Vents
Vents
A A
BAYSIDE COUNCIL
B M6 MOTORWAY B
M6 MOTORWAY - STAGE 1
C
PACKAGE 2203 C
N
ARNCLIFFE PARKLAND BRIGHTON-LE-SANDS BOTANY BAY
E KYEEMAGH
ACTIVE
TRANSPORT E
CORRIDOR (ATC)
TUNNEL BICENTENNIAL PARK CUT & COVER
NORTHERN
MOC1 UPPER SECTION LOCAL ROAD
WE MOC3 MONTEREY
BANKSIA TUNNEL ST
BO
TAN
SOUTHERN YS
T
ARNCLIFFE SECTION .9
2
N
D
.9
2
TUNNEL XP
R0
6
CAVERN
X
PR
0
5
F F
XPR0
4
T AVE
XPR
03
APR01
EXISTING FUTUR
TUNNEL STAGE 2 E M6
PRESIDEN
M8 MOTORWAY RAMPS TUNNEL
TUNNEL ROCKDALE
PRINCES
HWY
KOGARAH
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: - CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 COVER SHEET H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422101 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: - CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 DRAWING INDEX H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422102 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
• CARRIAGEWAY – ALL DELINEATED ROAD LANES WITHIN A TUNNEL, IN A MECHANICAL AND ELECTRICAL
SINGLE TRAFFIC FLOW DIRECTION, INCLUSIVE OF SHOULDERS AND 1904 - HYDRAULIC PUMP SYSTEMS
RAMPS. 2701 - TUNNEL - VENTILATION ANALYSIS
2702 - TUNNEL - MVAC SYSTEM
• FRNSW EMERGENCY EQUIPMENT POINT (FEEP) ARE LOCATIONS ON 2801 - TUNNEL VENTILATION
THE TUNNEL WALL OR WALL PANELS THAT WILL CONTAIN THE 3102 - MECHANICAL VENTILATION DESIGN - OUTLET MONITORING
C FOLLOWING: 3202 - FIRE SAFETY ENGINEERING PLAN C
• ONE DOUBLE HEADED FIRE HYDRANT 3203 - FIRE ENGINEERING BRIEF
• ONE FIRE HOSE REEL OF 60M IN LENGTH 3204 - FIRE ENGINEERING REPORT - TUNNELS
• TWO SPARE SINGLE PHASE 240V POWER OUTLETS 3501 - FIRE SUPPRESSION
• ONE FIRE TELEPHONE FOR EMERGENCY PURPOSES 4201 - TUNNEL M&E COMBINED SERVICES
TUNNEL DESIGN
1402 - TUNNEL DESIGN - MOC3 VENTILATION ADIT
1403 - TUNNEL DESIGN - MAINLINE NORTHERN UPPER SECTION
1404 - TUNNEL DESIGN - MAINLINE NORTHERN LOWER SECTION
1501 - TUNNEL DESIGN - RAMPS AND PORTAL - SOFT GROUND
1502 - TUNNEL DESIGN - RAMPS - SANDSTONE
D 1503 - TUNNEL DESIGN - SOFT GROUND IMPROVEMENT WORKS D
1504 - TUNNEL DESIGN - MAINLINE SOUTHERN SECTION
1801 - TUNNEL DESIGN - CAVERN AND FUTURE M6 STUBS
2206 - MOC3 VENTILATION SHAFT STRUCTURE FITOUT
F F
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: - CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SCOPE, TERMINOLOGIES AND REFERENCES H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422103 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
GENERAL NOTES GENERAL ARRANGEMENT LEGEND R03. REINFORCEMENT BAR NOTATION GIVES INFORMATION IN THIS C06. CONCRETE STRUCTURES SHALL NOT BE LOADED AND TEMPORARY S04. DURABILITY.
G01. WORKMANSHIP AND MATERIALS. No. DESCRIPTION ORDER: PROPPING SHALL NOT BE REMOVED UNTIL THE CONCRETE HAS ACHIEVED
AN EXPOSURE CATEGORY OF C4 IS ADOPTED FOR THE STEELWORK.
ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH ALL No. OF BARS, TYPE, BAR SIZE (mm), SPACING (mm), LAYER, eg. 20N16-200 C. THE NOMINATED 28 DAY STRENGTH, UNO.
MEMBERS ARE PLACED SYMMETRICALLY ABOUT GRID STEELWORK TO BE GALVANISED TO THE FOLLOWING TABLE UNO.
RELEVANT RMS SPECIFICATIONS INCLUDING RMS D & C B80 AND THE L01.
A LINES UNO R04. FABRIC NOTATION GIVES INFORMATION IN THIS ORDER: "SL" OR "RL" C07. MINIMUM 28 DAY COMPRESSIVE STRENGTH OF CONCRETE SHALL BE: A
PROJECT SPECIFICATION THE DURABILITY OF HDG COATING PROVIDED IN THE TABLE BELOW IS
L02. DENOTES STRUCTURE MEMBER LEVEL SYMBOL, AS REFERENCE NUMBER, LOCATION, eg. RL918 TOP.
RL 00.000 ELEMENT STRENGTH GRADE CALCULATED IN ACCORDANCE WITH AS/NZS 4680
G02. METRIC UNITS. IN SECTION / ELEVATION IN METRES
ALL DIMENSIONS ARE IN MILLIMETRES (mm). ALL RELATIVE LEVELS ARE IN R05. REINFORCEMENT IS PRESENTED DIAGRAMMATICALLY AND NOT SLAB S40 ARTICLE AVERAGE COATING
DENOTES STEP IN TOP STRUCTURAL NECESSARILY IN TRUE PROJECTION. REFERENCE
METRES (m). RELATIVE LEVELS ARE RELATED TO AUSTRALIAN HEIGHT L03. STEP BEAM S40 THICKNESS THICKNESS
LEVEL OR EDGE REBATE STANDARD
DATUM. S40 mm g/m2 µm
DENOTES STRUCTURAL R06. UNLESS SPECIFIED OTHERWISE. THE REQUIRED COVER TO GROUND SLAB
L04. 200 HDG390 1.5 to 3.0 390 55
G03. DIMENSIONS. SLAB / WALL THICKNESS REINFORCEMENT NEAREST TO THE CONCRETE SURFACE SHALL BE :
C08. TOLERANCES HDG500 3.0 to 6.0 500 70
DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE STRUCTURAL SSL ELEMENT MINIMUM COVER (mm) IN ADDITION TO TOLERANCES GIVEN IN RMS SPECS, TOLERANCES IN
SECTION THROUGH DOWNSTAND BEAM HDG600 Over 6.0 600 85
DRAWINGS. SLAB 60 ABSOLUTE POSITION FOR ANY POINT ON A CONCRETE ELEMENT TO BE
L05. SHOWN ON PLAN D x W
D
(O/A DEPTH FROM TOP OF SLAB) +/- 20mm. NOTE THIS APPLIES TO ALL CONCRETE ELEMENTS DETAILED IN
B G04. W
BEAM 60
THIS DESIGN LOT. IT DOES NOT APPLY TO TUNNEL LININGS AND MASONRY B B
WHERE PROPRIETARY PRODUCTS ARE NOTED AS "OR APPROVED CAST IN SITU WALLS 60 CARRIAGEWAY PAVEMENTS. NO NEGATIVE TOLERANCE SHALL BE
W MN01. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE
EQUIVALENT" APPROVAL IS TO BE OBTAINED FROM THE DESIGNER. SECTION THROUGH UPSTAND BEAM SOFFIT (FORMED, CONDECK PERMITTED TO GAPS IN ROAD BARRIERS AND NO STRUCTURAL ELEMENT
60 WITH AS3700 AND OTHER RELEVANT CODES.
L06. SSL SHOWN ON PLAN D x W OR AGAINST MASS CONCRETE) TO INTRUDE INTO VEHICLE ENVELOPE..
DESIGN DATA
D
(O/A DEPTH FROM SOFFIT OF SLAB) MINIMUM COVER IS TO BE MAINTAINED ON ALL SIDES INCLUDING SET MN02. THE MASONRY UNITS SHALL HAVE THE FOLLOWING PROPERTIES:
C09. POLYPROPYLENE FIBRES AT A DOSAGE OF 1.5kg/m3 SHALL BE
DOWNS, STEPS OR RECESSES. THE ABOVE VALUES ASSUME CURING ADDED TO THE CONCRETE FOR ALL ELEMENTS LIKELY TO BE EXPOSED - CORE FILLED "H" CONCRETE UNITS TO AS/NZS 4455.1
DD01. APPLIED LOADS. DENOTES: SLAB / WALL PENETRATION COMPOUND IS USED FOR SLAB TOP ONLY. - A CHARACTERISTIC UNCONFINED COMPRESSIVE STRENGTH OF 15Mpa.
THE STRUCTURE DETAILED ON THE ASSOCIATED DRAWINGS HAS BEEN L07. TO HYDROCARBON FIRE. THIS APPLIES TO PLENUM SLABS AND BEAMS.
IN PLAN / ELEVATION - MORTAR SHALL BE CLASS M3 WITH 10mm JOINT THICKNESS AND FACE-
DESIGNED FOR APPLIED LOADS IN ACCORDANCE WITH AS1170 AND R07. LAP REINFORCEMENT ONLY AT LOCATIONS SHOWN ON THE C10. FLOW ABLE CONCRETE SPECIFICATION UNDER REVIEW. SHELL BEDDING TYPE.
AS5100. DENOTES: REBATE IN PLAN / ELEVATION DRAWINGS OR AS APPROVED. UNLESS NOTED OTHERWISE, THE MINIMUM
L08. DEVELOPMENT AND LAP LENGTHS SHALL BE AS TABULATED BELOW. MN03. CONCRETE FOR THE CORE FILLING SHALL HAVE THE FOLLOWING
(a) PERMANENT AND SUPERIMPOSED LOADS, AS SHOWN ON DRAWING
STRUCTURAL STEEL PROPERTIES:
C NO. M6S1-CGU-ML-TU-DRG-442110 BAR SIZE: N12 N16 N20 N24 N28 N32 N36 - A MINIMUM CEMENT CONTENT OF 300kg/m3. C
DENOTES: STRUCTURAL SECTION MARK
L09. 01 (SECTION TAKEN THROUGH STRUCTURE HORIZONTAL BAR WITH S01. WORKMANSHIP & MATERIALS. - A CHARACTERISTICS COMPRESSIVE CYLINDER STRENGTH OF 40MPa AT
(b) AIR FLOW PRESSURE >300mm OF CONCRETE STRUCTURAL STEELWORK SUPPLY AND CONSTRUCTION SHALL BE IN 28 DAYS.
S301 IN DIRECTION OF ARROWS.) 560 860 1190 1540 1920 2300 2700
AIR PRESSURE CAST BELOW THE BAR ACCORDANCE WITH RMS SPECIFICATIONS GIVEN BELOW. - A SLUMP OF 180mm.
L10. A DENOTES: STRUCTURAL DETAIL MARK CONSTRUCTION CATEGORY OF STEELWORK CC2. - ALL CORES ARE TO BE GROUT FILLED, 10mm MAX AGGREGATE
TYPICAL OPERATING PRESSURE ±2 kPa (ENLARGED STRUCTURE DETAIL TAKEN LAP IN REINFORCEMENT SHALL BE STAGGERED AND NOT MORE THAN 50%
S601
MAX SHUT OFF PRESSURE ±5 kPa WITHIN AREA HIGHLIGHTED) OF REINFORCEMENT IN A SECTION SHALL BE LAPPED AT A LOCATION. RELEVANT RMS SPECIFICATIONS ARE: MN04. CLEAN OUT OPENING SHALL BE PROVIDED AT THE BASE OF ALL
1. RMS D&C B201 - STEELWORK FOR BRIDGES CORES TO BE CORE FILLED. ADDITIONAL CLEAN-OUT OPENINGS ARE
INDUCED VEHICLE AIR PRESSURE ±1.5 kPa L11. DENOTES LOAD BEARING UNDER R08. FABRIC SHALL BE LAPPED SUCH THAT THE TWO OUTERMOST WIRES OF 2. RMS D&C B220 - PROTECTIVE TREATMENT OF BRIDGE STEELWORK REQUIRED TO ALL HORIZONTAL BREAKS IN CONSTRUCTION. MORTAR
ONE SHEET OVERLAP THE TWO OUTERMOST WIRES OF THE OTHER SHEET 3. RMS D&C B240 - SUPPLY OF STEEL FASTENERS FINS PROTRUDING FROM JOINTS SHALL BE REMOVED BEFORE
(c) SEISMIC EFFECTS IN THE TABLE BELOW ARE BASED ON AS1170.4 L12. DENOTES INSITU ELEMENT OVER
BY 25mm MINIMUM UNO. GROUTING CORES.
L13. DENOTES PRECAST ELEMENT OVER AN EXPOSURE CATEGORY OF C4 IS ADOPTED FOR THE STEELWORK.
D EARTHQUAKE LOADING 25mm MIN
STEELWORK TO BE HOT DIP GALVANISED TO AS4680 TO HDG390 IN MN05. GROUT SHALL NOT BE POURED IN TO CORES FROM ANY HEIGHT D
IMPORTANCE LEVEL 4 L14. DENOTES MASONRY ELEMENT OVER ACCORDANCE WITH AS2312.2 UNO. GREATER THAN 3m.
HAZARD FACTOR (z) 0.09
L15. DENOTES EXISTING BUILDING
PROBABILITY FACTOR (kp) 1.8 R09. REINFORCEMENT IN BLOCKWORK AND SHOTCRETE WALLS TO BE DURABILITY REPORT, REFER TO APPENDIX G.1 OF THE REPORT. MN06. STOP POUR 50mm BELOW TOP OF BLOCK TO PROVIDE KEY FOR
SITE SUBSOIL CLASS Be DENOTES DIRECTION OF LOCATED USING A COVER METER PRIOR TO DRILLING. THE FOLLOWING POUR.
L16. METAL DECK FORMWORK
EARTHQUAKE DESIGN CATEGORY II S02. COMPONENTS.
Wxx DENOTES WALL IDENTITY, THICKNESS R10. REINFORCEMENT SHALL NOT BE HEATED AND BENT ON SITE WITHOUT ALL STRUCTURAL STEELWORK COMPONENTS SHALL CONFORM TOTHE MN07. RODDING OR OTHER APPROVED MEANS SHALL BE USED TO
L17.
xxxTHK AND ELEVATION DIRECTION THE ENGINEER'S PRIOR APPROVAL. FOLLOWING TABLE UNO. ENSURE PROPER COMPACTION OF GROUT IN CORES.
