 0,15 1
Active energy (Import)
-0,01% ±0,5%
als 2
The password is composed by 5 numerical
Confirm
Verification –
characters. After entering the password#19
it is 230 230 230 6 - 6 0,5 ind. -0,01% ±0,5% Passed
needed to press Confirm.
Active energy (Import)
3
3-phase 3-wire network with 2CTs Verification –
#20 230 230 230 0,9 - 0,9 0,5 ind. -0,01% ±0,5% Passed
If a 4th CT is used, CT ratio for Active energy (Import)
Neutral has to be configured.
Co →
#21 230 230 230 0,15 - 0,15 0,5 ind.
Verification –
-0,01% ±0,5% Passed
nfig Active energy (Import)
ura
Enter Password
Current Password
tio
n 5.5.VoltageThis Calibration Certificate may not be reproduced, in whole or in part,
2-phase 3-wire network with 2CTs
Transformer ratio
1 Enter the voltage transformer ratio (both without written permission of ABB
primary and secondary) manually with + or -
Confirm
3 2 → → Installation → VT ratio
1-phase 2-wire network with 1CT Default password is 00000. At first VT ratio
4
use, the password shall be defined.
In order to disable the password,
please enter 00000.
2
1
5.2.Setting language
3
For current measurement, please → → Unit → Language
notice that it is needed to fasten the
Finalize the installation through screw-type terminal to the device In case of direct insertion,
removable terminals. Select the desired language for the display 400/400V value shall be used.
with the two screws. among the ones available.
4 4 5
Packaging contents
1 Network analyzer M4M 30 or M4M 30-M (MID)
2 Installation manual
3 Calibration certificate
4 Installation accessories (removable terminals, fixing clips)
5 M4M 30-M (MID): Sealable terminal block
The number and type of removable terminals in the package varies according to the different versions.
Please refer to below table to check the removable terminals included in each package.
Please notice that terminals for current input on M4M 30 Rogowski are pre-wired on ABB’s R4M
Rogowski coils
8 M4M 30 NETWORK ANALYZER MANUAL
USER MANUAL
3. Technical characteristics
3.2.Product Marking
1 2 15 1 1 23
13 21
6 14
5 16 17
7 22
8
9
19 24
11
10 18
12 20 1
Packaging contents
1 Tightening torque 13 Product code
2 Calibration date 14 Serial number
3 Current 15 Voltage inputs
4 Frequency 16 Protection class II, Cat III
5 3-element metering 17 Cable strip
6 2-element metering 18 Notified body
7 1-element metering 19 Caution, possibility of electric shock
8 Import/Export 20 Auxiliary supply
9 MID and year of verification 21 Digital output connection
10 MID certificate number 22 RS485 connectoin
11 Caution, refer to accompaigning document 23 Manufacturer information
Accuracy class, LED pulse frequency,
12 Cable strip 24
operating temperature
M4M 30 NETWORK ANALYZER MANUAL
USER MANUAL 9
3.3.Main functionalities
Real-time
TRMS current •
TRMS Voltage •
Frequency •
Active, Reactive and Apparent Power •
Power Factor •
Operating timer, countdown timer •
Energy
Active, Reactive and Apparent Energy •
4 quadrant Energy (Import/Export) •
Tariffs •
Power quality
THD (I, VLN, VLL) •
Individual Harmonics 40th
Unbalances (I, VLN, VLL) •
Neutral current Measured
Phasors (I, VLN) •
Waveforms (I, VLN, VLL) •
Data recording and logs
Single alarms 25
Warnings, alarms and errors logs •
Complex alarms with logics 4
Demand values (average) Advanced
Min/Max Demand values Advanced
Energy Trending logs •
RTC •
HMI
Graphs visualization Advanced
Notifications •
Homepage and favourite page •
Password protection •
Connectivity
Automatic integration in ABB Ability™ EDCS •
Bluetooth Low Energy •
Modbus RTU, Modbus TCP/IP,
Communication Protocols
Profibus DP-V0, BACnet/IP
RJ45 Daisy Chain (Ethernet version)* •
*1x RJ45 port available on M4M 30-M
10 M4M 30 NETWORK ANALYZER MANUAL
USER MANUAL
3.4.Versions
3.5.Overall dimensions
96 mm
96 mm
57 mm*
75,5 mm
IEC 61554
77,5 mm*
*with terminal.
92 -0+0,8 mm
mm
-0+0,8
92
M4M 30 NETWORK ANALYZER MANUAL
USER MANUAL 11
3.6.Technical data
Measurement accuracy
Measurement type True RMS up to the 40th harmonic
128 samples per cycle, zero blind
IEC 61557-12 IEC 61557-12 PMD/S/K70/0,5
Active energy Class 0,5 acc. to IEC 61557-12
Class 0,5S acc. to IEC 62053-22
Reactive energy Class 2 acc. to IEC 61557-12
Class 2S acc. to IEC 62053-23
Active power Class 0,5 acc. to IEC 61557-12
Reactive power Class 1 acc. to IEC 61557-12
Apparent power Class 0,5 acc. to IEC 61557-12
Voltage Class 0,2 acc. to IEC 61557-12
Current Class 0,2 acc. to IEC 61557-12
Neutral current Class 0,2 acc. to IEC 61557-12
Frequency Class 0,1 acc. to IEC 61557-12
Unbalances Class 0,2 acc. to IEC 61557-12
Harmonics, THD (Current, voltage) Class 1 acc. to IEC 61557-12
Analog output ±2% accuracy rate*
The M4M voltage inputs have a high impedance which decreases power consumption and increases
security due low current flow in the voltage input circuit. However, if the voltage input wirings are
floating, i.e. not connected to a voltage source, the wires may work as an antenna to the surroundings
electric fields which can create a perceived floating voltage. The M4M will not show this floating voltage
in case it is below 40V (below the Voltage measurement range) and in case of a three phase system
with measuring current below starting current (below current measurement range). In all other cases
of floating voltage the M4M display may show a voltage bigger than zero, which depends on installation
conditions. This behavior does not affect the reliability of the M4M in normal conditions with a connected
load.
*The total accuracy rate returned in the output of the Analog Output is equal to the sum of the Analog Output accuracy rate
and the device accuracy rate.
