OVERHEAD LINES
SECTION 17: CABLE TO OHL RISER SDCS-01-17 REV.01
INSTALLATION STRUCTURE
SDCS-01-17
REV.01
This document contains proprietary information developed by and for exclusive use of Saudi Electricity
Company (SEC) Distribution Network. Your acceptance of the document is an acknowledgment that it
must be used for the identified purpose/application and during the period indicated. It cannot be used or
copied for any other purposes nor released to others without prior written authorization of SEC
Distribution Services Sector. SEC shall assume no responsibility for any type of misuse and/or
misapplication, and any harm resulting there from. SEC also reserves the right to take any necessary
actions to protect its interest against unauthorized use.
DRW 17-01 OC13S, FOR 13.8KV 13M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 2 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
SERIAL
QTY BILLS OF MATERIALS DESCRIPTION REFERENCES
NO.
DRW.17-01A OC13S, FOR 13.8 KV, 13M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 3 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
DRW 17-01 OC13S, FOR 33KV 13M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 4 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
SERIAL
QTY BILLS OF MATERIALS DESCRIPTION REFERENCES
NO.
DRW.17-01B OC13S, FOR 33 KV, 13M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 5 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
DRW 17-02 OC14S, FOR 13.8KV 14M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 6 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
SERIAL
QTY BILLS OF MATERIALS DESCRIPTION REFERENCES
NO.
DRW.17-02A OC14S, FOR 13.8 KV, 14M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 7 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
DRW 17-02 OC14S, FOR 33KV 14M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 8 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
SERIAL
QTY BILLS OF MATERIALS DESCRIPTION REFERENCES
NO.
DRW.17-02B OC14S, FOR 33 KV, 14M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 9 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
DRW 17-03 OC15S, FOR 13.8KV 15M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 10 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
SERIAL
QTY BILLS OF MATERIALS DESCRIPTION REFERENCES
NO.
DRW.17-03A OC15S, FOR 13.8 KV, 15M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 11 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
DRW 17-03 OC15S, FOR 33KV 15M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 12 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
SERIAL
QTY BILLS OF MATERIALS DESCRIPTION REFERENCES
NO.
DRW.17-03B OC15S, FOR 33 KV, 15M, CABLE RISER, TERMINAL STRUCTURE WITH STAYS
Page 13 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
Page 14 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
SERIAL
QTY BILLS OF MATERIALS DESCRIPTION REFERENCES
NO.
DRW.17-04A OC13S, FOR 13.8 KV, 13M, CABLE RISER TO MAINLINE STRUCTURE
Page 15 of 16
CONSTRUCTION STANDARD FOR OVERHEAD LINES SDCS-01-17 REV.01
SECTION 17 : CABLE TO OVERHEAD LINE RISER
INSTALLATION STRUCTURE DATED: 07 - 2019
SERIAL
QTY BILLS OF MATERIALS DESCRIPTION REFERENCES
NO.
Page 16 of 16