7m.span Slab
7m.span Slab
7m.span Slab
1
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
z in Eq. 9.15 = 30000 N/mm (AASHTO 2004,Art. 5.7.3.4.-2 for moderate exposure)
2
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
Weight of wearing surface ws= 1.1 " 0.25 1.85 20.683 57.3953
========= 0.3 2.22 16.5464 64.2828
Total DL= 11.18 KN/m2 0.35 2.59 12.4098 69.6397
0.4 2.96 8.2732 73.466
0.404 2.99 7.94898 73.7012
0.45 3.33 4.1366 75.7618
0.5 3.70 0 76.5271
2.5. Live load moments:
point of maximum live load moment= (S/2-0.711)/S 0.404 Se
Distribution of live load laterally: (see section 12-8 Eq. 12.40)
The equivalent width of longitudinal strips per lane for both shear and moment with one lane, I.e., two lines of wheels, loaded may be determined as:
E1 = 250+0.42sqrt(L1W1) L1 = 7400 mm = 7.40 m
= 3658.5 mm/lane load W1 = 8900.0 mm
The equivalent width of longitudinal strips per lane for both shear and moment with more than one lane loaded may be determined as:
E2 = 2100+0.12sqrt(L1W1)<=W/NL L1 = 7400 mm
= 3074 mm/lane load W1 = 8900.0 mm
E= 3.074 m
Impact factor I = 1+IM/100 Where IM = 33 % (for Servicibility limit state design) = 1.33 Tab.3-8
a) HS20-44
3
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
7.40
Case -1 Moment and shear at rear wheel position ( truck moving to the right )
a) HS20-44 Loading
p P P/4
4.3 4.3
X=a*s
A B
X1
X2
X3
4
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
a x x1 x2 x3 VA VA(KN) Mo Mo(KN/m)
0 0 0.00 3.100 7.4 1.42 89.02 0.000 0.00
0.05 0.37 0.00 2.730 7.03 1.32 82.75 0.488 30.62
0.1 0.74 0.00 2.360 6.66 1.22 76.47 0.902 56.59
0.15 1.11 0.00 1.990 6.29 1.12 70.20 1.242 77.92
0.2 1.48 0.00 1.620 5.92 1.02 63.93 1.508 94.61
0.25 1.85 0.00 1.250 5.55 0.92 57.65 1.700 106.66
0.3 2.22 0.00 0.880 5.18 0.82 51.38 1.818 114.06
0.35 2.59 0.00 0.510 4.81 0.72 45.10 1.862 116.82
0.4 2.96 0.00 0.140 4.44 0.62 38.83 1.832 114.94
0.404 2.989 0.00 0.111 4.411 0.61 38.34 1.827 114.59
0.45 3.33 0.00 0.000 4.07 0.55 34.51 1.832 114.91
0.5 3.7 0.00 0.000 3.7 0.50 31.37 1.850 116.07
case -2 Moment and shear at middle wheel position ( truck moving to the left )
P/4 P P
4.3 4.3
A B
X=a*s X1
X2
X3
5
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
a x x1 x2 x3 rA RA VA VA(KN) Mo Mo(KN/m)
0 0 3.100 7.40 0 1.419 89.021 1.419 89.021 0.000 0.000
0.05 0.37 2.730 7.03 0 1.319 82.748 1.319 82.748 0.488 30.617
0.1 0.74 2.360 6.66 0 1.219 76.474 1.219 76.474 0.902 56.590
0.15 1.11 1.990 6.29 0 1.119 70.200 1.119 70.200 1.242 77.922
0.2 1.48 1.620 5.92 0 1.019 63.926 1.019 63.926 1.508 94.610
0.25 1.85 1.250 5.55 0 0.919 57.652 0.919 57.652 1.700 106.656
0.3 2.22 0.880 5.18 0 0.819 51.378 0.819 51.378 1.818 114.059
0.35 2.59 0.510 4.81 0 0.719 45.104 0.719 45.104 1.862 116.820
0.4 2.96 0.140 4.44 0 0.619 38.830 0.619 38.830 1.832 114.938
0.404 2.989 0.111 4.41 0 0.611 38.339 0.611 38.339 1.827 114.594