DD02. FIRE RESISTANCE PERIODS (FRP). DENOTES CONCRETE COLUMN COMPONENT TO COMPLY WITH MIN GRADE
Lx x x
THE STRUCTURE DETAILED ON THE ASSOCIATED DRAWINGS HAS BEEN L18. R11. STANDARD COGS AND HOOKS TO BE BENT AROUND A 4 BAR DIAMETER MN08. TEMPORARY BRACING SHALL BE PROVIDED TO WALLS AS
W
C
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
CRANE MONORAIL
MONORAIL SHALL BE IN ACCORDANCE WITH AS1418.1 AND AS1418.18, AND
SHALL BE MAINTAINED AND INSPECTED TO THE SATISFACTION OF
AS1418.1, AS1418.18 AND AS2550.1.
A A
MONORAIL SHALL BE UNDERSLUNG, WITH STEEL WHEELS AND
UNSPRUNG, AND SHALL BE MOUNTED DIRECTLY ABOVE THE CENTRELINE
OF THE PUMPS.
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: - CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 GENERAL NOTES - SHEET 2 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422105 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND:
N
KOGARAH GOLF COURSE - DENOTES SOUTH VENTILATION SHAFT STRUCTURE
MARS
(THIS DESIGN LOT)
A - DENOTES TUNNEL M6 STAGE 1 CARRIAGEWAY FOR A
H ST RELEVANT CONTROL LINE (NOT PART OF THIS DESIGN LOT)
- DENOTES PASSAGES DETAILED IN OTHER DESIGN LOT
SHEET 1
REFER TO DRAWING No.
M6S1-CGU-ML-TU-DRG-422107
LE
KYEEMAGH
VE
SOUTHBOUND
YST
WAY
R
TO
B M O B
E
T
E AV
E AS
M 5
MCINTYR
AD
NORTHBOUND
RO
LE
DA
FRANCIS A
ST
VE
T
VE
ES
BRUCE S
RA
EA
INN
FLO
AD
VL
MU
C DD
YC C
PR
RE
EK
IN
WE S T B O C A REDMOND FIELD
CE
TANY ST
S
HW
BRIGHTON LE-SANDS
Y
ST
BANKSIA
LE
KY
N AVEO
SHEET 2
TANTALL
D SEGENHO WE S T B O
TANY ST REFER TO DRAWING No. D
E ST
MEMORIAL FIELDS
M6S1-CGU-ML-TU-DRG-422108
ST
BAY
T
ROCKDALE ILINDEN
TABRETT S
SPORTS CENTER
TURELLA WE
CIVIC AVENUE
RESERVE
AVE
BESTIC ST
GIBBES S ST
E T B E
OT
NT
SHORT ST A NY
ST
PRESIDE
CAMERON CIVIC AVE
ST NUE
GEORGE
KSIA
ST
T
BAN
BEACH S
F F
ARNCLIFFE
SPRING ST
PRINCES HWY
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND:
N - DENOTES ROAD CONTROL LINES
B B
SOUTHBOUND
VENTILATION STRUCTURE
REFER TO DRAWING No.
M6S1-CGU-ML-TU-DRG-422200
B
B
EPM01S XPM01
C EPM02S C
EPM03S
EPM04S
B CONT
ROL L
EPM05 INE M110
B S
B
XPM02
EPM0
B 6S
EPM01
N
B B EPM
B EPM 07S
02N
D EPM
08S D
B EPM
09S
EPM
03N
B
XPM03
CON
TRO B
L LINE
M12 EPM
0 04N
NORTHBOUND
VENTILATION STRUCTURE
REFER TO DRAWING No.
E M6S1-CGU-ML-TU-DRG-422150 EPM
E
XPM04
05N
B
XPM05
F F
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:1000 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 10000 20000 30000 40000 50000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
10000 5000 (1:1000 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 LAYOUT PLAN - SHEET 1 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422107 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND:
- DENOTES ROAD CONTROL LINES
N
- DENOTES VENTILATION CONNECTIONS (THIS DESIGN LOT)
A A
- DENOTES TUNNEL M6 STAGE 1 CARRIAGEWAY FOR
RELEVANT CONTROL LINE (NOT PART OF THIS DESIGN LOT)
- DENOTES PASSAGES DETAILED IN OTHER DESIGN LOT
ADD
AND PUT
CLOUD - DENOTES M6 FUTURE STAGES
B B
VENTILATION ADIT
C REFER TO DRAWING No. C
M6S1-CGU-ML-TU-DRG-422250
5
XPR0
ME
MO
RI
AL
FIE
LD
XPR05
S
CONTROL LINE M1A0
XPR07
XPR08
D D
CONTROL LINE M1B0
XP
R0
9
WEST
BOTA
E E
ST NY
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:1000 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 10000 20000 30000 40000 50000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
10000 5000 (1:1000 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 LAYOUT PLAN - SHEET 2 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422108 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND:
A DENOTES INDICATIVE TUNNEL A
DENOTES CARRIAGEWAY
CONTROL LINE
C C
M120 CARRIAGEWAY
CONTROL LINE
D D
E E
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:100 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 1000 2000 3000 4000 5000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
1000 500 (1:100 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 LOADING DIAGRAMS - SHEET 1 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422110 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND:
A DENOTES INDICATIVE TUNNEL A
DENOTES CARRIAGEWAY
CONTROL LINE
C C
PLENUM SLAB
FOR LOADING DETAILS REFER
TO DESIGN PACKAGE 1403
CH 421.967
D D
E E
STEP
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
N 1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAIL, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
M8
E1
B B
TAG
LAB
S
M6 S
NO
1
422150
C C
M12
0
CON CARR
TRO IAGE
L LI N W A Y
0
E
91.8
03
CH 3
00.0
D D
CH 4
2
422150
42
16.1
CH 4
NORTHBOUND VENTILATION STRUCTURE - LAYOUT PLAN
SCALE 1 : 250
B
E E
CH 392.00
CH 408.6
INDICATIVE E-LINE
VENTILATION
MONORAIL PLENUM SLAB
INDICATIVE C-LINE
INDICATIVE E-LINE
HANDRAILS STRIP FOOTING
NORTHBOUND MONORAIL
REFER TO TUNNEL DESIGN -
F RL-60.384 F
VENTILATION BW2 MAINLINE NORTHERN UPPER
PLENUM SLAB SECTION - 1403 PACKAGE
NORTHBOUND PLENUM 0.5% NORTHBOUND PLENUM
Strip footing
RL-65.384 RL-65.384
EPM02N EPM03N MONO RAIL
M120 CARRIAGEWAY PRECAST BEAM
B CONCRETE COLUMN INSIDE ROCK
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:250 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 2500 5000 7500 10000 12500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
2500 1250 (1:250 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422150 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
CH 400.000
CH 416.142
CH 391.80
CH 406.305
MAINLINE NORTHERN UPPER
SECTION - 1403 PACKAGE DETAIL
250 PRECAST CONCRETE PLANK AND
FOR COLUMN
A 150 MIN CONCRETE TOPPING OVER
CAST AND INTERLOCK INSIDE OF THE ROCK
DENOTES SLAB PENETRATION A
EXCAVATION LINE NO SLAB REFER TO DRAWING NO.
UNDER REFER TO 1403 PACKAGE FOR DETAIL DESIGN ISOLATION JOINT
M6S1-CGU-ML-TU-DRG-422154 FOR XXX DENOTES SLAB THICKNESS
LAYOUT CAST IN ACO SLOPED 20mm COMPRESSIBLE FILLER
6800 1900 KLASSIKDRAIN DENOTES HANDRAILS
6800
DP
B.J.
DP
DENOTES BUTT JOINT
HB1
HB1
HB1
HB1
HB1
HB1
PENETRATIONS TYP
NOTES:
600W x 1000D BEAM
BW1
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
CABLE LADDERS 190THK x 1600 LONG 2. FOR BLOCKWORK WALL DETAIL, REFER TO
BELOW BUTTRESS WALL DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
400 400 BW2 EQUALLY SPACED 3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
ISOLATION JOINT LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
20mm COMPRESSIBLE HB1 HB1 HB1
600W x 1000D BEAM
FILLER
HB1
HB1
HB1
HB1
HB1
BEAM MARK
(WIDTH x DEPTH)
1925
BW2
1 BW1 190 REINFORCED CORE FILLED BLOCK WALL
422165
400 CONCRETE SLAB ON
HB1
HB1
HB1
HB1
HB1
HB1
HB1 BW2 190 REINFORCED CORE FILLED BLOCK WALL
E DEAD FORMWORK E
HB1 200 CONCRETE HOB
HB1 HB1 HB1
HB1
HB1
HB1
HB1
HB1
SLIDING COVER TO
200W x 150D HOBS
F ACCESS HATCH FRL -/240/-
AROUND ALL PENOS, F
FIXING DETAILS AS PER HB1 HB1 HB1 TYPICAL.
MANUFACTURER'S
RECOMMENDATION
ISOLATION JOINT 2
G EXCAVATION LINE
3
422165 20mm COMPRESSIBLE
CAST IN ACO SLOPED 422165 G
KLASSIKDRAIN
UNDER FILLER
NORTHBOUND VENTILATION STRUCTURE PLENUM SLAB - GENERAL ARRANGEMENT PLAN B
SCALE 1 : 50
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - GENERAL ARRANGEMENT PLAN H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422151 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N
LEGEND:
CH 400.000
CH 416.142
CH 391.80
CH 406.305
A DENOTES SLAB PENETRATION A
NO SLAB
XXX DENOTES SLAB THICKNESS
CAST IN ACO SLOPED
6800 6800 KLASSIKDRAIN DENOTES HANDRAILS
DP
1900 B.J.
DP
DENOTES BUTT JOINT
BW2
DENOTES COLUMN UNDER
HB1
HB1
HB1
HB1
HB1
HB1
600W x 1000D BEAM
600W x 1000D BEAM
600W x 1000D BEAM
NOTES:
600W x 1000D BEAM
BW1
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
2. FOR BLOCKWORK WALL DETAIL, REFER TO
150 150 DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
150 400 150 400 150 BW2
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
HB1 HB1 HB1
600W x 1000D BEAM
HB1
HB1
HB1
HB1
HB1
150 400 400
HB1 HB1 HB1
400
HB1
DAMPER C
150 150 150 L
HB1
400 BW2
EQUIPMENT HATCH HB1 HB1 HB1
HB1
HB1
HB1
HB1
HB1
HB1
HB1
E DELETE THIS LINE E
SHOW AS FOLD LINE SAME AS
CONCRETE SET OUT PLAN
HB1 HB1 HB1
HB1
HB1
HB1
HB1
HB1
F F
HB1 HB1 HB1
INDICATIVE E-LINE
NORTHBOUND VENTILATION STRUCTURE PLENUM SLAB - CONCRETE TOPPING GENERAL ARRANGEMENT PLAN
SCALE 1 : 50
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED.
150 SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N LEGEND:
CH 400.000
CH 391.80
CH 416.142
CH 406.305
150mm MIN CONCRETE TOPPING OVER
PRECAST PLANK REFER TO DRAWING NO. DENOTES CIRCULATION SPACE
M6S1-CGU-ML-TU-DRG-422166 FOR DETAILS (1450 x 1530 TYP. U.N.O)
A A
NO SLAB
EXCAVATION LINE DENOTES PITS (INDICATIVE ONLY)
6800 6300 500 UNDER T.O.C. RL -65.263
T.O.C. RL -65.384
600 600 1444 600 600 2600 600 600 3700 600 600 3700 600 600 3700 600 600 925 600 600 XXX DENOTES CONCRETE SLAB TOPPING
THICKNESS OVER PRECAST
DP
DP
100 DENOTES 150 WIDE SPOON DRAIN
DENOTES C-LINE
2647
B B
3663
DENOTES SETOUT POINT. REFER TO DRG.
750 420 0.5% M6S1-CGU-ML-TU-DRG-421208 FOR SCHEDULE.
REFER TO PLAN FOR EASTING AND NORTHING
200
750 420
DENOTES BLOCK WALL OVER
M120 CARRIAGEWAY CONTROL LINE
500
2000
1645 1655
3668
600W x 1000D BEAM
600W x 1000D BEAM
BW1
600W x 1000D BEAM
0.5%
800.10 mm
1600
NOTES:
1200
500
5250
5250
2. FOR BLOCKWORK WALL DETAIL, REFER TO
600W x 1000D BEAM
2000
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
2958
3668
18337
600
DAMPER C
L
400
FOLD LINE FOLD LINE
600
BW2
1600
2940
2000
E E
750 420
3668
0.7%
1600
BW2
2000
F F
800.10 mm
3663
0.5%
2,289.61 mm
T.O.C. RL -65.263
G T.O.C. RL -65.384
1200 1121 1200 2600 1200 3700 1200 3700 1200 3700 1199 784 1200 G
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND: NOTES:
N 1. CONCRETE EXPOSURE CLASSIFICATION:
DENOTES 250mm PRECAST SLAB PANEL DENOTES BLOCK WALL OVER
SOFFIT = B2
DENOTES 400mm DEAD FORMWORK KF70 ELSEWHERE = A
KING FLOOR 1.0 BMT DENOTES COLUMN UNDER
2. MINIMUM 28 DAY COMPRESSIVE STRENGTH OF CONCRETE SHALL BE 40MPa.
A 3. IN ADDITION TO THE REQUIREMENTS OF TfNSW SPECIFICATION D&C B80/B110, A
DENOTES STRIP FOOTING THE MINIMUM CEMENTITIOUS MATERIAL CONTENT SHALL BE 450kg/m³ AND
UNDER THE MAXIMUM WATER/CEMENTITIOUS MATERIALS RATIO SHALL BE 0.40.
EXCAVATION LINE
UNDER 4. THE CEMENTITIOUS MATERIAL SHALL CONTAIN A COMBINATION OF MINIMUM
25% FLY ASH AND 30% BLAST FURNACE SLAG IN ACCORDANCE WITH TfNSW
SPECIFICATION D & C 3211.
5. PANEL CONCRETE SHALL CONTAIN 1.0kg/m³ OF MICRO-SYNTHETIC FIBRES
PLANK - TYP 6A
(POLYPROPYLENE FIBRES).
PLANK - TYP 4
6. NOMINAL AGGREGATE SIZE SHALL BE 10 OR 14mm. NORTH END OF PRECAST
BEAM AND PLANKS SHALL BE MARKED TO FACILITATE ERECTION CONCRETE
PLANK - TYP 1
PLANK - TYP 1 PLANK - TYP 1 SHALL NOT BE DRILLED OR OTHERWISE DISTURBED ONCE INITIAL SET HAS
PLANK - TYP 6B OCCURRED UNTIL TRANSFER STRENGTH HAS BEEN ACHIEVED. DRILLING IS
B B
PRECAST BEAM - TYP2
PRECAST BEAM - TYP2
D PLANK - TYP 6J
2 138 kN. D
422166 15. AFTER THE TRANSFER OF PRESTRESS, STRANDS SHALL BE CUT FLUSH WITH
THE END OF THE BEAM AND EXPOSED STRANDS SEALED AGAINST
CORROSION BY APPLICATION OF EPOXY RESIN.
