ISO 22716 2017 Checklist
ISO 22716 2017 Checklist
ISO 22716 2017 Checklist
Date: ___________
Note: S = Compliance, CR = Critical non-conformity, MA = Major non-conformity, MI = Minor non-conformity, N/A Not Applicable or no such
activities were performed during Audit
3.1 Persons involved in the implementation of the activities described in these guidelines should have
appropriate training to produce, control and store products with a defined quality.
3.2.1.1 The organizational structure should be defined such that the organization and functioning of the staff of the company be understood.
It should be appropriate for the size of the company and the diversity of its product.
3.2.1.2 Each company should ensure that there are adequate staffing levels in the different scope of activity, according to the diversity of its
production.
3.2.1.3 The organization chart should show the independence, from the other units of the plant, of each quality unit, such as quality
assurance unit and quality
control unit. The quality assurance and quality control responsibilities can be undertaken by a separate quality
assurance unit and a quality control unit, or they can be undertaken by a single unit.
The company should have an adequate number of properly trained personnel with regards to the defined activities in these guidelines.
3.3.1.1 The organization should be supported by the top management of the company.
3.3.1.2 The implementation of the Good
Manufacturing Practices should be the responsibility of top management and should require the participation and commitment of personnel in
all departments and at all levels within the company.
3.3.1.3 Management should define and communicate the areas in which authorized personnel are allowed to
access.
All personnel should:
c) have access to and comply with documents relevant to their particular responsibility scope;
AUDIT CHECKLIST
e) be encouraged to report irregularities or other non-conformities which may occur at the level of their responsibilities;
f) have adequate education training and skills to perform the assigned responsibilities and activities
Personnel involved in production, control, storage and shipment should have skills based on relevant training and experience acquired, or any
combination thereof ,
that are appropriate to their responsibilities and activities.
3.4.2.1 Appropriate Good Manufacturing Practices training relative to the defined activities of these guidelines should be provided for all
personnel.
3.4.2.2 The training needs of all personnel, regardless of level or seniority in the company, should be identified and a corresponding training
program should be developed and implemented.
3.4.2.3 Considering the expertise and experience of the respective personnel, training courses should be tailored to be appropriate to the
jobs and responsibilities of individuals.
3.4.2.4 According to the needs and in-house resources available, training courses may be designed and executed by the company itself or
with the help of expert external organization, if necessary.
3.4.2.5 Training should be regarded as a constant and on-going process that is subject to regular updates.
3.4.3 Newly recruited personnel
Besides basic training on the theory and practice of Good Manufacturing Practices, newly recruited personnel should receive training
appropriate to the duties assigned to them.
3.4.4 Personnel training evaluations
3.5.1.1 Hygiene programs should be established and adapted to the needs of the plant. These requirements should be understood and
followed by every person
whose activities take them into production, control and storage areas
3.5.1.2 Personnel should be instructed to use hand washing facilities.
AUDIT CHECKLIST
3.5.1.3 Every person entering production, control and storage areas should wear appropriate clothing and
protective garments to avoid contamination of cosmetic product.
3.5.1.4 Eating, drinking, chewing, smoking or the storage of food, drink or smoking materials or personal medication in the production,
control and storage areas should be avoided.
3.5.1.5 Any unhygienic practice within the production, control and storage areas or in any other area where the product might be adversely
affected should be forbidden.
3.5.2 Personnel health
Steps should be taken to ensure, as far as is practicable, that any person affected by an apparent illness or having open lesions on the exposed
body surface should be
excluded from direct contact with product until the condition is corrected or determined by medical personnel that the quality of cosmetic
products will not
be compromised.
3.6 Visitors and untrained personnel
Visitors or untrained personnel should preferably not be taken into production, control and storage areas, If this is
unavoidable, they should be given information in advance, particularly about personnel hygiene and the prescribed protective clothing. They
should be closely
supervised.
4.1.1 Premises should be located, designed, constructed and utilized so as:
c)to minimize the risk of mix-up of products, raw materials and packing materials.
4.1.2 Premises design recommendations are described in these guidelines. Design decisions should be based on the type of cosmetic product
produced, existing conditions, cleaning and, if necessary, sanitizing measures used.
Separate or defined areas should be provided for storage, production, quality control, ancillary, washing and toilets.
AUDIT CHECKLIST
Sufficient space should be provided to facilitate operations such as receipt, storage and production.
