0% found this document useful (0 votes)
77 views9 pages

Dnssec Requirements 102909

The document outlines testing and implementation requirements for deploying DNSSEC in the authoritative root zone by the end of 2009. It proposes initially overlaying the deployment on the existing root zone management process between ICANN, Verisign, and the Department of Commerce. Key requirements include: 1) Each partner must have security policies and procedures that are regularly reviewed and updated, including incident response and contingency plans. 2) Strict access controls and authentication are required for all key management functions. 3) All personnel must have security training. 4) Comprehensive auditing, accountability, and reporting policies and procedures are needed.

Uploaded by

said salmas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views9 pages

Dnssec Requirements 102909

The document outlines testing and implementation requirements for deploying DNSSEC in the authoritative root zone by the end of 2009. It proposes initially overlaying the deployment on the existing root zone management process between ICANN, Verisign, and the Department of Commerce. Key requirements include: 1) Each partner must have security policies and procedures that are regularly reviewed and updated, including incident response and contingency plans. 2) Strict access controls and authentication are required for all key management functions. 3) All personnel must have security training. 4) Comprehensive auditing, accountability, and reporting policies and procedures are needed.

Uploaded by

said salmas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

October 29, 2009

Testing and Implementation Requirements


for the Initial Deployment of DNSSEC in the Authoritative Root Zone

Introduction and Baseline Architecture

In recognition of the pressing need for enhanced security for the Internet domain name and
addressing system, the Department would like to move forward with its root zone management
partners in testing and implementing DNSSEC at the authoritative root zone level, with the goal
of a signed root by year-end 2009. To facilitate an accelerated deployment in a secure manner,
the Department proposes initially to overlay the deployment process on the existing root zone
management process, thereby minimizing the introduction of new steps and changes of
responsibilities among the involved parties.1 The Department envisions the process to include
ICANN, the IANA Functions Operator, receiving and processing TLD DNSSEC public key
information updates as well as publicly distributing the Root Zone public key; VeriSign, the
Root Zone Maintainer, signing the root zone file data and holding the Zone Signing Key (ZSK).
Detailed Key Signing Key (KSK) and Zone Signing Key (ZSK) management plans will be
jointly developed by ICANN and VeriSign in consultation with the Department.

Meeting this goal will require cooperation and collaboration between the current root zone
management partners and the Department, specifically ICANN and VeriSign committing to
jointly develop detailed DNSSEC design, testing and implementation plans for the Department
to review. The Department sees this arrangement as an interim approach to meet a pressing need
with the recognition that advancements in technology and process and/or procedure related to
DNSSEC may necessitate change in the future.

General Requirements

The Root Zone system needs an overall security lifecycle, such as that described in ISO 27001,
and any security policy for DNSSEC implementation should be validated against existing
standards for security controls.

The remainder of this section highlights security requirements that should be considered in
developing any solution. ISO 27002:2005 (formerly ISO 17799:2005) and NIST SP 800-53 are
recognized sources for specific controls. Note that reference to SP 800-53 is used as a
convenient means of specifying a set of technical security requirements.2 It is expected that the
systems referenced in this document would meet all the SP 800-53 technical security controls
1
The Department’s current agreements with ICANN (IANA Functions Operator) and VeriSign (Root Zone
Maintainer) set forth the root zone management process as: (1) TLD operator submits change request to the
IANA Functions Operator; (2) the IANA Functions Operator processes the request; (3) the IANA Functions
Operator sends a request to the Department (Administrator) for verification/authorization; (4) the
Administrator sends verification/authorization to the Root Zone Maintainer to make the change; (5) the Root
Zone Maintainer edits and generates the new root zone file; and (6) the Root Zone Maintainer distributes the
new root zone file to the 13 root server operators.
2
Note in particular that the use of the requirements in SP 800-53 does not imply that these systems are subject
to other Federal Information Security Management Act (FISMA) processes.

1
October 29, 2009

required by a HIGH IMPACT system.3

Whenever possible, references to NIST publications are given as a source for further
information. These Special Publications (SP) and FIPS documents are not intended as a future
auditing checklist, but as non-binding guidelines and recommendations to establish a viable IT
security policy. ICANN and VeriSign may choose to substitute comparable security
standards where available and appropriate. All of the NIST document references can be
found on the NIST Computer Security Research Center webpage (http://www.csrc.nist.gov/).

1) Security Authorization and Management Policy

a) Each partner4 in the Root Zone Signing process shall have a security policy in place; this
security policy should be periodically reviewed and updated, as appropriate.

i) Supplemental guidance on generating a Security Authorization Policy may be found


in NIST SP 800-37.

b) These policies shall have a contingency plan component to account for disaster recovery
(both man-made and natural disasters).

i) Supplemental guidance on contingency planning may be found in SP 800-34.

c) These policies shall address Incident Response detection, handling and reporting (see 4
below).

i) Supplemental guidance on incident response handling may be found in NIST SP 800-


61.

