Sample Actual Estimates Proposed 2 Storey Residential Dwelling (Final)
Sample Actual Estimates Proposed 2 Storey Residential Dwelling (Final)
Sample Actual Estimates Proposed 2 Storey Residential Dwelling (Final)
No. Description Quantity Unit Material Cost Labor Cost Total (Php)
Unit cost Amount Unit cost Amount
1 GENERAL REQUIREMENTS
1.1 Temporary Facilities incuding Water supply & Electricity 1 lot 50,000.00
1.2 Overhead Cost and Miscellaneuos 1 lot 60,000.00
1.3 Mobilization and Demobilization 1 lot 20,000.00
1.4 Bonds and Insurances 1 lot 50,000.00
1.5 Permits and Licenses 1 lot 20,000.00
2 SITEWORKS
2.1 Excavation Works 315 cu.m 250.00 78,750.00 78,750.00
2.2 Backfilling & Compaction 232.2 cu.m 250.00 58,050.00 58,050.00
2.3 Gravel Bedding 26.87 cu.m 500.00 13,435.00 - 13,435.00
2.4 Soil Poisoning 175.4 L 250.00 43,850.00 - 43,850.00
4 ARCHITECTURAL WORKS
4.1 MASONRY WORKS:
Portland Cement 279 bags 250.00 69,750.00 75.00 20,925.00 90,675.00
Sand 23 cu.m. 1,200.00 27,600.00 360.00 8,280.00 35,880.00
CHB #4 642 pcs 14.00 8,988.00 4.20 2,696.40 11,684.40
CHB #6 1859 pcs 17.00 31,603.00 5.10 9,480.90 41,083.90
10mm dia. Def. Bars 87 kgs 45.00 3,914.87 13.50 1,174.46 5,089.32
4.4 FINISHES
300x300 non skid Homogenous Floor Tiles 485.00 pcs 40.00 19,400.00 12.00 5,820.00 25,220.00
600x600 Glazed Homogenous Floor Tiles 254.00 pcs 240.00 60,960.00 72.00 18,288.00 79,248.00
1230 x180mm stone plastic composite 337.00 pcs 220.00 74,140.00 66.00 22,242.00 96,382.00
205x615 wood Porcelain Tiles 294.00 pcs 90.00 26,460.00 27.00 7,938.00 34,398.00
Acrylic Latex Paint Semi Gloss Paint 193.50 sq.m 38.00 7,353.00 11.40 2,205.90 9,558.90
Acrylic Latex Paint Low Sheen 197.79 sq.m 38.00 7,516.02 11.40 2,254.81 9,770.83
Tile Adhesive 38.0 bag 340.00 12,920.00 102.00 3,876.00 16,796.00
Poly Ethylene Dap Proofing Membrane 109.0 sq.m 210.00 22,890.00 63.00 6,867.00 29,757.00
Liquid Applied Water Proofing 8.8 sq.m 150.00 1,320.00 45.00 396.00 1,716.00
SUBTOTAL 4.4 302,846.73
4.7 MISCELLANEOUS
5 PLUMBING WORKS
Angle Valve 1/2" 5 pcs 200.00 1,000.00 140.00 700.00 1,700.00
Flexible Hose Stainless Steel 1/2" x 12" 5 pcs 160.00 800.00 112.00 560.00 1,360.00
Floor Drain 4'x4' 4 pcs 250.00 1,000.00 175.00 700.00 1,700.00
Shower Head 1/2" 2 pcs 1,900.00 3,800.00 1,330.00 2,660.00 6,460.00
Shower Knob 1/2" 2 pcs 150.00 300.00 105.00 210.00 510.00
PVC Pipe # 3 " sched 40 10 pcs 480.00 4,800.00 336.00 3,360.00 8,160.00
PVC Pipe # 2 " sched 40 24 pcs 250.00 6,000.00 175.00 4,200.00 10,200.00
PVC P- Trap # 2" 7 pcs 110.00 770.00 77.00 539.00 1,309.00
PVC Clean-out 4" 4 pcs 65.00 260.00 45.50 182.00 442.00
Sanitary Tee 4" 4 pcs 70.00 280.00 49.00 196.00 476.00
Sanitary Wye 4"x4" 1 pcs 85.00 85.00 59.50 59.50 144.50
PVC Elbow 4" 2 pcs 85.00 170.00 59.50 119.00 289.00
Sanitary Tee 4"x2" 2 pcs 120.00 240.00 84.00 168.00 408.00
Sanitary Tee 4'x3' 2 pcs 150.00 300.00 105.00 210.00 510.00
PVC Elbow 3" 8 pcs 75.00 600.00 52.50 420.00 1,020.00
PPR Pipe # 1/2" 10 pcs 280.00 2,800.00 196.00 1,960.00 4,760.00
Gate Valve 1/2" PPR 2 pcs 360.00 720.00 252.00 504.00 1,224.00
Check Valve 1/2" PPR 1 pcs 150.00 150.00 105.00 105.00 255.00
Threaded Elbow 1/2" PPR 10 pcs 110.00 1,100.00 77.00 770.00 1,870.00
Union Patente 1/2" PPR 1 pcs 40.00 40.00 28.00 28.00 68.00
Tee PPR 1/2" 5 pcs 20.00 100.00 14.00 70.00 170.00
Coupling PPR 1/2" 12 pcs 10.00 120.00 7.00 84.00 204.00
Teflon Tafe (Big) 5 pcs 30.00 150.00 21.00 105.00 255.00
Water Closet 2 sets 5,000.00 10,000.00 3,500.00 7,000.00 17,000.00
Lavatory 2 sets 6,800.00 13,600.00 4,760.00 9,520.00 23,120.00
Kitchen Sink 1 sets 1,000.00 1,000.00 700.00 700.00 1,700.00
Faucet 2 pcs 200.00 400.00 140.00 280.00 680.00
Water meter 1 sets 1,700.00 1,700.00 1,190.00 1,190.00 2,890.00
6 ELECTRICAL WORKS
Pannel Box (10 branches) bolt on 1 pc 4,500.00 4,500.00 3,150.00 3,150.00 7,650.00
THHN wire 3.5mm 3 box 3,700.00 11,100.00 2,590.00 7,770.00 18,870.00
THHN wire 2.0mm 2 box 2,600.00 5,200.00 1,820.00 3,640.00 8,840.00
THHN wire 14mm 16 l.m. 150.00 2,400.00 105.00 1,680.00 4,080.00
THHN wire 8mm 16 l.m. 120.00 1,920.00 84.00 1,344.00 3,264.00
MCCB Breaker 240V 2 pole 70amps 1 pcs 1,500.00 1,500.00 1,050.00 1,050.00 2,550.00
Circuit Breaker 20Amps. Bolt on 8 sets 450.00 3,600.00 315.00 2,520.00 6,120.00
Circuit Breaker 15Amps. Bolt on 2 sets 450.00 900.00 315.00 630.00 1,530.00
Conduit Pipe 3/4" 6 meter 300.00 1,800.00 210.00 1,260.00 3,060.00
Weather Head Cap 3/4" 1 pcs 65.00 65.00 45.50 45.50 110.50
Junction Box 4"x4" with cover (PVC) 22 pcs 60.00 1,320.00 42.00 924.00 2,244.00
One Gang Outlet 2 pcs 80.00 160.00 56.00 112.00 272.00
Duplex Convinience Outlet 20 pcs 115.00 2,300.00 80.50 1,610.00 3,910.00
Range Outlet 1 pcs 250.00 250.00 175.00 175.00 425.00
Electrical PVC Pipe 3/4" Neltex 2 pcs 170.00 340.00 119.00 238.00 578.00
Short Elbow 3/4" 4 pcs 30.00 120.00 21.00 84.00 204.00
KWH Meter base 1 pcs 350.00 350.00 245.00 245.00 595.00
Electrical PVC Pipe 1/2" Neltex 41 pcs 120.00 4,920.00 84.00 3,444.00 8,364.00
Long Elbow 1/2" Neltex 14 pcs 25.00 350.00 17.50 245.00 595.00
Utility Box 2"x4" PVC 33 pcs 40.00 1,320.00 28.00 924.00 2,244.00
One Gang 3 way switch 2 pcs 85.00 170.00 59.50 119.00 289.00
Two Gang Switch 8 pcs 115.00 920.00 80.50 644.00 1,564.00
One Gang Switch 5 pcs 75.00 375.00 52.50 262.50 637.50
3 Gang Switch 2 pcs 155.00 310.00 108.50 217.00 527.00
Electrical Tape (Big) 4 pcs 40.00 160.00 28.00 112.00 272.00
Pull Box (PVC) 4 pcs 150.00 600.00 105.00 420.00 1,020.00
Metal Clamp 1/2" Double 20 pcs 15.00 300.00 10.50 210.00 510.00
Tox Screw # 5 50 pcs 2.00 100.00 1.40 70.00 170.00
Electric Meter 1 sets 2,000.00 2,000.00 1,400.00 1,400.00 3,400.00
Electric Bulb 22 sets 250.00 5,500.00 175.00 3,850.00 9,350.00
Concrete (2400kg/cu.m)
Footing
Total Concrete 188.210 m3 m3 79.82 Footing; concrete
m3 4.39 Wall Footing; concrete
Total Formworks 871.684 m2
Column
m3 51.12 Column; concrete
Beam
m3 36.63 Beam; concrete
m3 2.53 Ground Beam; concrete
Slab
m3 0.00 Slab 150mmthk
m3 7.28 Slab 100mmthk SOG
m3 5.77 Slab 100mmthk
Stair
m3 0.67 Stair; Concrete
Formworks
m2 0.00 Slab ; formworks; metal decking
m2 57.70 Slab ; formworks
m2 0.00 Footing; Formworks
m2 306.72 Column; formworks
m2 502.41 Beam; formworks
m2 4.85 Stair; formworks
Earthworks
1,610.39dimcheck 1,610.39
S02
BELOW GROUND
C1; 200x400mm; 900mmH 1 1 4.000 2.000 0.400 0.900 m3 2.88 Column; concrete
C1; 200x400mm; 900mmH 1 1 4.000 4.800 1.000 0.900 m2 17.28 Column; formworks
C2; 200x400mm; 900mmH 1 1 4.000 2.000 0.400 0.900 m3 2.88 Column; concrete
C2; 200x400mm; 900mmH 1 1 4.000 4.800 1.000 0.900 m2 17.28 Column; formworks
C3; 200x400mm; 900mmH 1 1 1.000 2.000 0.400 0.900 m3 0.72 Column; concrete
C3; 200x400mm; 900mmH 1 1 1.000 4.800 1.000 0.900 m2 4.32 Column; formworks
WF1; 250mmBx500mmD 1 1 8.000 0.250 0.500 1.000 m3 1.00 Wall Footing; concrete
WF1; 250mmBx500mmD 1 1 8.000 0.250 0.500 0.075 m3 0.08 75mthk Gravel Bedding