PLANK - TYP 6K 16. RELEASE OF THE STRANDS SHALL BE DONE SYMMETRICALLY ABOUT THE
GIRDER CENTRELINE STARTING WITH THE OUTER STRANDS.
PLANK - TYP 2 PLANK - TYP 2 PLANK - TYP 2
17. CALCULATED HOG OF BEAM AT TRANSFER IS 8mm.
PLANK - TYP 6L -DENSITY = 2500 Kg/m3 THE MASS OF BEAM SHALL BE VERIFIED BY THE
MANUFACTURER AND MARKED ON THE PLANKS.
-ELASTICITY MODULUS AT TRANSFER = 32800MPa
-STEAM CURING AT 70 DEG C FOR 8 HOURS AFTER CASTING
PLANK - TYP 6M -STORAGE IN OPEN AIR, AFTER STEAM CURING, AT 20 DEG C
E -AVERAGE TEMPERATURE AND RELATIVE HUMIDITY IN RANGE 50%-75% E
-NO LOADS EXCEPT BEAM SELF WEIGHT
18. MASS OF BEAM IS APPROXIMATELY 28 TONNES DURING STORAGE,
PLANK - TYP 6N PLANK - TYP 4
TRANSPORT AND HANDLING, BEAM SHALL BE IN AN UPRIGHT POSITION AND
SUPPORTED AT NOT MORE THAN 1000mm FROM EACH END.
00°
60.
1 PLANK - TYP 6S PLANK - TYP 3 PLANK - TYP 3 PLANK - TYP 3
00°
60.
MIN
MIN
422166
PLANK - TYP 5
PLANK - TYP 6T
LIFTING DEVICES TO BE
45°
45°
SYSTEM TO DISTRIBUTE LOAD
NORTHBOUND VENTILATION STRUCTURE PLENUM SLAB - PRECAST CONCRETE PANEL LAYOUT EQUALLY BETWEEN THE END LIFTING
SCALE 1 : 50 LIFTING DIAGRAM POINTS
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL NTS
FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN S.IMMACULATA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - PRECAST CONCRETE PANEL LAYOUT H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422154 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
CH 391.800
CH 408.000
CH 416.142
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NORTHBOUND MONORAIL BEAM
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A FOR DETAIL, REFER TO
2. FOR BLOCKWORK WALL DETAILS, REFER TO A
M6S1-CGU-ML-TU-DRG-422231
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
INDICATIVE E-LINE 3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
INDICATIVE C-LINE LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
NORTHBOUND MONORAIL
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
RL-60.384
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
HANDRAILS REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
6989
BW2
150THK TOPPING CONCRETE EQUIPMENT 200W x 200D HOBS
B FOR DETAIL, REFER TO ACCESS HATCH AROUND ALL PENOS 400 THK CONCRETE SLAB B
M6S1-CGU-ML-TU-DRG-422175 TO 176 TYPICAL FOR DETAILS, REFER TO
M6S1-CGU-ML-TU-DRG-422175 TO 176
0.5% 0.5% 0.5%
NORTHBOUND PLENUM
RL-65.384
CONCRETE COLUMN INSIDE ROCK
ISOLATION JOINT REFER TO TUNNEL DESIGN -
20mm COMPRESSIBLE FILLER MAINLINE NORTHERN UPPER
SECTION - 1403 PACKAGE
PRECAST BEAM
FOR DETAIL, REFER TO
M6S1-CGU-ML-TU-DRG-422166
C C
PRECAST PLANK
FOR DETAIL, REFER TO EPM03N
M6S1-CGU-ML-TU-DRG-422181
D D
CL M120 M120
NORTHBOUND
VENTILATION NORTHBOUND MONORAIL
INDICATIVE E-LINE FOR DETAIL, REFER TO
INDICATIVE E-LINE PLENUM
INDICATIVE C-LINE M6S1-CGU-ML-TU-DRG-422231
INDICATIVE C-LINE
200W x 150D HOBS
AROUND ALL PENOS
TYPICAL
NORTHBOUND MONORAIL
RL-60.384 PRECAST BEAM
E 400 THK
FOR DETAILS, REFER TO
E
CONCRETE SLAB
TOPPING CONCRETE 6858 M6S1-CGU-ML-TU-DRG-422166
5000
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:100 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 1000 2000 3000 4000 5000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
1000 500 (1:100 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - SECTIONS - SHEET 1 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422165 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
MIN.
400
C -STORAGE IN OPEN AIR, AFTER STEAM CURING, AT 20 DEG C C
AVERAGE TEMPERATURE AND RELATIVE HUMIDITY IN RANGE
5N28 MIN TOP 50%-75%
MIN
125
REINFORCEMENT KF70 KING FLOOR -NO LOADS EXCEPT BEAM SELF WEIGHT
KF70 KING FLOOR 1.0 BMT 1.0 BMT MASS OF BEAM IS APPROXIMATELY 28 TONNES DURING STORAGE,
N16-200 CLOSED TIES 10. TRANSPORT AND HANDLING, BEAM SHALL BE IN AN UPRIGHT
N16-200 SIDE BARS 150x10 EA
POSITION AND SUPPORTED AT NOT MORE THAN 1000mm FROM
EACH END.
DRILL AND EPOXY 2N16-250 WITH
3 ROW OF 5 STRAND 12.7 AT
300
100mm SPACING
100
USE BONDING PRIMER SIKADUR 32 OR 150mm CONCRETE AT TOP REFER PRECAST PLANK END USE BONDING PRIMER SIKADUR 32 OR TYP. WALL STARTER BAR
E PARCHAM NITBOND IN ACCORDANCE SEATING DETAIL PARCHAM NITBOND IN ACCORDANCE HOB REO NOT SHOWN FOR CLARITY E
12N28 TOP REO WITH MANUFACTURER'S SPECIFICATION N16-120 TOP BAR NOT SHOWN FOR CLARITY WITH MANUFACTURER'S SPECIFICATION
FOR TOPPING SLAB BEFORE CASTING TOPPING CONCRETE N16-120
BEFORE CASTING TOPPING CONCRETE
TOP AND BOTTOM
REINFORCEMENT
400
2 SET N16-200 TIES
250
TOP REINFORCEMENT
250mm THK PRECAST PANEL
N16-200 CLOSED TIES 5N28 MIN TOP
250
1000
F REINFORCEMENT F
3 ROW OF 5 STRAND 12.7 AT
250
1000
100mm, 200mm AND 300mm
TIE PRECAST BEAM BEFORE DISTANCE FROM THE 4 ROW OF 5 STRAND 12.7 AT
INSTALLATION OF PRECAST BOTTOM OF THE BEAM 100mm SPACING HORIZONTALLY
400
SLAB ON SITE
300
TYPE 2 TYPE 1 AND 100mm, 200mm, 300mm AND
200
3 ROW N20-3000 USE BONDING PRIMER SIKADUR 32 6N28 MIN
100
OR PARCHAM NITBOND IN ACCORDANCE BOTTOM REINFORCEMENT 400mm DISTANCE FROM THE
SLEEVE IN PRECAST WITH MANUFACTURER'S SPECIFICATION BOTTOM OF THE BEAM
TYPE 1 TYPE 2
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:20, 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 200 400 600 800 1000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
200 100 (1:20 AT A1)
DRAWN S.IMMACULATA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 500 1000 1500 2000 2500mm
DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - SECTIONS - SHEET 2 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
500 250 (1:50 AT A1)
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422166 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
DETAIL C
SCALE 1 : 20 422165
D D
CL COLUMN /
STRIP FOOTING
CL COLUMN
STRIP DRAIN
935 20mm COMPRESSIBLE
UPPER HEADING
E-LINE (ABOVE) FILLER
E E
CL BEAM
CL COLUMN
EQ
CL BEAM
EQ
F BEARING PAD
F
UNDER
STRIP FOOTING
G G
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
530
530 480
GENERAL NOTES
CL BEARING / CL BEARING / PLANK CL BEARING / FOR OTHER GENERAL NOTES RELATING TO THIS SHEET, SEE SHEET No 25.
A PLANK PLANK IF THE MEASURED HOG IS OUTSIDE THE RANGE IN TABLE 2. VALUES GIVEN SHALL A
= = Ø10 CLEARANCE HOLES BE ADJUSTED BY THE PRINCIPAL.
= = = =
50 50 FOR M8 LEVEL SETTING HOGS SHALL BE MEASURED TWO WEEKS PRIOR TO ERECTION OF THE PLANKS AND
TYP
BOLTS THE GRADE OF THE TOP OF THE BEARINGS SHALL BE DETERMINED FROM THE
25
FIGURES IN TABLE 2 ACCORDINGLY.
50
DENOTES THE MINIMUM AND MAXIMUM THICKNESS OF GROUT 15mm AND 70mm AT
LAMINATED ELASTOMERIC ANY LOCATION
CL BEARING /
CL BEARING /
CL BEARING /
BEARING DENOTES THE DIRECTION OF THE POSITIVE GRADE. A POSITIVE GRADE INDICATES
=
PLANK
PLANK
DIRECTION OF
PLANK
DIRECTION OF
A RISE IN THE DIRECTION OF INCREASING CHAINAGE.
TRAFFIC
TRAFFIC
DENOTES THE LONGITUDINAL GRADE OF THE BEARINGS THAT HAVE BEEN
1 2 3
350
350
300
422168 422168 422168 DERIVED BY THE DESIGNER TAKING IN ACCOUNT THE FOLLOWING:
-THE DEFLECTION OF THE PLANK DUE TO THE CAST-IN-PLACE CONCRETE DECK
B INDICATED ON SHEET NO. 44. B
=
BEARING BASE PLATE -THE LONGITUDINAL GRADE OF THE PLANK BETWEEN SUPPORTED ENDS.
=
=
AND GROUT PAD - THE HOG OF THE PLANK AT 60 DAYS.
50
Ø36 x 15mm DP
RL 'X' TO BE MEASURED Ø36 HOLE IN 25 THICK RECESS IN UNDERSIDE
ON TOP IN THE CENTRE PLATE FOR Ø32 DOWEL OF BEARINGS
OF THE BEARING PLAN PLAN PLAN
BEARING ASSEMBLY BEARING BASE PLATE LAMINATED ELASTOMETRIC BEARING
(96 No REQUIRED) (AS 5100.4 PART No AS04 1204R, DUROMETER HARDNESS OF 53, 93 No REQUIRED)
C C
CL BEARINGS
12
D D
73
73
200
Ø36 HOLE IN BOTTOM
STEEL PLATE
25mm THK STEEL PLATE
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:2, 1:5 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 20 40 60 80 100mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
20 10 (1:2 AT A1)
DRAWN S.IMMACULATA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 50 100 150 200 250mm
DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - SECTIONS - SHEET 4 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
50 25 (1:5 AT A1)
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422168 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
CL
B B
WALL/HOB MEMBER SCHEDULE
NORTHBOUND
M120 VENTILATION MARK THICKNESS COMMENTS
PLENUM BW1 190 REINFORCED CORE FILLED BLOCK WALL
5032
BW2 190 REINFORCED CORE FILLED BLOCK WALL
LEGEND:
WALL REINFORCEMENT
BW2
BW2
BW2
BW2
BWI
BW1 BW1 BW1 BW1 BW1 VERTICAL: N16-400 CENTRAL (U.N.O.)
HORIZONTAL: N12-400 CENTRAL (U.N.O.)
D D
BW2
VERTICAL: N16-200 CENTRAL (U.N.O.)
HORIZONTAL: N12-200 CENTRAL (U.N.O.)
650
200
NORTHBOUND PLENUM
RL-65.384
E E
F F
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - ELEVATIONS H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422170 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N
R.C SLAB BAR LAP LENGTH 'L'
BAR SIZE LAP LENGTH (mm) U.N.O
A N12 560 A
N16 860
REINFORCEMENT NOTATIONS:
12N12-200 (B1) L.V.
LENGTH VARIES
REINFORCEMENT BAR
LAYER SEQUENCE
N16-120 (B2)
SPACING (mm)
B BAR GRADE / TYPE AND DIAMETER
B
NUMBER OF BARS IN GROUP
N16-120 (B2)
N16-120 (B1) N16-120 (B1) N16-120 (B1)
C C
N16-120 (B2) REINFORCEMENT LAYING SEQUENCE:
N16-120 (B2) N16-120 (B2)
FIRST AND LAST
N16-120 (B2)
SECOND AND THIRD
N16-120 (B2)
N16-120 (B2)
N16-120 (B1) N16-120 (B1) N16-120 (B1)
D N16-120 (B1) D
N16-120 (B2) N16-120 (B2)
N16-120 (B2)
N16-120 (B2)
N16-120 (B1) N16-120 (B1) N16-120 (B1)
E E
N16-120 (B2) N16-120 (B2)
N16-120 (B2)
N16-120 (B2)
N16-120 (B1) N16-120 (B1) N16-120 (B1)
N16-120 (B2)
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N
R.C SLAB BAR LAP LENGTH 'L'
BAR SIZE LAP LENGTH (mm) U.N.O
A N12 560 A
N16 860
N16-120 (T2)
B 12N28 (T1) 12N28 (T1) 12N28 (T1) 12N28 (T1) 12N28 (T1) 12N28 (T1) N16-120 (T1) 12N12-200 (B1) L.V. B
N16-120 (T1)
LENGTH VARIES
N16-120 (T1)
N16-120 (T1) 12N28 (T1) REINFORCEMENT BAR
N16-120 (T2) N16-120 (T1) N16-120 (T1) N16-120 (T1) LAYER SEQUENCE
N16-120 (T1) N16-120 (T2) SPACING (mm)
BAR GRADE / TYPE AND DIAMETER
N16-120 (T2) NUMBER OF BARS IN GROUP
TRIMMER BAR
3N16-125 TYP (T1) PRIMARY (T2) SECONDARY
N16-120 (T2)
N16-120 (T2)
C N16-120 (T2) N16-120 (T2) C
N16-120 (T2)
N16-120 (T2)
N16-120 (T2)
N16-120 (T1)
(B1) PRIMARY (B2) SECONDARY
N16-120 (T2)
N16-120 (T2) N16-120 (T1) N16-120 (T1) N16-120 (T1) REINFORCEMENT LAYING SEQUENCE:
N16-120 (T2)
N16-120 (T2)
N16-120 (T1) N16-120 (T1) N16-120 (T1)
D SECOND AND THIRD D
N16-120 (T2)
N16-120 (T2)
N16-120 (T1)
N16-120 (T2) N16-120 (T2)
N16-120 (T2)
2N16-100 TRIMMER BARS
N16-120 (T1) N16-120 (T1) N16-120 (T1) TOP AND BOTTOM TYP
1000
TYP
N16-120 (T2)
E E
N16-120 (T2)
N16-120 (T2)
N16-120 (T2)
N16-120 (T2)
N16-120 (T2)
N16-120 (T1) N16-120 (T2) 2N16-100 RE-ENTRANT
N16-120 (T2) N16-120 (T2) BARS TYP
F F
N16-120 (T1)
N16-120 (T2) TYPICAL TRIMMER BARS AT OPENING DETAIL
N16-120 (T1) N16-120 (T1) N16-120 (T1)
N16-120 (T2)
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
2 2 2
- - -
A 'L' 'L' VARIES
A
SEE CONCRETE PLANK SCHEDULE
SWIFTLIFT TO BE SWIFTLIFT TO BE
°
.00
.00
DESIGNED BY PRECAST DESIGNED BY PRECAST
90
SUBCONTRACTOR SUBCONTRACTOR
741
750
'W' = 1000
'W' = 998
VARIES
1
1 1
B -
- - B
257
250
'n' 750 520 750 520 SWIFTLIFT TO BE
DESIGNED BY PRECAST
C SUBCONTRACTOR C
PLAN 'n' PLAN
2
-
THIS SURFACE SHALL BE MADE ROUGH
'L' = 1592 'L'
IN MANUFACTURE OF THE PANEL BY
50 x 30 CHAMFER TYP 50 BROOM FINISHING TRANSVERSELY
SWIFTLIFT TO BE
°
.00
250
DESIGNED BY PRECAST
90
E SUBCONTRACTOR E
637
'W' = 887
THIS SURFACE SHALL BE MADE ROUGH 3. TRANSPORT AND HANDLING PLANK SHALL BE IN AN UPRIGHT POSITION
'W'
IN MANUFACTURE OF THE PANEL BY AND SUPPORTED AT NOT MORE THAN 300 FROM EACH END.