12 M4M 30 NETWORK ANALYZER MANUAL
USER MANUAL
I/O
Digital Output
Voltage (min - max) 5 - 240 VAC/DC
Current (min - max) 2 - 100 mA
Max ON state drop voltage 1,5 V
Max R value at Min voltage conditions (5 V) 1750 Ohm
Min R value at Max voltage conditions (240 V) 2400 Ohm
Pulse duration [ms] 20 ms ON, 20 ms OFF
Pulse frequency 25 Hz
Alarm activation delay [s] 1 - 900 s (programmable)
Alarm return hysteresis 0 - 40% (programmable)
Digital Input
Maximum Voltage 240 VAC/DC
Max voltage for OFF state on input 20 VAC/DC
Min voltage for ON state on input 45 VAC/DC
M4M 30-M (MID): The I/O 1 of the M4M 30-M Modbus and M4M 30-M Ethernet is assigned as Digital Output -
Pulse Output, associated to the active energy measured value
M4M 30 NETWORK ANALYZER MANUAL
USER MANUAL 13
Analogue Output
Programmable electrical parameters Span [0 - 20 mA or 4 - 20 mA]
Load Typical 250 Ohm, max 500 Ohm
Mechanical characteristics
96 mm x 96 mm x 77,5 mm
Overall dimensions
(Depth inside the switchboard: 57mm )
IP degree of protection (IEC 60529) Front: IP54
Terminals: IP20
Weight [g] 400
Terminal characteristics
Tightening torque 0,4 Nm
Nominal cross section: 2,5 mm2
Solid/stranded wire: 0,2 - 2,5 mm2 (AWG 24 - 12)
Voltage inputs
Pitch: 7,62 mm
Poles: 4
Nominal cross section: 2,5 mm2
Solid/stranded wire: 0,2 - 2,5 mm2 (AWG 24 - 12)
Current inputs Pitch: 5,08 mm
Poles: 8
Screw flanges for fixing
Nominal cross section: 2,5 mm2
Solid/stranded wire: 0,2 - 2,5 mm2 (AWG 24 - 12)
RS-485 Serial port
Pitch: 5,08 mm
Poles: 3
Nominal cross section: 2,5 mm2
Solid/stranded wire: 0,2 - 2,5 mm2 (AWG 24 - 12)
Pitch: 5,08 mm
I/O Poles: 5 (Programmable I/O)
Poles: 3 (Programmable I/O only on M4M 30
I/O)
Poles: 3 (Analogue outputs, only on M4M 30 I/O)
Only with ABB Rogowski probes:
Rogowski current probes -R4M-200: 200 mm diameter (2CSG202150R1101)
-R4M-80: 80 mm diameter (2CSG202160R1101)
14 M4M 30 NETWORK ANALYZER MANUAL
USER MANUAL
Climatic conditions
Operating temperature -25 to 70 °C (K70 acc. to IEC 61557-12)
Storage temperature -40 to 85 °C (K70 acc. to IEC 61557-12)
Relative humidity Max 93% (non-condensing) at 40°C
Pollution degree 2
Altitude < 2000 m
Mounting requirement Only for internal usage
User Interface
Access to device Touchscreen
Display type Graphic color display
Display dimensions 70 x 52 mm (3.5")
Communication protocol
M4M 30 Modbus, M4M 30 I/O, M4M 30 Rogowski, M4M
Modbus RTU
30-M Modbus
Communication interface RS485 with optical isolation
Baud rate 9.6, 19.2, 38.4, 57.6, 115.2 kbps
Parity number Odd, Even, None
Stop bit 1, 2
Address 1-247
Connector 3 pole terminal
Profibus DP-V0 M4M 30 Profibus
Profibus with slave DP-V0 function in
Protocol
compliance with IEC 61158 regulations
Communication interface RS485 with optical isolation
Baud rate Automatic detection [9.6k - 12 Mbps]
Address 0-126
DB 9 female connector (do not use connectors
Connector
with 90° cable outlet)
Green for communication status
LED indicators
Red for communication error
Modbus TCP/IP M4M 30 Ethernet, M4M 30-M Ethernet
Protocol Modbus TCP/IP
Communication interface RJ45 (2 ports for daisy-chain)*
BACnet M4M 30 Bacnet
Protocol BACnet/IP
Communication interface RJ45
Bluetooth
Type BLE (Bluetooth Low Energy)
Real-time clock
Clock drift ~ 0.4 seconds per day
Battery backup time ~ 3 days without control power
Standards
Power metering and monitoring devices (PMD) IEC 61557-12 (IEC 62053-22, IEC 62053-23)
Electrical safety IEC 61010-1
IEC 61326-1 (IEC 61000-3-2, IEC 61000-3-3, IEC
61000-4-2, IEC 61000-4-3, IEC 61000-4-
EMC
4, IEC 61000-4-5, IEC 61000-4-6, IEC 61000-4-8,
IEC 61000-4-11)
*1x RJ45 port available on M4M 30-M
M4M 30 NETWORK ANALYZER MANUAL
USER MANUAL 15
Technical data for M4M 30-M according to the Measuring Directive 2014/32/EU
EN 50470-1
MID standards
EN 50470-3
3Ph/4W/4CT
3Ph/4W/3CT
Voltage measurement
3Ph/3W/2CT
(type of network and rated voltage)
1Ph/2W/1CT
3 x 230 (400)...3 x 400 (690) V
Current rating (I min- I ref(Imax)) 0,01-1(6) A
Rated frequencies, tolerance 50 Hz and 60 Hz, +/- 2%
Active Energy accuracy class Class C
Electromagnetic ambient conditions Class E2
Mechanical ambient conditions Class M1
LED indicator pulse frequency 200000 imp/kWh
LED indicator pulse length 1ms
16 M4M 30 NETWORK ANALYZER USER MANUAL
4. Measurement method
Import energy registers increments when the power is positive and export energy registers increments
when power is negative.
All import and export registers are positive (or zero) and will either increment or stand still. Net energy
registers contains the import minus the export register for corresponding registers and can be positive
or negative.
The ABB M4Ms use the vector registration method for computation of energy.
Note that if a 3-phase load with neutral have connections between the phases that have a power factor
smaller than 0.5, that is constitute a mainly reactive load, the power in single phases can be negative even
if the 3-phase load is consuming energy. The total power and energy will however always be positive for a
3-phase load that is consuming energy.
Note also that the sum of the per phase registers will be bigger than the total register if the power in the
phases contains a mix of both positive and negative power. In applications where the load is a 3-phase
load the total register should always be used for billing.
M4M 30 NETWORK ANALYZER USER MANUAL 17
5. Installation
5.1.Assembly M4M 30
2
1
M4M 30-M (MID): In order to ensure antitampering for MID directive, sealing of terminal block is
mandatory
2
click
1
Sealing
3
18 M4M 30 NETWORK ANALYZER USER MANUAL
5.2.Disassembly M4M 30
1
2
3 2
Please notice that if seal is broken, tampering of M4M for MID will happen!
M4M 30 NETWORK ANALYZER USER MANUAL 19
5.4.Wiring diagrams
The operations to carry out for the correct connection of the device, based on the type of electric line
available, are described in this section.
The installation and the cabling of the device must be carried out by qualified personnel.
Wiring diagrams - M4M 30 Modbus, M4M 30 Ethernet, M4M 30 I/O, M4M 30 Profibus, M4M 30
Bacnet, M4M 30-M Modbus, M4M 30-M Ethernet
The M4M 30 can be used on different type of network (please refer to chapter “7. First commissioning” for
the configuration on the device).
According to the type of network that has been chosen, the parameters visualized on the device HMI
change.
Below the wiring diagrams for M4M 30 working with CT .../5A or .../1A (M4M 30 Modbus, M4M 30 Ethernet,
M4M 30 I/O, M4M 30 Profibus, M4M 30 Bacnet, M4M 30-M Modbus, M4M 30-M Ethernet) are shown:
M4M 30-M (MID): In order to ensure antitampering for MID directive, only MID compliant wiring have to be
selected and sealing of terminal block is mandatory.
Same wiring schemes apply for I/O5 and I/O6 available only on M4M 30 I/O.
• Analogue outputs, typical load 250 Ohm, max 500 Ohm (available only on M4M 30 I/O):
6. Access to device
6.1.Homepage
The device menu is divided into four sections.
Home
Historicals Configuration
Menu Description
Graphs Graphical representation of the main measured parameters.
Data reading Reading of the main measured parameters.
Historicals Reading of the measured parameters recorded in the flash memory.
Configuration Setup of the device.
26 M4M 30 NETWORK ANALYZER USER MANUAL
6.2.Navigation symbols
Symbol Description
Bluetooth enabled.
Notifications.
Favourite page.
Home.
6.3.Notification icons
Symbol Description
→ Graphs
Menu Description
Bargraphs for voltage (L-N, L-L), current, power (active, reactive,
Realtime Graphs
apparent).
Waveforms Waveforms visualization for voltage (L-N, L-L), current.
Harmonics Harmonic composition of voltage (L-N, L-L), current.
Phasor diagram for voltage L-N and current and visualization of
Phasors
displacements.
→ Data Reading
Menu Description
Summary, voltage (L-N, L-L), current, power (active, reactive,
Realtime
apparent), frequency.
Active, reactive, apparent energy, import, export and net, including
Energy
tariffs if defined.
THD (voltage, current), unbalances (voltage, current), power factor
Power quality
and cosphi per each phase.
Average values in the latest period for voltage, current and power
Average
(active, reactive, apparent).
Minimum values forvoltage, current and demand power (active,
Min value
reactive, apparent).
Maximum values for voltage, current and demand power (active,
Max value
reactive, apparent).
I/O I/O status according to the I/O type and M4M version.
