Pipe Testing Certificates

The document reports on hydrostatic pressure testing of liquefied petroleum gas liquid pipelines, vapor pipelines, and hose pipes at an LPG filling plant in Rawalpindi, Pakistan. Pipelines of various diameters were tested up to 525 PSI for 60 minutes, with no leakage or seepage observed. Pipelines and joints were similarly tested at 150 PSI for 30 minutes and maintained pressure without issue. The tests certified that the pipelines and joints passed pressure testing requirements.

Uploaded by

Inspection pics
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
349 views4 pages

Pipe Testing Certificates

The document reports on hydrostatic pressure testing of liquefied petroleum gas liquid pipelines, vapor pipelines, and hose pipes at an LPG filling plant in Rawalpindi, Pakistan. Pipelines of various diameters were tested up to 525 PSI for 60 minutes, with no leakage or seepage observed. Pipelines and joints were similarly tested at 150 PSI for 30 minutes and maintained pressure without issue. The tests certified that the pipelines and joints passed pressure testing requirements.

Uploaded by

Inspection pics
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

FOUNDATION GAS

HYDROSTATIC PRESSURE TESTING REPORT

This is to certify that we the undersigned have witnessed the hydrostatic pressure test of
Liquefied Petroleum Gas Liquid pipelines installed at the close of LPG storage T anks area of
LPG Filling Plant, situated at MORGAH RAWALPINDI.

Date of Pressure test

Test Medium : Water

Test Pressures . 525 PSI

Pipe line Dia : 2", 3" & 4"

Line Groups

1. Bowzer off loading to storage tank.

2. Storage tank to discharge pump.

3. Discharge pump to bottle filling shed .

Hydrostatic Pressure Test

The pipelines of liquid were subject to hydrostatic pressure test for period of 60 Minutes. All
the pipelines held tight at applied pressure. NO seepage or leakage was found at the time of
hydrostatic test.

Supervisor Operations

Dated 2-.tJ ~ c<). r '2.-L-


nag er Technical
ana . Terhnical
FoundGJton GrJ.s
[.OUND/\ l ION GAS

HYDROSTATIC PRLSSUHE TFS TING HI l'OH I


11
This 1s to certify that we the undersigned l1 ,1w w1t11u r, •,t·d IIH~ l 1yclr c,•,t.d1c, firt·';' " ' •• ,,f
1 1 1
Liquefied Petroleum Gas L1qu1d Vnpo1s p1pPl11w, 1nst.1lll'd .tl 1111 • (.lu•,, ,f 11 •r , ' , 1t,1 1r
Tanks area of LPG F1ll1ng Plant, s1tuntcd ,1l MOHC1/\I I H/\W/\1 I JI f'JI JI
,. I
Date of Pressure test . ') C JL'l L l

Test Medium Water

Test Pressures 375 PSI

Pipe line Dia 2"

Line Groups

1. Bowzer off loading to storage tank

2 Storage tank to discharge pump.

Hydrostatic Pressure Test

The pipelines of vapors were subjected to hydrostatic pressure test for period of 60 Minut~s
All the pipelines held tight at applied pressure . NO seepage or leakage was found at the
time of hydrostatic test.

Supervisor Operations

Dated
FOUNDATION GAS

HYDROSTATIC PRESSURE TESTING REPORT

This is to certify that we the undersigned have witnessed the hydrostatic pressure test of
Liquefied Petroleum Gas Hose Pipes, installed at Bowzer Decanting Prnnt. s1tua ed at
MORGAH RAWALPINDI .

Date of Pressure test

Test Medium : Water

Test Pressures : 525 PSI

Hose Pipe Dia : 2"

Line Groups

1. Bowzer to off load Arm .

Hydrostatic Pressure Test

The Hose pipes were subject to hydrostatic pressure test for period of 60 Second . All the
pipelines held tight at applied pressure. NO seepage or leakage was found at the time of
hydrostatic test.

Dated . 1---o - o1 1-1..-


r

,,
,,
FOUNDATION GAS

HYDROSTATIC PRESSURE TESTING REPORT

This 1s to certify that we the undersigned have witnessed the hydrostatic pressure test of
L1quef1ed Petroleum Gas Liquid pipelines and Joints installed at the close of LPG storage
Tanks area of LPG Filling Plant, situated at MORGAH RAWALPINDI .

Date of Pressure test

Test Medium : Water

Test Pressures : 150PSI

Pipe line Dia : 2", 3" & 4"

Line Groups

1. Bowzer off loading to storage tank.

2. Storage tank to discharge pump.

3. Discharge pump to bottle filling shed.

4. Hose Pipes

Hydrostatic Pressure Test

The pipelines and joints of liquid and vapors were subjected to hydrostatic pressure test for
period of 30 Minutes. All the pipelines and Joints held tight at applied pressure. NO seepage
or leakage was found at the time of hydrostatic test.

Supervisor Operations

Dated V ~ tJ 1,..LL---