uPVC Window & Door Project Report
uPVC Window & Door Project Report
uPVC Window & Door Project Report
New enterpriuner
Hyd Telangana
Total 762.5
Total Window cost 5065.66
Cost / sqft 253.28
Glass - 5 mm 50.00 1526
Fabrication Cost 30.00
Sales Costs 13.19
Installation Cost 12.00
Transportation 10.00
Total 368.48
Margin 30% 110.54
Total 479.02
Window cost 9580.41
SQM
SQFT
SUMMARY OF PROJECT COST
SHED ON RENT -
MACHINERY & EQUIPMENTS 3,388,000
ELECTRICAL INSTALLATIONS 100,000
OFFICE EQUIPMENTS 100,000
FURNITURE & FIXTURES 100,000
3,688,000
OFFICE EQUIPMENTS
Nos.
1 Computer 1 35,000.00 35,000
2 Printer 1 10,000.00 10,000
3 U.P.S. 1 2,500.00 2,500
5 Miscellaneous 25,000
Total 72,500
UTILIZATION OF FUND
MEANS OF FINANCE
BANK LOAN
TERM LOAN FINANCE 4,967,025.00
WORKING CAPITAL FINANCE 1,655,675.00 6,622,700
Installation
1 Installation team 15000 1
Marketting
1 Marketting Head 25000 1
2 Marketting exe 12500 1
Accountant
1 Commercial+ Accountat+ Disp 12000 1
2 Assistant/ Front office exe 7500 1
Total
Min Max
Factory area sft 5000 8000
Power hp 30 50
Air compressor hp 7.5 10
Salary per annum
0
300000
576000
900000
72000
180000
300000
150000
144000
90000
Per mth
2,712,000.00 226,000.00
PROJECTED PROFITABILITY STATEMENT
Assumption
40 windows / day
25 working days in a month
YEARS YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7
INSTALLED CAPACITY 12,000 12,000 12,000 12,000 12,000 12,000 12,000
CAPACITY UTILIZATION 50% 60% 70% 80% 90% 96% 98%
INCOME
1 Sale of UPVC windows 57,482,481 75,876,875 96,570,569 119,563,561 144,855,853 165,549,546 180,265,061
EXPENDITURE
NET CREDIT [A-B] 11,822,538 14,147,397 19,609,551 24,529,579 29,942,894 34,076,172 34,485,019
Profit before Taxation 11,822,538 14,147,397 19,609,551 24,529,579 29,942,894 34,076,172 34,485,019
Provision for Taxation 3,546,761 4,244,219 5,882,865 7,358,874 8,982,868 10,222,852 10,345,506
Profit after Taxation 8,275,777 9,903,178 13,726,686 17,170,705 20,960,026 23,853,321 24,139,513
Bal carried over to Balance Sheet 8,275,777 18,178,955 31,905,640 49,076,346 70,036,372 93,889,693 118,029,206
YEARS YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7
LIABILITIES
ASSETS
Net Fixed Assets (W.D.V.) 3,496,050 2,971,643 2,525,896 2,147,012 1,824,960 1,551,216 1,318,534
Advance & Deposits 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Advance for Material 3,000,000 4,000,000 5,500,000 6,000,000 6,500,000 7,000,000 6,500,000
Stock 2,000,000 3,000,000
Net Current Assets (Debt &Ot 8,000,000 7,000,000 8,000,000 9,000,000 10,000,000 10,500,000 11,000,000
Cash & Bank Bal. 567,109 9,927,995 25,474,915 42,236,356 62,878,271 86,481,161 110,211,853
SOURCES
APPLICATION
YEAR OPENING PAYMENT CLOSING INTEREST OPENING PAYMENT CLOSING INTEREST TOTAL TOTAL
BALANCE BALANCE BALANCE BALANCE INTEREST PRINCIPAL
YEAR YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7
TERM LOAN INTEREST 573,118.27 481,419.35 389,720.42 298,021.50 206,322.58 114,623.65 22,924.73
CASH CREDIT INTEREST 198,681.00 198,681.00 198,681.00 198,681.00 198,681.00 198,681.00 198,681.00
Note: 1 Repayment term has been considered to be in 13 equal half yearly instalments.
2 Term Loan Interest has been considered @ 12.00 % p.a.
3 Cash Credit Interest has been considered @ 12.00 % p.a.
CALCULATION OF INTEREST ON TERM LOAN
Consolidated Payout
TOTAL
REPAYMENT
955,197.12
1,245,577.04
1,153,878.12
1,062,179.19
970,480.27
878,781.35
787,082.42
7,053,175.50
Machinery Suppl 0 client India
Pos. pe or nomber 0 piece- tension supply air consumption
machine order in
type nomber s in KW in Volt Ampere litre/min
1 e tec 801 1 4.50 KW 400 V /PEN400V 14.2 A 76
2 e tec 611 1 1.90 KW 400 V /PEN400V 4.8 A 81
3 e tec n11 1 1.65 KW 400 V /PEN400V 4.8 A 81
4 e tec 301 1 1.50 KW 400 V /PEN400V 4.8 A 120
5 e tec 511 1 2.00 KW 400 V/N/PE230V 4.8 A 40
6 e tec 201 1 2.20 KW 400 V /PEN400V 4.8 A 40
7 e tec 701 1 5.50 KW 230 V /PEN400V 15 A 150