F 50 x 30 CHAMFER TYP 50 BROOM FINISHING TRANSVERSELY F
00°
60.
00°
60.
MIN
MIN
322 750 520
250
LIFTING DEVICES TO BE
PLAN DESIGNED BY THE CONTRACTOR.
SEE DRG No M6S1-CGU-CCPRA-
PANEL - TYPE 6C 15 x 15 CHAMFER TYP 90° RS-DRG-426502 FOR LOCATIONS
45°
45°
SYSTEM TO DISTRIBUTE LOAD
G SCALE 1 : 10 - EQUALLY BETWEEN THE END LIFTING
G
POINTS
LIFTING DIAGRAM
NTS
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:10 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 100 200 300 400 500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
100 50 (1:10 AT A1)
DRAWN S.IMMACULATA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - PRECAST PANEL TYPES AND DETAILS H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422180 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
2
422181
N12-200 B2 N12-400 U-BARS EACH WAY
SPACE ROWS AT 500
MAXIMUM CENTRES PRECAST CONCRETE PLANK SCHEDULE
N12-200 T2
A N16-200 A
(SIDE) U-BARS PANEL TYPE THICKNESS (mm) LENGTH (m) WIDTH (m) QUANTITY (no.)
N16-200
U-BARS TYPE 1 250 3900 2214 6
150
TYPE 2 250 3900 1200 9
TYPE 3 250 3900 2282 3
TYPE 4 250 2800 1672 8
TYPE 5 250 2800 1296 1
N16-125 T1
REFER TO TABLE
B B
TYPE 6B 250 1608 987 1
CL
TYPE 6D 250 1573 1086 1
N16-125 B1
400 TYPE 6J 250 1482 1099 1
MAXIMUM TYPE 6K 250 1462 1099 1
(END)
(END)
MAXIMUM
400
1 TYPE 6M 250 1424 1099 1
422181
TYPE 6Q 250 1369 994 1
C C
150
TYPE 6R 250 1351 994 1
(SIDE) TYPE 6S 250 1333 994 1
EDGE DETAILS VARIES
TYPICAL. REFER TO DETAILS
TYPE 6T 250 1317 994 1
PLANK LENGTH ON THIS DRAWING
48
N16-125 U-BARS
LAP WITH MAIN BAR
100 SEATING MIN
400 CENTRES ON MCDOWELS CONTINUOUS PRECAST CONCRETE PLANK
ROUGHENED N12 TIES N16-125 BEARING STRIP 50 WIDE
MAXIMUM SURFACE 10
T1 DOW CORNING 888 SILICONE
PRECAST CONCRETE BEAM (OR SIMILAR) SEALANT AND
BEAM REINFORCEMENT NOT
E E
250 48
BACKING ROD
SHOWN FOR CLARITY
TYPICAL PRECAST PLANK END SEAT DETAIL TYPICAL PLANK TO PLANK SIDE JOINT DETAIL
25
SCALE 1 : 15 SCALE 1 : 10
F 750 200 F
N12-400 TIES
35 35 ROUGHENED T1 N16-125
COVER
EQ EQ
SURFACE 70 SEATING MIN
40
50
20
ON MCDOWELS CONTINUOUS
BEARING STRIP 50 WIDE PRECAST CONCRETE PLANK
250
80
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:15, 1:10 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 150 300 450 600 750mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
150 75 (1:15 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 100 200 300 400 500mm
DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - TYPICAL PRECAST PANEL DETAILS H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
100 50 (1:10 AT A1)
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422181 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N LEGEND:
CH 428.001
B.J.
CH 361.044
DENOTES BUTT JOINT
CH 421.967
FW DENOTES FLOOR WASTE
1
422200 NOTES:
CL 1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
2. FOR BLOCKWORK WALL DETAIL, REFER TO
M110 CARRIAGEWAY CONTROL LINE DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
1000 LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
STEP
C C
1000
INDICATIVE C-LINE
INDICATIVE E-LINE 2
422200
D D
CL
VENTILATION
E NICHE E
CH 421.967
CH 361.044
CH 428.001
INDICATIVE E-LINE
CONNECTION NICHE
SOUTHBOUND PLENUM
RL-65.166 1200THK VENTILATION
PLENUM SLAB, REFER TO
DESIGN PACKAGE 1403 STEEL STAIRS
FOR DETAILS REFER TO DRAWING
M110 CARRIAGEWAY NO. M6S1-CGU-ML-TU-DRG-422210 & 422211
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:250 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 2500 5000 7500 10000 12500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
2500 1250 (1:250 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422200 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
N LEGEND:
B.J.
DENOTES BUTT JOINT
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
ADD A CLOUD NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
2. FOR BLOCKWORK WALL DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
CH 421.967
CH 428.001
C C
4000 4000
1200 THK PLENUM SLAB 11600x3500 SUPPLY 190 THK x 1600 LONG 200W x 150H HOB
FOR DETAILS REFER TO VENT PENETRATIONS (TYP) BUTTRESS WALL AROUND SLAB FOR CONTINUATION REFER TO DRG NO.
CH 361.044
DESIGN PACKAGE 1403 SIZE TBC BY UGL EQUALLY SPACED PENETRATION (TYP) M6S1-CGU-ML-TU-DRG-422202
E
D 422211 D
1
422200
EXHAUST
VENTILATION
A
SUPPLY VENTILATION 422210
E 1600
E
STEP
CABLE NICHE
REFER TO DESIGN
PACKAGE 1403
1000x2100 REMOVABLE HANDRAILS ACCESS STAIR
HINGE DOOR (TYP) 4 2
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:100 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 1000 2000 3000 4000 5000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
1000 500 (1:100 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - GENERAL ARRANGEMENT PLAN - H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22 SHEET 1
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422201 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
FW
REFER TO DRAWING NO.
DENOTES CONCRETE BARRIER
BW2
3 B3 3
BW2
M6S1-CGU-ML-TU-DRG-422305
1800
422206 D 422206
D 422211
422211 800 150 2600 150 1000 B.J.
COMMS AND HV CONDUITS DENOTES BUTT JOINT
SHOWN INDICATIVELY
BW1
COMMS AND HV CONDUITS HB1 390x390 BLOCKWORK PIER DENOTES ISOLATION JOINT
PROMATECH H FIRE BOARD
S.C.
SHOWN INDICATIVELY 225
B B
FALL
0.5%
FIXING DETAILS AS PER A.1 A.1
MANUFACTURER'S RECOMMENDATION UP 422221 422221
FW DENOTES FLOOR WASTE
FALL FALL 900 WIDE x 2860 LONG
B1
PRECAST CONCRETE PANELS 225
1
INDICATIVE E-LINE
BP
HB1
HB1
LINE OF STAIRS INDICATIVE E-LINE
DENOTES BLOCK WALL OVER
3650
B1
INDICATIVE C-LINE ABOVE
180 INDICATIVE C-LINE
150 SPOON DRAIN ZONE 5 225
FOR DRAINAGE DETAILS 422207
DENOTES COLUMN UNDER
UP REFER TO PACKAGE 2202 1 FOR STAIR DETAILS REFER TO
422210
B.J. 20mm COMPRESSIBLE 225 DRG NO. M6S1-CGU-ML-DRG-422220 DENOTES COLUMN OVER
LINE OF PENETRATION FILLER HB1 & 422221
LL
ABOVE
FA
FA
EQUIPMENT
FW DENOTES STRIP FOOTING UNDER
LL
1
BW1
BP
)
OW
2500 SAFETY HANDRAILS
(B 1
B2
EL
C
C1
NOTES:
C1
BW1
)
OW
E.J. 1. FOR GENERAL NOTES, REFER TO DRAWING
(B 1
EL
C
3500 MIN.
190 THK BLOCKWORK WALL NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
2 2. FOR BLOCKWORK WALL DETAIL, REFER TO
FALL
1132
422205 300 C 1 2 C 1
422210 422205 422205 422210 422205 DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
BEAM NO.
LOTS REFER TO DRAWING SCHEDULE
M6S1-CGU-ML-TU-DRG-422103
500
CH 421.967
REMOVABLE BARRIER REFER TO 1403 PACKAGE
D FOR DETAILS REFER TO FOR DETAILS B2 450 x 700 D
DESIGN PACKAGE 2502 B3 600 x 600
CL
CL
COLUMN SCHEDULE
SOUTHBOUND VENTILATION CONNECTION GENERAL ARRANGEMENT SLAB PLAN AT RL- 74.802 SOUTHBOUND VENTILATION CONNECTION GENERAL ARRANGEMENT SLAB PLAN AT RL-65.166 COLUMN MARK SIZE (DEPTH x WIDTH)
SCALE 1 : 50 SCALE 1 : 50
C1 450 x 450
F F
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50, 1:10 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 100 200 300 400 500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
100 50 (1:10 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 500 1000 1500 2000 2500mm
DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - GENERAL ARRANGEMENT PLAN - H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22 SHEET 2
500 250 (1:50 AT A1)
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422202 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND:
8000 DENOTES CIRCULATION SPACE
(1450 x 1530 TYP. U.N.O)
A 8000 A
4000 4000
DENOTES PITS (INDICATIVE ONLY)
4000 4000 800 600 2300 300 700 190 3110
T.O.C. RL -65.200
610 980 2410 180 DENOTES SLAB THICKNESS
T.O.C. RL -65.197 T.O.C. RL -65.200
A AHD -RL. 20.000 AHD - DENOTES AUSTRALIAN
T.O.C. RL -74.771 422211 HEIGHT DATUM
T.O.C. RL -74.771
DENOTES 150 WIDE SPOON DRAIN
DENOTES C-LINE
BW2
BW2
B3
400
1800
DENOTES E-LINE
800 20 2860 20 1000 B.J.
B DENOTES BUTT JOINT B
S.C. DENOTES SAW CUT JOINT
BW1
HB1
S.C.
225 I.J. DENOTES ISOLATION JOINT
600
180
T.O.F. R.L. 20.000 DENOTES TOP OF FOOTING
B1
FALL FALL
6160
225
B1
390
6693
HB1
HB1
VOID DENOTES SETOUT POINT. REFER TO DRG.
5160
6110
1
BP
REFER TO PLAN FOR EASTING AND NORTHING
225 NOT SHOWN IN SCHEDULE
700 DEEP LOCALIZED
COLUMN THICKENING DENOTES BLOCK WALL OVER
T.O.C. RL -65.169
C C
2950
B.J. 225
700 DEEP LOCALIZED
HB1 T.O.C. RL -65.166
COLUMN THICKENING
LL
600 DENOTES COLUMN UNDER
FA
FA
600
1128
T.O.C. RL -65.169
LL
)
(B C1
OW
FALL
3500 MIN.
0.5%
300 FW 600 200 350 200 100
EL
BW1
DENOTES COLUMN OVER
100 450
650
650
100 450
B2
533
1
C1
C1
BP
T.O.C. RL -65.166 E.J. 700 400 1000 1900 NOTES:
BW1 B
1322
)
(B C1
OW
B
FALL
1132
EL
T.O.C. RL -74.802 422216
2. FOR BLOCKWORK WALL DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
D D
500
CH 421.967
CH 421.967
CL
CL
SOUTHBOUND VENTILATION CONNECTION CONCRETE SETOUT PLAN AT RL -74.802 SOUTHBOUND VENTILATION CONNECTION CONCRETE SETOUT PLAN AT RL -65.166
SCALE 1 : 50 SCALE 1 : 50
E E
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - CONCRETE SETOUT PLAN H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422204 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A B 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
422233 DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
BR
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
2
SC3 REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
2
A
BR
INDICATIVE C-LINE MONORAIL 1
B REFER TO DRAWING NO. SC3 422232 B
INDICATIVE E-LINE M6S1-CGU-ML-TU-DRG-422230 10000 STEEL MEMBER SCHEDULE
FOR DETAILS
MARK SECTION COMMENTS
SB1 250 PFC STAIR STRINGER
SC3 SC3 SB2 200 PFC STAIR STRINGER
BOTTOM OF MONORAIL 1
RL-60.716 SB3 42.4x3.2 CHS STAIR STRINGER
600 600 MB1
SB4 100 x 100 x 10 EA STAIR STRINGER
193 3200 3200 3200 207
250
250
SC1 150 UC 30 STAIR COLUMN
SC2 SHS 75x75x6 MONORAIL COLUMN
C BR1 20mmØ ROD MONORAIL BRACING C
EQUIPMENT
BW1
BP1
BP1
4450
MB1 250 UC 89.5 MONORAIL BEAM
3500
3500
PLENUM SLAB SAFETY HANDRAILS NOTE:
REFER TO DESIGN LOT ALL STEEL MEMBER SHALL BE HOT DEEP GALVANIZED.
1403 FOR DETAILS
150
SOUTHBOUND PLENUM B1 (BEHIND) SOUTHBOUND PLENUM
RL-65.166 RL-65.166 20mm COMPRESSIBLE
SB2
D FILLER D
SB
B2
B2
1
B3
25mm ELASTOMERIC 25mm ELASTOMERIC
C BEARING STRIP 250
BEARING STRIP 250 422207
WIDE ALONGSIDE BEAM WIDE ALONGSIDE BEAM
CONCRETE COLUMN CONCRETE COLUMN
REFER TO DRAWING NO. SB2 REFER TO DRAWING NO.