2) IT Access Control

a) There shall be an IT access control policy in place for each of the key management
functions and it shall be enforced.

i) This includes both access to hardware/software components and storage media as


well as ability to perform process operations.
ii) Supplemental guidance on access control policies may be found in NIST SP 800-12.

b) Users without authentication shall not perform any action in key management.

c) In the absence of a compelling operational requirement, remote access to any


cryptographic component in the system (e.g. HSM) is not permitted.5
3
For the purpose of identifying SP 800-53 security requirements, the Root Zone system can be considered a
HIGH IMPACT system with regards to integrity and availability as defined in FIPS 199.
4
For this document, the roles in the Root Zone Signing process are those associated with the Key Signing Key
holder, the Zone Signing Key holder, Public Key Distributor, and others to be conducted by the IANA
Functions Operator and the Root Zone Maintainer.
5
Remote access is any access where a user or information system communicates through a non-organization

2
October 29, 2009

3) Security Training

a) All personnel participating in the Root Zone Signing process shall have adequate IT
security training.

i) Supplemental guidance on establishing a security awareness training program may be


found in NIST SP 800-50.

4) Audit and Accountability Procedures

a) The organization associated with each role shall develop, disseminate, and periodically
review/update: (1) a formal, documented, audit and accountability policy that addresses
purpose, scope, roles, responsibilities, management commitment, coordination among
organizational entities, and compliance; and (2) formal, documented procedures to
facilitate the implementation of the audit and accountability policy and associated audit
and accountability controls.

i) Supplemental guidance on auditing and accountability policies may be found in


NIST SP 800-12.
ii) Specific auditing events include the following:
o Generation of keys
o Generation of signatures
o Exporting of public key material
o Receipt and validation of public key material (i.e., from the ZSK holder or from
TLDs)
o System configuration changes
o Maintenance and/or system updates
o Incident response handling
o Other events as appropriate

b) Incident handling for physical and exceptional cyber attacks6 shall include reporting to
the Department’s National Telecommunications and Information Administration (NTIA)
in a timeframe and format as mutually agreed by the Department, ICANN, and VeriSign.

c) The auditing procedures shall include monthly reporting to NTIA.

d) The auditing system shall be capable of producing reports on an ad-hoc basis.

e) A version of these reports should be made publically available.

5) Physical Protection Requirements

a) There shall be physical access controls in place to only allow access to hardware
components and media to authorized personnel.

controlled network (e.g., the Internet).


6
Non-exceptional events are to be included in monthly reporting as required in 4 c.

3
October 29, 2009

i) Supplemental guidance on token based access may be found in NIST SP 800-73 and
FIPS 201.
ii) Supplemental guidance on token based access biometric controls may be found in
NIST SP 800-76.

b) Physical access shall be monitored, logged, and registered for all users and visitors.

c) All hardware components used to store keying material or generate signatures shall have
short-term backup emergency power connections in case of site power outage. (See, SP
800-53r3)

d) All organizations shall have appropriate protection measures in place to prevent physical
damage to facilities as appropriate.

6) All Components

a) All commercial off the shelf hardware and software components should have an
established maintenance and update procedure in place.

i) Supplemental guidance on establishing an upgrading policy for an organization may


be found in NIST SP 800-40.

b) All hardware and software components provide a means to detect and protect against
unauthorized modifications/updates/patching.

Role Specific Requirements

7) Root Zone Key Signing Key (KSK) Holder

The Root Zone KSK Holder (RZ KSK) is responsible for (1) generating and protecting the
private component of the RZ KSK(s); (2) securely exporting or importing any public key
components, should this be required (3) authenticating and validating the public portion of the
RZ Zone Signing Key (RZ ZSK); and (4) signing the Root Zone’s DNSKEY record (ZSK/KSK).

a) Cryptographic Requirements

i) The RZ KSK key pair shall be an RSA key pair, with a modulus of at least 2048 bits.
ii) RSA key generation shall meet the requirements specified in FIPS 186-3.7 In
particular, key pair generation shall meet the FIPS 186-3 requirements for exponent
size and primality testing.
iii) The RZ KSK private key(s) shall be generated and stored on a FIPS 140-2 validated
hardware cryptographic module (HSM)8, validated at Level 4 overall.9
7
Note that FIPS 186-3 and FIPS 140-2 are referenced as requirements in sections a and b, rather than
supplemental guidance.
8
FIPS 140 defines hardware cryptographic modules, but this specification will use the more common HSM

4
October 29, 2009

iv) RZ KSK Digital Signatures shall be generated using SHA-1 or SHA-256. 10


v) All cryptographic functions involving the private component of the KSK shall be
performed within the HSM; that is, the private component shall only be exported
from the HSM with the appropriate controls (FIPS 140-2) for purposes of key backup.

b) Multi-Party Control

At least two persons shall be required to activate or access any cryptographic module that
contains the complete RZ KSK private signing key.