WF2; 250mmBx500mmD 1 1 20.700 0.250 0.500 1.000 m3 2.59 Wall Footing; concrete
WF2; 250mmBx500mmD 1 1 20.700 0.250 0.500 0.075 m3 0.19 75mthk Gravel Bedding
WF3; 250mmBx400mmD 1 1 8.000 0.250 0.400 1.000 m3 0.80 Wall Footing; concrete
S03
ABOVE GROUND
C1; 200x400mm; 6200mmH 1 1 4.000 2.000 0.400 6.200 m3 19.84 Column; concrete
C1; 200x400mm; 6200mmH 1 1 4.000 4.800 1.000 6.200 m2 119.04 Column; formworks
C2; 200x400mm; 6200mmH 1 1 4.000 2.000 0.400 6.200 m3 19.84 Column; concrete
C2; 200x400mm; 6200mmH 1 1 4.000 4.800 1.000 6.200 m2 119.04 Column; formworks
C3; 200x400mm; 6200mmH 1 1 1.000 2.000 0.400 6.200 m3 4.96 Column; concrete
C3; 200x400mm; 6200mmH 1 1 1.000 4.800 1.000 6.200 m2 29.76 Column; formworks
GB1; 200mmBx350mmD 1 1 9.900 0.200 0.350 1.000 m3 0.69 Ground Beam; concrete
GB2; 200mmB x 350mmD 1 1 17.800 0.200 0.350 1.000 m2 1.25 Ground Beam; concrete
GB2; 200mmB x 350mmD 1 1 17.800 0.900 1.000 1.000 m2 16.02 Beam; formworks
GB3; 200mmBx350mmD 1 1 7.000 0.200 0.350 1.000 m3 0.49 Ground Beam; concrete
GB4; 200mmB x 350mmD 1 1 1.400 0.200 0.350 1.000 m2 0.10 Ground Beam; concrete
GB4; 200mmB x 350mmD 1 1 1.400 0.900 1.000 1.000 m2 1.26 Beam; formworks
Slab 100mmthk SOG 1 1 72.800 1.000 1.000 0.100 m3 7.28 Slab 100mmthk SOG
Slab 100mmthk SOG 1 1 72.800 1.000 1.000 1.000 m2 Slab ; formworks; SOG soffit
Slab 100mmthk SOG 1 1 131.400 1.000 1.000 0.150 m2 Slab ; formworks; SOG sides
B1; 200mmB x 400mmD 1 1 25.500 0.200 0.400 1.000 m3 2.04 Beam; concrete
B1; 200mmB x 400mmD 1 1 25.500 1.000 1.000 1.000 m2 25.50 Beam; formworks
B2; 200mmB x 400mmD 1 1 7.300 0.200 0.400 1.000 m2 0.58 Beam; concrete
B2; 200mmB x 400mmD 1 1 7.300 1.000 1.000 1.000 m2 7.30 Beam; formworks
B3; 200mmB x 350mmD 1 1 29.000 0.200 0.350 1.000 m3 2.03 Beam; concrete
B3; 200mmB x 350mmD 1 1 29.000 0.900 1.000 1.000 m2 26.10 Beam; formworks
B4; 200mmB x 400mmD 1 1 3.500 0.200 0.400 1.000 m2 0.28 Beam; concrete
B4; 200mmB x 400mmD 1 1 3.500 1.000 1.000 1.000 m2 3.50 Beam; formworks
B5; 200mmB x 350mmD 1 1 1.800 0.200 0.350 1.000 m3 0.13 Beam; concrete
B5; 200mmB x 350mmD 1 1 1.800 0.900 1.000 1.000 m2 1.62 Beam; formworks
RB1; 200mmB x 350mmD 1 1 451.000 0.200 0.350 1.000 m3 31.57 Beam; concrete
RB1; 200mmB x 350mmD 1 1 451.000 0.900 1.000 1.000 m2 405.90 Beam; formworks
Stair Steps 1 0.5 14.000 0.175 0.275 0.760 m3 0.26 Stair; Concrete
Stair Steps 2 0.5 14.000 0.175 0.275 1.000 m2 0.67 Stair; formworks
Project :-
Client :-
Taker off. :-
DIMENSION SHEET Ref No. :-
Timesing DIMENSIONS
DRWNG REF Width Depth UNIT QTY BILL OF QUANTITIES / DESCRIPTION
X Length -
(Thick) (Height)
Steel works
Miscellaneous
m2 858.66 Red oxide
Roofing works
m2 900.00 Roofing
S-5
TRUSS-1
M-1; 6mm x 59mm x 100mm 2 22 30.000 0.159 0.006 7850.000 kg 9,885.35 M-1; 6mm x 59mm x 100mm
M-1; 6mm x 59mm x 100mm 2 22 30.000 0.318 1.000 1.000 m2 419.76 Red oxide
M-2; 4mm x 50mm x 100mm 2 11 29.600 0.150 0.004 7850.000 kg 3,067.15 M-2; 4mm x 50mm x 100mm
M-2; 4mm x 50mm x 100mm 2 11 29.600 0.300 1.000 1.000 m2 195.36 Red oxide
FLAT TRUSS-1
M-1; 6mm x 59mm x 100mm 2 1 30.000 0.159 0.006 7850.000 kg 449.33 M-1; 6mm x 59mm x 100mm
M-1; 6mm x 59mm x 100mm 2 1 30.000 0.318 1.000 1.000 m2 19.08 Red oxide
M-2; 4mm x 50mm x 100mm 2 31 0.880 0.150 0.004 7850.000 kg 256.98 M-2; 4mm x 50mm x 100mm
M-2; 4mm x 50mm x 100mm 2 31 0.880 0.300 1.000 1.000 m2 16.37 Red oxide
M-2; 4mm x 50mm x 100mm 2 30 1.330 0.150 0.004 7850.000 kg 375.86 M-2; 4mm x 50mm x 100mm
M-2; 4mm x 50mm x 100mm 2 30 1.330 0.300 1.000 1.000 m2 23.94 Red oxide
FLAT TRUSS-2
M-1; 6mm x 59mm x 100mm 2 1 30.000 0.159 0.006 7850.000 kg 449.33 M-1; 6mm x 59mm x 100mm
M-1; 6mm x 59mm x 100mm 2 1 30.000 0.318 1.000 1.000 m2 19.08 Red oxide
M-2; 4mm x 50mm x 100mm 2 31 1.040 0.150 0.004 7850.000 kg 303.70 M-2; 4mm x 50mm x 100mm
M-2; 4mm x 50mm x 100mm 2 31 1.040 0.300 1.000 1.000 m2 19.34 Red oxide
M-2; 4mm x 50mm x 100mm 2 30 1.362 0.150 0.004 7850.000 kg 384.90 M-2; 4mm x 50mm x 100mm
M-2; 4mm x 50mm x 100mm 2 30 1.362 0.300 1.000 1.000 m2 24.52 Red oxide
Miscellaneuous
M-3; 50mm x 100mm C-purlins 7 1 30.000 0.200 0.006 7850.000 kg 1,978.20 M-3; 50mm x 100mm C-purlins
M-3; 50mm x 100mm C-purlins 7 1 30.000 0.400 1.000 1.000 m2 84.00 Red oxide
10mm dia. Sagrod 4 1 30.000 1.000 1.000 1.000 lm 120.00 10mm dia. Sagrod
Roofing
d bf tf tw perimeter (inch)
d bf tf tw perimeter (inch)
d bf tf tw perimeter (inch)
d bf tf tw perimeter (inch)
d bf tf tw perimeter (inch)
Client :
Ref No. :
Taker off : Jm
REINFORCEMENT DIMENSION SHEET
Element : Footing
Position :
Bar Segment GRADE 60 GRADE 40 / 33
Total Length
Member Bar Mark Type & Size Lap Straight No of Bars Timesing Total No
Hook 1 Hook 2 Bend 1 Bend 2 (m) T8 T10 T12 T16 T20 T22 T25 T28 T32 T36 T40 T50 R6 R8 R10 R12 R16
Splice Length
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
drwg no: S-2 - - - - - - - - - - - - - - - - - - -
timesing 5 - - - - - - - - - - - - - - - - - - -
F-1 length 1.00 - - - - - - - - - - - - - - - - - - -
height 1.00 - - - - - - - - - - - - - - - - - - -
thickness 0.3 - - - - - - - - - - - - - - - - - - -
cc 0.075 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 Bottom bar (BOH SDES) T16 0.23 0.23 1.00 1.45 6.00 10.00 60.00 - - - 87.00 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 3 - - - - - - - - - - - - - - - - - - -
F-2 length 1.10 - - - - - - - - - - - - - - - - - - -
height 1.10 - - - - - - - - - - - - - - - - - - -
thickness 0.3 - - - - - - - - - - - - - - - - - - -
cc 0.075 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 vb T16 0.23 0.23 1.10 1.55 6.00 6.00 36.00 - - - 55.80 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 1
F-3 length 1.20 - - - - - - - - - - - - - - - - - - -
height 1.20 - - - - - - - - - - - - - - - - - - -
thickness 0.3 - - - - - - - - - - - - - - - - - - -
cc 0.075 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 vb T16 0.23 0.23 1.05 1.50 7.00 2.00 14.00 - - - 21.00 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 1
F-4 length 1.60 - - - - - - - - - - - - - - - - - - -
height 1.60 - - - - - - - - - - - - - - - - - - -
thickness 0.3 - - - - - - - - - - - - - - - - - - -
cc 0.075 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 vb T16 0.23 0.23 1.45 1.90 7.00 2.00 14.00 - - - 26.60 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 1 - - - - - - - - - - - - - - - - - - -
WF-1 length 8.00 - - - - - - - - - - - - - - - - - - -
WDTH 0.50 - - - - - - - - - - - - - - - - - - -
thickness 0.25 - - - - - - - - - - - - - - - - - - -
cc 0.075 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 TIES T10 0.18 0.18 0.50 0.85 28.00 1.00 28.00 - 23.80 - - - - - - - - - - - - - - -
0.15 CONT bar T10 0.18 0.18 8.00 8.35 3.00 1.00 3.00 - 25.05 - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 1 - - - - - - - - - - - - - - - - - - -
WF-2 length 20.70 - - - - - - - - - - - - - - - - - - -