Notifications List of notifications divided into alarms, warnings, errors.
Timers Count-up timer (on hours), count-down timer (maintenance timer).
→ Historicals
Menu Description
Load profile Stored load profiles and trends associated to realtime parameters.
Max/Min Demand Stored max/min demand values (up to 3 each) of realtime parameters.
Energy - Trend Trend of energy consumption values over a certain period
Energy - Snapshots Instantaneous snapshots of energy consumption cumulative values
28 M4M 30 NETWORK ANALYZER USER MANUAL
→
Menu Description
Unit Settings related to the device itself.
Installation Settings related to the installation conditions.
Historicals Settings related to Historicals functionalities, stored on the flash memory.
I/O Definition of I/O type of the M4M version.
Definition of alarm conditions to be visualized as notifications or linked
Alarms
to I/O.
Definition of user-defined logics based on single alarms to be visualized
Complex Alarms
as notifications or linked to I/O.
Tariffs Definition of tariffs via clock, communication or input.
Settings related to the embedded communication protocols of the M4M
Communication
version.
Settings for average values, timers, energy conversion, warning levels of
Other settings
harmonics.
6.5.Data entry
For the configuration it is possible either to choose from a list of values or to manually enter a value.
List of values
3Ph/4W/4CT
3Ph/4W/3CT 1
3Ph/4W/1CT
2
3Ph/3W/1CT
1a
1b
Confirmation pop-up
For some configurations of the device it is mandatory to give further confirmation after data entry. A
confirmation pop-up is shown on the screen:
1a 1b
Operation succeeded pop-up bar
When the configuration is completed successfully, the green pop-up bar “Operation succeeded” will
appear.
Enter Password
Current Password
Confirm
Operation succeeded
30 M4M 30 NETWORK ANALYZER USER MANUAL
6.6.Favourite page
It is possible set a page as a “Favourite page”, that is then easily accessible by clicking the“Favourite” key.
M4M 30-M (MID): It is not possible to set a Favourite page, after stand-by time the menu go back to a
meter summary screen with active import and export energy.
To reset the Favourite page follow above steps when inside Homepage.
Only the pages from Graphs, Data Reading and Historicals menus can be set as favourite.
Menu list pages cannot be set as favourite page.
M4M 30 NETWORK ANALYZER USER MANUAL 31
7. First commissioning
At first power up of M4M network analyzers, wizard procedure will guide the user in the first
commissioning steps:
7.1.Language
It is possible to change the display language to one of the languages present in the device.
→ → Unit → Language
1 Confirm
Operation succeeded
In order to disable the password, please set the new password as 00000.
The password can be changed in any moment in Configurations -> Unit -> Modify password (please refer to
chapter “7.1 Unit”)
M4M 20-M (MID): It is not possible to disable password. Password only protects non-critical
configurations. Critical configurations are protected by Lock (please refer to chapter “7.7.Lock MID
version”)
32 M4M 30 NETWORK ANALYZER USER MANUAL
→ → Unit → Date/Time
Date/Time
Set Date
Set Time
Menu Description
Set date Configure the current date with format YYYY/MM/DD.
Set time Configure the current time.
7.4.Type of network
In order to configure the type of network it is needed to choose one of the available options according to
the installation conditions.
3Ph/4W/4CT
3Ph/4W/3CT
1
2 3Ph/4W/1CT
3Ph/3W/1CT
According to the type of network that has been chosen, the parameters visualized on the device HMI
change.
Option Description Option Description
3Ph/4W/4CT 3-phase 4-wire + 4CTs 3Ph/3W/3CT 3-phase 3-wire + 3CTs
3Ph/4W/3CT 3-phase 4-wire + 3CTs 3Ph/3W/2CT 3-phase 3-wire + 2CTs
3Ph/4W/1CT 3-phase 4-wire + 1CT 2Ph/3W/2CT 2-phase 3-wire + 2CTs
3Ph/3W/1CT 3-phase 3-wire + 1CT 1Ph/2W/1CT 1-phase 2-wire + 1CT
M4M 30 NETWORK ANALYZER USER MANUAL 33
7.5.CT ratio
M4M is capable to measure current only via indirect connection by means of current transformers
CTs.../5A or .../1A (M4M 30 Modbus, M4M 30 Ethernet, M4M 30 I/O, M4M 30 Profibus, M4M 30 Bacnet,
M4M 30-M Modbus, M4M 30-M Ethernet), or Rogowski coils (M4M 30 Rogowski).
If CTs are used, then on the network analyzer it is needed to set the transformation ratio of the installed
current transformers.
If Rogowski coils are used (M4M 30 Rogowski), it is not needed to set any transformation ratio.
In order to configure the current transformers ratio it is possible either to choose the values from a list of
values (default settings) or to manually enter a value.
→ → Installation → CT ratio L1 L2 L3
Manual
40/5 A 1
2 50/5 A
60/5 A
→ → Installation → CT ratio L1 L2 L3
Manual
40/5 A 1
50/5 A
60/5 A
If the CT is replaced varying the value of the transformation ratio, before proceeding it is recommended to:
1. Note down the value of the energy counts accumulated with the previous ratio.
2. Reset the energy counts.
3. Insert a new value of the transformation ratio.
Please notice that if M4M 30 Rogowski is being used, no CT ratio has to be set for Rogowski coils.
Primary of CT has to be higher than the secondary.
M4M 30 NETWORK ANALYZER USER MANUAL 35
In case a 4th current transformer is used to measure the neutral current, CT ratio for the Neutral has to be
configured.
CT ratio Neutral
Manual
40/5 A
50/5 A
60/5 A
7.6.VT ratio
M4M is capable to measure voltage via direct connection up to 400 VL-N (690V L-L), or via indirect
connection by means of voltage transformers.
In order to configure the voltage transformer ratio it is needed to enter manually the values of both
primary and secondary.
→ → Installation → VT ratio
In case of direct insertion without voltage transformers (possible up to 400V L-N), please set VT ratio as
400/400 (default)
36 M4M 30 NETWORK ANALYZER USER MANUAL
At the end of the “7. First commissioning” phase the lock operation is required. It can be set once and the
user cannot reset the lock state.
M4M 30-M will not count any MID energy until it is locked.
8. Configuration
In order to change any configuration of the device, it is mandatory to enter the password. The password
is valid as soon as the user remains in the Configuration section and for max. 10 minutes. After quitting
the Configuration section, it is needed to enter again the password.
If the padlock icon is closed, it is needed to enter the password in order to modify any configuration.
If the padlock icon is open, it is possible to modify any configuration without entering any password.
Configuration
Unit
Installation
Historicals
Average
8.1.Unit
Unit
Modify Password
Language
Reset
Device info
Menu Description
Modify Password Change the existing password.
Language Change the language of the display.
Reset Reset options for the meter.
Device info Visualization of info related to the meter.
Date/Time Change date and time on the device.
Brightness Change the brightness of the display.
Energy Saving Set energy saving mode for the display.
Audit Logs Visualization of audit log.
38 M4M 30 NETWORK ANALYZER USER MANUAL
Confirm
Language menu
It is possible to change the display language to one of the languages present in the device. (please refer
to chapter “7.1.Language”).
→ → Unit → Language
M4M 30 NETWORK ANALYZER USER MANUAL 39
Reset menu
→ → Unit → Reset
Reset
Factory reset
Global reset
Historicals reset
Energy reset
In order to update the FW to the latest version (via Modbus RTU or Modbus TCP/IP) it is necessary to use ABB
Software Ekip Connect 3.
Date/Time menu
During the first commissioning, it is highly recommended to configure the date and time on the network
analyzer (please refer to chapter “7.3.Date and time”).
Brightness menu
In this menu it is possible to modify the display brightness during normal operation conditions.
→ → Unit → Brightness
Brightness
Confirm
The default value is 100% but it can differ from 10% to 100%.
The lifetime of the graphical display depends on the brightness of the display. It is highly recommended to
limit the brightness level of the display in order to ensure a longer lifetime of the device.
