0% found this document useful (0 votes)
263 views16 pages

CS605 Grand Quiz by Junaid

LMS handling service and grand quiz services are available from 0304-1659294. This document contains a quiz with 62 multiple choice questions related to software engineering topics like software measures, capability maturity model levels, software development lifecycles, software project management principles, and software quality assurance techniques. The questions assess understanding of key concepts, principles, models, and processes in software engineering.

Uploaded by

tarhum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
263 views16 pages

CS605 Grand Quiz by Junaid

LMS handling service and grand quiz services are available from 0304-1659294. This document contains a quiz with 62 multiple choice questions related to software engineering topics like software measures, capability maturity model levels, software development lifecycles, software project management principles, and software quality assurance techniques. The questions assess understanding of key concepts, principles, models, and processes in software engineering.

Uploaded by

tarhum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

LMS handling service

are available
GRAND QUIZ PAID
Assignment, QUIZ, GDBZ and
0304-1659294 GRAND QUIZ SERVICE are
available
MUHAMMAD JUNAID
0304-1659294
AL-JUNAID INSTITUTE GROUP
CS605 GRAND QUIZ
Sr. No MCQS ANSWERS
1. Detect per function point is a______ Metric
2. Which statement is correct? The greater the dependency
between the component is
greater is coupling
3. ________ technique was initially Control chart
developed for manufacturing processes
in the 1920s by Walter Shewart.
4. Hardware/software tools. People and Resources
reusable software components are
considered as _________ for an
organization.
5. In________ there is both vertical and Controlled
horizontal communication. Decentralized( CD)
6. Requirements are sometimes filled with Toxic requirements
defects, normally known as
_____requirements.
7. A process model defines a task set Deliverables
which comprises of SE work task,
milestone and_______
8. ______ activity is performed Quality assurance
throughout software production.
9. The major activity related to software Requirement gathering,
construction are: design development,
coding, and testing
10. Estimation of the _______ is a Software scope
prerequisite of all sorts o estimate,
including, resources, time, and budget.
11. Which of the following is not a Defeats per function point
software measure?
12. Capability maturity model (CMM) 5
has______ levels.
13. ________ is the ability to encourage the Innovation
people to create and feel creative.
14. ________ model is a haphazard type of Build and fix
AL-JUNAID INSTITUTE GROUP
software development activity.
15. A_______entity is the one which have Strong, role
any ________ in the problem domain
without some other entity.
16. The conceptual interface between the Application boundary
‘internal’ application and the ‘external’
user world is known as_______
17. Every project has a defined number of People
staff members. As time allocation
occurs, project manager must ensure
that no more than the allocated number
of _______ has been scheduled at any
given time.
18. SEI stands for________ Software Engineering
Institute
19. We need to employ some statistical Graphically
techniques and plot the results_______.
These are known as statistical control
techniques.
20. Software Project Planning is an activity Project Manager
carried out by the______.
21. ________ is an object oriented model. Fountain
22. Files are the logical files that are the Internal
customer understands and must be
maintained by the system.
23. In measuring process by using a control The product is in unusable
chart, if the gap between the defect condition
reported and defect fixed is increasing.
24. _________ is fundamental or providing
mechanisms for objects evaluation of
any process or activity.
25. _____ lifecycle models appreciate the Object-Oriented
need for iteration within and between
phases.
26. _______of a product can be measured if Quality
we can measure its non-functional
properties i.e. maintainability, integrity,
and usability, etc.