WDTH 0.50 - - - - - - - - - - - - - - - - - - -
thickness 0.25 - - - - - - - - - - - - - - - - - - -
cc 0.075 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 TIES T10 0.18 0.18 0.50 0.85 70.00 1.00 70.00 - 59.50 - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 1 - - - - - - - - - - - - - - - - - - -
WF-3 length 13.00 - - - - - - - - - - - - - - - - - - -
WDTH 0.50 - - - - - - - - - - - - - - - - - - -
thickness 0.25 - - - - - - - - - - - - - - - - - - -
cc 0.075 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 TIES T10 0.18 0.18 0.50 0.85 45.00 1.00 45.00 - 38.25 - - - - - - - - - - - - - - -
0.15 CONT bar T10 0.18 0.18 13.00 13.35 3.00 1.00 3.00 - 40.05 - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
TOTAL LENGTH (m) - 249.80 - 190.40 - - - - - - - - - - - - -
Factor (Kg / m) 0.395 0.617 0.888 1.578 2.466 2.984 3.853 4.834 6.313 7.990 9.865 15.413 0.222 0.395 0.617 0.888 1.578
Weight (Kg) - 154.01 - 300.52 - - - - - - - - - - - - -
Total (Kg) 454.53
BULK CHECK
concrete m3
rebar 455 kgs
ratio #DIV/0! kgs/m3
Project :
Client :
Ref No. :
Taker off :
REINFORCEMENT DIMENSION SHEET
Element : Column
Position :
Bar Segment GRADE 60 GRADE 40 / 33
Total Length
Member Bar Mark Type & Size Lap Straight No of Bars Timesing Total No
Hook 1 Hook 2 Bend 1 Bend 2 (m) T8 T10 T12 T16 T20 T22 T25 T28 T32 T36 T40 T50 R6 R8 R10 R12 R16
Splice Length
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 4 - - - - - - - - - - - - - - - - - - -
C-1 length 0.200 - - - - - - - - - - - - - - - - - - -
width 0.400 - - - - - - - - - - - - - - - - - - -
height 7.1 - - - - - - - - - - - - - - - - - - -
cc 0.035 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 vb T16 0.60 0.60 7.10 8.30 4.00 4.00 16.00 - - - 132.80 - - - - - - - - - - - - -
0.15 vb T16 0.60 0.60 7.10 8.30 2.00 4.00 8.00 - - - 66.40 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
0.2 ties T10 0.92 0.92 31.00 1.00 31.00 - 28.52 - - - - - - - - - - - - - - -
0.2 ties T10 0.92 0.92 18.00 1.00 18.00 - 16.56 - - - - - - - - - - - - - - -
0.15 links z2 T10 0.13 - 47.00 2.00 94.00 - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 4 - - - - - - - - - - - - - - - - - - -
C-2 length 0.200 - - - - - - - - - - - - - - - - - - -
width 0.400 - - - - - - - - - - - - - - - - - - -
height 7.1 - - - - - - - - - - - - - - - - - - -
cc 0.035 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 vb T16 0.60 0.60 7.10 8.30 4.00 4.00 16.00 - - - 132.80 - - - - - - - - - - - - -
0.15 vb T16 0.60 0.60 7.10 8.30 - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
0.2 ties T10 0.92 0.92 31.00 1.00 31.00 - 28.52 - - - - - - - - - - - - - - -
0.2 ties T10 0.92 0.92 18.00 1.00 18.00 - 16.56 - - - - - - - - - - - - - - -
0.15 links z2 T10 0.13 - 47.00 2.00 94.00 - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
timesing 1 - - - - - - - - - - - - - - - - - - -
C-3 length 0.200 - - - - - - - - - - - - - - - - - - -
width 0.400 - - - - - - - - - - - - - - - - - - -
height 7.1 - - - - - - - - - - - - - - - - - - -
cc 0.035 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar - - - - - - - - - - - - - - - - - - -
0.15 vb T16 0.60 0.60 7.10 8.30 4.00 1.00 4.00 - - - 33.20 - - - - - - - - - - - - -
0.15 vb T16 0.60 0.60 7.10 8.30 4.00 1.00 4.00 - - - 33.20 - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
0.2 ties T10 0.92 0.92 31.00 1.00 31.00 - 28.52 - - - - - - - - - - - - - - -
0.2 ties T10 0.92 0.92 18.00 1.00 18.00 - 16.56 - - - - - - - - - - - - - - -
0.15 links z2 T10 0.13 - 47.00 2.00 94.00 - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
TOTAL LENGTH (m) - 135.24 - 398.40 - - - - - - - - - - - - -
Factor (Kg / m) 0.395 0.617 0.888 1.578 2.466 2.984 3.853 4.834 6.313 7.990 9.865 15.413 0.222 0.395 0.617 0.888 1.578
Weight (Kg) - 83.38 - 628.81 - - - - - - - - - - - - -
Total (Kg) 712.19
BULK CHECK
concrete m3
rebar 712 kgs
ratio #DIV/0! kgs/m3
Project :
Client :
Ref No. :
Taker off :
REINFORCEMENT DIMENSION SHEET
Element : Slab
Position :
Bar Segment GRADE 60 GRADE 40 / 33
Total Length
Member Bar Mark Type & Size Lap Straight No of Bars Timesing Total No
Hook 1 Hook 2 Bend 1 Bend 2 (m) T8 T10 T12 T16 T20 T22 T25 T28 T32 T36 T40 T50 R6 R8 R10 R12 R16
Splice Length
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
Ground Floor
100mmthk SOG length 8 - - - - - - - - - - - - - - - - - - -
width 9.2 - - - - - - - - - - - - - - - - - - -
thickness 0.1 - - - - - - - - - - - - - - - - - - -
cc 0.05 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar x - - - - - - - - - - - - - - - - - - -
0.3 Top T10 0.35 0.35 7.90 8.60 31.00 1.00 31.00 - 266.60 - - - - - - - - - - - - - - - slab
0.3 bot T10 0.35 0.35 7.90 8.60 31.00 1.00 31.00 - 266.60 - - - - - - - - - - - - - - - slab
main bar y - - - - - - - - - - - - - - - - - - -
0.3 top T10 0.35 0.35 9.10 9.80 27.00 1.00 27.00 - 264.60 - - - - - - - - - - - - - - - slab
0.3 bot T10 0.35 0.35 9.10 9.80 27.00 1.00 27.00 - 264.60 - - - - - - - - - - - - - - - slab
- - - - - - - - - - - - - - - - - - -
Second Floor - - - - - - - - - - - - - - - - - - -
100mmthk SOG length 8 - - - - - - - - - - - - - - - - - - -
width 5.3 - - - - - - - - - - - - - - - - - - -
thickness 0.1 - - - - - - - - - - - - - - - - - - -
cc 0.05 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar x - - - - - - - - - - - - - - - - - - -
0.3 Top T12 0.42 0.42 7.90 8.74 18.00 1.00 18.00 - - 157.32 - - - - - - - - - - - - - - slab
0.3 bot T12 0.42 0.42 7.90 8.74 18.00 1.00 18.00 - - 157.32 - - - - - - - - - - - - - - slab
main bar y - - - - - - - - - - - - - - - - - - -
0.3 top T12 0.42 0.42 5.20 6.04 27.00 1.00 27.00 - - 163.08 - - - - - - - - - - - - - - slab
0.3 bot T12 0.42 0.42 5.20 6.04 27.00 1.00 27.00 - - 163.08 - - - - - - - - - - - - - - slab
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
100mmthk SOG length 3.07 - - - - - - - - - - - - - - - - - - -
width 3.725 - - - - - - - - - - - - - - - - - - -
thickness 0.1 - - - - - - - - - - - - - - - - - - -
cc 0.05 - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
main bar x - - - - - - - - - - - - - - - - - - -
0.3 Top T12 0.42 0.42 2.97 3.81 13.00 1.00 13.00 - - 49.53 - - - - - - - - - - - - - - slab
0.3 bot T12 0.42 0.42 2.97 3.81 13.00 1.00 13.00 - - 49.53 - - - - - - - - - - - - - - slab
main bar y - - - - - - - - - - - - - - - - - - -
0.3 top T12 0.42 0.42 3.63 4.47 10.00 1.00 10.00 - - 44.65 - - - - - - - - - - - - - - slab
0.3 bot T12 0.42 0.42 3.63 4.47 10.00 1.00 10.00 - - 44.65 - - - - - - - - - - - - - - slab
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
TOTAL LENGTH (m) - 1,062.40 829.16 - - - - - - - - - - - - - -
Factor (Kg / m) 0.395 0.617 0.888 1.578 2.466 2.984 3.853 4.834 6.313 7.990 9.865 15.413 0.222 0.395 0.617 0.888 1.578
slab - 655.01 736.14 - - - - - - - - - - - - - -
1,391.15 Total (Kg) 1,391.15
links - - - - - - - - - - - - - - - - -
- Total (Kg) 0.00