Energy saving
Stand-by time
Stand-by brightness
Menu Description
Set up the time after that the brightness decrease. The default value is 3
Stand-by time
minutes but it can differ from 1 to 60 minutes.
Set up the level of brightness when the device is in stand-by. The default
Stand-by brightness
value is 40% but it can differ from 0% to 100%.
The lifetime of the graphical display depends on its brightness and stand-by time.
It is highly recommended to limit the brightness level of the display in order to ensure a longer lifetime of the
device.
M4M 30 NETWORK ANALYZER USER MANUAL 41
→ → Unit → Logs
Each entry contains following data:
Data Description
Where general information about device from the moment of entry
System info
creation is presented.
Where snapshot of CT/VT ratios and Type of network just right after a
Configuration
successfully performed operation is presented.
Where value of total imported active energy, imported active energy of L1-
Energy L3 and tariff 1-6 as well as total exported active energy from the moment
of entry creation are presented.
Below you can find the detail of data present for each log entry:
Entry num
Timestamp
System info
Upgrade counter
FW Version
TRAFO_V_Prim
TRAFO_V_Sec
TRAFO_I_Prim
Configuration TRAFO_I_Sec
TRAFO_IN_Prim
TRAFO_IN_Sec
WIRES
ACTIVE_ENERGY_IMPORT_TOTAL
ACTIVE_ENERGY_IMPORT_L1
ACTIVE_ENERGY_IMPORT_L2
ACTIVE_ENERGY_IMPORT_L3
ACTIVE_ENERGY_IMPORT_TAR1
Energy ACTIVE_ENERGY_IMPORT_TAR2
ACTIVE_ENERGY_IMPORT_TAR3
ACTIVE_ENERGY_IMPORT_TAR4
ACTIVE_ENERGY_IMPORT_TAR5
ACTIVE_ENERGY_IMPORT_TAR6
ACTIVE_ENERGY_EXPORT_TOTAL
42 M4M 30 NETWORK ANALYZER USER MANUAL
8.2.Installation
→ → Installation
Installation
CT ratio L1 L2 L3
CT ratio Neutral
VT ratio
Type of network
Menu Description
Set the ratio of current transformers for current measurement on Line 1, 2
Ct ratio L1 L2 L3
and 3.
CT ratio Neutral Set the ratio of current transformers for current measurement on neutral.
VT ratio Set the ratio of voltage transformers for voltage measurement, if any.
Set the type of network and number of wires on which the device is
Type of network
installed.
LED Source Set the source for the frontal LED.
M4M 30-M (MID): For MID directive, it is only possible to configure these parameters before the Lock is
completed. After the lock operation, these configurations cannot be modified in order to avoid antitampering.
For locked meter this settings are read only parameters.
M4M 30 NETWORK ANALYZER USER MANUAL 43
CT ratio L1 L2 L3 menu
During the first commissioning, it is highly recommended to configure the CT ratio L1, L2, L3 and Neutral
(please refer to chapter “7.5.CT ratio”).
→ → Installation → CT ratio L1 L2 L3
Installation
CT ratio L1 L2 L3
CT ratio Neutral
VT ratio
Type of network
Installation
CT ratio L1 L2 L3
CT ratio Neutral
VT ratio
Type of network
VT ratio menu
During the first commissioning it is mandatory to configure the VT ratio (please refer to chapter “7.6.VT ratio”).
→ → Installation → VT ratio
Installation
CT ratio L1 L2 L3
CT ratio Neutral
VT ratio
Type of network
44 M4M 30 NETWORK ANALYZER USER MANUAL
Installation
CT ratio L1 L2 L3
CT ratio Neutral
VT ratio
Type of network
LED
Installation
Source
Active
CT ratio L1 L2 L3
CT ratio Neutral
Reactive
VT ratio
Apparent
Type of network
Option Description
Active Flashes in proportion to the active energy measured.
Reactive Flashes in proportion to the reactive energy measured.
Apparent Flashes in proportion to the apparent energy measured.
M4M 30 NETWORK ANALYZER USER MANUAL 45
8.3.Historicals
In this section it is possible to carry out configurations related to Historicals functionalities. Historicals
functionalities allow to store measurements (instantaneous snapshots, demand values) inside the device
flash memory.
→ → Historicals
Historicals
Load profile
Max/Min Demand
Energy historicals
Menu Description
Load profile Configuration for the Load profile feature in Historicals.
Max/Min Demand Configuration for the Max/min demand feature in Historicals.
Common configuration for Energy - Snapshots and Energy - Trends
Energy historicals
features in Historicals.
M4M 30-M (MID): Historicals functionalities are not designed to comply with MID requirement.
46 M4M 30 NETWORK ANALYZER USER MANUAL
Load profile
Time interval
Channels
Menu Description
Time interval used for calculation of demand values that will be stored
Time interval
into the memory with timestamp.
Available channels in load profile. Each channel can be configured to a
Channels
defined parameter.
Please note that M4M allows to store 1 year of load profiles with time interval of 30 min. for 25 parameters (25
channels of memory).
• Time interval
The time interval is in common for all the load profile channels. For this reason, this configuration has to
be done only once.
The demand calculation will take place over the time interval defined. The interval will start in the moment
of selection and the following one will start after the time interval is over.
Select the time interval among one of the following options: 1, 2, 5, 10, 15 (default value), 30, 60 minutes.
Load profile
Time interval
1 min
2 min
5 min
10 min
M4M 30 NETWORK ANALYZER USER MANUAL 47
• Channels
It is possible to configure each channel to one of the following parameters, allowing to store one
parameter in each channel. Up to 25 parameters can be selected and stored. Default parameters are
already configured and defined in the M4M for each channel, see details below.
Load Profile
Channels
Parameter Ch.1
Parameter Ch.2
Parameter Ch.3
Parameter Ch.4
Max/min demand
Time interval
Time period
Channels
Menu Description
Time interval used for calculation of demand values that will be stored
Time interval
into the memory with timestamp.
Time period over which max and/or min values are evaluated and then
TIme period
stored.
Available channels in max/min demand. Each channel can be configured
Channels
to a defined parameter.
Please note that M4M allows to store 1 year of 3 highest and 3 lowest demand values with time interval of 30
min. and time period of day for 25 parameters (25 channels of memory).
M4M 30 NETWORK ANALYZER USER MANUAL 49
• Time interval
The time interval is in common for all the max/min demand channels. For this reason, this configuration
has to be done only once. Average values can either be calculated with sliding demand or no sliding.
The demand calculation will take place over the time interval defined. The interval will start in the moment
of selection and the following one will start after the time interval is over.
Select the time interval among one of the following options: 1, 2, 5, 10, 15 (default value), 30, 60 minutes.
After the configuration of time interval, it is needed to select the time sub-interval
Max/min demand
Time sub interval
No sliding
1 min
2 min
5 min
Menu Description
After the configuration of time interval, in case no sliding demand is
needed, please configure the time sub-interval as no sliding.
No sliding
If no sliding is selected the average will be calculated over the intervals
01:00 - 01:15, 01:15 - 01:30, 01:30 - 01:45 etc...
1 min
After the configuration of time interval, in case of sliding demand it is
2 min
needed to setup a sub-interval, with measured interval that will slide
5 min forward one sub interval at a time. The sub-interval must always be
10 min smaller than the time interval the time interval must be evenly divisible
15 min (default value) with the sub-interval. If for example an interval of 15 minutes and a sub-
interval of 1 minute is selected the average will be measured over the
30 min
intervals 01:00 - 01:15, 01:01 - 01:16, 01:02 - 01:17 etc...
60 min
50 M4M 30 NETWORK ANALYZER USER MANUAL
• Time period
The time period is in common for all the max/min demand channels. For this reason, this can
configuration has to be done only once.
The time period represents the timeframe over which the max/min demand values are evaluated and
then stored. When the last interval of an ongoing period has finished, the max and/or min values are
stored, and a new period starts.