M6S1-CGU-TU-DRG-422216 M6S1-CGU-TU-DRG-422216 B
1
C1 SB SB3
NON LOAD BEARING
SB2 190THK BLOCKWORK FINS
E E
9636
SB
BW1
BW1
BW2
SB3 STEEL STAIRS C1
9636
REFER TO DRAWING NO.
M6S1-CGU-ML-TU-DRG-422220
1
SB SB3
SB2
SC1
SC1
3500
1303 FOR DETAILS
SC1
SC1
SB2
1
GROUND SB GROUND
RL-74.802 RL-74.802
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - SECTIONS - SHEET 1 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 3 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422205 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
B
B CL NICHE B
B CL MONORAIL
2040
T.O.C. RL -60.116
A
422232
BOTTOM OF MONORAIL 1
RL-60.716
250
250
250 600
C BW1
C
BP1
BW1
1000W x 2100H HINGE DOOR SAFETY HANDRAILS
INDICATIVE C-LINE
REFER TO DESIGN LOT
4450
3500
M8 CONNECTION
SAFETY HANDRAILS RL-63.616
B
1550
SOUTHBOUND PLENUM
RL-65.166 20mm COMPRESSIBLE FILLER
D SOUTHBOUND PLENUM D
B1
RL-65.166
B1
B2 (BEHIND)
25mm ELASTOMERIC
BEARING STRIP 250 REFER TO PACKAGE 1403
WIDE ALONGSIDE BEAM TUNNEL DESIGN - MAINLINE
NORTHERN UPPER SECTION
C1 FOR CONNECTION DETAIL
B
C1
1200THK PLENUM SLAB
NON LOAD BEARING FOR DETAILS, REFER TO
E 190THK BLOCKWORK FINS DESIGN PACKAGE 1403 E
BW2
BW2
9636
F F
B
20mm COMPRESSIBLE
F FILLER
422207
GROUND
8000
G G
SECTION 3 SECTION 4
SCALE 1 : 50 422202 SCALE 1 : 50 422201
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - SECTIONS - SHEET 2 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 3 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422206 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
SAFETY HANDRAILS
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
BW1
D 3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
422207
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
T.O.C. RL -65.032 4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
SOUTHBOUND PLENUM 5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
RL-65.166 ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
ISOLATION JOINT WITH
20mm COMPRESSIBLE
B FILLER PLENUM SLAB B
B1
B1
SECTION 5
SCALE 1 : 20 422202
SAFETY HANDRAILS
C C
RL-65.166
WATERPROOF AND 20mm COMPRESSIBLE
FIRE PROOF SEALANT FILLER
D TOP AND BOTTOM OF GAP D
B1 (BEHIND)
BW1
1200 THK PLENUM SLAB
B2
B3
DESIGN PACKAGE 1403 25mm ELASTOMERIC
BEARING STRIP 250
PRIMARY SHOTCRETE
WIDE ALONGSIDE BEAM
SECONDARY
DETAIL C SHOTCRETE
SCALE 1 : 20 422205
DRAINHOLE INTO ROCK
E (REFER TO DESIGN LOT 1401) E
20 GAP, FILL WITH SEALANT
(ST OR GT TYPE C TO RMS B312)
PROPRIETARY FITTING WITH
TO BE FIRE RATED
PLENUM SLAB BITUTHENE 5000 OR FLUSHING TUBE CONNECTION
15
150
225
25
TO RMS B312) SURFACES PRIMED IN
F ACCORDANCE WITH F
25
MANUFACTURER'S
350
BACKING ROD
250
INSTRUCTIONS TYP
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:20, 1:10, 1:5 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 200 400 600 800 1000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
200 100 (1:20 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 100 200 300 400 500mm
DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - SECTIONS - SHEET 3 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
100 50 (1:10 AT A1)
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 3 OF 3 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422207 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
CL SOUTHBOUND
M110 VENTILATION PLENUM CONCRETE MEMBER SCHEDULE
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
190THK x 1600 LONG MARK THICKNESS COMMENTS NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A BLOCKWORK BUTTRESS WALL BW1 190 190 CORE FILLED BLOCK WALL 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
INDICATIVE C-LINE EQUALLY SPACED HB1 200 BLOCK WALL/CONCRETE HOB DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
INDICATIVE E-LINE LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
LEGEND: 4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
- REINFORCED BANDS CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
N12-200 (CENTRAL)
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
1000 WIDE BAND: 5-N16 ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
800/900 WIDE BAND: 4-N16 DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
- REINFORCED BANDS
B VERTICAL: N16-200 CENTRAL (U.N.O.) B
HORIZONTAL: N12-200 CENTRAL (U.N.O.)
BW1
CL MONORAIL CL NICHE
9170 9170 - WALL REINFORCEMENT 2040 190 THK BLOCKWORK WALL
1000
BOTTOM OF MONORAIL 1
1000W x 2100H AIR LOCK RL-60.716
HINGE DOOR REFER TO DESIGN
LOT 1303 FOR DETAILS
1000 800
C C
2100
1000
REFER TO DESIGN LOT
4450
SOUTHBOUND PLENUM 1303 FOR DETAILS
RL-65.166
1200THK VENTILATION PLENUM
2100
SLAB, REFER TO DESIGN
PACKAGE 1403 FOR DETAILS
SOUTHBOUND PLENUM
D 4313 RL-65.166 D
8389 8381 500 1000 2500 1000 3000
WALL ELEVATION A
SCALE 1 : 50
BW1
2950
INDICATIVE E-LINE
TOP OF WALL
RL-59.855
E INDICATIVE C-LINE
E
390x390
INDICATIVE E-LINE
BLOCKWORK PIER
9636
1000
BW1
F F
1200THK VENTILATION PLENUM SLAB 2500W x 3500H SLIDING DOOR
REFER TO DESIGN PACKAGE 1403 REFER TO DESIGN LOT
3500
FOR DETAILS 1303 FOR DETAILS
SOUTHBOUND PLENUM
RL-65.166
B3 B1 B2
G 8000 G
WALL ELEVATION B WALL ELEVATION C
SCALE 1 : 50 SCALE 1 : 50
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - ELEVATIONS - SHEET 1 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422210 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
600 1. FOR GENERAL NOTES, REFER TO DRAWING
SOUTHBOUND PLENUM NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A RL-65.166 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
INDICATIVE E-LINE LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
INDICATIVE E-LINE INDICATIVE C-LINE
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
INDICATIVE C-LINE ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
B B
190 THK x 1600 LONG
BW1 BLOCKWORK BUTTRESS WALL
EQUALLY SPACED
N12-200 N12-200
HORIZONTAL HORIZONTAL
REINFORCEMENT REINFORCEMENT
N16-400 N16-400
C VERTICAL VERTICAL C
REINFORCEMENT REINFORCEMENT
ROW 2
N12-200
HORIZONTAL ROW 1
PROMATECT H FIRE BOARD REINFORCEMENT N12-200
FIXING DETAILS AS PER N16-400 HORIZONTAL
E MANUFACTURER'S RECOMMENDATION VERTICAL REINFORCEMENT E
REINFORCEMENT
190 BLOCKWALL (10m MAX HEIGHT)
N16, SS316L, GRADE 450MPa
N16-400
F VERTICAL F
REINFORCEMENT
ROW 3 ROW 4
300
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50, 1:20, 1:10 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 200 400 600 800 1000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
200 100 (1:20 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 500 1000 1500 2000 2500mm
DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - ELEVATIONS - SHEET 2 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
500 250 (1:50 AT A1)
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 2 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422211 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
S.C.
LENGTH VARIES
SL102 MESH IN TOP 6N32 IN 2-LAYERS 6N32 IN 2-LAYERS
REINFORCEMENT BAR
LAYER SEQUENCE
N20-100 (B2) N20-100 (B2)
2 SPACING (mm)
422216
BAR GRADE / TYPE AND DIAMETER
B.J. PRECAST LID, REFER TO DRG. NUMBER OF BARS IN GROUP
M6S1-CGU-ML-TU-DRG-422217
N20-100 (B1) (T1) PRIMARY (T2) SECONDARY
FOR REINFORCEMENT DETAILS
N16-100 (B1)
N16-200 (B2)
C N16-200 (T1) C
C1
C1
E.J.
(B1) PRIMARY (B2) SECONDARY
N16-200 (B2)
N16-200 (T2)
6N32 IN 2-LAYERS
3 4
422216 422216
SOUTHBOUND VENTILATION CONNECTION REINFORCEMENT PLAN AT RL -74.802 SOUTHBOUND VENTILATION CONNECTION BOTTOM REINFORCEMENT PLAN AT RL -65.166
D SECOND AND THIRD D
SCALE 1 : 50 SCALE 1 : 50
N20-200 (T1)
N16-200 (T2) N20-100 (T1)
2N16-100 TRIMMER BARS TYP. 400
2 SETS N16-200 CLOSED LIGS N20-200 (T1) TOP AND BOTTOM
1 1
400
422216 422216
2 SETS N16-200 CLOSED LIGS
N20-200 (T1)
PRECAST LID, REFER TO DRG. 4N12-100 CLOSED LIGS PRECAST LID, REFER TO DRG. 2N16-100 TRIMMER BARS TYP.
M6S1-CGU-ML-TU-DRG-422217 4N12-100 CLOSED LIGS M6S1-CGU-ML-TU-DRG-422217 TOP AND BOTTOM
FOR REINFORCEMENT DETAILS FOR REINFORCEMENT DETAILS N20-200 (T1)
F 1000 TYP. F
4
422216
N16-200 CLOSED LIGS N16-200 (T2)
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
6
422216
CL NICHE
450
3N32 TOP BAR N16-200 TOP BAR 3N32 TOP BAR
N20-200 TOP BAR 2N16-1000
A N20-200 TOP BAR N20-200 TOP BAR 3N32 TOP BAR STARTER BAR DRILL AND EPOXY IN ROCK A
USE HILTI RE 500 V3 WITH
SOUTHBOUND PLENUM SOUTHBOUND PLENUM
250mm MIN EMBEDMENT DEPTH
RL-65.166 RL-65.166
MIN 200
3N12-300 TIES
450
3 SETS N16-200
CLOSED LIGS 2 SETS N16-200
CLOSED LIGS 2SET N16-200 BUNDLE
CLOSED LIGS 10N28 VERTICAL BARS
N20-200 BOTTOM BAR
N16-200 BOTTOM BAR 6N32 IN 2-LAYERS 6N32 IN 2-LAYERS
6N32 IN 2-LAYERS
N20-100 BOTTOM BAR
C1 COLUMN DETAILS
B N20-100 BOTTOM BAR SCALE 1:10 B
C 20mm NON-SHRINK C
220
4mm THK GALVANIZED PLATE GROUT FOR LEVELING
BOTTOM OF THE PAD
5
CL NICHE 450x250x25 PLAIN
422216 BLOCK WALL TOP OF ELASTOMERIC BEARING PAD
THE BEAM STARTER NOT
2N16-1000 DRILL AND EPOXY IN
SHOWN FOR CLARITY
N20-200 TOP BAR N20-200 TOP BAR 225THK PRECAST ELEMENT ROCK USE HILTI RE 500 V3 WITH
3N32 TOP BAR 250mm MIN EMBEDMENT DEPTH
N16-200 TOP BAR N16-200 TOP BAR 3N32 TOP BAR N16-200 TOP & BOTTOM BAR
BW1
LIG SPACING 100
SECTION 2 SECTION 5
C1
SCALE 1 : 20 422215 SCALE 1 : 20 422216
COLUMN VERTICAL
E REINFORCEMENT E
1200
1000
MAX
50
CLOSED LIGS
F F
2N16-200 CLOSED
N20-100 BOTTOM BAR N16-200 BOTTOM BAR TIES
6N32 IN 2-LAYERS N20-200 BOTTOM BAR
G SECTION 3
SCALE 1 : 20 422215
G
SECTION 6
SCALE 1 : 10
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:20 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 200 400 600 800 1000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
200 100 (1:20 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - SECTION REINFORCEMENT H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422216 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
B B
REINFORCEMENT NOTATIONS:
N12-200 (B1)
12N12-200 (B1) L.V.
N12-200 (T1)
2
422217
900
LENGTH VARIES
REINFORCEMENT BAR
N12-200 (T2)
LAYER SEQUENCE
N12-200 (B2) SPACING (mm)
BAR GRADE / TYPE AND DIAMETER
NUMBER OF BARS IN GROUP
60.
MIN
MIN
LIFTING DEVICES TO BE
N12-200 T&B BARS SWIFTLIFT DEVICES TYP
DESIGNED BY THE CONTRACTOR.
TO BE DESIGNED BY
SEE DRG No M6S1-CGU-CCPRA-
SUBCONTRACTOR
RS-DRG-426502 FOR LOCATIONS
F 90° F
SPREADER GIRDER OR EQUIVALENT
45°
45°
SYSTEM TO DISTRIBUTE LOAD
EQUALLY BETWEEN THE END LIFTING
POINTS
LIFTING DIAGRAM
NTS
N12-200 T&B BARS
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:10 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 100 200 300 400 500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
100 50 (1:10 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - REINFORCEMENT DETAILS H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422217 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 1 1 1
422205 2. FOR STAIR DETAILS, REFER TO A
422205 422205
DRAWING NO. M6S1-CGU-ML-TU-DRG-422300 AND 422301
A
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
1
SC
422300 SB2 SB2
1
1
SC
SC
SC
SC
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
SC
980
1 SB2
1 SB2
SB4
SB4
1180
1180
SB2
SB2
1000 290 1000 STAIR STEEL MEMBER SCHEDULE
UP
UP
1
SB1 SB1
1
SC
SC
SC
SC
MARK SECTION COATING/FINISH COMMENTS
8 9 10 11 12 13 14 15 16
14 15 16
950
1
UP
8 GOINGS @ 250
8 GOINGS @ 250
SB1 250 PFC HDG600 STAIR STRINGER
SC
SC
25 24 23 22 21 20 19 18 17
19 18 17
SB2 200 PFC HDG600 STAIR STRINGER
SB1
SB1
SB1
SB1
SB1
SB1
SB1
SB1
5 GOINGS AT 250
2000
2000
7 6 5 4 3 2 1
4610
4610
4610
SB3 42.4x3.2 CHS HDG500 STAIR STRINGER
B B
26 27 28 29
1500
8 9 10
1 SB1
SB1
SB1
7 6 5
1
250
1180 250
SC
SC SB2 SC
SC
1
1
SC
SC
SC
NOTE:
UP
UP
UP
ALL STEEL MEMBER SHALL BE HOT DEEP GALVANIZED.