BULK CHECK
concrete m3
rebar 1,391 kgs
ratio #DIV/0! kgs/m3
Project :
Client :
Ref No. :
Taker off :
REINFORCEMENT DIMENSION SHEET
Element : Stair
Position :
Bar Segment GRADE 60 GRADE 40 / 33
Total Length
Member Bar Mark Type & Size Lap Straight No of Bars Timesing Total No
Hook 1 Hook 2 Bend 1 Bend 2 (m) T8 T10 T12 T16 T20 T22 T25 T28 T32 T36 T40 T50 R6 R8 R10 R12 R16
Splice Length
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
ST-01
length 5.43 - - - - - - - - - - - - - - - - - - -
width 0.75 - - - - - - - - - - - - - - - - - - -
thickness 0.1 - - - - - - - - - - - - - - - - - - -
cc 0.04 - - - - - - - - - - - - - - - - - - -
rise 0.175
run 0.27
- - - - - - - - - - - - - - - - - - -
at Landing - - - - - - - - - - - - - - - - - - -
0.3 Top T10 0.35 1.36 1.71 3.00 2.00 6.00 - 10.25 - - - - - - - - - - - - - - - slab
0.3 bot T10 0.35 0.35 5.43 6.13 3.00 1.00 3.00 - 18.39 - - - - - - - - - - - - - - - slab
at steps
0.3 nosing T10 0.35 0.67 1.02 1.00 18.00 18.00 - 18.36 - - - - - - - - - - - - - - - slab
0.3 rise plus run T10 0.35 0.35 0.45 1.15 3.00 18.00 54.00 - 61.83 - - - - - - - - - - - - - - - slab
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - -
TOTAL LENGTH (m) - 108.83 - - - - - - - - - - - - - - -
Factor (Kg / m) 0.395 0.617 0.888 1.578 2.466 2.984 3.853 4.834 6.313 7.990 9.865 15.413 0.222 0.395 0.617 0.888 1.578
slab - 67.09 - - - - - - - - - - - - - - -
67.09 Total (Kg) 67.09
links - - - - - - - - - - - - - - - - -
- Total (Kg) 0.00
BULK CHECK
concrete m3
rebar 67 kgs
ratio #DIV/0! kgs/m3
- - - - - -
drwg no: S-2 - - - - - -
- - -
GB1; 200x350 length 9.9 - - - - - -
width 0.2 - - - - - -
ht 0.35 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 0.56 0.56 9.90 11.02 2.00 1.00 2.00 - - - 22.04
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 3.30 3.86 1.00 1.00 1.00 - - - 3.86
ETB ( middle support) T16 3.30 3.30 1.00 1.00 1.00 - - - 3.30
- - - - - -
main bar - - - - - -
Bot (continuous) T16 0.56 0.56 9.90 11.02 2.00 1.00 2.00 - - - 22.04
ETB (middle) T16 0.40 - 1.00 1.00 1.00 - - - -
ETB (extra at endspan support) T16 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 (1.24) (1.24) 9.90 7.43 1.00 1.00
links span 3 - - - - - -
stirrups left T10 0.13 0.13 0.82 1.08 2.00 3.00 6.00 - 6.48 - -
0.14 midspan T10 0.13 0.13 0.82 1.08 39.00 1.00 39.00 - 42.12 - -
stirrups right T10 0.13 0.13 0.82 1.08 20.00 3.00 60.00 - 64.80 - -
- - - - - -
GB2; 200x350 length 17.8 - - - - - -
width 0.2 - - - - - -
ht 0.35 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 1.12 1.12 17.80 20.04 2.00 1.00 2.00 - - - 40.08
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 5.93 6.49 1.00 1.00 1.00 - - - 6.49
ETB ( middle support) T16 - 1.00 1.00 1.00 - - - -
links span 5 - - - - - -
stirrups left T10 0.13 0.13 0.82 1.08 2.00 3.00 6.00 - 6.48 - -
0.14 midspan T10 0.13 0.13 0.82 1.08 74.00 1.00 74.00 - 79.92 - -
stirrups right T10 0.13 0.13 0.82 1.08 20.00 3.00 60.00 - 64.80 - -
- - - - - -
GB3; 200x350 length 7 - - - - - -
width 0.2 - - - - - -
ht 0.35 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 0.56 0.56 7.00 8.12 2.00 1.00 2.00 - - - 16.24
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 2.33 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 2.33 - 1.00 1.00 1.00 - - - -
- - - - - -
main bar - - - - - -
Bot (continuous) T16 0.56 0.56 7.00 8.12 2.00 1.00 2.00 - - - 16.24
ETB (middle) T16 0.40 - 1.00 1.00 1.00 - - - -
ETB (extra at endspan support) T16 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 (0.88) (0.88) 7.00 - 1.00 1.00
links span 2 - - - - - -
stirrups left T10 0.13 0.13 0.82 1.08 2.00 3.00 6.00 - 6.48 - -
0.14 midspan T10 0.13 0.13 0.82 1.08 29.00 1.00 29.00 - 31.32 - -
stirrups right T10 0.13 0.13 0.82 1.08 20.00 3.00 60.00 - 64.80 - -
- - - - - -
GB4; 200x350 length 1.4 - - - - - -
width 0.2 - - - - - -
ht 0.35 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 1.12 1.12 1.40 3.64 2.00 2.00 4.00 - - - 14.56
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 0.47 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 0.47 - 1.00 1.00 1.00 - - - -
- - - - - -
main bar - - - - - -
links span 1 - - - - - -
stirrups left T10 0.13 0.13 0.82 1.08 2.00 3.00 6.00 - 6.48 - -
0.14 midspan T12 0.13 0.13 0.82 1.08 (1.00) 1.00 (1.00) - - - -
stirrups right T10 0.13 0.13 0.82 1.08 20.00 3.00 60.00 - 64.80 - -
- - - - - -
2B1; 200x400 length 25.5 - - - - - -
width 0.2 - - - - - -
ht 0.4 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 2.24 2.24 25.50 29.98 2.00 1.00 2.00 - - - 59.96
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 8.50 9.06 1.00 1.00 1.00 - - - 9.06
ETB ( middle support) T16 8.50 8.50 1.00 1.00 1.00 - - - 8.50
- - - - - -
main bar - - - - - -
Bot (continuous) T16 2.24 2.24 25.50 29.98 2.00 1.00 2.00 - - - 59.96
ETB (middle) T16 0.40 - 1.00 1.00 1.00 - - - -
ETB (extra at endspan support) T16 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 (3.19) (3.19) 25.50 - 1.00 1.00
links span 7 - - - - - -
stirrups left T10 0.13 0.13 0.92 1.18 2.00 3.00 6.00 - 7.08 - -
0.14 midspan T10 0.13 0.13 0.92 1.18 108.00 1.00 108.00 - 127.44 - -
stirrups right T10 0.13 0.13 0.92 1.18 20.00 3.00 60.00 - 70.80 - -
- - - - - -
2B2; 200x400 length 7.3 - - - - - -
width 0.2 - - - - - -
ht 0.4 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 0.56 0.56 7.30 8.42 2.00 2.00 4.00 - - - 33.68
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 0.56 2.42 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 - 1.00 1.00 1.00 - - - -
- - - - - -
main bar - - - - - -
Bot (continuous) T16 0.56 0.56 7.30 8.42 2.00 2.00 4.00 - - - 33.68
ETB (middle) T16 0.40 - 1.00 1.00 1.00 - - - -
links span 2 - - - - - -
stirrups left T10 0.13 0.13 0.92 1.18 2.00 3.00 6.00 - 7.08 - -
0.14 midspan T10 0.13 0.13 0.92 1.18 31.00 1.00 31.00 - 36.58 - -
stirrups right T10 0.13 0.13 0.92 1.18 20.00 3.00 60.00 - 70.80 - -
- - - - - -
2B3; 200x350 length 29 - - - - - -
width 0.2 - - - - - -
ht 0.35 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 0.56 0.56 29.00 30.12 2.00 1.00 2.00 - - - 60.24
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 9.67 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 9.67 - 1.00 1.00 1.00 - - - -
- - - - - -
main bar - - - - - -
Bot (continuous) T16 0.56 0.56 29.00 30.12 2.00 1.00 2.00 - - - 60.24
ETB (middle) T16 0.40 - 1.00 1.00 1.00 - - - -
ETB (extra at endspan support) T16 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 (3.63) (3.63) 29.00 - 1.00 1.00
links span 11 - - - - - -
stirrups left T10 0.13 0.13 0.82 1.08 2.00 3.00 6.00 - 6.48 - -
0.14 midspan T10 0.13 0.13 0.82 1.08 90.00 1.00 90.00 - 97.20 - -
stirrups right T10 0.13 0.13 0.82 1.08 20.00 3.00 60.00 - 64.80 - -
- - - - - -
2B4; 200x400 length 3.5 - - - - - -
width 0.2 - - - - - -
ht 0.4 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 1.12 1.12 3.50 5.74 2.00 1.00 2.00 - - - 11.48