Select the time period among one of the following options: day (default value), week, month
Max/min demand
Time period
Day
Week
Month
Menu Description
If day is chosen the starting point for evaluation of max and min
Day (default value) will be now and the ending point will be 00:00 (time period ends
and restarts at 00:00).
If week is chosen, a start day of the period has to be chosen. Options are:
Week
Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, and Sunday.
If month is chosen the starting point will be now and the ending
Month point will be the first of next month at 00:00 (time period ends
and restarts on the 1st).
The time period and time interval are common for all the max/min demand channels. For this reason, the
configuration of time period and time interval are applied to all the channels.
• Channels
It is possible to link each channel to one of the following parameters, allowing to store one parameter in
each channel. Up to 25 parameters can be selected and stored. Default parameters are already setup in
the M4M for each channel, see details below.
After configuring the parameter, for each channel it is possible to configure whether to store only maximum
values, only minimum values or both maximum and minimum values.
Configure the max/min type among one of the following options: Max, Min or Max and Min.
52 M4M 30 NETWORK ANALYZER USER MANUAL
Energy historicals
Time interval
Channels
Menu Description
Time interval Time interval selected for storage of energy values.
Channels of memory of the device, allowing to store a defined
Channel
parameter in each channel.
M4M 30 NETWORK ANALYZER USER MANUAL 53
• Time interval
The time interval is in common for all the channels of memory. For this reason, this can configuration has
to be done only once.
Energy historicals
Time interval - Trends
1 hour
6 hours
12 hours
Day
Menu Description
The snapshot will take place now and the following one will be after
1 hour
1 hour.
The snapshot will take place now and the following one will be after
6 hours
6 hours.
The snapshot will take place now and the following one will be after
12 hours
12 hours.
The snapshot will take place now and the following one will be at
Day (default value)
00:00.
It is needed to indicate when the demand period ends between
Week these following options: Monday, Tuesday, Wednesday, Thursday,
Friday, Saturday, and Sunday.
The snapshot will take place now and the following one will be at the
Month
first of next month at 00:00.
54 M4M 30 NETWORK ANALYZER USER MANUAL
• Channels
It is possible to link each channel to one of the following parameters, allowing to store
one parameter in each channel. Up to 20 parameters can be selected and stored. Default
parameters are already setup in the M4M for each channel, see details below.
8.4.Input / output
In this section it is possible to configure I/O slots of the meter.
The number and type of I/O on the M4M network analyzer varies according to the different product
versions. Please refer to the table in “3.4.Versions” for the detail of I/O types per each M4M.
→ → I/O
I/O
Slot 1
Slot 2
Slot 3
Slot 4
M4M 30-M (MID):For MID directive, slot 1 is assigned as pulse output for active energy.
Input
Each programmable I/O can be configured as Pulse Input or Tariff Input.
Selecting Pulse Input, the device counts detected pulses connected to input port, that should last at least
30ms. It is needed to consecutively set a pulse ratio associated to the pulse counter, and then a unit of
measurement to be associated to the pulses.
Selecting Tariff Input allows to manage the tariffs via inputs. Only I/O1, I/O2 and I/O3 can be used for
Tariff inputs. It is mandatory to select Tariff source as “Input” inside Configuration -> Installation ->
Tariffs. Please see chapter “8.7.Tariffs” for relationship between tariffs and input status.
Digital Output
Each programmable I/O can be configured as Alarm output, Communication output, Pulse output,
Output ON or Output OFF.
Selecting Alarm output, the output can be associated to a simple alarm or to a complex alarm. Please
note that it is mandatory to set up a single alarm or a complex alarm prior to setting an output as Alarm
output. In case no alarms have been set up, an information pop-up will appear to inform that no alarm is
set, with an hyperlink to the Alarm settings. For alarm settings, please refer to chapter “8.5.Alarms” and
“8.6.Complex alarms”.
Selecting Comm. output, the output status is controlled directly via bus.
Selecting Pulse output, the output is set as a pulse generator associated with a measured parameter. It
is needed to consecutively set a measured parameter associated to the pulse output, the pulse ratio and
the pulse length.
The MID active energy import total function is assigned to pulse output 1.
The pulse duration is 30 ms and is not configurable.
The frequency is not configurable. It is adjusted by the algorithm according to the voltage and current
primaries, see follow:
Selecting Output ON / Output OFF, the output acts as a contact close / contact open.
Selecting Output ON the circuit is closed, selecting Output OFF the circuit is open.
For output connections, please refer to chapter “5.4.Wiring diagrams”.
M4M 30 NETWORK ANALYZER USER MANUAL 57
• Analog output
Slots 7 and 8 of the I/O menu for M4M 30 I/O contain analog outputs that can be used to associate a
measured parameter to a current output value.
It is possible to define the parameter to be associated to the analogue output, as well as minimum and
maximum measured values to be linked to the output span.
Menu Description
Output span 0 - 20mA or 4 - 20mA
Voltage L1, L2 and L3, Voltage L1-L2, L2-L3, L1-L3, Total Current,
Current L1, L2, L3, Current Neutral, Total Active Power, L1 Active
Power, L2 Active Power, L3 Active Power, Total Reactive Power,
L1 Reactive Power, L2 Reactive Power, L3 Reactive Power, Total
Parameter
Apparent Power, L1 Apparent Power, L2 Apparent Power, L3
Apparent Power, THD Voltage L1, L2, L3, L1-L2, L2-L3, L1-L3, THD
Current L1, L2, L3, N, Unbalance L-L, L-N, Unbalance Current,
Frequency, Total PF, PF L1, L2, L3.
Manual value of the measured parameter, to be associated to 0mA
Min. value
or 4mA (minimum).
Manual value of the measured parameter, to be associated to 20mA
Max. value
(maximum).
58 M4M 30 NETWORK ANALYZER USER MANUAL
8.5.Alarms
In this section it is possible to configure the single alarms, allowing to monitor certain value selected from a
list of parameters.
→ → Alarms
When specific conditions are met, alarms is turned on or off. Triggering of alarms can be registered in the
devices notifications log, in the alarms section. In addition to that, they can be set up to control digital
outputs of the device. In order to set an output as alarm output, please refer to chapter “8.4.Input /
output”.
There are two types of alarms available on M4M: simple alarms and complex alarms. For complex alarms,
please refer to chapter “8.6.Complex alarms”.
Up to 25 simple alarms can be configured in the device. The following graph explains how the alarm
features work in relationship to threshold, delay, hysteresis.
300 delay
250
200 threshold
150
turn off threshold
100
0
0,00
0,44
0,84
1,21
1,53
1,83
2,08
2,30
2,48
2,74
2,81
How the alarm is turned on: Whenever measured value crosses threshold for a time that is higher than 2,85
the defined delay, timer is set and starts counting down delay. If count down is finished and the value
have not crossed back the threshold, alarm is turned on. At this point, according to configuration, alarms
trip is registered in the notifications log (alarm section) and/or alarm output is set High.
How the alarm is turned off: The alarm state is held until the value crosses turn off threshold, which is
the difference between the threshold and the threshold hysteresis. Crossing turn off threshold results
in turning off the alarm, thus digital output is turned off or/and it is registered in the notifications log
(alarm section).
M4M 30 NETWORK ANALYZER USER MANUAL 59
In order to set an alarm, it is needed to define the parameter associated to the alarm, the alarm type (cross
up over threshold, or cross down under threshold), the threshold value for the parameter, the activation
delay and the hysteresis for the turn off threshold.
Setting Description
Voltage (L1, L2, L3, L1-L2, L2-L3, L1-L3), Current (total, L1, L2, L3, neutral,
ground), Active Power (total, L1, L2, L3), Reactive Power (total, L1, L2, L3),
Parameter Apparent Power (total, L1, L2, L3), THD Voltage (L1, L2, L3, L1-L2, L2-L3, L1-L3),
THD Current (L1, L2, L3, neutral), Unbalance Voltage (L-L, L-N), Unbalance
Current, Frequency, Power Factor (total, L1, L2, L3), Count down Timer.