27. ________dimension of Spiral model Radial
AL-JUNAID INSTITUTE GROUP
represented the cultivative cost to date
28. MOI model of leadership stands for. Motivation, Organization,
Innovation
29. The important feature of extreme Pair programming
programming is the concept of_____
30. If the gap between reported and defects Stable
fixed is decreasing then it means that
the product is in __________ condition.
31. After building the decision tree, the Expected cost=?(path
following formula is used to find the probability)i*(estimated
expected cost for an option. Choose the path cost)
correct formula:
32. Extent to which access to software or Integrity
data by unauthorized persons can be
controlled, called ______
33. By default, every organization is Level 1
working at________
34. Caper jhons is a famous researcher in Software engineering
the field of ______ who made a
company named Software Productivity
Research.
35. In Capability maturity model Level 5
(CMM) ,______ performs
optimaization.
36. Continuous process improvement is Qualitative, process
enabled by_____feedback from the
_____.
_________ can be the reason of project Miscommunication
failure.
37. The _______model of software Prototyping
development is a useful approach when
a customer cannot define requirements
clearly.
38. Capability maturity model (CMM) is Maturity
used to judge the______level of an
organization.
39. A ______provides a quantitative value Measure
of some attribute of a process or a
product.
AL-JUNAID INSTITUTE GROUP
40. In controlled centralized structure Vertical
communication between team leader
and the member is______.
41. Effective software project management People, product, process,
focuses on the 4 P’s. These are project
42. Software ______ relates individual Metric
software measures to provide a
normalized view.
43. Each process defines certain Work products
deliverables known as the________.
44. FAST is a team-oriented approach to Facilitated Application
requirement gathering, the team FAST Specification Techniques
stands for:
45. _________ is fundamental for Measuremnet
providing mechanisms for objective
evaluation of any process or activity.
46. A PM has to first come up with the Progress, one day
schedule and then monitor
the_______of the project to ensure that
things are happening accourding to the
schedule. It would not be out of place to
quote Fred Brooks at this point. He
says” Project fall behind schedule
________at a time”.
47. Certain reusable software component Third-party
was to be developed by a/an ______
having no knowledge of its internal
design standards.
48. The amount of “computing resources” Efficiency
required by a program to perform its
function is called________.
49. FTR stands for: Formal Technical Review
50. ________ engineering for software is a Reserve
process for analyzing a program in an
effort to create a representation of the
program at a higher level abstraction
than the source code.
51. A ________ provides a quantitative Measure
value of some attribute of a process or a
AL-JUNAID INSTITUTE GROUP
product.
52. A major issue in requirements ENDED
engineering is the rate at at which
requirements change once the
requirements phase has "officially"
________.
53. We need to employ some statistical Graphically
techniques and plot the results
__________. These are known as
statistical control techniques.
54. Effort required to test a program to Testability
ensure that it performs its intended
function ________.
55. Milestone represents:
The defined target
which you need to
achieve
56. Configuration Auditing deals with:
Ensuring that the
changes have been
implemented
properly
57. A system is considered to be a legacy
system if it has been in operation for Many
________ years. A legacy system has
many components.
58. Which of the following is incorrect?
Most faults are
introduced during
the coding phase
59. When more than one users interpret the
same requirement in different ways then Ambigous
we can say that the requirement is:
60. The amount of "computing resources",
required by a program to perform its Efficiency
function is __________.
61. Configuration Status Reporting (CSR)
reports on 1. What happened?
AL-JUNAID INSTITUTE GROUP
2. Who did it?
3. When did it happen?
4. All of the given