Flow of materials, products and personnel through the building or buildings should be defined in order to prevent mix-ups
4.5.1 Floors, walls, ceilings and windows in production areas should be designed or constructed for ease of cleaning and, if necessary,
sanitization and be kept clean
and in good repair.
4.5.2 Windows should be of non-opening design where ventilation is adequate. If windows are opened to the outside environment, they
should be properly screened.
4.5.3 New construction of production areas should incorporate considerations for proper cleaning and maintenance. Design of new
construction should include
smooth surface if appropriate and these surfaces should allow for resistance to corrosive cleaning and sanitizing agents.
Adequate, clean, washing and toilet facilities should be provided for personnel. The washing and toilet facilities should be differentiated from,
but accessible to,
production areas. Adequate facilities for showering and changing clothes should be provided when appropriate.
should allow for resistance to corrosive cleaning and sanitizing agents.
4.7.1 Adequate lighting, that is sufficient for operations, should be installed in all areas.
4.7.2 Lighting should be installed in a manner to ensure containment of any debris from potential breakage. Alternatively, measures should be
taken to protect the product.
4.8 Ventilation should be sufficient for the intended production operations. Alternatively, specific measures should be taken to protect the
product.
4.9.1 Pipework, drains and ducts should be installed in such a manner so that drip or condensation does not contaminate materials, products,
surfaces and equipment.
4.9.2 Drains should be kept clean and should not allow back flow.
4.9.3 Design considerations should be given to the following:
b) exposed pipes should not touch walls, but be suspended from or supported by brackets, sufficiently separated to allow thorough cleaning;
4.10.2 Cleaning and, if necessary, sanitization should be carried out to achieve the objective of protecting
each product.
4.10.3 Cleaning and, if necessary, sanitizing agents to be used should be specified and effective.
4.10.4 There should be cleaning and, if necessary, sanitization programs corresponding to specific needs
of each area.
Premises used in activities described in these guidelines should be maintained in a good state of repair.
4.12 Consumables
Consumables used for premises should not affect the quality of the product.
4.13 Pest control
4.13.1 Premises should be designed, constructed and maintained so as to restrict access to insects, birds,
rodents, pests and other vermin.
4.13.2 There should be a pest control program appropriate for the premises.
4.13.3 Measures should be taken to control the exterior of the premises to prevent attracting or harboring
pests.
5.2.1 Production equipment should be designed to prevent contamination of the product.
5.2.2 Bulk product containers should be protected from air contaminants, such as dust and moisture.
5.2.3 Transfer hoses and accessories that are not in use should be cleaned and, if necessary sanitized, kept dry and protected from dust, splash
or other contamination.
5.2.4 The material used in the construction of equipment should be compatible with products and the
cleaning and sanitizing agents.
5.3.1 The design and the installation of equipment should ease its drainage in order to facilitate cleaning
and sanitization.
5.3.2 Equipment should be placed so that movement of materials, mobile equipment and personnel do not
pose a risk to quality.
5.3.3 Reasonable access under, inside and around equipment should be provided for maintenance and
cleaning.
5.3.4 Major equipment should be readily identifiable.
5.4.1 Laboratory and production measuring instruments that are important for the quality of the product,
should be calibrated regularly.
5.4.2 If results of calibration are out-of-acceptance criteria, measuring instruments should be appropriately
AUDIT CHECKLIST
b) name of the product as given by the company, if different from the name given by the supplier and/or its
code number;
d) supplier’s name;
e) batch reference given by the supplier and the one given at receipt, if different.
6.5.1 Physical or alternative systems should be set up to ensure that only released raw materials and packaging materials are used.
6.5.2 The release of materials should be carried out by the authorized personnel responsible for quality.
6.5.3 Raw materials and packaging materials can be accepted on the basis of the supplier certificate of analysis only if there are established
technical requirements, experience and knowledge of the supplier, supplier audit and agreed supplier’s test methods.
6.6.1 Storage conditions should be appropriate for each raw material and packaging material.
6.6.2 Raw materials and packaging materials should be stored and handled in a manner appropriate to their characteristics.
6.6.3 Specific storage conditions should be respected and monitored, where appropriate.
6.6.4 Containers of raw materials and packaging materials should be closed and should be stored off the floor.
6.6.5 When raw materials and packaging materials are repacked, they should carry the same labelling as at origin.
6.6.6 When raw materials and packaging materials are quarantined or rejected, they should be stored in their respective physical locations or
by using any other system providing the same level of assurance.
