Scope of Services - Servicing Calibration Protection Relay
Scope of Services - Servicing Calibration Protection Relay
Scope of Services - Servicing Calibration Protection Relay
SERVICES : TO CONDUCT SERVICING AND CALIBRATION PROTECTION RELAY ON THE ELECTRICAL EQUIPMENT INSTALLATION.
SCOPE OF SERVICES
1 To supply labour for servicing VCB and ACB HT Consumer, HT Transformer, LV and Genset Room.
i To conduct servicing and test of the following electrical at HT, LV, Transformer and Genset panel c/w test report for submision to the relevent authorities.
iii To check and make good any loose bus-bar and cable terminal connection.
2 To supply labour for Calibration Protection Relay in HT, LV, Genset and Electrical Riser.
i To conduct recalibration test of the following electrical protection equipment c/w test report for submission to the relevent authorities.
ii To conduct stability tests on live and loaded circuits using Computerized Power Quality Analyzer.
iii To check and make good any loose connection on the protection system.
iv To conduct overall functional tripping test on Over Current (OC) and Earth Faulth (EF).
a) HT Consumer Room 11KV - OC & EF relay for 11KV Panel. 5 SETS 0.00
b) HT Transformer Room 11KV - OC & EF relay for 11KV Panel. 6 SETS 0.00
c) Genset Room 500KVA & 100KVA - OC & EF relay for 415V Panel. 2 SETS 0.00
e) LV Room 415V System - Earth Faulty relay for LV Panel. 44 SETS 0.00
f) DCS HT Room 11KV - OC & EF relat for 11KV Panel. 6 SETS 0.00
g) DCS LV Room 415V System - OC & EF relay for LV Panel. 8 SETS 0.00
h) DCS LV Room 415V System - Eartg Faulty relay for LV Panel. 15 SETS 0.00
3 To supply labour for servicing Genset 2,550KW and 85KW at Genset Room.
Sub-Total 0.00
Service Tax 6%