62. In context of moving range and


individual control charts, UNPL stands Upper Natural
for: Process Limit
63. For a software the total number of
requirements are equal to ________. Functional
requirements + non
functional
requirements

64. ________ engineering does not simply


create a modern equivalent of an older Forward
program, rather new user and
technology requirements are integrated
into the reengineering effort.
65. Quality can be measured if we measure
the _____ of the product. 1. correctness
2. maintainability
3. integrity and
usability
4. All of the given
options

66. If an error related to requirements is


identified in testing phase, this error Requirements
will be considered as an error of
___________ phase.
67. Quality cost may be divided into costs
associated with: Moving range
control charts and
AL-JUNAID INSTITUTE GROUP
Individual control
charts

68. Extent to which access to software or


data by unauthorized persons can be Integrity
controlled, is called ________.
69. _______ is one of the techniques used
during severe deadline pressure. Time Boxing
70. Defects per function points is a
________. Metric
71. BAC stands for
Budget at
Completion
72. CPM stands for: Critical Path Model

73. In context of "Individual control chart",


if a single metrics value lies outside Process is out of control
UNPL, it means that:

74. Which of the following is not TRUE


about "Error Tracking"? During "Error
Tracking", we may also
need the historical data
from similar projects.

75. Identify the most appropriate statement:


The quality of the
software
specification is of
extreme importance.

76. BCWP refers to:


Budgeted cost of work
AL-JUNAID INSTITUTE GROUP
performed so far

77. SQA is an umbrella activity in which


following activities are performed Inspection
EXCEPT
78. BCWS for a task i will be equal to:
Effort (person-days etc)
for task i

79. Schedule Performance Index (SPI) is


equal to BCWP/BCWS
80. BCWS stands for:
Budgeted Cost of Work
Schedule

81. Critical path defines:


The chain of tasks that
determines the duration
of the project.

82. The boundary time defines the


following parameter(s) for a project: 1. The latest time for
task initiation before
the minimum project
completion time is
delayed
2. The earliest finish
3. The latest finish
4. All of the given
AL-JUNAID INSTITUTE GROUP
83. The equation to find out the
Availability of software is: Availability = (MTTF /
MTBF) x 100

84 ________ technique was initially


developed for manufacturing processes Control Chart
in the 1920’s by Walter Shewart.
85 The software reengineering is a
________ activity. Non-Trival
86 In order to use the PERT and CPM,
which one of the following is NOT Teams communication
required? mode details.

87 Defect removal efficiency is calculated


as: Where E = errors found before DRE = E/(E+D)
delivery D = errors found after delivery
(typically within the first year of
operation)
88 The extent to which a program can be
reused in other applications is called Reusability
________
89 MTTF is the abbreviation of
Mean time to failure
90 ________ is the measure of how many
defects are removed by the quality Defect removal
assurance processes before the product efficiency
is shipped for operation.

91 Effort required transferring the program


from one hardware and/or software Portability
system environment to another.
92 Effort required to couple one system to
another Interoperability
93 Effort required to test a program to
ensure that it performs its intended Testability
function
AL-JUNAID INSTITUTE GROUP
94 Effort required to locate and fix an error
in a program Maintainability
95 Effort required to modify an operational
program Flexibility
96 The extent to which a program satisfies
its specifications and fulfills the Correctness
customer’s mission objectives
97 The extent to which a program can be
expected to perform its intended Reliability
function with required precision.
98 The amount of computing resources
required by a program to perform its Efficiency
function
99 Extent to which access to software or
data by unauthorized persons can be Integrity
controlled.
100 Effort required to learn, operate,
prepare input, and interpret output of a Usability
program
101 ________ is one of the techniques to
prepare project schedule once we have Program evaluation
defined "task network" and review techniques
(PERT)

102 Earned Value Analysis (EVA) is a


________ technique for assessing the Quantitative
progress of a project.
103 The more you refine the tasks, the more
you can: 1. Estimate task with
accuracy
2. Conclude about
scope with accuracy
3. Schedule the project
with accuracy
4. All of the given
AL-JUNAID INSTITUTE GROUP
104 Quality assurance helps management in
providing the necessary data about: Product Quality
105 The progress on a project at any given
point in time can be calculated by: Adding all the BCWS
till that point for all
tasks

106 Defining a "Task Network" helps in


defining: Sequence in which
activities will be
performed

107 Mean Time Between Failure (MTBF)


can be calculated by: MTBF=MTTF+MTTR

108 ________ engineering requires


application of SE principles, methods, Forward
and concepts to re-create an existing
application.
109 Following are effective guidelines for
Review EXCEPT Tone should be high
and strict

110 Which of the following is NOT an


example of Software Configuration Integration Plan
Item (SCI):