6.6.7 Measures should be set up to ensure stock turnover. Except in special circumstances, stock rotation should ensure that the oldest
released stock is used first.
6.6.8 Periodic inventory should be performed to ensure stock reliability. Any significant discrepancy should be investigated and corrective
action taken.
A system should be set up to re-evaluate materials as appropriate to determining their suitability for use, after a defined period of storage. The
system should be set up so as to prevent the use of materials which require
re-evaluation.
6.8.1 The water treatment system should supply a defined quality of water.
AUDIT CHECKLIST
6.8.2 Water quality should be verified by either testing or monitoring of process parameters.
6.8.3 The water treatment system should permit sanitization.
6.8.4 Water treatment equipment should be set up so as to avoid stagnation and risks of contamination.
6.8.5 Materials used in water treatment equipment should be selected to ensure that water quality is not affected.
At each stage of manufacturing operations and packaging operations, measures should be taken to produce a
finished product that meets the defined characteristics.
7.2.1.1 Relevant documentation should be available at each stage of manufacturing operations.
7.2.1.2 Manufacturing operations should be carried out according to manufacturing documentation, including:
a) suitable equipment;
b) all raw materials are available and released;
c) suitable equipment is available for use, in working order, cleaned and, if necessary, sanitized;
d) clearance of the area has been performed to avoid mixing with materials from previous operations.
A batch number should be assigned to each batch of manufactured bulk product. This number does not need to be identical with the batch
number that appears on the label of the finished product, but, if not, it should be easy to relate to that number.
7.2.4.1 In accordance with the formula, all raw materials should be measured or weighed, into clean and suitable containers labelled with
appropriate identification or directly into the equipment used for manufacturing.
7.2.4.2 At all times, it should be possible to identify major equipment, containers of raw materials and containers of bulk products.
7.2.4.3 Identification of containers of bulk products should indicate:
b) batch number;
7.2.6.3 When this duration is reached, the bulk product should be re-evaluated before use.
If raw materials remain unused after weighing and are intended and deemed acceptable to return to stock, their containers should be closed
and properly identified.
7.3.1.1 Relevant documentation should be available at each stage of packaging operations.
7.3.1.2 Packaging operations should be carried out according to packaging documentation including:
a) suitable equipment;
b) list of packaging materials defined for the intended finished product;
c) detailed packaging operations such as filling, closing, labelling, and coding.
Before starting any packaging operation, it should be ensured that:
a) the area has been cleared of materials to avoid mixing with materials from previous operations;
b) all documentation relevant to the packaging operations, is available;
c) all packaging materials are available;
d) suitable equipment is available for use, in working order, cleaned and, if necessary, sanitized;
e) any coding to permit identification of the product is defined.
7.3.3.1 A batch number should be assigned to each unit of finished product.
7.3.3.2 This number does not need to be identical with the batch number that appears on the label of the bulk product, but, if not, it should be
easy to relate to that number.
At all times, it should be possible to identify the packaging line with its name or identifying code, the name or
identifying code of the finished product and the batch number.
If used, on-line control equipment should be regularly checked according to a defined programme.
7.3.6.1 In-process controls and their acceptance criteria should be defined.
7.3.6.2 In-process controls should be performed according to a defined programme.
7.3.6.3 Any result that is outside the acceptance criteria should be reported and appropriately investigated.
If packaging materials remain unused after packaging operations and are intended and deemed acceptable to return to stock, their containers
should be closed and properly identified.
7.3.8 Identification and handling of work-in-process Filling and labelling is usually a continuous process. Where this is not the case, special
measures including
segregation and identification should be applied so that no mix-ups or mislabeling can occur.
Finished products should meet the defined acceptance criteria.
AUDIT CHECKLIST
Storage, shipment and returns should be managed in a manner so as to maintain the quality of finished products.
8.2.1 Prior to being placed on the market, all finished products should be controlled in accordance with established test methods and should
comply with acceptance criteria.
8.2.2 Product release should be carried out by the authorized personnel responsible for quality.
8.3.1 Finished products should be stored in defined areas under appropriate conditions for an appropriate length of time. If necessary, finished
products should be monitored while stored.
8.3.2 Storage areas should permit organized storage.
8.3.3 When finished products are released, quarantined or rejected, they should be stored in their respective physical locations or by using any
other system providing the same level of assurance.
8.3.4 Identification of finished product containers should indicate:
a) name or identifying code;
b) batch number;
c) storage conditions when such information is critical to assure the quality of the product;
d) quantity.