0.45 3.33 0.000 4.07 0 0.550 34.506 0.550 34.506 1.832 114.906
0.5 3.7 0.000 3.70 0 0.500 31.369 0.500 31.369 1.850 116.067
6
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
Summary of maximum live load shear and moments at different points Lane load moments at different points
a x [m] VA [KN/m] Mo[KNm/m]
Mo [KNm] Mo [KNm]
VA [KN] VA [KN] Design
(HS20-44) DESIGN
x (HS20-44) (Tandem) Mo
a + (Tandem) VA
[m] + +
+ [KN/m]
[KNm/m
Lane
Lane
Lane
Lane
] 0.00 0.00 11.1944 0
0.00 0.00 100.22 0.00 98.67 0.00 100.22 0.00 0.05 0.37 10.075 3.935
0.05 0.37 92.82 34.55 92.79 34.54 92.82 34.55 0.10 0.74 8.95554 7.455
0.10 0.74 85.43 64.05 86.91 65.14 86.91 65.14 0.15 1.11 7.8361 10.562
0.15 1.11 78.04 88.48 81.03 91.81 81.03 91.81 0.20 1.48 6.71666 13.254
0.20 1.48 70.64 107.86 75.15 114.54 75.15 114.54 0.25 1.85 5.59722 15.532
0.25 1.85 63.25 122.19 69.27 133.33 69.27 133.33 0.30 2.22 4.47777 17.396
0.30 2.22 55.86 131.46 63.39 148.19 63.39 148.19 0.35 2.59 3.35833 18.846
0.35 2.59 48.46 135.67 14.94 103.97 48.46 135.67 0.40 2.96 2.23889 19.881
0.40 2.96 41.07 134.82 51.63 166.09 51.63 166.09 0.404 2.99 2.15115 19.945
0.404 3.33 40.49 134.54 51.17 166.47 51.17 166.47 0.450 3.33 1.11944 20.503
0.450 3.33 39.46 135.41 45.76 169.14 45.76 169.14 0.50 3.70 0 20.710
0.50 3.70 34.51 136.78 39.88 168.25 39.88 168.25
7
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
8
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
d= 367.57 ok
9
GELEGO-GUBA ROAD PROJECT SUPERSTRUCTURE ANNEXURE 1-1
500
400
300
200
100
0
00 37 .74(Half
11 .48 .85 .22 .59 .96 .33 .37 .70
0. 0. X (m)
0 1. Span)
1 1 2 2 2 3 3 3
Moment(KN-M/M)
Shear(KN) 10
0
00 37 .74(Half
11 .48 .85 .22 .59 .96 .33 .37 .70
0. 0. X (m)
0 1. Span)
1 GELEGO-GUBA
1 2 2 2 ROAD
3 3PROJECT
3 SUPERSTRUCTURE ANNEXURE 1-1
Moment(KN-M/M)
Shear(KN)
ESTIMATED QUANTITIES
ITEM No DESCRIPTION UNIT QUANTITY
GRADE 30 CONCRETE m3 31.29
REINFORCEMENT STEEL Kg 2371
11
1. SUPERSTRUCTURES
1.1 CONCRETE
GRADE 20 25 30 35
Total
Length/ Total Length/ Length/ Total Length/ T.
Depth Width Depth Width Volume Depth Width Depth Width
T. Span Volume T. Span T. Span Volume Span
(m3)
Str. Type (m3) (m3)
1.2 REINFORCEMENT
Dia. 12 16 20 24
Total Total Total Total
Total Total Total
Length Length Weight Length Length Weight Total Length Weight Length
Bar. Type No. (m) (m) (Kg) No. (m) (m) (Kg) No. Length (m) (Kg) No. length (m)
1 S
2 S1
3 S2 25 8.52 213.00 336.23
4 S3 19 7.72 146.68 130.24
5 S4 20 7.60 152.00 134.97
6 C-1 40 2.69 107.51 95.46
7 C-2 8 7.72 61.76 54.84
415.50 336.23 0.00
Total Weight
(Kg)
2370.98
2. SUBSTRUCTURES
35
Total
Volume
(m3)
0.00
24 28 30 32
Total Total
Total Total Total Total Total
Weight Length Weight Length Weight Length Weight
(Kg) No. length (m) (Kg) No. length (m) (Kg) No. length (m) (Kg)
22 8.54 187.95 908.605
21 7.00 147.00 710.639
0.00 1619.24 0.00 0.00