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 1.17 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 1.17 - 1.00 1.00 1.00 - - - -
- - - - - -
main bar - - - - - -
Bot (continuous) T16 1.12 1.12 3.50 5.74 2.00 1.00 2.00 - - - 11.48
ETB (middle) T16 0.40 - 1.00 1.00 1.00 - - - -
ETB (extra at endspan support) T16 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 (0.44) (0.44) 3.50 - 1.00 1.00
links span 1 - - - - - -
stirrups left T10 0.13 0.13 0.82 1.08 2.00 3.00 6.00 - 6.48 - -
0.14 midspan T12 0.13 0.13 0.82 1.08 3.00 1.00 3.00 - - - -
stirrups right T10 0.13 0.13 0.82 1.08 20.00 3.00 60.00 - 64.80 - -
- - - - - -
RB1; 200x350 length 45.1 - - - - - -
width 0.2 - - - - - -
ht 0.35 - - - - - -
cc 0.035 - - - - - -
- - - - - -
main bar - - - - - -
top (continuous) T16 3.36 3.36 45.10 51.82 2.00 1.00 2.00 - - - 103.64
ETB (middle) T16 0.40 - - 1.00 - - - - -
ETB (extra at endspan support) T16 0.56 15.03 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 15.03 - 1.00 1.00 1.00 - - - -
- - - - - -
main bar - - - - - -
Bot (continuous) T16 3.36 3.36 45.10 51.82 2.00 1.00 2.00 - - - 103.64
ETB (middle) T16 0.40 - 1.00 1.00 1.00 - - - -
ETB (extra at endspan support) T16 - 1.00 1.00 1.00 - - - -
ETB ( middle support) T16 (5.64) (5.64) 45.10 - 1.00 1.00
links span 14 - - - - - -
T1
LAP 1 2 3 4
H O O K & B E N D S
35D 49D 70D
Rebar 90 DEG 135 DEG 180 DEG
T10 350 490 700 T10 0.130 0.130 0.080
T12 420 590 840 T12 0.156 0.156 0.096
T16 560 785 1120 T16 0.208 0.208 0.128
T20 700 980 1400 T20 0.260 0.260 0.160
T25 875 1225 1750 T25 0.350 0.350 0.225
T32 1120 1570 2240 T28 0.392 0.392 0.252
T40 1400 1960 2500 T32 0.448 0.448 0.288
T36 0.504 0.504 0.324
T40 0.560 0.560 0.360
Hooks and Bends
135 Deg Concrete Cover for Columns
T10 0.13 Concrete Grade for Columns/Structural Wall
T12 0.156 Drill-in bar minimum embedment length for column A2
T16 0.208 Concrete Grade for Beams/slab
T20 0.28 Concrete Grade for Non-Struc Wall
T25 0.35
T32 0.42
T40 0.56
Siniloan
LAP
40D 49D 70D
Rebar
T10 400 490 700
T12 450 590 840
Client :-
Ref No. :-
Taker off :-
ORCEMENT DIMSHEET
GRADE 60 GRADE 40 / 33
T20 T22 T25 T28 T32 T36 T40 T50 R6 R8 R10 R12 R16
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
0.035
60D
0.8
45D
30D
general reinforcement
RFT Summary
G.I. Tie wire for every 1000kg of 10mm bars about 12kg tie wire
for every 1000kg of 28 to 32mm bars about 7kg tie wire
T22 T25 T28 T32 T36 T40
- - - - - - 1,914.03
- - - - - - 1,391.15
- - - - - - 712.19
- - - - - - 454.53
- - - - - - 67.09
- - - - - - 4,471.90 checking
1,914
1,391
712
455
67
4,472
PROJECT : PROPOSED SMPFC FULL GOODS WAREHOUSE
SCOPE OF WORKDesign and Construction of the Site Development, Shed for Refrigerated Vans & Ancillary Buildings
LOCATION : Ermin Garcia, Cubao
OWNER : SAN MIGUEL PUREFOODS, CORP.
SUBJECT : TECHNICAL BID FORM
EQUIPM
MATERIA LABOR TOTAL AMOUNT
ENT UNIT COST BRANDS /
ITEM DESCRIPTION QTY UNIT L COST COST (UNIT COST x REMARKS / SPECIFICATIONS
COST (A+B+C) SPECIFICATIONS
(A) (C) QTY)
(B)
1.00 GENERAL REQUIREMENTS
Desig n o f a ll civil / structura l, architectural, sanitary, electrical a nd mechanical works necessary for the constructio n o f
1.10 1.00 lot 1400000.00 1400000.00 1400000.00
the s ite development, warehouse & ancillary buildings
1.20 Mobilization / Demobilization lot 1780000.00 1780000.00
1.2.1 Materials and Personnels 1.00 50000.00 30000.00 80000.00 80000.00
1.2.2 Machines 1.00 1000000.00 1000000.00 1000000.00
1.2.3 Heavy Equipment 1.00 700000.00 700000.00 700000.00
1.30 Bonds and Insurances lot 147078.00 147078.00
1.3.1 Surety Bond (Advance Payment) (20%) 1.00 27168.00 27168.00 27168.00
1.3.2 Performance Bond (30%) 1.00 104550.00 104550.00 104550.00
1.3.3 Guarantee Bond (10%) 1.00 15360.00 15360.00 15360.00
1.40 National / Local Government Permits lot 370000.00 370000.00
1.4.1 Fencing Permits 1.00 10000.00 10000.00 10000.00
1.4.2 Excavation & Ground Preparation Permits (Site Development Permit) 1.00 15000.00 15000.00 15000.00
1.4.3 Locational Clearance 1.00 10000.00 10000.00 10000.00
1.4.4 Barangay Clearance 1.00 15000.00 15000.00 15000.00
1.4.5 Building Permit 1.00 100000.00 100000.00 100000.00
1.4.6 Mechanical Permit 1.00 40000.00 40000.00 40000.00
1.4.7 Electrical Permit 1.00 40000.00 40000.00 40000.00
1.4.8 Fire Protection Permit 1.00 100000.00 100000.00 100000.00
1.4.9 Sanitary Permit 1.00 40000.00 40000.00 40000.00
1.4.10 Certificate of Non-Coverage 1.00 10000.00 10000.00 10000.00
1.50 Geotechnical Investigation lot 0.00 0.00
1.60 Relocation and Topographic Survey / Stakeout / Layout lot 300000.00 300000.00
1.6.1 Line and Grade 1.00 100000.00 0.00 0.00 100000.00 100000.00
1.6.2 Survey Aids/ Engineers 1.00 100000.00 0.00 0.00 100000.00 100000.00
1.6.3 Use of Instruments 1.00 100000.00 0.00 0.00 100000.00 100000.00
1.70 Temporary Facilities / Field Office / Storage of Equipment / Temporary Enclosure lot 1130000.00 1547500.00
1.7.1 Owner's Field Office 367500.00 407000.00
a. 20Footer - Container Van type w/ AC unit, w/ CR, with floor, wall and ceiling finishes 1.00 unit 200000.00 200000.00 200000.00
b. 600mm x 1400mm modular desk w/ drawers 2.00 units 10000.00 10000.00 20000.00
c. Office chairs (black or gray w/ arm rest) 2.00 units 4000.00 4000.00 8000.00
2.50 Reinforced Concreting Works - includes all concreting works needed to complete the structure but not limited to the following:
a. Base Course (Compacted Gravel or Crushed Stones) 207.90 cu.m 1035.00 287.50 1322.50 274947.75
b. Sub-Base Course (Granular Materials) 614.25 cu.m 805.00 287.50 1092.50 671068.13
c. Concrete, 3000psi 2000.00 cum 4600.00 655.50 5255.50 10511000.00
d. Reinforcing Steel Bars 900.90 kgs 46.00 13.80 59.80 53873.82
e. Formworks N/A lot
f. Slab Sealant for control joints 427.00 l.m 575.00 172.50 747.50 319182.50
g. Slab Sealant for dowel & expansion joints N/A l.m
h. Consumables (G.I. Tie Wire Ga. #16, CW Nails, etc.) 0.00 kgs 97.75 0.00 97.75 0.00
i. Others (Pls Specify)
i.1)
2.60 Masonry Works
a. Construction of 100mm thk. CHB Wall, including reinforcements N/A sqm
b. Construction of 150mm thk. CHB Wall, including reinforcements 38327.00 sqm 632.50 230.00 862.50 33057037.50
c. Plastering of CHB Walls 76654.00 sqm 172.50 230.00 402.50 30853235.00
d. Others (Pls Specify)
d.1)
Structural Steel Works - includ es all Supply / Fabricatio n / Ins tallation / Con struction of s teel co mpo nents o f the structure b ut
2.70
not limited to the follo wing:
a. Supply & Installation of Stainless Steel Railings for Stair N/A l.m
b. Supply & Installation of Stainless Steel Edging for Concrete Stair N/A l.m
c. Construction of Sliding Gate (6-m wide x 4-m high) 1.00 lot 138000.00 138000.00 138000.00
d. Painting of Structural Steels 1.00 lot 28750.00 28750.00 28750.00
e. Miscellaneous and Consumables 1.00 lot 6900.00 6900.00 6900.00
f. Others (Pls Specify)
f.1)
2.80 Others, Please Specify:
a.)