SC SB2
1 SB2
1 SB2
1 SB2
1180
1180
SB4
SB4
SB2
SB4
1
SC
1
SC
SC
SC
B
C C
STAIR LAYOUT PLAN AT RL - 74.802 TO RL - 73.505 STAIR LAYOUT PLAN AT RL -73.505 TO RL -71.837 STAIR LAYOUT PLAN AT RL -71.837 TO RL -70.169
SCALE 1 : 50 SCALE 1 : 50 SCALE 1 : 50
D 1 6 D
422205 422300
1 1
422205 422205
SB2 SB2
1
1
SC
SC
SB2
1430
SB2
SB2
1 SB2
SB2
SB2
SB4
SB4
1180
1180
SB2
SB2
UP
UP
44 45 46 47 48 49 50 51 52
26 27 28 29 30 31 32 33 34
32 33 34
UP
1
8 GOINGS @ 250
8 GOINGS @ 250
8 GOINGS @ 250
SC
43 42 41 40 39 38 37 36 35
38 37 36 35
SB1
SB1
SB1
SB1
SB1
SB1
SB1
SB1
E E
2000
2000
2000
4860
43 42 41 40 39 38 37
4610
4610
SB1
SB1
SB1
SB1
44 45 46 47
25 24 23
1
250
250
250
SC
SC
SC
1
1
SC
SC
SC
SB1 SB1 SB1
UP
UP
UP
SC SB2
SC SB2
SC SB2
1 SB2
1 SB2
1 SB2
1180
1180
1180
SB4
SB4
SB4
1
1
SC
SC
SC
3 SB2 3 SB2 3 SB2
422206 1000 290 1000 422206 1000 290 1000 422206 1000 290 1000
F F
STAIR LAYOUT PLAN AT RL -70.169 TO RL -68.502 STAIR LAYOUT PLAN AT RL -68.502 TO RL -66.834 STAIR LAYOUT PLAN AT RL -66.834 TO RL -65.166
SCALE 1 : 50 SCALE 1 : 50 SCALE 1 : 50
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - STAIR LAYOUT PLANS H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422220 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR STAIR DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422300 AND 422301
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
9 RISERS AT 185.3
RL-65.166 RL-65.166
9 RISERS AT 185.3
SB2 SB1
1668
1668
SB
1
C C
LANDING 5 LANDING 5
9 RISERS AT 185.3
9 RISERS AT 185.3
RL-66.834 H RL-66.834
SB2 422301
SB2
1668
1668
1
SB SB3 SB3
LANDING 4 LANDING 4
9 RISERS AT 185.3
9 RISERS AT 185.3
1668
SB
SB3 1 SB3
D LANDING 3 LANDING 3
D
9 RISERS AT 185.3
9 RISERS AT 185.3
RL-70.169 RL-70.169
E SB2
422300
1668
1668
K
1 SB3 422301
SB
LANDING 2 SB2 LANDING 2
9 RISERS AT 185.3
9 RISERS AT 185.3
RL-71.837 RL-71.837
SB2
F
1668
1668
SB3 SB SB3
1 422300
7 RISERS AT 185.3
7 RISERS AT 185.3
E LANDING 1 LANDING 1 E
RL-73.505 C RL-73.505
422300 SB2 SB2
1297
1297
SC1
SC1
1
SB
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 SOUTHBOUND VENTILATION STRUCTURE - STAIR ELEVATIONS H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422221 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
INDICATIVE E-LINE NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR STAIR DETAILS, REFER TO A
SAFETY HANDRAIL INDICATIVE C-LINE
DRAWING NO. M6S1-CGU-ML-TU-DRG-422300 AND 422301
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
SB1 SB2
1000
1000
SB1
UP
SB2
STAIR STEEL MEMBER SCHEDULE
1 2 3 4 5 6 7 8 9
MARK SECTION COATING/FINISH COMMENTS
SB1 SB2
SB1 250 PFC HDG600 STAIR STRINGER
2000 1000
SAFETY HANDRAIL SB2 200 PFC HDG600 STAIR STRINGER
8 GOINGS AT 250
SB3 42.4x3.2 CHS HDG500 STAIR STRINGER
B B.1
B
SB4 100 x 100 x 10 EA HDG500 STAIR STRINGER
422222
SC1 150 UC 30 HDG600 STAIR COLUMN
C C
J
422301
SAFETY HANDRAIL
E2
422300
M8 CONNECTION
8 RISERS AT 250
RL-63.616
SB2
E3
1550
SC1
1
SB
422300
D D
SOUTHBOUND PLENUM
RL-65.166
G
422301
ELEVATION B.1
SCALE 1 : 50 422222
E E
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 NORTHBOUND VENTILATION STRUCTURE - STAIR LAYOUT PLANS H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422222 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
4600-4900mm
SC3
1. INSTALL BASE PLATE IN TUNNEL LINING IN ACCORDANCE
BR SC3 WITH PROVIDED DETAILS.
D 2. THE BEAM SHALL BE IN CORRECT POSITION, SITTING ON D
2
2
BR
THE FLANGE.
3. SCISSOR LIFT OR LIFTING POINT SHALL BE LOCATED
EACH SIDE OF THE BEAM, 2.0m DISTANCE FROM EACH
END.
4. THE COLUMN SC2 WILL BE MOUNTED TO THE BEAM
BEFORE LIFTING.
5. THE BEAM WILL BE LIFTED AND HELD DURING THE
INSTALLATION AT THE CORRECT LOCATION.
6. THE COLUMN WILL BE CONNECTED TO THE T BASE PLATE
A WITH BOLTS.
422232 7. THE BRACINGS WILL BE MOUNTED AFTER THE MAIN BEAM
E INSTALLATION. E
8. ALL THE BOLTS WILL BE TIGHTENED AFTER ALL THE
ELEMENTS ARE LOCATED IN CORRECT LOCATION.
9. FOR MAINTENANCE, BEFORE REMOVING THE BEAM FROM
350-650
THE COLUMNS, THE SCISSOR LIFT WILL BE LOCATED
SC3 SC3 UNDERNEATH OF THE BEAM WITH 2.0m DISTANCE FROM
EACH END.
10. THE MONORAIL WILL BE DETACHED FROM THE COLUMNS,
BOTTOM OF MONORAIL 1 SITTING ON THE SCISSOR LIFT AND WILL BE MOVED TO
RL-60.716 MB1 SLAB LEVEL IN SPECIFIC AREA.
193 3200 3200 3200 207 11. THE RELEVANT EXAMINATION WILL BE CARRIED OUT, IF
THE MONORAIL BEAM HAS ITS OWN INTEGRITY. IT WILL BE
F 10000 REINSTALLED OTHERWISE, IT WILL BE REPLACED WITH
F
NEW BEAM.
G 2 2 G
10
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:20 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 200 400 600 800 1000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
200 100 (1:20 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MONORAIL DETAILS - SHEET 1 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422230 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
1700-2300
1500-2100 mm
1 BR 1 BR THE FLANGE.
BR 1 BR 1 3. SCISSOR LIFT OR LIFTING POINT SHALL BE LOCATED
1200-1800 mm
1000-1500 mm
EACH SIDE OF THE BEAM, 2.0m DISTANCE FROM EACH
SC2
SC2
SC2
SC2
SC2
END.
4. THE COLUMN SC2 WILL BE MOUNTED TO THE BEAM
BEFORE LIFTING.
5. THE BEAM WILL BE LIFTED AND HELD DURING THE
INSTALLATION AT THE CORRECT LOCATION.
6. THE COLUMN WILL BE CONNECTED TO THE T BASE PLATE
WITH BOLTS.
7. THE BRACINGS WILL BE MOUNTED AFTER THE MAIN BEAM
E NORTHBOUND MONORAIL
INSTALLATION. E
RL-60.384 MB1 8. ALL THE BOLTS WILL BE TIGHTENED AFTER ALL THE
200 2400 2400 2400 1295 1105 200
ELEMENTS ARE LOCATED IN CORRECT LOCATION.
10000 9. FOR MAINTENANCE, BEFORE REMOVING THE BEAM FROM
G 2 2 G
10
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:20 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 200 400 600 800 1000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
200 100 (1:20 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MONORAIL DETAILS - SHEET 2 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422231 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
20mm T SECTION TO TUNNEL LINING MAXIMUM LOAD ON COLUMN 25mm T SECTION TO TUNNEL LINING MAXIMUM LOAD ON BRACING
WITH 4M20 GRADE A-70 STAINLESS FOR ANCHOR BOLT DESIGN WITH 4M30 GRADE A-70 STAINLESS FOR ANCHOR BOLT DESIGN 1. FOR CRANE MONORAIL NOTES, REFER TO DRAWING
STEEL ANCHOR COLUMN GROUTED STEEL ANCHOR COLUMN GROUTED M6S1-CGU-ML-TU-DRG-422503.
A WITH CEMENTITIOUS GROUT FOR MAXIMUM LOAD WITH CEMENTITIOUS GROUT FOR MAXIMUM LOAD 2. MONORAIL DETAILS TO BE CONFIRMED, WITH DESIGNER'S A
DOWEL INSTALLATION T=55 KN DOWEL INSTALLATION REQUIREMENTS T=12 KN REPRESENTATIVE WHEN VENDOR DATA IS KNOWN AND
REQUIREMENTS REFER TO NOTE 9 IN Vx=8 KN REFER TO NOTE 9 IN THIS DRAWING Vx=6 KN SUBJECT TO CHANGE.
3
THIS DRAWING. Vy=8 KN 422232 3. MONORAIL HAS BEEN DESIGNED FOR A MANUAL SYSTEM,
20mmØ ROD NOT AN ELECTRIC HOIST.
3000 3000 WELD 6 CFW 4. TUNNEL LINING THICKNESS SHOWN IS INDICATIVE ONLY.
ALL AROUND 5. NYLON TOP HAT WASHERS AND SLEEVE PROTECTION
FOR STAINLESS STEEL FIXING/ BOLTS SHALL BE
10mm CLEAT PROVIDED AS REQUIRED FOR GALVANIC PROTECTION.
PLATE 6. FOR ALL CONNECTIONS TO TUNNEL SIDEWALL AND
2M16 8.8 SB CROWN, EMBEDMENT DEPTH SHOWN ARE MINIMUM
4 EMBEDMENT DEPTH INTO ROCK SUBSTRATE.
B B
40
2 7. CONTRACTOR TO CONFIRM 'D' DOES NOT EXCEED 20mm.
0
422233
30
422232 25mm T BASE PLATE 20mm T SECTION TO TUNNEL LINING WITH 10mm CLEAT OTHERWISE SUBMIT TO DESIGNER'S REPRESENTATIVE
80
G300 4M20 GRADE A-70 STAINLESS STEEL ANCHOR PLATE FOR APPROVAL.
COLUMN GROUTED WITH CEMENTITIOUS
40
1M30/8.8 TB 16mm T PLATE 8. ALL MONORAIL ANCHOR TO CONFORM TO PROOF
GROUT FOR DOWEL INSTALLATION
G300 TESTING METHODOLOGY DETAILED IN DESIGN PACKAGE
SHS 75x75x6 REQUIREMENTS REFER TO NOTE 9 IN THIS
1505.
DRAWING
9. DOWELS TO BE INSTALLED VERTICALLY PLUMB WITH
MONORAIL 250UC89.5 MAXIMUM VERTICALITY TOLERANCE OF 1:20 (H:V)
DEGREES FROM VERTICAL.
10. THE MONORAIL AND ITS CONNECTION HAS BEEN
20mmØ ROD 20mmØ ROD DESIGNED FOR USAGE OF 3 TIMES PER DAY FOR 25
YEARS = 27375 TIMES U1 UTILIZATION BASED ON AS1418,
C THE ANCHOR FOR 100 YEARS WITH 109500 TIMES WITH C
UTILIZATION OF U3, THEREFORE THE FATIGUE LIFE IS
NOT REQUIRED. TBC.
DETAIL 11. THE MONORAIL HAS BEEN DESIGNED FOR A MAXIMUM
F HOIST LOAD CAPACITY OF 2.5 TONNES.
SCALE 1 : 5 422232
D 75 250 75 D
REFER TO NOTES
STEEL ANCHOR COLUMN GROUTED
20mmØ ROD WITH CEMENTITIOUS GROUT FOR
'D'
DOWEL INSTALLATION REQUIREMENTS
10mm CLEAT REFER TO NOTE 9 IN THIS DRAWING
F
8mm CLEAT
422232 M30 8.8 TB
2M16 8.8 SB GROUT
SHS 75x75x6
400
E 25mm T PLATE E
25
MONORAIL 250UC89.5
10mm CLEAT G300
75
TOP HAT ISOLATION WASHERS
TO MATCH ANCHOR BOLT SIZE
75
200
75 250 75
WELD 6 CFW ALL SHS 75x75x6 4M20 8.8 TB
300
A1 AROUND
10mm CLEAT 150 150 20mm T SECTION TO TUNNEL LINING WITH 4M20 GRADE 422232
A-70 STAINLESS STEEL ANCHOR COLUMN GROUTED
40
WITH CEMENTITIOUS GROUT FOR DOWEL INSTALLATION 16mm END PLATE
F 20mmØ ROD
G300 F
40
115
200
4M20 8.8TB
250UC89.5 SP WELD 8 CFW
200
120
45
10mm CLEAT 2M16 8.8 SB
20mmØ ROD 400
10mm CLEAT
40
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:5, 1:20 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 50 100 150 200 250mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
50 25 (1:5 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 200 400 600 800 1000mm
DESIGNED M. MORADI 20.09.22 MONORAIL DETAILS - SHEET 3 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
200 100 (1:20 AT A1)
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 3 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422232 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR CRANE MONORAIL NOTES, REFER TO DRAWING
M6S1-CGU-ML-TU-DRG-422503.
A 2. MONORAIL DETAILS TO BE CONFIRMED, WITH DESIGNER'S A
REPRESENTATIVE WHEN VENDOR DATA IS KNOWN AND
SUBJECT TO CHANGE.
3. MONORAIL HAS BEEN DESIGNED FOR A MANUAL SYSTEM,
NOT AN ELECTRIC HOIST.
4. TUNNEL LINING THICKNESS SHOWN IS INDICATIVE ONLY.
20mmØ ROD 5. NYLON TOP HAT WASHERS AND SLEEVE PROTECTION
10mm T SECTION TO TUNNEL FOR STAINLESS STEEL FIXING/ BOLTS SHALL BE
LINING WITH 4M30 GRADE A-70 8mm CLEAT 8mm CLEAT PROVIDED AS REQUIRED FOR GALVANIC PROTECTION.