Alarm Type Cross up or Cross down.
Threshold Manual entry from 0 to 999k.
Delay Manual entry from 0s to 900s.
Hysteresis Manual entry from from 0% to 40%.
Logs Enable or Disable the logging of alarms inside notifications.
Alarm 3 +
Alarm 4 1b +
8.6.Complex alarms
In this section it is possible to configure the complex alarms, allowing to combine simple alarm into single
entity through specific logics.
Up to 4 complex alarms can be configured on the device. It is possible to create an alarm logic that will allow
the alarm activation only in case specific conditions take place.
Each complex alarm can be linked to up to 4 simple alarms, selected along with OR / AND logical operator.
When OR is selected alarm will be tripped every time one of the conditions of the equation will turn positive;
when AND is selected alarm will be tripped every time all the conditions of the equation will turn positive.
Complex alarm trip can be registered in the notifications (alarm section) and/or alarm output is set High.
Once logical equation will turn negative again, complex alarm is turned off, thus digital output is turned off
or/and it is registered in the notifications log (alarm section).
Complex Alarms 1a. In case an alarm has been set, it will present
an edit symbol ( ) in the list of alarms. A tap
on an alarm with edit symbol allows to edit
Complex Alarm 1 an existing alarm.
1b. In case an alarm is not completely set, it will
Complex Alarm 3 +
Complex Alarm1b4 +
60 M4M 30 NETWORK ANALYZER USER MANUAL
8.7.Tariffs
In this section it is possible to configure up to six tariffs to monitor consumption in different time
frames. It is possible to control activation via: clock, setting up to three input channels and settings sent
via bus.
→ → Tariffs
Tariffs
Tariff source
Clock
Input
Communication
Menu Description
Up to 6 tariffs can be defined according to specific timebands, driven by the
Clock
device Real Time Clock.
Based on the number of I/O that are set as Tariff Inputs (from 1 to 3) that are
Input set up from the Input menu (please refer to chapter “8.4.Input / output”), 2, 4
or 6 tariffs can be activated.
It is possible control directly the activation of the individual tariffs. Multiple
Communication
configuration settings cannot be used.
M4M 30 NETWORK ANALYZER USER MANUAL 61
• Clock
→ → Tariffs → Clock
Selecting Clock, it is possible to define when the different tariffs are active, according to specific day and
hour, driven by Real Time Clock.
After selecting a tariff (6 tariffs available), it is needed to configure the type of day of the tariff - during
the week or during the weekend.
Select the day type among one of the following options: None, Weekday, Weekend. In order to disable a
tariff, please select None.
If weekday or weekend is chosen, then the tariff will be enabled during the weekdays or during the
weekend, and it is needed to select the start hour of the tariff. Configure the start hour in the format
hh:mm.
Each tariff is kept active until the next tariff is activated, thus to define the end hour of each tariff set it as the
start hour of the following tariff in the same day type.
• Input
→ → Tariffs → Input
Selecting Input, the activation of the tariffs will follow the following table:
Please see chapter “7.4 Inputs / Outputs” for further details on how to setup an I/O slot as Tariff input.
• Communication
→ → Tariffs → Communication
See Modbus communication manual for details on how to read Tariff via communication.
62 M4M 30 NETWORK ANALYZER USER MANUAL
8.8.Communication
→ → Communication
Communication menu allow to set all the parameters related to the communication protocol available
for a specific product version. The embedded communication protocol varies according to the different
product versions. Please refer to “3.3. Versions” for the details on the embedded communication
protocols.
Based on product version following configuration menus are available:
→ → Communication → Bluetooth
Bluetooth
Enable / Disable
Start pairing
Menu Description
Enable/Disable Enable / disable bluetooth communication. Disabled by default.
Start paring Starts the paring, only if Bluetooth communication is enabled.
When the Bluetooth communication is enabled, the communication active symbol appears
When Start pairing is selected, in order to complete the pairing with EPiC Mobile, due to Cybersecurity
reasons it is needed to enter a passkey on your smartphone. The following screen will appear, followed by
a passkey randomly generated by M4M.
Bluetooth
Passkey
EPIC
is connected via Bluetooth
OK
M4M 30 NETWORK ANALYZER USER MANUAL 63
Please follow the instructions on EPiC Mobile to complete the pairing. Once the pairing is completed, a
confirmation pop-up will appear on the device as per below picture:
Bluetooth
Passkey
OK
MODBUS RTU (M4M 30 Modbus, M4M 30 I/O, M4M 30 Rogowski, M4M 30-M Modbus product
versions)
This section is available on all the M4M 30 product versions with Modbus RTU embedded communication.
Menu Description
Address From 1 to 247
Baud rate 9600, 19200, 38400, 57600, 115200
Parity Even, Odd, None
See Modbus communication manual for details on Modbus communication protocol and communication map.
Menu Description
DHCP Enable / Disable (disabled by default)
IP address 192.168.1.12 (by default)
Subnet mask 255.255.255.0 (by default)
Gateway 192.168.1.1 (by default)
TCP port 502 (by default)
If DHCP is disabled, the values of above configurations (IP address, subnet mask, gateway, TCP port) are
the default ones. In this case, it is possible to modify each of above configurations.
If DHCP is enabled, it is not needed to enter the above configurations as they are automatically set.
See Modbus communication manual for details on Modbus communication protocol and communication map.
64 M4M 30 NETWORK ANALYZER USER MANUAL
→ → Communication → Profibus
Menu Description
Address From 1 to 126
If DHCP is disabled, the values of above configurations (IP address, subnet mask, gateway, TCP port) are
the default ones. In this case, it is possible to modify each of above configurations.
If DHCP is enabled, it is not needed to enter the above configurations as they are automatically set.
See Profibus communication manual for details on Profibus communication protocol and communication
map.
→ → Communication → BACnet
Ekip Connect mode item shall be used only for FW upgrade via Ekip Connect desktop. When Ekip Connect
mode is enabled, the device reboots and waits for FW upgrade. At the end of the firmware upgrade
operation the device will reboot with the updated firmware. Once the device has rebooted, ensure that
Ekip connect mode parameter is disabled.
If DHCP is disabled, the values of above configurations are the default ones. In this case, it is possible to
modify each of above configurations.
If DHCP is enabled, it is not needed to enter the above configurations as they are automatically set.
See BACnet communication manual for details on BACnet communication protocol and communication map.
M4M 30 NETWORK ANALYZER USER MANUAL 65
8.9.Other settings
In this menu it is possible to configure the time interval for average values calculation, timers settings,
energy conversion parameters.
→ → Other settings
Other settings
Average
Timers
Energy conversion
Warning levels
Menu Description
Average Configuration of time interval for Average values.
Timers Configuration of count-down timer and timer reset.
Energy conversion Configuration of conversion factors for energy.
Warning levels Configuration of warning level for single harmonics.
Average menu
In this menu it is possible to configure the time interval used for calculation of average parameters that
can be read out in Data reading -> Average. For the data reading of average values please refer to chapter
“9.4.Average”
For the configuration of demand values related to the flash memory, please refer to chapter
“8.3.Historicals”
Average
Time interval
15 min
Confirm
Setting Description
Time interval Manual entry from 1 to 60m. Default: 15m
66 M4M 30 NETWORK ANALYZER USER MANUAL
Timers menu
In this menu it is possible to configure the count-down timer, used for maintenance notification, and the
timers reset.
For the data reading of timers values please refer to chapter “9.10.Timers”.
Countdown timer
Star time
Confirm
Menu Description
Count-down timer Used for the count of the system operating time.
Timers reset Reset of the count-down timer.
If countdown timer menu is chosen, the screen above will appear, allowing to manually enter the value in the
format days: hours: minutes.
Energy conversion
Currency/kWh
CO2/kWh
Menu Description
Currency conversion factor that allows to display the equivalent of
Currency/kWh active 3-phase energy in local currency. Factor has to be defined as
currency/kWh.
CO2conversion factor that allows to display the equivalent of active
CO2/kWh
3-phase energy in CO2. Factor has to be defined as kg CO2/kWh.
