Appendix IV
Scope of Work
(Employer)
And
CAMCE-DHDC-SEMARCO Consortium
(Contractor)
Scope of Work
STORAGE AREA
Lignite (Steam coal) storage area (if coal changing to gas, this part will be deleted)
Absorption Units (Absorption system will adopt the process technology provided by the Employer):
Liquid ammonia feeding system.
Equipped with 3 ammonia brine tanks, each with a capacity of 200m3, GRP material.
Distillation Units (Distillation system will adopt the process technology provided by the Employer)
Carbonation Units:
Filtration Units:
One belt filter and its accessories will be provided for each production line (total 2 production lines)
with a capacity of 250.000MTY
Each set of belt filter accessories includes its supporting vacuum pump, gas-liquid separator, tail gas
absorption tower.
The washing water with filter machine adopts soft water or condensate, and the consumption is less
than 0.8T/T soda ash.
Three mother liquor tanks are provided to collect filtrate. Mother liquor tank material is GRP. The
Employer is responsible for the design solution and shall assist contractor by providing drawings.
Compression Units:
3 identical screw type carbon dioxide compressors must be enough for two production line with a
capacity of 500.000MTY.
The compressor gas is cooled by direct or indirect contact with circulating cooling water. It will be
discussed during detail engineering.
Each compressor will be driven by 49 bar(g) steam turbine.
The Contractor will provide compressor data sheet
Calcination Units:
One ∅3600 calciner and its accessories will be provided for each production line (total 2 production
lines) with a capacity of 250.000MTY
Light ash calcination furnace with external soda circulation.
The cooling and cleaning process of calciner gas is as follows: dry system dust removal and wet
system dust removal and indirect cooling and water washing for ammonia removal. The absorption of
ammonia in the gas from calciner will be discussed during detail engineering.
Material of the all washing columns and related equipment will be discussed during detail
engineering.
The heat source used for light ash calcination furnace is 32 bar(g) and 280℃ steam.
The light ash calciner is equipped with a double shaft mixer before entering the furnace, which fully
mixes the sodium bicarbonate and the return soda and feeds them together into the light ash calciner.
Auxiliary Units:
2 sets of water cooling tower facility each with a capacity of 4000 m³/h for soda production will be
provided.
Water treatment units will be capable of demineralized and soft water.
Demineralized water capacity will be the 220 t/h.
Softening and conditioning capacity will be convenient for plant operation capacity.
Two steam boilers each with a capacity of 120MTH, 53bars gauge and 485 ℃.
Two circulating type, fluidized bed coal fired steam boilers are required.
Two steam turbine with a suction of 3 bar,16bar and 32 bar are required.
Steam turbines capacity should compensate all plant electrical consumption.
For a safe operation, 2 or 3 MW steam turbine can be a condensing type, it will be discussed during
detailed engineering.
Power plant, water cooling and conditioning units should obey the environmental limits as per
Appendix V [Schedule of Contractor’s Performance Guarantees and Test Specifications].
At least one raw water tank with a capacity of 1.000M3 is required.
All the other equipment’s, which are necessary for the safe operation of the whole plant, must be
supplied.
Service air and instrument air systems must obey whole plants requirements
All maintenance groups (mechanical, electrical, instrumentation civil etc.) workshops and equipment
must obey whole plants requirements.
RESIDENTIAL AREA
68 Bed Guesthouse
Monolithic Concrete Building with Basement Floor
An entrance lobby area and restaurant to be placed at entrance floor
Open Car Parking Both for Staff & Guests
Furnished Room Floors & Rooms the list of furniture in the rooms will be detailed .
Clean Floor height of up to 4.5 m at Lobby Zone and up to 3m at room floors for service purposes
2 Single Apartments
2 Buildings of each 1 floor Monolithic Concrete Structure
Clean floor height will be up to 3.2m
Each household is equipped with a master bedroom and a guest bedroom, a closet, a bathroom, a
toilet, a living room, a kitchen, and 2 balconies
Substation Area
A substation to convert high voltage to low voltage will be implemented in residential zone