HVAC - Equipment Schedule

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL


MACTAN CEBU INTERNATIONAL AIRPORT
LAPU-LAPU CITY
EQUIPMENT SCHEDULE
AIR HANDLING UNITS: RECOMMENDING APPROVAL:

ARCHITECTURAL SECTION DATE

APPROVED:
2

BUILDING OFFICIAL DATE

PRECISION AIR-CONDITIONING UNIT (CHILLED WATER TYPE):

CHILLED WATER FAN COIL UNITS:

FANS AND BLOWERS:


LEGENDS:

DUCT MOUNTED SILENCER:

ELECTROSTATIC PRECIPITATOR SCHEDULE:

2 28NOV18 100% DESIGN DEVELOPMENT MCT

1 19OCT18 100% DESIGN DEVELOPMENT MCT

0 21SEP18 100% DESIGN DEVELOPMENT MCT

SCALE @ A0
PROJECT ARCHITECT: DESIGN CONSULTANT: DESIGN SUB-CONSULTANT: DESIGN PHASE: NAME & SIGNATURE OF ENGINEER PROJECT: GRANTORS: CONCESSIONAIRE: CONTRACTOR: DRAWING TITLE:
DESIGN DEVELOPMENT
Drawn by: Date: 19OCT18
OSCAR V. RELUCIO Department of Transportation MECHANICAL SERVICES
AME
Meinhardt Philippines, Inc. MACTAN - CEBU INTERNATIONAL AIRPORT Mactan Cebu International Airport Authority EQUIPMENT SCHEDULE
BUDJI ROYAL TERMINAL 1- REFURBISHMENT
25th Floor Chatham House 116 Valero cor.
V.A. Rufino St. Salcedo Village, Makati City
Checked by: MCT Date: 19OCT18 P.R.C. NO. 2886 P.T.R. NO. 6619159 SEAL
Republic of the Philipplines DWG NO: REV:
G/F W TOWER, 1117 39th STREET BONIFACIO TRIANGLE, BONIFACIO GLOBAL CITY, TAGUIG 1634 PHILIPPINES Tels. (632) 887-1391 E-mail [email protected] M0-02
TEL: (632) 403 55 02 / 403 55 03 / 403 55 04
E-MAIL: [email protected] / [email protected]
Fax (632) 887-1172 Authorized by: Date: 19OCT18 DATE: 31OCT18 DATE: 05JAN18 T.I.N. 112-191-886

You might also like