STAINLESS STEEL ANCHOR 6. FOR ALL CONNECTIONS TO TUNNEL SIDEWALL AND
COLUMN GROUTED WITH 2M16 8.8 SB M30 8.8 TB CROWN, EMBEDMENT DEPTH SHOWN ARE MINIMUM
75 CEMENTITIOUS GROUT FOR EMBEDMENT DEPTH INTO ROCK SUBSTRATE.
89x89x5 SHS
B DOWEL INSTALLATION 400
7. CONTRACTOR TO CONFIRM 'D' DOES NOT EXCEED 20mm. B
REQUIREMENTS REFER TO OTHERWISE SUBMIT TO DESIGNER'S REPRESENTATIVE
NOTE 9 IN THIS DRAWING FOR APPROVAL.
25
0
8. ALL MONORAIL ANCHOR TO CONFORM TO PROOF
25
TESTING METHODOLOGY DETAILED IN DESIGN PACKAGE
0
1505.
20
75
9. DOWELS TO BE INSTALLED VERTICALLY PLUMB WITH
200
5
17
S
SP WELD 8 CFW 11. THE MONORAIL HAS BEEN DESIGNED FOR A MAXIMUM
TE
HOIST LOAD CAPACITY OF 2.5 TONNES.
NO
'D'
10mm CLEAT
TO
2M16 8.8 SB
1M30 8.8TB
R
20mmØ ROD
FE
RE
SHS 89x89x5
20mm T PLATE MONORAIL ANCHOR EMBEDMENT TABLE
G300
SECTION ANCHOR ROD MIN BOREHOLE ROCK MIN EMBEDMENT
B1
D SCALE 1 : 5 422233
SIZE DIAMETER (mm) TYPE DEPTH (mm) D
M20 24 SST-I / II 300
SST-III 450
SST-10 600
20mmØ ROD 25mm T SECTION TO TUNNEL LINING WITH 4M30 M30 36 SST-I / II 1200
WELD 6 CFW SHS 89x89x5 GRADE A-70 STAINLESS STEEL ANCHOR COLUMN SST-III 2000
ALL AROUND B1 GROUTED WITH CEMENTITIOUS GROUT FOR SST-10 3400
422233 DOWEL INSTALLATION REQUIREMENTS
EA 50x50x8 REFER TO NOTE 9 IN THIS DRAWING
1M20 8.8 TB
8mm CLEAT 16mm T PLATE
75
PLATE G300
16
150
300
8 CFW WELD
BASE PLATE TO
75
BEAM CONNECTION M30 8.8 TB
F BOTTOM OF MONORAIL 1
F
25mm T BASE PLATE G300
RL-60.716
DETAIL B SECTION 4
SCALE 1 : 5 422205 SCALE 1 : 5 422232
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:5 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 50 100 150 200 250mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
50 25 (1:5 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MONORAIL DETAILS - SHEET 4 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 4 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422233 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR CRANE MONORAIL NOTES, REFER TO DRAWING
M6S1-CGU-ML-TU-DRG-422503.
A 2. MONORAIL DETAILS TO BE CONFIRMED, WITH DESIGNER'S A
REPRESENTATIVE WHEN VENDOR DATA IS KNOWN AND
SUBJECT TO CHANGE.
3. MONORAIL HAS BEEN DESIGNED FOR A MANUAL SYSTEM,
NOT AN ELECTRIC HOIST.
4. TUNNEL LINING THICKNESS SHOWN IS INDICATIVE ONLY.
5. NYLON TOP HAT WASHERS AND SLEEVE PROTECTION
FOR STAINLESS STEEL FIXING/ BOLTS SHALL BE
PROVIDED AS REQUIRED FOR GALVANIC PROTECTION.
6. FOR ALL CONNECTIONS TO TUNNEL SIDEWALL AND
CROWN, EMBEDMENT DEPTH SHOWN ARE MINIMUM
EMBEDMENT DEPTH INTO ROCK SUBSTRATE.
B 7. CONTRACTOR TO CONFIRM 'D' DOES NOT EXCEED 20mm. B
OTHERWISE SUBMIT TO DESIGNER'S REPRESENTATIVE
FOR APPROVAL.
8. ALL MONORAIL ANCHOR TO CONFORM TO PROOF
TESTING METHODOLOGY DETAILED IN DESIGN PACKAGE
1505.
CEMENT GROUT (MIN f'c = 40MPa 9. DOWELS TO BE INSTALLED VERTICALLY PLUMB WITH
MAXIMUM VERTICALITY TOLERANCE OF 1:20 (H:V)
DEGREES FROM VERTICAL.
REFER TABLE
C THE ANCHOR FOR 100 YEARS WITH 109500 TIMES WITH C
UTILIZATION OF U3, THEREFORE THE FATIGUE LIFE IS
NOT REQUIRED. TBC.
A
422234
11. THE MONORAIL HAS BEEN DESIGNED FOR A MAXIMUM
HOIST LOAD CAPACITY OF 2.5 TONNES.
EMBEDMENT LENGTHS
REFER TABLE FOR
SMOOTHING SHOTCRETE
MONORAIL ANCHOR EMBEDMENT TABLE
STAINLESS STEEL BAR DOWELS
GRADE A-70 TO BE FULLY COLUMN ANCHOR ROD MIN BOREHOLE ROCK MIN EMBEDMENT
MEMBRANE
D GROUTED WITH CEMENT GROUT SIZE DIAMETER (mm) TYPE DEPTH (mm) D
(DOWEL INSTALLATION STAINLESS STEEL BAR DOWELS M20 24 SST-I / II 300
REQUIREMENTS - REFER TO NOTE 9 GRADE A-70 TO BE FULLY COLUMN SST-III 450
GROUTED WITH CEMENT GROUT SST-10 600
(DOWEL INSTALLATION
M30 36 SST-I / II 1200
REQUIREMENTS - REFER TO NOTE 9
SST-III 2000
SFR SHOTCRETE
SFR SHOTCRETE SST-10 3400
(FOR THICKNESS REFER TO DESIGN
MIN 1000
PACKAGE 1505) (FOR THICKNESS REFER
TO DESIGN PACKAGE 1505)
MIN 1000
100
STAINLESS STEEL
50 MIN
SECONDARY SHOTCRETE STAINLESS STEEL M36 WASHER
LAYER (TO BE INSTALLED FLAT)
F F
ANCHOR EMBEDMENT DETAIL ANCHOR EMBEDMENT DETAIL
(WHERE NO MEMBRANE PRESENT IN WATER RESISTANT LINING) (WHERE MEMBRANE PRESENT IN WATER RESISTANT LINING) DETAIL A
SCALE 1 : 1 422234
SCALE : N.T.S SCALE : N.T.S
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:1 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 10 20 30 40 50mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
10 5 (1:1 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MONORAIL DETAILS - SHEET 5 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 5 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422234 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND:
N
DENOTES SLAB PENETRATION
A A
XXX DENOTES SLAB THICKNESS
DENOTES HANDRAILS
FLOWABLE FILL
4
2148
0.5%
180
1800
422259 UP
D D
3
422258
M831
HV PIT
1250 DEPTH 2853
E E
950 T.O.C. RL -24.111
LV PIT
DESIGN PACKAGE 3103
MASS CONCRETE
FW
FW BEHIND BARRIER
900x900x950D
F COMMS PIT F
3000x1200x1250D
HV PIT
B
M830
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:100 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 1000 2000 3000 4000 5000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
1000 500 (1:100 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - GENERAL ARRANGEMENT PLAN H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422250 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
LEGEND:
N DENOTES CIRCULATION SPACE
(1450 x 1530 TYP. U.N.O)
A A
DENOTES PITS (INDICATIVE ONLY)
BW1
BW1 DESIGN PACKAGE 2206 T.O.C. R.L. 20.000 DENOTES TOP OF CONCRETE RLs ARE
2200 BASED ON AUSTRALIAN HEIGHT DATUM
5010
DENOTES SETOUT POINT. REFER TO DRAWING
14.3%
M6S1-CGU-ML-TU-DRG-421208 FOR SCHEDULE.
830
2350x2350x950D REFER TO PLAN FOR EASTING AND NORTHING
LV PIT NOT SHOWN IN SCHEDULE
5884 8323
NOTES:
C C
2672
1. FOR GENERAL NOTES, REFER TO DRAWING
3.4% NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
BW1
5010
T.O.C. RL -21.966
2. FOR BLOCKWORK WALL DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
180
2338
0.5%
1210
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
1210
T.O.C. RL -23.500 LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
7950
5010 5010
D T.O.C. RL -23.133 D
T.O.C. RL -23.162
7.1%
M831
E 950 E
1500
3253 747 900x900x950D
COMMS PIT
5010 5010
T.O.C. RL -22.300 T.O.C. RL -22.080
1067
7.4%
1500
T.O.C. RL -23.979
T.O.C. RL -23.982
4915 95
10.9
3000x1200x1250D
HV PIT
2846
2846
2471
M830
T.O.C. RL -22.843
14.8%
WAY T.O.C. RL -23.063
CONT
G ROL L
INE T.O.C. RL -23.066 SCALE 1 : 100 G
2350x2350x950D T.O.C. RL -22.459
LV PIT T.O.C. RL -22.462
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:100 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 1000 2000 3000 4000 5000mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
1000 500 (1:100 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - CONCRETE SETOUT PLAN H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422251 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAIL, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302 & 422303
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
BW1
1811
C SB6 SB6 SB6 SB6 C
VENT ADIT 1
FOR DETAILS REFER TO MOC3 BUILDING
1811
SB5
SB5
DESIGN PACKAGE 3103
SB5
SB5
SB5
FOR DETAILS REFER TO
DESIGN PACKAGE 2206
SB6 SB6 SB6 SB6
1811
D SB6 SB6 SB6 SB6
D
338
BW1
BW1
UP
0.5%
2148
180 REFER TO 1303 PACKAGE
FOR DOOR DETAILS
E E
7950
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - STEEL FRAME PLAN H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422253 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
B B
M830 M831
2672
250THK REINFORCED
CONCRETE WALL
MOC3 BUILDING
FOR DETAILS REFER TO
C DESIGN PACKAGE 2206
C
4920
D 1000Wx2100H
D
CLEAR DOOR OPENING
FOR DOOR DETAILS
REFER TO 1303 PACKAGE
T.O.C. RL -22.080
T.O.C.
552
RL-21.966
270
225
MOC3 VENT ADIT
666
MOC3 VENT ADIT RL-22.632
RL-22.632
E 2000 E
FLOWABLE FILL
FLOWABLE FILL
F F
CONDUIT
FOR DETAILS REFER TO
DESIGN PACKAGE 1301
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - ELEVATIONS AND SECTIONS - SHEET 1 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422255 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
250THK REINFORCED
B CONCRETE WALL B
C M830
422270
5
SB
SB6
5
SB
C SB6 C
5
SB
SB6
5
SB
SB6
5
SB
MOC3 BUILDING
FOR DETAILS REFER TO Ø225 WALL PENETRATIONS
DESIGN PACKAGE 2206 @ 615 CENTRES.
4920
FOR DETAILS REFER
BW1
DESIGN PACKAGE 3103
615
TYP.
DESIGN PACKAGE 3103
1650
1650
1650
1650
T.O.C.
RL-21.966
14.3%
MOC3 VENT ADIT
RL-22.632
3.4%
E E
F F
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - ELEVATIONS AND SECTIONS - SHEET 2 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422256 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
B B
C VENT ADIT 1
C
FOR DETAILS REFER TO
DESIGN PACKAGE 3103
D D
E E
F F
SECTION 1
SCALE 1 : 50 422250
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - ELEVATIONS AND SECTIONS - SHEET 3 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 3 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422257 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
M830 M830 DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
6000
2672 3328
B B
PROMATECT H FIRE BOARD FIXING
DETAILS AS PER MANUFACTURER'S
RECOMMENDATION
A
422270
A
422270
SB5
2
SB
SB
SB
SB
C C
VENT ADIT 1 VENT ADIT 1
FOR DETAILS REFER TO FOR DETAILS REFER TO
DESIGN PACKAGE 3103
BW1
BW1
DESIGN PACKAGE 3103
4920
AIR QUALITY
MONITORING
ROOM 2350x2350 LV PIT
T.O.C.
D RL-21.966 T.O.C. RL -22.508 D
MOC3 VENT ADIT
RL-22.632
CONDUIT
FOR DETAILS REFER TO
DESIGN PACKAGE 1301 CONDUIT
FOR DETAILS REFER TO
DESIGN PACKAGE 1301
FLOWABLE FILL
FLOWABLE FILL
E E
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - ELEVATIONS AND SECTIONS - SHEET 4 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 4 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422258 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
NOTES:
1. FOR GENERAL NOTES, REFER TO DRAWING
NO. M6S1-CGU-ML-TU-DRG-422104 & 422105
A 2. FOR BLOCKWORK WALL DETAILS, REFER TO A
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302
3. FOR REFERENCE DRAWINGS INCLUDING ASSOCIATED DESIGN
LOTS REFER TO DRAWING NO. M6S1-CGU-ML-TU-DRG-422103
4. 1.0kPa SLS & 5.0kPa ULS SHUT-OFF PRESSURE HAS BEEN
CONSIDERED FOR BLOCKWORKS WALL ABOVE PLENUM SLAB
5. LINTEL BEAMS ARE NOT SHOWN ON THE SECTIONS AND
ELEVATIONS. FOR TYPICAL LINTEL BEAM DETAIL, REFER TO
DRAWING NO. M6S1-CGU-ML-TU-DRG-422302. LINTEL
REINFORCEMENT TO EXTEND FULL WIDTH OF BLOCK WALL PANEL.
B M830 B
C C
MOC3 BUILDING
FOR DETAILS REFER TO
DESIGN PACKAGE 2206
AIR QUALITY
MONITORING ROOM
D D
MOC3 VENT ADIT
RL-22.632
3.4%
E E
FLOWABLE FILL
SECTION 4
F SCALE 1 : 50 422250
F
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:50 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
FOR LIST OF 3D MODELS REFER DRG-422103 purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 500 1000 1500 2000 2500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
500 250 (1:50 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - ELEVATIONS AND SECTIONS - SHEET 5 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 5 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422259 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
1
A 422270 A
190 40
160x200x10mm T-PLATE 20 45 35
10 CLEAT FULL
DEPTH PLATE BOTH
80
B SIDES 6 CFW B
160
SB1
50
BW01 2M24 HILTI HST3
HB 70 FOR LEVELLING 25 25 SB2
THE BASEPLATE AREA
C C
DETAIL A DETAIL C
SCALE 1 : 5 422258 SCALE 1 : 5 422256
160x200x10mm T-PLATE
2M20 8.8/S BOLTS
D SB1 D
MECHANICAL BOLTS
160
ENGAGED
SECTION 1
F F
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:5 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 50 100 150 200 250mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
50 25 (1:5 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 MOC3 VENTILATION ADIT - STEEL CONNECTION DETAIL H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A REV A NOT ISSUED - - --
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422270 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
152
150 x 10 PL BRACKET
SC1 HANDRAIL OVER
AND 2M16 8.8/TB BOLTS 2 M16 4.6/S SB4 100 x 100 x 10 EA
1 WITH 40mm SLOTTED HOLES INDICATIVE 10 END PLATE
422300 C-LINE SC1 SC1 150 UC 30
150 x 10 EA BRACKET
LENGTH VARIES SUPPLY 150 x 10 EA IN WITH2M16 8.8/TB HANDRAIL OVER
INDICATIVE NOTE:
50mm INCREMENTS MAX 300mm WITH BOLTS 6mm STEEL PLATE
152 E-LINE SB2 ALL STEEL MEMBER SHALL BE HOT
150
40mm SLOTTED HOLES FOR LANDING DEEP GALVANIZED.
