0% found this document useful (0 votes)
121 views1 page

HVAC - Schematic - ELEC Control

This document is from the Office of the Building Official at the Mactan Cebu International Airport recommending approval of mechanical services design drawings for a project. It includes 6 diagrams related to chilled water systems, ventilation, and air handling. The diagrams are part of the 100% design development phase. The project architect, design consultant, and sub-consultant are listed. It was drawn and signed by an engineer on October 19, 2018.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views1 page

HVAC - Schematic - ELEC Control

This document is from the Office of the Building Official at the Mactan Cebu International Airport recommending approval of mechanical services design drawings for a project. It includes 6 diagrams related to chilled water systems, ventilation, and air handling. The diagrams are part of the 100% design development phase. The project architect, design consultant, and sub-consultant are listed. It was drawn and signed by an engineer on October 19, 2018.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE BUILDING OFFICIAL


MACTAN CEBU INTERNATIONAL AIRPORT
LAPU-LAPU CITY

RECOMMENDING APPROVAL:

·
·
ARCHITECTURAL SECTION DATE
·

APPROVED:

·
BUILDING OFFICIAL DATE
·

1 2 3
CHILLED WATER PACU (UP-BLAST) CONTROL DIAGRAM CHILLED WATER FAN COIL UNIT CONTROL DIAGRAM KITCHEN VENTILATION CONTROL DIAGRAM

4 5 6
FRESH AIR FAN UNIT CONTROL DIAGRAM TYPICAL EXHAUST FAN CONTROL DIAGRAM AIR HANDLING UNIT CONTROL DIAGRAM

1 19OCT18 100% DESIGN DEVELOPMENT MCT

0 21SEP18 100% DESIGN DEVELOPMENT MCT

SCALE @ A0
PROJECT ARCHITECT: DESIGN CONSULTANT: DESIGN SUB-CONSULTANT: DESIGN PHASE: NAME & SIGNATURE OF ENGINEER PROJECT: GRANTORS: CONCESSIONAIRE: CONTRACTOR: DRAWING TITLE:
DESIGN DEVELOPMENT MECHANICAL SERVICES
Drawn by: Date: 19OCT18
OSCAR V. RELUCIO Department of Transportation
AME
Meinhardt Philippines, Inc. MACTAN - CEBU INTERNATIONAL AIRPORT Mactan Cebu International Airport Authority CONTROL DIAGRAM
BUDJI ROYAL 25th Floor Chatham House 116 Valero cor. Checked by: MCT Date: 19OCT18 P.R.C. NO. 2886 P.T.R. NO. 6619159 SEAL TERMINAL 1- REFURBISHMENT
V.A. Rufino St. Salcedo Village, Makati City Republic of the Philipplines DWG NO: REV:
G/F W TOWER, 1117 39th STREET BONIFACIO TRIANGLE, BONIFACIO GLOBAL CITY, TAGUIG 1634 PHILIPPINES Tels. (632) 887-1391 E-mail [email protected] M3-03
TEL: (632) 403 55 02 / 403 55 03 / 403 55 04
E-MAIL: [email protected] / [email protected]
Fax (632) 887-1172 Authorized by: Date: 19OCT18 DATE: 31OCT18 DATE: 05JAN18 T.I.N. 112-191-886

You might also like