111. Detect per function point is a______ Metric

112. Which statement is correct? The greater the dependency


between the component is
greater is coupling
113. ________ technique was initially Control chart
developed for manufacturing processes
in the 1920s by Walter Shewart.
AL-JUNAID INSTITUTE GROUP
114. Hardware/software tools. People and Resources
reusable software components are
considered as _________ for an
organization.
115. In________ there is both vertical and Controlled
horizaontal communication. Decentralized( CD)
116. Requirements are sometimes filled with Toxic requirements
defects, normally known as
_____requirements.
117. A process model defines a task set Deliverables
which comprises of SE work task,
milestone and_______
118. ______ activity is performed Quality assurance
throughout software production.
119. The major activity related to software Requirement gathering,
construction are: design development,
coding, and testing
120. Estimation of the _______ is a Software scope
prerequisite of all sorts o estimate,
including, resources, time, and budget.
121. Which of the following is not a Defeats per function point
software measure?
122. Capability maturity model (CMM) 5
has______ levels.
123. ________ is the ability to encourage the Innovation
people to create and feel creative.
124. ________ model is a haphazard type of Build and fix
software development activity.
125. A_______entity is the one which have Strong, role
any ________ in the problem domain
without some other entity.
126. The conceptual interface between the Application boundary
‘internal’ application and the ‘external’
user world is known as_______
127. Every project has a defined number of People
staff members. As time allocation
occurs, project manager must ensure
that no more than the allocated number
of _______ has been scheduled at any
AL-JUNAID INSTITUTE GROUP
given time.
128. SEI stands for________ Software Engineering
Institute
129. We need to employ some statistical Graphically
techniques and plot the results_______.
These are known as statistical control
techniques.
130. Software Project Planning is an activity Project Manager
carried out by the______.
131. ________ is an object oriented model. Fountain

132. Files are the logical files that are the Internal
customer understands and must be
maintained by the system.
133. In measuring process by using a control The product is in unusable
chart, if the gap between the defect condition
reported and defect fixed is increasing.
134. _________ is fundamental or providing
mechanisms for objects evaluation of
any process or activity.
135. _____ lifecycle models appreciate the Object-Oriented
need for iteration within and between
phases.
136. _______of a product can be measured if Quality
we can measure its non-functional
properties i.e. maintainability, integrity,
and usability, etc.
137. ________dimension of Spiral model Radial
represented the cultivative cost to date
138. MOI model of leadership stands for. Motivation, Organization,
Innovation
139. The important feature of extreme Pair programming
programming is the concept of_____
140. If the gap between reported and defects Stable
fixed is decreasing then it means that
the product is in __________ condition.
141. After building the decision tree, the Expected cost=?(path
following formula is used to find the probability)i*(estimated
expected cost for an option. Choose the path cost)
AL-JUNAID INSTITUTE GROUP
correct formula:
142. Extent to which access to software or Integrity
data by unauthorized persons can be
controlled, called ______
143. By default, every organization is Level 1
working at________
144. Caper jhons is a famous researcher in Software engineering
the field of ______ who made a
company named Software Productivity
Research.
145. In Capability maturity model Level 5
(CMM) ,______ performs
optimaization.
146. Continuous process improvement is Qualitative, process
enabled by_____feedback from the
_____.
_________ can be the reason of project Miscommunication
failure.
147. The _______model of software Prototyping
development is a useful approach when
a customer cannot define requirements
clearly.
148. Capability maturity model (CMM) is Maturity
used to judge the______level of an
organization.
149. A ______provides a quantitative value Measure
of some attribute of a process or a
product.
150. In controlled centralized structure Vertical
communication between team leader
and the member is______.
151. Effective software project management People, product, process,
focuses on the 4 P’s. These are project
152. Software ______ relates individual Metric
software measures to provide a
normalized view.
153. Each process defines certain Work products
deliverables known as the________.
154. FAST is a team-oriented approach to Facilitated Application
AL-JUNAID INSTITUTE GROUP
requirement gathering, the team FAST Specification Techniques
stands for:
155. _________ is fundamental for Measuremnet
providing mechanisms for objective
evaluation of any process or activity.
156. A PM has to first come up with the Progress, one day
schedule and then monitor
the_______of the project to ensure that
things are happening accourding to the
schedule. It would not be out of place to
quote Fred Brooks at this point. He
says” Project fall behind schedule
________at a time”.
157. Certain reusable software component Third-party
was to be developed by a/an ______
having no knowledge of its internal
design standards.
158. The amount of “computing resources” Efficiency
required by a program to perform its
function is called________.