8.3.5 Measures should be set up to ensure stock turnover.
Except in special circumstances, stock rotation should ensure that the oldest released stock is used first.
8.3.6 Periodic inventory checks should be performed to:
a) ensure inventory accuracy;
b) ensure that acceptance criteria are met.
Any significant discrepancy should be investigated.
Measures should be taken to ensure the shipment of the defined finished product.
Precautions should be taken to maintain the finished product quality, when appropriate.
8.5.1 Returns should be identified in an appropriate way and stored in defined areas.
8.5.2 Returns need to be evaluated against established criteria to determine their disposition.
8.5.3 Release should be given before placing returns on the market again.
8.5.4 Measures should be established to distinguish any reprocessed return. Measures should be taken to avoid the inadvertent redistribution
of unreleased finished product.
9.1.1 Principles described for personnel, premises, equipment, subcontracting, and documentation should apply to the quality control
laboratory.
AUDIT CHECKLIST
9.1.2 The quality control laboratory is responsible for ensuring that the necessary and relevant controls, within its activity, are carried out for
sampling and testing so that materials are released for use and products are released for shipment, only if their quality fulfils the required
acceptance criteria.
9.2.1 The quality control laboratory should use all test methods necessary to confirm that the product complies with acceptance criteria.
9.2.2 Controls should be performed on the basis of defined, appropriate and available test methods.
Acceptance criteria should be established to specify the requirements to be met for raw materials, packaging materials, bulk products and
finished products.
All results should be reviewed. After this review, a decision should be made, notably in terms of approval, rejection or pending.
9.5.1 Out-of-specification results should be reviewed by authorized personnel and properly investigated.
9.5.2 There should be sufficient justification for any re-testing to be performed.
9.5.3 After the investigation, a decision by authorized personnel should be made, notably in terms of deviation, rejection or pending.
Reagents, solutions, reference standards, culture media, etc. should be identified by the following information:
a) the name;
b) its strength or concentration, when appropriate;
c) expiration date, when appropriate;
d) the name and/or signature of the person who prepared it, when appropriate;
e) opening date;
f) storage conditions, when appropriate.
9.7.1 Sampling should be performed by authorized personnel.
9.7.2 Sampling should be defined in terms of:
a) sampling method;
b) equipment to be used;
c) amounts to be taken;
d)any precautions to be observed to avoid contamination or deterioration;
e) identification of sample;
f) frequency.
9.7.3 Samples should be identified by:
AUDIT CHECKLIST
a) manufacturing;
b) packaging;
c) analysis;
d) cleaning, sanitization of premises;
e) pest control;
f) equipment and premises maintenance.
12.3.1 The contract giver should assess the contract acceptor's ability and capacity to carry out the contracted operations. Further, the
contract giver should ensure that the contract acceptor has all the means available to carry out the contract. The contract giver should assess
the contract acceptor’s ability to comply
with these guidelines, as appropriate, and to ensure the operations can be performed as agreed.
12.3.2 The contract giver should provide the contract acceptor with all the information required to carry out the operations correctly.
12.4.1 The contract acceptor should ensure that they have the means, experience and competent personnel to meet the contract
requirements.
12.4.2 The contract acceptor should not pass to a third party any of the work entrusted to them in the contract without the contractor giver’s
prior approval and consent. Arrangements should be made between the third party and the contract acceptor to ensure that all information
about operations is made available to the
contract giver in the same way as in the original contract.
12.4.3 The contract acceptor should facilitate any checks and audits that the contract giver has defined in the contract.
12.4.4 The contract acceptor should inform the contract giver of any changes that may affect the quality of the services or products provided
prior to implementation unless otherwise specified in the contract.
12.5.1 A contract or agreement should be drawn up between the contract giver and the contract acceptor which specifies their respective
duties and responsibilities.
12.5.2 All data should be kept or made available to the contract giver.
13.1 Deviations from the specified requirements should be authorized with sufficient data to support the decision.
13.2 Corrective action should be made to prevent recurrence of the deviation.
14.1.1 All complaints that fall within the scope of these guidelines and are communicated to the plant should be reviewed, investigated and
followed-up on, as appropriate.
14.1.2 When a product recall decision is made, appropriate steps should be taken to complete the recall within the scope of these guidelines
and to implement corrective action.
14.1.3 In the case of contracted operations, the contract giver and acceptor should agree on the process for
AUDIT CHECKLIST