Calculation Sheet For Tower Project
Calculation Sheet For Tower Project
Calculation Sheet For Tower Project
tower project
Supervised by :
Dr/Abdallah mostafa
1|P a g e
Table of contents
1. Project introduction/Project key…………………………………………………………3
2. Arch Drawings…………………………………………………………5
3. STATICAL SYSTEM…………………………………………………………7
4. Design of Slabs…………………………………………………………8
5. Check Punching…………………………………………………………10
6. Design of beams…………………………………………………………12
7. Wind Loads………………………………………………………….13
8. Earthquake Loads………………………………………………………….14
9. Design of Columns………………………………………………………….16
10. Design of Shear walls & Core………………………………………………………….18
11. Design of Raft on Piles………………………………………………………….19
2|P a g e
Project introduction
project is a tower of area 393 m2 consists of:
• Basement Floor (car garage ) at level (4.10)
•11 Typical Floor (residential) at level (2.9)
Project Key
3|P a g e
2-Arch Drawings
Ground floor
4|P a g e
Typical floor
5|P a g e
3-Software Used
6|P a g e
STATICAL SYSTEM
Typical floor
-Consists of flat slab with thickness200mm at level (4.6)
DESIGN CRITERIA
Design Building codes
( ECP 203-2018 & Egyptian Code for Loads -2012)
𝑓𝑐𝑢= 30 Mpa
& 𝑓𝑦 (main steel) = 360 Mpa & 𝑓𝑦 (stirrups) = 360 Mpa
𝐹. 𝐶 = 0.15 t/𝑚2 .
L𝑖𝑣𝑒 𝐿𝑜𝑎𝑑 = 0.3 t/𝑚2 .
Bearing capacity =200 𝐾𝑁/𝑚2 .
Flooring= 0.15 t/m2
Wall loads = 0.6 t/m2
Live loads
L.L=0.3 t/m2
Design load combinations
SERVICE LOAD COMBINATIONS:DL+LL
Ultimate LOAD COMBINATIONS:1.4D+1.6L
7|P a g e
7-Design of Slabs
8|P a g e
M11
M22
9|P a g e
Check Punching
Safe
10 | P a g e
11 | P a g e
8-Design of beams
Typical floor
12 | P a g e
9-Wind Loads
13 | P a g e
9-Earthquake Loads
14 | P a g e
Check center of math & center of rigidity
Check Drift
15 | P a g e
10- Design of Columns
16 | P a g e
17 | P a g e
11- Design of Shear walls & Core
18 | P a g e
12- Design of Raft on Piles
B.C = 20 ton/m2
T raft = 100cm
Use Piles D = 0.5 m , L=15m
No.of Piles = 81 piles
Smin =3 m Distance Between Piles
Emin=1 m Distance From Edge
Pile Stiffness=(EA/L)=31400 ton/m
Qall (Pile)=A(pile)*Fco=(3.14*500*500/4)*5=98.1 ton
19 | P a g e
20 | P a g e
Load Combination
Long Term Deflection=Case1-Case2+Case3
22 | P a g e
Piles Reactions
23 | P a g e