B 2M16 STAINLESS STEEL BOLTS HILTI HIT-RE 500 V3 150 x 10 PL BRACKET B
125 EMBEDMENT IN SHOTCRETE OR ROCK WITH WITH 40MM SLOTTED
TOP HAT EPDM SEPARATING WASHER BETWEEN HOLES
STAINLESS STEEL AND MILD STEEL. LOCATE 250 SHAPE GROUT PAD
ABOVE TYPICAL LANDING LEVEL AND 500 BELOW TO FORM DRIP GROOVE B
TOP LANDING. EMBEDMENT TO BE INCREASED TO
DETAIL A 250mm IF SHOTCRETE THICKNESS 50mm OR LESS SECTION 1 TO TOP SURFACE DETAIL B
SCALE 1 : 10 422220 SCALE 1 : 10 422300 SCALE 1 : 10 422220
425
152
SC1
SC1 6mm STEEL PLATE
2 M16 8.8 TB FOR LANDING
422300
300x200x16 40 NOM GROUT 300
WEBGRIP ANTI-SLIP
150
M16 8.8 TB BASE PLATE 200
2x12mm THK 3 NOSING SAFETY
152
EMBEDMENT
200
SB2
D TO BE CHECKED D
100
200
2x12mm THK 12mm THK
END PLATE SC1 CONTINUOUS 6mm
END PLATE
FSBW 2 M16 8.8 CAPTIVE NUTS FLOOR PLATE RISER
4-M12 8.8 TB TO BE WELDED TO PLATE AND TREADS
EACH SIDE SC1 180 THK 2M16 HILTI 300x200x16
GROUND SLAB HIT RE500 V3 BASE PLATE SB1
EMBEDMENT
0
25
DETAIL C SECTION 2 DETAIL D SECTION 3 (APPLY DETAIL ALSO WITHOUT SC1)
SCALE 1 : 5 422221 SCALE 1 : 5 422300 SCALE 1 : 10 422221 SCALE 1 : 10 422300
DETAIL E
SCALE 1 : 10 422221
E E
30
30
30
SB1 FSBW WELD TO PFC
F FOR CONNECTION SB2 F
250
150
150
90
90
90
CAPTIVE STUDS TO
4M16 HILTI HIT-RE 500 V3
BE WELDED TO PL WEBGRIP ANTI-SLIP
30
30
30
UP 40 MPa GROUT
NOSING SAFETY
SB1 BELOW YELLOW (TYP) SB1
SB2 150x150x10mm T-PLATE SB2
6mm STEEL PLATE 4M16 HILTI HIT-RE 500 V3
FOR LANDING PART 260 250 6mm RISER 40 MPa GROUT
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:10, 1:5 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 50 100 150 200 250mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
50 25 (1:5 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 100 200 300 400 500mm
DESIGNED M. MORADI 20.09.22 TYPICAL DETAILS - SHEET 1 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
100 50 (1:10 AT A1)
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422300 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
152 250
STEEL STEEL
MEMBER ID MEMBER SIZE
A SB1 250 PFC
A
INFILL RAIL WELDED BETWEEN
25
BALUSTRADE WITH WELDS SB2 200 PFC
0
152 GROUND TO A SMOOTH AND WEB GRIP ANTI
SLIP NOSING SB3 42.4 x 3.2 CHS
CLEAN FINISH FSBW HANDRAIL
SB4 100 x 100 x 10 EA
6mm STEEL PLATE 6mm STEEL PLATE
3 1 FOR LANDING SC1 150 UC 30
FOR LANDING
3 SB
SB1
250
B SC1
6 CFW AR B
200
SB3 SB2 10mm SEATING
PLATE
BUTT WELD TO SC1
2 M16 GR4.6 CAPTIVE NUTS 10mm END PLATE WELDED
SC1
DETAIL H DETAIL J TO BE WELDED TO PLATE TO PFC STRINGER
152
SCALE 1 : 5 422221 SCALE 1 : 5 422221 SB1
SC1
DETAIL K DETAIL L
C SCALE 1 : 10 422221 SCALE 1 : 10 C
2
422301
=
1 ACHIEVE 270° AT HANDRAIL STANCHION 42.4x3.2 CHS
422301 350 4.6/S
410
1500
=
2M16 BOLTS HILT HIT
425
425
SB1 RE500 V3 125 EMBEDMENT KNEERAIL 33.7x3.2 CHS
0
25
D 350x200x12 D
200
SB1
1000
BASE PLATE
STEEL HANDRAIL
145
=
150
10mm END PLATE
425
=
350x200x12 STAIR TREAD 350x200x12
BASE PLATE BASE PLATE 50 6mm STEEL PLATE BASERAIL 33.7x3.2 CHS
SB1 WEB GRIP ANTI
=
FOR LANDING
40 NOM GROUT SLIP NOSING 40 NOM GROUT
=
80 THK MAX.4.6/S = = BASE PLATE 75x10PLx145
2M16 BOLTS TO PFC TOP OF PFC
2M16 BOLTS HILTI HIT 2M16 BOLTS HILTI
RE500 V3 125 EMBEDMENT HIT RE500 V3 125
EMBEDMENT
E SB1 E
"OUTSIDE" "INSIDE RETURN"
SB2 SB2
DETAIL M SECTION 1 SECTION 2
SCALE 1 : 10 422221 SCALE 1 : 10 422301 SCALE 1 : 10 422301
270°
F F
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:10, 1:5 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 50 100 150 200 250mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
50 25 (1:5 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 100 200 300 400 500mm
DESIGNED M. MORADI 20.09.22 TYPICAL DETAILS - SHEET 2 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
100 50 (1:10 AT A1)
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 2 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422301 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TBC
AT 400 VERTICAL CENTRES DOWELS TO
.
MINIMUM 20mm THICK SIKA FIRE RATE Pu 200 MIN FROM FACE OF SHOTCRETE
BE LOCATED 100mm CLEAR OF TUNNEL SEALANT OR APPROVED EQUIVALENT TO
LINING STRIPDRAINS "JOINTFLEX" CONTINUOUS JOINT FILLER OR
EACH FACE FOR FRL OF - /120/120.
20
APPROVED EQUIVALENT N16-200 BW2
CUT BLOCK AS REQUIRED TO FOR WALLS EXPOSED TO CARRIAGEWAY N16-400 BW1
SUIT EXCAVATION PROFILE EXPOSED FACE TO BE -/240/240 GROUT. REFER NOTE MN03 ON DRAWING M6S1-CGU-ML-TU-DRG-421310.
400
STARTER BARS
180 THK
REINFORCEMENT 4. CONCRETE FILL ALL CORES.
SLAB
10mm VERTICAL MOVEMENT.
270 THK
SLAB
MINIMUM 20mm THICK SIKA FIRE RATE Pu 5. INSTALL FORMWORK BETWEEN BLOCKWALL AND TUNNEL ROOF. EXTENT OF FORMWORK MAY BE
DOWELS TO BE LOCATED 100mm CLEAR OF TUNNEL LINING
SEALANT OR APPROVED EQUIVALENT TO REDUCED USING BLOCKS WITH FACE SHELL PARTS REMOVED.
STRIP DRAINS.
EACH FACE FOR FRL OF - /120/120. 6. POUR CONCRETE PROGRESSIVELY STARTING FROM SIDES OF CROSS PASSAGE.THIS MAY INVOLVE
FOR WALLS EXPOSED TO CARRIAGEWAY VERTICAL WALL REINFORCEMENT THE PROGRESSIVE PLACEMENT OF FORMS TO WITHIN 100mm OF APEX OF ARCH.
EXPOSED FACE TO BE -/240/240 7. DRY PACK REMAINING CAVITY AT APEX USING APPROVED NON-SHRINK GROUT.
8. PRESSURE GROUTING OF BLOCKS MAY BE UTILIZED FOR ITEM 4 ABOVE.
C ADJACENT IN SITU/ SHOTCRETE/BLOCKWORK WALL MASS CONCRETE C
NOTE: NOTE:
"BLOCKWORK WALL JOINT - PLAN" IS ONLY APPLICABLE AGAINST THE TUNNEL LINING. "BLOCKWORK WALL TOP JOINT - SECTION" IS APPLICABLE FOR
WALLS BELOW TUNNEL LINING AND BELOW FORMED CONCRETE.
TYPICAL BLOCKWALL SECTION
BLOCKWORK WALL JOINT TO TUNNEL LINING - PLAN BLOCKWORK WALL TOP JOINT TO TUNNEL LINING - SECTION SCALE 1:10
SCALE 1:10 SCALE 1:10
D D
"JOINTFLEX" JOINT
FILLER OR EQUIVALENT
SAWCUT GROOVE IN SIDE VERTICAL WALL FOR REINFORCEMENT
OF BLOCK TO SUIT REINFORCEMENT REFER TO DRG NO.
480 LAP LENGTH
HORIZONTAL REINFORCEMENT
M6S1-CGU-ML-TU-
HORIZONTAL WALL
DRG-421337 & 421340/41
REINFORCEMENT
SAWCUT GROOVE IN SIDE
OF BLOCK TO SUIT HORIZONTAL
REINFORCEMENT N16-200 BW2 N16-200 BW2
LAP TYPICAL
E N16-400 BW1 N16-400 BW1 E
STARTER BARS STARTER BARS
N16 VERTICAL
MINIMUM 20mm THICK SIKA FIRE DRILL STARTER BARS
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:10 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 100 200 300 400 500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
100 50 (1:10 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 TYPICAL DETAILS - SHEET 3 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 3 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422302 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A A
PROVIDE ADDITIONAL N16
BAR IN FIRST CORE AT ALL
OPENINGS & PENETRATIONS
ON ALL SIDES EXTEND 1000
PAST OPENING TYPICAL.
1000 MIN
LINTEL BEAM ZONE
1000
TYPE A
TYPE B
LINTEL BEAM
TYPE B
1000 OPENING 'W'
200
(200 HIGH)
SEE TABLE PROVIDE ADDITIONAL N16
N10 TIES AT 200 CTRS
400
LINTEL BEAM - TYPE A (MAX SPAN 2000) LINTEL BEAM - TYPE B (MAX SPAN 4600) TYPICAL ELEVATION OF OPENING TYPICAL PENETRATION DETAIL
SCALE 1:10 SCALE 1:10 SCALE 1:20 SCALE 1:20
B
E E
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: 1:20, 1:10 CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
0 100 200 300 400 500mm written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
100 50 (1:10 AT A1)
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H 0 200 400 600 800 1000mm
DESIGNED M. MORADI 20.09.22 TYPICAL DETAILS - SHEET 4 H
B SUBSTANTIAL DETAILED DESIGN (SDD) MM 20.09.22 LL 20.09.22 NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
200 100 (1:20 AT A1)
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 4 OF 5 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422303 B 02 -- -
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
300mm THK REINFORCED SLAB DETAIL 180mm THK REINFORCED SLAB DETAIL
C SCALE 1:20 SCALE 1:20 C
NOTE - GROUND WATER IN PASSAGES: NOTE - GROUND WATER IN PASSAGES:
DETAILS APPLICABLE FOR THE EXPECTED CASE OF A DRY PASSAGE FOLLOWING DETAILS APPLICABLE FOR THE EXPECTED CASE OF A DRY PASSAGE FOLLOWING
EXCAVATION. THE PAVEMENT SLABS ARE NOT DESIGNED FOR ANY HEAD OF GROUND EXCAVATION. THE PAVEMENT SLABS ARE NOT DESIGNED FOR ANY HEAD OF GROUND
WATER. WHERE GROUND WATER INGRESS IS ENCOUNTERED OR A HEAD OF GROUND WATER. WHERE GROUND WATER INGRESS IS ENCOUNTERED OR A HEAD OF GROUND
WATER IS EXPECTED, A DRAINAGE SYSTEM SHALL BE INSTALLED. WATER IS EXPECTED, A DRAINAGE SYSTEM SHALL BE INSTALLED.
SCALE 1:10
HOT-DIP GALVANIZED DOWEL TO FLOOR
SLAB
300 MIN
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A A
B B
C C
D D
E E
DRAWING COLOUR CODED - PRINT ALL COPIES IN COLOUR OFFICIAL FOR REVIEW AND COMMENT
This drawing and the related information have been prepared by, or at the request of, Transport for NSW for a specific purpose and may not be used for any
REFERENCES: THIS DRAWING MAY BE PREPARED IN COLOUR AND MAY BE INCOMPLETE IF COPIED. SCALE: - CLIENT: purpose other than the purpose intended by Transport for NSW. BAYSIDE COUNCIL
M6 MOTORWAY
Transport for NSW does not provide any warranties and accepts no liability arising out of the use of this drawing or any of the related information for any
- purpose other than the intended purpose. This drawing is protected by copyright and no part of this drawing may be reproduced in any form without the express
written permission of Transport for NSW.
M6 MOTORWAY - STAGE 1
DRAWN I.GUEVARRA 20.09.22 IN-TUNNEL STRUCTURES - VENTILATION CONNECTIONS
H DESIGNED M. MORADI 20.09.22 DRAWING DELETED H
B DRAWING DELETED NP 20.09.22 PREPARED FOR: DRG CHECK O.THOMPSON 20.09.22
A DEVELOPED CONCEPT DESIGN (DCD) GV 13.04.22 LL 13.04.22 DG 13.04.22
SYDNEY PROJECT DELIVERY DESIGN CHECK A.RAYGANI 20.09.22 DRAWING SET No: DS2022/000350 PART: - SHEET: 1 OF 1 A1
REV DESCRIPTION DESIGNER VERIFIED APPROVED
INFRASTRUCTURE AND PLACE CPB, GHELLA, UGL PROJ/DES MNGR L.LOGANATHAN 20.09.22 STATUS:SUBSTANTIAL DETAILED DESIGN BRIDGE No: - C
INITIAL/DATE INITIAL/DATE INITIAL/DATE
WSP AUSTRALIA DRG No. REV VER EDMS No. AMD No.
TRANSPORT FOR NSW APPROVED N.PAYNTER 20.09.22
COORDINATE SYSTEM: GDA2020/MGA Zone56 HEIGHT DATUM: AHD71 DESIGN LOT CODE: 2203 TUNNEL STRUCTURES M6S1-CGU-ML-TU-DRG-422305 B 02 -- -