M4M 30 NETWORK ANALYZER USER MANUAL 67
The limits can be configured for Line-Neutral Voltage, Line-Line Voltage, Currents.
For the visualization of harmonic graphs please refer to chapter “11.3.Harmonics”.
68 M4M 30 NETWORK ANALYZER USER MANUAL
9. Data Reading
Data reading section allows to visualize all the parameters measured by M4M.
→ Data Reading
Data Reading
Realtime
Energy
Power Quality
Average
9.1.Realtime
→ Data Reading
→ Realtime
Realtime measurement
Frequency
50.03 Hz
9.2.Energy
→ Data Reading
→ Energy
Energy Energy Energy Energy
Active Energy - Import Reactive Energy - Import Apparent Energy - Import Active Energy - Export
Tariffs
I 0.756 g I 0.09 CU
1220.56 E 0.178 g E 0.02 CU
VAh
N 0.578 g N 0.07 CU
Visualization page
Active Energy - Import Total imported active energy in Wh/kWh/MWh.
Reactive energy - Import Total imported reactive energy in varh/kvarh/Mvarh.
Apparent energy - Import Total imported apparent energy in VAh/kVAh/MVAh.
Active Energy - Export Total exported active energy in Wh/kWh/MWh.
Reactive Energy - Export Total exported reactive energy in varh/kvarh/Mvarh.
Apparent Energy - Export Total exported apparent energy in VAh/kVAh/MVAh.
Net value of active energy import/export total in Wh/kWh/
Active Energy - Net
MWh.
Net value of reactive energy import/export total in varh/
Reactive Energy - Net
kvarh/Mvarh.
Net value of apparent energy import/export total in VAh/
Apparent Energy - Net
kVAh/MVAh.
CO2 emission linked to imported (I), exported (E) and net
Equivalent CO2/kWh energy. To set the conversion factor go to Configuration -
Other settings - Energy conversion.
Currency linked to imported (I), exported (E) and net
Equivalent Currency/kWh energy. To set the conversion factor go to Configuration -
Other settings - Energy conversion.
Tariffs
→ Data Reading
→ Energy → Tariffs
Energy Tariffs Tariffs
Active Energy - Import Active Energy - Import Active Energy - Import
T1 211.32 Wh T4 253.65 Wh
1512.7 T2 132.70 Wh T5 449.46 Wh
Wh
T3 57.47 Wh T6 408.10 Wh
Tariffs
T1 23.77 Wh T4 57.56 Wh
356.23 T2 12.68 Wh T5 102.36 Wh
Wh
T3 65.30 Wh T6 94.56 Wh
Tariffs
9.3.Power Quality
→ Data Reading
→ Power Quality
Power Quality Power Quality Power Quality Power Quality
THD Line-Neutral Voltage THD Line-Line Voltage THD Current Unbalances
N 289.0 %
L1 42.1 % L12 27.4 % L1 11.0 % VLN 0.1 %
L2 42.2 % L23 27.3 % L2 11.1 % VLL 0.1 %
L3 42.2 % L13 27.2 % L3 11.1 % I 0.2 %
0.981 0.976
L1 0.990 L1 1.000
L2 0.909 L2 0.940
L3 0.969 L3 0.986
9.4.Average
→ Data Reading
→ Average
Average values are calculated on the average time. See chapter “8.9.Other settings” for the configuration
of average time.
9.5.Min Value
→ Data Reading
→ Min Value
Min Value Min Value Min Value Min Value
Line-Neutral voltage Line-Line voltage Current Current
Minimum values are the minimum since latest reset of maximum/minimum values.
Move with keys to navigate among the visualization pages.
M4M 30 NETWORK ANALYZER USER MANUAL 75
9.6.Max Value
→ Data Reading
→ Max Value
Max Value Max Value Max Value Max Value
Line-Neutral voltage Line-Line voltage Current Current
Maximum values are the maximum since latest reset of maximum/minimum values.
Move with keys to navigate among the visualization pages.
76 M4M 30 NETWORK ANALYZER USER MANUAL
9.7.I/O
The number and type of I/O on the M4M network analyzer varies according to the different product
versions. Please refer to the table in “3.3 Versions” for the detail of I/O types per each M4M.
For each I/O specific information is shown according to the I/O type. Below an example for I/O set as
pulse output:
→ Data Reading
→ I/O
I/O
Slot 1
9.8.Notifications
→ Data Reading
→ Notifications
Notifications
All
Alarms
Warnings
Errors
Menu item Description
All alarms, warnings, errors displayed in chronological order
All
(latest first).
Alarms User settable, related to specific parameters, threshold, etc.
Warnings Related to installation conditions and device settings.
Errors Related to the device and to its self-diagnostics.
Please refer to chapters “8.5.Alarms” and “8.6.Complex alarms” for details on how to set the alarms on M4M.
All
→ Data Reading
→ Notifications → All
Notifications
All
Alarm 2
Firmware CRC
Persistent storage
Alarm 1
Symbol Description
Alarms.
Warnings.
Errors.
When one of the notifications is selected, the timestamp of the notification will be shown, indicating
date and time of the alarm, warning or error.
78 M4M 30 NETWORK ANALYZER USER MANUAL
Alarms
→ Data Reading
→ Notifications → Alarms
Notifications
Allarms
Alarm 2
Alarm 3
Alarm 1
Alarm 4
If one of the alarms is selected, timestamp (Day, Hour) will be shown. Day format is YYYY:MM:DD, time
format is hh:mm:ss.
Warnings
→ Data Reading
→ Notifications → Warnings
Notifications
Warnings
l1 missing
V1 missing
l1 missing
l1 missing
If one of the warnings is selected, timestamp (Day, Hour) will be shown. Day format is YYYY:MM:DD, time
format is hh:mm:ss.
Errors
→ Data Reading
→ Notifications → Errors
Notifications
Errors
Firmware CRC
Persistent storage
9.9.Power outages
→ Data Reading
→ Power outages
At each power fail condition, has stored in the persistent storage a power outage log.
It is possible to have up to 50 entries in cycle way. It is not possible to erase the power outages log
entries.
1. Go to Warnings menu
2. Short click of hamburger button
3. Long click of left-most (empty) button in hamburger menu
4. Long click of hamburger button
80 M4M 30 NETWORK ANALYZER USER MANUAL
9.10.Timers
→ Data Reading
→ Timers
Timers
Up counter
0 00:04
Down Counter
364 23:55
Menu Description
Represents the timer count up of the device lifetime since the
Up counter
power up.
Down counter Represents the timer count down for the device maintenance.
M4M 30 NETWORK ANALYZER USER MANUAL 81
10. Historicals
In the Historicals section it is possible to read out the parameters stored in the device flash memory (32 MB).
Each feature has a predefined number of parameters that can be stored in each channel of flash memory.
It is possible to configure the historical functionalities and the different channels.
For further details on how to configure the Historicals functionalities, please refer to the chapter
“8.3.Historicals”.
→ Historicals
Historicals
Load profile
Max/Min Demand
Energy Snapshots
Energy Trends
10.1.Load profile
Visualization of load profile curves for 25 different parameters.
Each page shows the graph of the latest 48 demand values for the selected parameter stored in a
channel. The bottom part shows what parameter is configured in the channel and what is the time
interval used for demand calculation of average values.
By clicking on the buttons on the bottom part of the display you can directly go to the setting page to
change the parameters to be stored and the time interval. Please notice that each modification settings
will erase the load profiles stored data inside M4M.
→ Historicals
→ Load profile
Load Profile
Channel 1 of 25
-24 -20 -16 -12 -8 -4 15:30 m
20.0
20.5
21.0
21.5
22.0
kW
Move with keys to navigate through the different parameters stored in the device. Every
channel holds a configurable parameter, 25 channels are present..
82 M4M 30 NETWORK ANALYZER USER MANUAL
10.2.Max/min demand
Visualization of the maximum and minimum values for 25 different parameters.