SITE DEVELOPMENT WORKS SUB-TOTAL (VAT INC) #NAME?
3.00 SHED FOR REFRIGERATED VANS
3.10 CIVIL WORKS / STRUCTURAL WORKS
3.1.1 Earthworks and Base Preparations
a. Structural Excavation 0.00 cu.m 862.50 862.50 0.00
b. Backill and Compaction(95% FDT) 0.00 cu.m 287.50 287.50 0.00
c. Gravel Base Course 0.00 cu.m 1035.00 287.50 1322.50 0.00
d. Soil Poisoning 506.00 sq.m 69.00 46.00 115.00 58190.00
e. Polyethylene Sheet Liner / Vapor Barrier (10mil / 0.2mm thk) 506.00 sq.m 63.25 23.00 86.25 43642.50
f. Hauling/Disposal of Excess and Unsuitable Materials N/A cu.m
g. Others (Pls Specify)
g.1)
3.1.2
Reinforced Concreting Works - includes all concreting works needed to complete the structure but not limited to the following:
e. Gutter, Stainless Steel Type, Ga.#24 (including anchorage/support, flashing to complete installation 572.31 sqm 345.00 69.00 414.00 236934.78
f. Consumables (Welding Rods, Oxy-Acetylene, bolts, nuts, and washers, etc.) 1.00 lot #REF! #REF! #REF! #REF!
g. Others (Pls Specify)
g.1)
3.1.6 Supply & Installation of Rubber Fenders at Truck Docking/Loading & Unloading Area 5.00 sets 4600.00 4600.00 23000.00
3.1.7 Others (Pls. Specify)
a.)
3.20 Architectural Works
3.2.1 Floor Finishes
a. Concrete Broom Finish w/ Hardener 91.61 sq.m 230.00 172.50 402.50 36873.03
3.2.2 Painting Works
a. Traffic Paint for Column Pedestals #NAME? sq.m 345.00 345.00 #NAME?
3.2.3 Doors and Windows Schedule
Supply and Installation of th e fo llowing items, includ ing all th e required acces sories, ironmo ngery, paint, and other finis hes
(refer on the Schedule of Doors & Wind ows):
a. D-5 1.90m x 2.20m, 3' PU Roll Up Door including Dock Shelter 5.00 sets 80500.00 80500.00 402500.00
3.2.4 Fixtures
Supply and Installation of the following fixtures:
a. Wall hung Stainless Steel Lavatory 1.00 set 17250.00 1725.00 18975.00 18975.00
b. Paper Dispenser 1.00 unit 1150.00 1150.00 1150.00
c. Hand Drier 1.00 unit 4600.00 4600.00 4600.00
3.2.5 Others (Pls. Specify)
a.)
SHED FOR REFRIGERATED VANS SUB-TOTAL (VAT INC) #NAME?
4.00 ANCILLARY BUILDINGS
4.10 OFFICE BUILDING
4.1.1 CIVIL WORKS / STRUCTURAL WORKS
4.1.1.2 Earthworks and Base Preparations
a. Structural Excavation #NAME? cu.m 862.50 862.50 #NAME?
b. Backill and Compaction(95% FDT) 0.00 cu.m 287.50 287.50 0.00
c. Gravel Base Course #NAME? cu.m 1035.00 287.50 1322.50 #NAME?
d. Soil Poisoning 125.00 sq.m 69.00 46.00 115.00 14375.00
e. Polyethylene Sheet Liner / Vapor Barrier (10mil / 0.2mm thk) 124.00 sq.m 63.25 23.00 86.25 10695.00
f. Hauling/Disposal of Excess and Unsuitable Materials #NAME? cu.m 402.50 402.50 #NAME?
g. Others (Pls Specify)
g.1)
4.1.1.2
Reinforced Concreting Works - includes all concreting works needed to complete the structure but not limited to the following:
a. Pre-painted longspan rib-type GI Sheet, GA. 24, Roofing 154.65 sqm 1150.00 230.00 1380.00 213417.00
b. Roofing Insulation (Envirotuff Nfr2) #REF! sqm 230.00 80.50 310.50 #REF!
c. Prepainted Flashing, Ga. #24 #REF! sq.m 632.50 221.38 853.88 #REF!
d. Prepainted Ridge Roll 8.40 l.m 747.50 261.63 1009.13 8476.65
e. Gutter, Stainless Steel Type, Ga.#24 (including anchorage/support, flashing to complete installation 154.65 sq.m 345.00 69.00 414.00 64025.10
f. Consumables (Welding Rods, Oxy-Acetylene, bolts, nuts, and washers, etc.) 1.00 lot #REF! #REF! #REF! #REF!
g. Others (Pls Specify)
g.1)
4.1.1.6 Waterproofing Works
a. Torch-Applied Waterproof for CR 8.00 sqm 1150.00 1150.00 9200.00
4.1.1.7 Others (Pls. Specify)
a.)
4.1.2 Architectural Works
4.1.2.1 Floor Finishes
a. Concrete Polished / Resin Flooring for Offices & Kitchen 48.50 sq.m 0.00 0.00 0.00 0.00 0.00
b. 6mm thk. x 600mm x 600mm Unglazed Ceramic Tiles for CR 8.00 sq.m 483.00 169.05 652.05 5216.40
4.1.2.2 Wall Finishes
a. CHB Wall Paint, Interior and Exterior, Semi Gloss Latex Paint Finish 0.00 sq.m 345.00 345.00 0.00
b. 6mm x 300 mm x 300 mm Glazed Ceramic Tiles for CR 0.00 sq.m 483.00 169.05 652.05 0.00
4.1.2.3 Ceiling Finishes
a. 12mm thk. Moisture Resistant Gypsum board, painted finish 8.00 sq.m 345.00 120.75 465.75 3726.00
b. 19mm thk. x 600mm x 600mm Acoustic board panels, painted finish 0.00 sq.m 1610.00 563.50 2173.50 0.00
4.1.2.4 Doors and Windows Schedule
Supply and Installation of th e fo llowing items, includ ing all th e required acces sories, ironmo ngery, paint, and other finis hes
(refer on the Schedule of Doors & Wind ows):
a. D-1 1.60mx 2.15m, Aluminum Framed with 10mm thk. Tempered Clear Glass Single Door 1.00 set 70725.00 70725.00 70725.00
b. D-2 0.90mx 2.15m, Aluminum Framed with 10mm thk. Tempered Clear Glass Single Door 3.00 sets 39100.00 39100.00 117300.00
c. D-3 0.85m x 2.15m, PVC Door with louvers and Door Knob Type Handle 3.00 sets 8625.00 8625.00 25875.00
d. D-4 0.90m x 2.15m, Metal Louver Door GA. 18 Galvanized Steel with Lever Type Door Handle 1.00 set 21275.00 21275.00 21275.00
e. W-1 1.10m x 0.90m, Sliding window with 6mm thk. Clear Glass on PVC Frame 6.00 sets 13800.00 13800.00 82800.00
4.1.2.5 Fixtures
Supply and Installation of the following fixtures:
a. Water Closet, Flushometer type 2.00 units 9200.00 9200.00 18400.00
b. Men Urinals, Flushometer Type 1.00 unit 11500.00 11500.00 11500.00
c. Phenolic Partition for Urinals N/A sets
d. Phenolic Door for CR; complete hardware and accessories 2.00 sets 23000.00 23000.00 46000.00
e. Wall hung lavatory for CR 2.00 sets 17250.00 17250.00 34500.00
f. Undercounter Lavatory w/ faucet for Kitchen 1.00 set 6900.00 6900.00 6900.00
g. Paper Dispenser 2.00 units 1150.00 1150.00 2300.00
h. Hand Drier 2.00 units 4600.00 4600.00 9200.00
4.1.2.6 Countertops
Constru ction of co unter's base, supp ly and installatio n of 19mm thk s ynth etic with 200mm high splash board & b as eb oard , for
th e following: granite countertop
a. Male CR 0.80 l.m 5750.00 5750.00 4600.00
b. Female CR 0.80 l.m 5750.00 5750.00 4600.00
c. Kitchen 2.10 l.m 5750.00 5750.00 12075.00
4.1.2.7 Mirrors (1.2m high)
a. Male CR 0.80 l.m 2300.00 2300.00 1840.00
b. Female CR 0.80 l.m 2300.00 2300.00 1840.00
4.1.2.8 Others (Pls. Specify)
a.)
