Micro Project Report CSS

This document summarizes a micro project report submitted by a group of students in their 5th semester of a computer engineering program. It includes details of the project such as the topic, group members, timeline of work completed over 10 weeks under the guidance of their project guide. It describes the activities conducted each week such as finalizing the project title, literature review, data collection, and content development. The document also includes formats for a certificate of completion, weekly progress report, and evaluation sheet for assessing the students' performance and learning outcomes from the project.

Uploaded by

NILESH KAMBLE
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
207 views

Micro Project Report CSS

This document summarizes a micro project report submitted by a group of students in their 5th semester of a computer engineering program. It includes details of the project such as the topic, group members, timeline of work completed over 10 weeks under the guidance of their project guide. It describes the activities conducted each week such as finalizing the project title, literature review, data collection, and content development. The document also includes formats for a certificate of completion, weekly progress report, and evaluation sheet for assessing the students' performance and learning outcomes from the project.

Uploaded by

NILESH KAMBLE
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Programme Name and Code:CO 5I Academic Year: 2022-2023

Course Name and Code: Semester: V

A STUDY ON The

MICRO PROJECT REPORT


Submitted in DEC. W 22 by the group of students
Sr. Roll No Enrollment Seat no-
Full name of Student
No (Sem. -V) No (Sem.-V)
1
Under the Guidance of
Mr. S.S.Rajigare
In
Three Years Diploma Programme in Engineering & Technology of Maharashtra
State Board of Technical Education, Mumbai (Autonomous)
ISO 9001:2008 (ISO/IEC-27001:2013)
At
1207 – Vidyavardhini Educational Academy’s
Vidyavardhini Institute of Technology, Pal -416209.
MAHARASHTRA STATE BOARD OF TECHNICAL
EDUCATION, MUMBAI

Certificate
This is to certify that Ms.

Roll No: _____of Fifth Semester of Third year Diploma Programme in

C o m p u t e r Engineering at 1207 - Shri Vidyavardhini Educational Academy’s

Vidyavardhini Institute of Technology Pal, has completed the Micro Project

satisfactorily in Subject ________________ in the academic year 2022-2023 as

prescribed in the MSBTE prescribed curriculum of I Scheme.

Place: Pal Enrollment No:

Date: / / 2022 Exam. Seat No:

Project Guide Head of the Department Principal

Seal of
Institute
Weekly Work / Progress Report …

Details of 16 Engagement Hours of the Student


Regarding Completion of the Project
Timing
Week Sign of
Date Duration Work or activity Performed
No. From To the Guide
in hours
Discussion and Finalization of the
1 / /2022 One hour
Project Title
Two Preparation and Submission of
2 / /2022
hours Abstracts
Two
3 / /2022 Literature Review
hours
Two
4 / /2022 Collection of Data
hours
Two
5 / /2022 Collection of Data
hours

6 / /2022 One hour Discussion and Outline of Content

7 / /2022 Two hour Rough Writing of the Projects Contents

Editing and Proof Reading of the


8 / /2022 One hour
Contents

9 / /2022 Two hour Final Completion of the Project

Seminar Presentation, viva-vice,


10 / /2022 One hour
Assessment and Submission of Report

Name of Project Guide: Prof. S.S.RAJIGARE


Lecturer, Computer Department.
1207-Vidyavardhini Institute of Technology, Pal.
Evaluation Sheet for the Micro Project

Academic Year: 2022-2023 Name of Faculty:-Miss. ________________________

Course: - Computer Engg. Course Code: - CO5I Semester: Fifth

Title of the Project:Develop web page design


CO’s addressed by the Micro Project:
A. _________________________________________________________________________________________________________________
B. _________________________________________________________________________________________________________________
C. _________________________________________________________________________________________________________________
D. _________________________________________________________________________________________________________________

Major Learning Outcomes achieved by students by doing the Project:


(a)Practical Outcomes ___________________________________________________________________________________________
_____________________________________________________________________________________________
(b) Unit Outcomes in Cognitive domain_________________________________________________________________________
______________________________________________________________________________________________________
(c) Outcomes in Affective domain ______________________________________________________________________________
______________________________________________________________________________________________________
Comments/Suggestion about team work/leadership/inter-personal communication
_____________________________________________________________________________________________________________________
____________________________________________________________________________________________________

Roll Student Name Marks out of 6 for Marks out of 4 for Total
No Performance in Performance in out of
Group activity Group activity 10
(D5 Col.8) (D5 Col.9)