Select a time period to view in the list of the available periods. Each page shows up to 3 levels of max and/or
3 levels of min demand values linked to the channel of memory, according to the configuration that has been
carried out. The bottom part shows on the left a link to the parameters configuration, in the center the time
period (e.g. Day) over which max and min are evaluated, and the time interval and sub-interval (e.g. 15/5 min),
that specify the interval used for demand values calculation.
By clicking on the buttons on the bottom part of the display you can directly go to the setting page to change
the parameters to be stored, the time period and the time interval. Please notice that each modification
settings will erase the max/min demand stored data inside M4M.
→ Historicals
→ Max/min demand
Max/min demand
Current period - Channel 1 of 25
Act. Power Tot.
Max Level Min
2.54 kW 1
0.54 kW
19-09-15 12:00 19-09-15 01:25
2.38 kW 2 0.75 kW
19-09-15 12:15 19-09-15 02:10
2.12 kW 3 0.76 kW
19-09-15 12:45 19-09-15 00:45
Move with keys to navigate through the different parameters stored in the device. Every channel
holds a configurable parameter, 25 channels are present.
10.3.Energy Snapshots
Visualization of energy graphs showing the energy consumption curve for 20 different parameters.
Each page shows the graph of the latest 12 stored energy snapshots taken according to the defined time
interval. The bottom part shows what parameter is linked to the channel and what is the time interval used to
take each snapshot.
By clicking on the buttons on the bottom part of the display you can directly go to the setting page to change
the parameters to be stored and the time interval. Please notice that each modification settings will erase the
Energy Snapshots stored data inside M4M.
→ Historicals
→ Energy Snapshots
Energy Snapshots
Channel 1 of 20
-12 -10 -8 -6 -4 -2 07-09 d
5.00
4.50
4.00
3.50
3.00
kWh
Move with keys to navigate through the different parameters stored in the device. Every channel
holds a configurable parameter, 20 channels are present.
M4M 30 NETWORK ANALYZER USER MANUAL 83
10.4.Energy Trend
Visualization of energy trends graphs for 20 different parameters.
Each page shows the graph of the latest 12 stored energy values in the defined time interval (differences
between value at the end and at the beginning of time interval). The bottom part shows what parameter
is linked to the channel and what is the time interval used to take the two snapshots for the trend
definition.
By clicking on the buttons on the bottom page you can directly go to the setting page to change the
configuration. Please notice that each modification settings will erase the Energy Trend stored data
inside M4M.
→ Historicals
→ Energy Trend
Energy Trend
Channel 1 of 20
-10 -8 -6 -4 -2 07-09 d
5.00
4.00
3.00
2.00
1.00
kWh
Move with keys to change the parameter. It is possible move among a list of channels, up
to 20 parameters (Parameter Ch.1, Parameter Ch.2, etc…).
84 M4M 30 NETWORK ANALYZER USER MANUAL
11. Graphs
In the Graphs section it is possible to visualize the main parameters measured by M4M in a graphical
view.
→ Graphs
Graphs
Realtime
Waveforms
Harmonics
Phasors
11.1.Realtime
Bargraphs showing in an intuitive way the realtime values of voltage, current and power. The graphs are
automatically scaled according to the values that are measured in realtime.
→ Graphs
→ Realtime
Realtime graph Realtime graph Realtime graph
Line-Neutral Voltage Line-Line Voltage Current
0 120 240 360 V 0 120 240 360 V 0 4.0 8.0 12.0 A
L1 L12 L1
L2 L23 L2
L3 L13 L3
L1 L1 L1
L2 L2 L2
L3 L3 L3
Graph
Line-Neutral voltage
Line-Line voltage
Current
Active Power
Reactive Power
Apparent Power
86 M4M 30 NETWORK ANALYZER USER MANUAL
11.2.Waveforms
Waveforms consists in storing signal samples over 2 line cycles for voltage and current. This functionality
provides a realtime snpashot of network condition.
→ Graphs
→ Waveforms
Waveforms
L-N Voltage
L-L Voltage
Current
Waveforms Description
Visualization of waveform graphs for line to neutral voltage per each
L-N Voltage
phase.
Visualization of waveform graphs for line to line voltage per each
L-L Voltage
line.
Current Visualization of waveform graphs for phase current.
→ Graphs
→ Waveforms → L-N Voltage
Waveforms Waveforms Waveforms
Line-Neutral Voltage Line-Neutral Voltage Line-Neutral Voltage
L1 L2 L3
Graphs
Line-Neutral Voltage (L1)
Line-Neutral Voltage (L2)
Line-Neutral Voltage (L3)
→ Graphs
→ Waveforms → L-L Voltage
Waveforms Waveforms Waveforms
Line-Line Voltage Line-Line Voltage Line-Line Voltage
L12 L23 L13
Graphs
Line-Line Voltage (L12)
Line-Line Voltage (L23)
Line-Line Voltage (L31)
Move with to change the line to line voltage (L12, L23, L31).
Current waveforms
→ Graphs
→ Waveforms → Current
Waveforms Waveforms Waveforms Waveforms
Current Current Current Current
L1 L2 L3 N
Graphs
Current (L1)
Current (L2)
Current (L3)
Current (N)
11.3.Harmonics
Harmonics are integer multiples of the fundamental frequency of the power system. Harmonics are used
to identify if the supplied system power meets required power quality standards, or if non-linear loads
are affecting your power system.
Power system harmonics can cause current flow on the neutral conductor, and damage to equipment
such as increased heating in electric motors.
Measurement of the harmonics is done sequentially, one at a time, over a number of line cycles. Each
harmonics is calculated according to:
In/If·100%
where If is the fundamental current and In is the current for harmonics with number n.
M4M 30 provides harmonic distortion metering up to the 40th harmonic, which are available on
communication protocol.
On the HMI in this section it is possible to visualize the first 15 harmonics as graphs, where the vertical
axis of the harmonics graph indicates the harmonic’s magnitude as a percentage of the fundamental
harmonic, and is scaled based on the largest harmonic displayed.
See section “8.9.Other settings” for the configuration of harmonics warning level.
→ Graphs
→ Harmonics
Harmonics
L-N Voltage
L-L Voltage
Current
→ Graphs
→ Harmonics → L-N Voltage
Harmonics Harmonics Harmonics
Line-Neutral Voltage Line-Neutral Voltage Line-Neutral Voltage
100 L1 100 L2 100 L3
0% 0% 0%
Graphs
Line-Neutral Voltage (L1)
Line-Neutral Voltage (L2)
Line-Neutral Voltage (L3)
Move with to change the line to neutral voltage harmonics graphs visualization (L1,L2,L3).
→ Graphs
→ Harmonics → L-L Voltage
Harmonics Harmonics Harmonics
Line-Line Voltage Line-Line Voltage Line-Line Voltage
100 L12 100 L23 100 L13
0% 0% 0%
Graphs
Line-Line Voltage (L12)
Line-Line Voltage (L23)
Line-Line Voltage (L31)
Move with to change the Line to Line voltage harmonics visualization (L12, L23, L31).
90 M4M 30 NETWORK ANALYZER USER MANUAL
Current harmonics
→ Graphs
→ Harmonics → Current
0% 0% 0% 0%
Graph
Current (L1)
Current (L2)
Current (L3)
Current (N)
11.4.Phasors
→ Graphs
→ Phasors
Phasors Phasors
Diagram Data
VL1 IL1
VL2 IL2 L1 224V 24.2A 2°
VL3 IL3
L2 223V 41.2A 7°
MAX MAX L3 224V 19.0A -8°
224V 41.2A
12. Maintenance
This product contains no parts that can be repaired or exchanged. A broken meter must be replaced.
If you need assistance please contact ABB.
Do not open the meter case and do not attempt to repair any component. Opening the meter will void
accuracy and calibration.
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
..........................................................................................................................................................................................................................................
ABB S.p.A
Electrification business
Viale dell’Industria, 18
20009 Vittuone (MI) Italy
new.abb.com/low-voltage