4.20 GUARDHOUSE
4.2.1 CIVIL WORKS / STRUCTURAL WORKS
4.2.1.1 Earthworks and Base Preparations
a. Structural Excavation 0.42 cu.m 862.50 862.50 362.25
b. Backill and Compaction(95% FDT) N/A cu.m
c. Gravel Base Course #NAME? cu.m 1035.00 287.50 1322.50 #NAME?
d. Soil Poisoning 4.00 sq.m 69.00 46.00 115.00 460.00
e. Polyethylene Sheet Liner / Vapor Barrier (10mil / 0.2mm thk) 4.00 sq.m 63.25 23.00 86.25 345.00
f. Hauling/Disposal of Excess and Unsuitable Materials 0.55 cu.m 402.50 402.50 219.77
g. Others (Pls Specify)
g.1)
4.2.1.2
Reinforced Concreting Works - includes all concreting works needed to complete the structure but not limited to the following:
a. Pre-painted longspan rib-type GI Sheet, GA. 24, Roofing 7.00 sqm 1150.00 230.00 1380.00 9660.00
b. Roofing Insulation (Envirotuff Nfr2) #REF! l.m 230.00 805.00 1035.00 #REF!
c. Prepainted Flashing, Ga. #24 N/A sqm
d. Prepainted Ridge Roll N/A l.m
e. Gutter, Stainless Steel Type, Ga.#24 (including anchorage/support, flashing to complete installation 7.00 l.m 345.00 69.00 414.00 2898.00
f. Consumables (Welding Rods, Oxy-Acetylene, bolts, nuts, and washers, etc.) 1.00 lot #REF! #REF! #REF! #REF!
g. Others (Pls Specify)
g.1)
4.2.1.6 Others (Pls. Specify)
a.)
4.2.2 Architectural Works
4.2.2.1 Floor Finishes
a. Concrete Polished / Resin Flooring for Offices & Kitchen N/A sq.m
4.2.2.2 Wall Finishes
a. CHB Wall Paint, Interior and Exterior, Semi Gloss Latex Paint Finish #NAME? sq.m 345.00 345.00 #NAME?
4.2.2.3 Ceiling Finishes
a. 12mm thk. Moisture Resistant Gypsum board, painted finish 4.00 sq.m 345.00 120.75 465.75 1863.00
4.2.2.4 Doors and Windows Schedule
Supply and Installation of th e fo llowing items, includ ing all th e required acces sories, ironmo ngery, paint, and other finis hes
set(s)
(refer on the Schedule of Doors & Wind ows):
a. D-2 0.90mx 2.15m, Aluminum Framed with 10mm thk. Tempered Clear Glass Single Door 1.00 set 39790.00 39790.00 39790.00
b. W-2 0.75m x 0.50m, Awning Type Windows with 6mm Thk Clear Glass on PVC Frame 1.00 set 5175.00 5175.00 5175.00
4.2.2.5 Others (Pls. Specify)
a.)
4.30 GENSET SHED
4.3.1 CIVIL WORKS / STRUCTURAL WORKS
4.3.1.1 Earthworks and Base Preparations
a. Structural Excavation 0.00 cu.m 862.50 862.50 0.00
b. Backill and Compaction(95% FDT) 0.00 cu.m 287.50 287.50 0.00
c. Gravel Base Course 0.00 cu.m 1035.00 287.50 1322.50 0.00
d. Soil Poisoning N/A sq.m
e. Polyethylene Sheet Liner / Vapor Barrier (10mil / 0.2mm thk) N/A sq.m
f. Hauling/Disposal of Excess and Unsuitable Materials N/A cu.m
g. Others (Pls Specify)
g.1)
4.3.1.2
Reinforced Concreting Works - includes all concreting works needed to complete the structure but not limited to the following:
4.3.1.4 Structural Steel Works - includ es all Supply / Fabricatio n / Ins tallation / Con struction of s teel co mpo nents o f the structure b ut
not limited to the follo wing:
a. Anchor Bolts N/A sets
b. Base Plates N/A kgs
c. Non-shrink Levelling Grout for Pedestal Base Plate N/A bags
d. Columns #NAME? kgs 57.50 23.00 80.50 #NAME?
e. Beams #REF! kgs 57.50 23.00 80.50 #REF!
f. Truss System #REF! kgs 57.50 23.00 80.50 #REF!
g. Roof Framing #REF! kgs 57.50 23.00 80.50 #REF!
h. Supply & Installation of Stainless Steel Railings for Stair N/A l.m
i. Supply & Installation of Stainless Steel Edging for Concrete Stair N/A l.m
j. Miscellaneous Plates (End Plates, Stiffeners, Gussets, Connector Plates, etc.) N/A lot
k. Painting of Structural Steels 1.00 lot 1955.00 977.50 2932.50 2932.50
l. Consumables (Welding Rods, Oxy-Acetylene, bolts, nuts, and washers, etc.) 1.00 lot #NAME? #NAME? #NAME? #NAME?
m. Others (Pls Specify)
m.1)
a. Pre-painted longspan rib-type GI Sheet, GA. 24, Roofing 38.00 sqm 1150.00 230.00 1380.00 52440.00
b. Roofing Insulation (Envirotuff Nfr2) N/A l.m
c. Prepainted Flashing, Ga. #24 N/A sqm
d. Prepainted Ridge Roll N/A l.m
e. Gutter, Stainless Steel Type, Ga.#24 (including anchorage/support, flashing to complete installation 38.00 sqm 345.00 69.00 414.00 15732.00
f. Consumables (Welding Rods, Oxy-Acetylene, bolts, nuts, and washers, etc.) 1.00 lot 2840.50 568.10 3408.60 3408.60
g. Others (Pls Specify)
g.1)
4.3.1.6 Others (Pls. Specify)
a.)
4.3.2 Architectural Works
4.3.2.1 Floor Finishes
a. Concrete Broom Finish w/ Hardener 30.00 sq.m 230.00 172.50 402.50 12075.00
4.3.2.2 Painting Works
a. Traffic Paint for Column Pedestals #NAME? sq.m 345.00 172.50 517.50 #NAME?
4.3.2.3 Others (Pls. Specify)
a.)
ANCILLARY BUILDINGS SUB-TOTAL (VAT INC) #NAME?
5.00 SANITARY / PLUMBING WORKS
5.10 Water Distribution System (Design, Supply of Materials, Tools, Equipments, Labor & Consumables)
a. Pressurized Water Tank w/ AVC 1.00 lot 170686.45 0.00 30130.00 200816.45 200816.45 1300 gal
b. Pipes, fittings & submeter 1.00 lot 0.00 0.00 0.00 0.00 0.00
G.I. pipe, diameter, pipe sch. 40 3/4 in. dia., G.I. pipe, sch. 40
Length m
Fittings
G.I. Elbow 90, dia pc/s
G.I. Equal Tee, dia pc/s
G.I. Flange, dia pc/s
G.I. Blind Flange, dia pc/s
G.I. Tee Reducer, dia pc/s
G.I. Reducer, dia pc/s
Threadolet pc/s
Submeter pc/s
Others (Pls. Specify)
c. Valves
Pressure Regulating Valve pc/s
Float Valve pc/s
Gate Valve pc/s
Strainer Valve pc/s
Check Valve pc/s
Others (Pls. Specify)
d. Others
Flowmeter pc/s
Pressure Gauge pc/s
Equipment Foundation lot
Fittings and accessories
Others (Pls. Specify)
G.I. pipe, diameter, pipe sch. 40, 1" 20.00 pc/s 1531.21 612.48 2143.69 42873.78 1 in. dia., G.I. pipe, sch. 40
Supply and installation of all necessary fire protectio n sys tem components (hoses, valves, cabinets /hos e reel, fire extinguishers,
fire pump, jock ey pump, fire ind icator board), conforming to PSM E Code an d OSHA safety stan dard s and sp ecifications.
c. Fire extinguisher 4.00 units 2608.20 1043.28 3651.48 14605.92 kindly specify
a. Office Area 2.00 units 103500.00 103500.00 207000.00 1.5 TR each, 2hp with inverter
b. Canteen 2.00 units 103500.00 103500.00 207000.00 1.5 TR each, 2hp with inverter
c. Pipes, fittings and other accessories needed for the completion of project. Included l.m drain pipes up to the catch basins
c. Male CR 1.00 unit 6900.00 6900.00 6900.00 37 CFM, Kruger KCE 160x, 35W Centrifugal,Switch Operated
d. Female CR 1.00 unit 6900.00 6900.00 6900.00 37 CFM, Kruger KCE 160x, 35W Centrifugal,Switch Operated
Materials Labor
Item
Items of work Qty Unit Unit Total Unit Total
# cost Cost cost Cost
A STRUCTURAL
1 Earthworks
Excavation
Footings 11.66 cum - - 780.00 9,090.90
Footing Tie Beam 61.24 cum - - 780.00 47,764.08
Backfilling and compaction
Footings/Footing Tie Beam #NAME? cum - #NAME? 260.00 #NAME?
Selected earth fill 1,257.50 cum 500.00 628,750.00 156.00 196,170.00
Gravel Bed G-1 60.50 cum 1,500.00 90,751.50 260.00 15,730.26
Sub Total
2 Concrete works
Footings
Concrete RMC ord. 3-4" 0.63 cum 6,250.00 3,937.50 780.00 491.40
Footing Tie Beam
Concrete RMC ord. 3-4" 53.58 cum 6,250.00 334,884.38 780.00 41,793.57
Slab on fill
Concrete RMC ord. 3-4" #NAME? cum 5,625.00 #NAME? 780.00 #NAME?
Columns
Concrete RMC ord. 3-4" 0.00 cum 6,250.00 - 780.00 -
Beams
Concrete RMC ord. 3-4" 0.00 cum 6,250.00 - 780.00 -
Suspended Slabs
Concrete RMC ord. 3-4" 0.63 cum 6,250.00 3,937.50 780.00 491.40
Stairs
Concrete RMC ord. 3-4" 54.41 cum 6,250.00 340,042.50 780.00 42,437.30
Retaining Wall
Concrete RMC ord. 3-4" 56.45 cum 6,250.00 352,800.00 780.00 44,029.44
Elevator Shaft
Concrete RMC ord. 3-4" 30.86 cum 6,250.00 192,858.75 780.00 24,068.77
Ramp
Concrete RMC ord. 3-4" 3.95 cum 5,625.00 22,219.31 780.00 3,081.08
Sub Total
3 Reinforcing bars
Footings
20mm dia deformed bar 32.73 kgs 52.50 1,718.37 15.60 510.60
#16 tie wire 0.52 kgs 106.25 54.77 - -
Slab on fill
10mm dia deformed bar #NAME? kgs 52.50 #NAME? 15.60 #NAME?
#16 tie wire #NAME? kgs 106.25 #NAME? - #NAME?
Columns
12mm dia deformed bars 0.00 kgs 52.50 - 15.60 -
20mm dia deformed bars 0.00 kgs 52.50 - 15.60 -
25mm dia deformed bars #NAME? kgs 52.50 #NAME? 15.60 #NAME?
#16 tie wire #NAME? kgs 106.25 #NAME? - #NAME?
Beams
10mm dia deformed bars 0.00 kgs 52.50 - 15.60 -
16mm dia deformed bars 0.00 kgs 52.50 - 15.60 -
20mm dia deformed bars #NAME? kgs 52.50 #NAME? 15.60 #NAME?
25mm dia deformed bars #NAME? kgs 52.50 #NAME? 15.60 #NAME?
#16 tie wire #NAME? kgs 106.25 #NAME? - #NAME?
Suspended slab
10mm dia deformed bars 37.59 kgs 52.50 1,973.73 15.60 586.48
12mm dia deformed bars #NAME? kgs 52.50 #NAME? 15.60 #NAME?
#16 tie wire #NAME? kgs 106.25 #NAME? - #NAME?
Stairs
10mm dia deformed bars 3,255.99 kgs 52.50 170,939.57 15.60 50,793.47
#16 tie wire 51.28 kgs 106.25 5,448.70 - -
Retaining Wall
12mm dia deformed bars 2,456.30 kgs 52.50 128,955.89 15.60 38,318.32
#16 tie wire 38.69 kgs 106.25 4,110.47 - -
Elevator Shaft
10mm dia deformed bars 865.91 kgs 52.50 45,460.14 15.60 13,508.16
20mm dia deformed bars 4,188.09 kgs 52.50 219,874.51 15.60 65,334.14
#16 tie wire 79.60 kgs 106.25 8,457.54 - -
Ramp
10mm dia deformed bars 242.25 kgs 52.50 12,718.11 15.60 3,779.10
#16 tie wire 3.82 kgs 106.25 405.39 - -
Sub Total
Sub Total
5 Masonry
Exterior walls
CHB Laying 6" (including reinforcements) 962.00 sq.m. 1,062.50 1,022,125.00 286.00 275,132.00
Exterior Plastering 962.00 sq.m. 225.00 216,450.00 325.00 312,650.00
Interior Plastering 962.00 sq.m. 225.00 216,450.00 169.00 162,578.00
Interior walls
CHB Laying 4" (including reinforcements) 28.00 sq.m. 687.50 19,250.00 286.00 8,008.00
Plastering 56.00 sq.m. 187.50 10,500.00 169.00 9,464.00
Sub Total
6 Roofing
Pre-painted Corrogated G.I. Sheet (G.A. 24) 318.00 sq.m. 1,250.00 397,500.00 260.00 82,680.00
LC150x75x25x5 7,324.13 kgs 75.00 549,309.60 26.00 190,427.33
L62.5x62.5x6mm 2,459.52 kgs 75.00 184,464.00 26.00 63,947.52
L50x50x6mm 1,842.18 kgs 75.00 138,163.73 26.00 47,896.76
L30x30x6mm 345.87 kgs 75.00 25,940.25 26.00 8,992.62
L25x25x3mm 144.59 kgs 75.00 10,843.88 26.00 3,759.21
Consumables (weld, gusset plates, etc.) 1.00 lot 90,872.15 90,872.15 31,502.34 31,502.34
Anchor bolts 72.00 pcs 750.00 54,000.00 130.00 9,360.00
Base plate 160.23 kgs 75.00 12,017.57 26.00 4,166.09
Sub Total
B ARCHITECTURAL
1 Floor Works
Toilets
Tileworks 194.67 sq.m. 1,000.00 194,670.00 390.00 75,921.30
Offices and Other Areas
Tileworks 1,781.98 sq.m. 1,250.00 2,227,470.00 390.00 694,970.64
Sub Total
2 Partitioning
Office Fixed Glass Partition Err:509 sqm 6,875.00 Err:509 780.00 Err:509
Toilet Partitions 124.00 sq.m. 1,000.00 124,000.00 390.00 48,360.00
Sub Total
Sub Total
4 Painting works
Exterior Painting 962.00 sq.m. 187.50 180,375.00 221.00 212,602.00
Interior Painting 1,018.00 sq.m. 187.50 190,875.00 195.00 198,510.00
Sub Total
5 Ceiling works
Framing and Board Installation 1,736.65 sq.m. 1,500.00 2,604,975.00 455.00 790,175.75
Sub Total
6 Toilet Counters
Counter (w/ tiling works) 19.85 sq.m. 3,125.00 62,015.63 780.00 15,479.10
Sub Total
7 Specialty Works
Exterior Fixed Glass 484.79 sq.m. 9,375.00 4,544,859.38 1,300.00 630,220.50
Exterior Module (Façade) 359.52 sq.m. 3,750.00 1,348,200.00 780.00 280,425.60
Green Wall (Vertical Garden) 23.52 sq.m. 2,500.00 58,800.00 780.00 18,345.60
Railing works 134.10 lm 2,125.00 284,962.50 390.00 52,299.00
Sub Total
C PLUMBING WORKS
Exclusions:
a) Tapping to main water, sewer & drainage line.
b) Water meter / water heater (materials)
Sub Total
D FIRE PROTECTION
Exclusions:
a) Fire pump, jockey pump and its electrical control & accessories
b) Electrical controls & its accessories
c) Fire extinguishers
d) Pressure relief valves
Sub Total
E ELECTRICAL WORKS
F MECHANICAL WORKS
TOTAL COST
TFA
COST/SQ
Prepared by: Noted by;
9,090.90
47,764.08
#NAME?
824,920.00
106,481.76
#NAME?
4,428.90
376,677.95
#NAME?
4,428.90
382,479.80
396,829.44
216,927.52
25,300.39
#NAME?
2,228.97
54.77
27,695.29
694,761.18
17,753.09
#NAME?
#NAME?
-
-
#NAME?
#NAME?
-
-
#NAME?
#NAME?
#NAME?
2,560.21
#NAME?
#NAME?
221,733.04
5,448.70
167,274.21
4,110.47
58,968.30
285,208.65
8,457.54
16,497.21
405.39
#NAME?
#NAME?
#NAME?
1,297,257.00
529,100.00
379,028.00
27,258.00
19,964.00
2,252,607.00
480,180.00
739,736.93
248,411.52
186,060.48
34,932.87
14,603.09
122,374.49
63,360.00
16,183.65
1,905,843.03
Err:509
270,591.30
2,922,440.64
3,193,031.94
Err:509
172,360.00
Err:509
32,800.00
266,850.00
772,975.00
520,575.00
83,300.00
91,500.00
49,200.00
1,817,200.00
392,977.00
389,385.00
782,362.00
3,395,150.75
3,395,150.75
77,494.73
77,494.73
5,175,079.88
1,628,625.60
77,145.60
337,261.50
7,218,112.58
962,829.43
295,552.07
555,759.77
1,039,002.64
767,520.00
295,200.00
114,800.00
289,000.00
64,562.40
78,478.82
1,928.48
61,685.61
2,217.60
88,218.47
104,866.24
2,576.90
73,356.12
3,742.20
21,457.80
4,822,754.55
2,835,792.86
128,957.14
32,500.00
26,000.00
3,023,250.00
#NAME?
2000
#NAME?