i) The RZ KSK private key(s) shall be backed up and stored under at least two-person
control. Backup copies shall be stored on FIPS 140-2 compliant HSM, validated at
Level 4 overall, or shall be generated using m of n threshold scheme and distributed
to organizationally separate parties.
ii) Backup copies stored on HSMs shall be maintained in different physical locations11,
with physical and procedural controls commensurate to that of the operational system.
iii) In the case of threshold secret sharing, key shares shall be physically secured by each
of the parties.
iv) In all cases, the names of the parties participating in multi-person control shall be
maintained on a list that shall be made available for inspection during compliance
audits.

c) Root Zone KSK Rollover

i) Scheduled rollover of the RZ KSK shall be performed.12 (See Contingency planning


for unscheduled rollover.)
ii) RZ KSK rollover procedures shall take into consideration the potential future need for
algorithm rollover.
iii) DNSSEC users shall be able to authenticate the source and integrity of the new RZ
KSK using the previously trusted RZ KSK’s public key.

d) Contingency Planning

i) Procedures for recovering from primary physical facility failures (e.g., fire or flood
that renders the primary site inoperable) shall be designed to reconstitute capabilities
within 48 hours.
ii) Procedures for emergency rollover of the RZ KSK shall be designed to achieve key
rollover and publication within 48 hours. These procedures, which are understood to

(for hardware security module) as the abbreviation.


9
Note that FIPS 186-3 and FIPS 140-2 are referenced as requirements in sections a and b, rather than
supplemental guidance.
10
Utilization of the SHA-2 family is expected once technically feasible / widely available.
11
Backup locations are to be within the United States.
12
The Department envisions the timeline for scheduled rollover of the RZ KSK to be jointly developed and
proposed by ICANN and VeriSign, based on consultation and input from the affected parties (e.g. root server
operators, large-scale resolver operators, etc). Note that subsequent test plans may specify more or less
frequent RZ KSK rollover to ensure adequate testing.

5
October 29, 2009

address DNSSEC key provision only, should accommodate the following scenarios:
(1) The current RZ KSK has been compromised; and
(2) The current RZ KSK is unavailable, but is not believed to be compromised.

e) DNS Record Generation/Supporting RZ ZSK rollover

i) The RZ KSK Holder shall authenticate the source and integrity of RZ ZSK public key
material
(1) Mechanisms should support proof of possession and verify the parameters (i.e.,
the RSA exponent)
ii) The signature on the root zone’s DNSKEY record shall be generated using SHA-1 or
SHA-256.13

f) Audit Generation and Review Procedures

i) Designated Audit personnel may not participate in the multi-person control for the RZ
ZSK or RZ KSK.
ii) Audit logs shall be backed up offsite at least monthly.
iii) Audit logs (whether onsite or offsite) shall be protected from modification or
deletion.
iv) Audit logs shall be made available upon request for Department review.

8) RZ KSK Public Key Distribution

a) The RZ KSK public key(s) shall be distributed in a secure fashion to preclude


substitution attacks.

b) Each mechanism used to distribute the RZ KSK public key(s) shall either

i) Establish proof of possession of the RZ KSK private key (for public key distribution);
or
ii) Establish proof of possession of the previous RZ KSK private key (for Root zone key
rollover).

9) RZ Zone Signing Key (RZ ZSK) Holder

The Root Zone ZSK Holder (RZ ZSK) is responsible for (1) generating and protecting the
private component of the RZ ZSK(s); (2) securely exporting or importing any public key
components, should this be required and (3) generating and signing Zone File Data in accordance
to the DNSSEC specifications.

a) Cryptographic Requirements

i) The RZ ZSK key pair shall be an RSA key pair, with a modulus of at least 1024
13
Utilization of the SHA-2 family is expected once technically feasible / widely available.

6
October 29, 2009

bits.14
ii) RSA key generation shall meet the requirements specified in FIPS 186-3.15 In
particular, key pair generation shall meet the FIPS 186-3 requirements for exponent
size and primality testing.
iii) RZ ZSK Digital Signatures shall be generated using SHA-1 or SHA-256.
iv) The RZ ZSK private key(s) shall be generated and stored on a FIPS 140-2 compliant
HSM. At a minimum, the HSM shall be validated at Level 4 overall.
v) All cryptographic functions involving the private component of the RZ ZSK shall be
performed within the HSM; that is, the private component shall not be exported from
the HSM except for purposes of key backup.

b) Multi-Party Control

i) Activation of the RZ ZSK shall require at least two-person control. This requirement
may be satisfied through a combination of physical and technical controls.
ii) If the RZ ZSK private key(s) are backed up, they shall be backed up and stored under
at least two-person control. Backup copies shall be stored on FIPS 140-2 validated
HSM, validated at Level 4 overall.16
(1) Backup copies shall be maintained both onsite and offsite17, with physical and
procedural controls commensurate to that of the operational system.
(2) The names of the parties participating in multi-person control shall be maintained
on a list and made available for inspection during compliance audits.

c) Contingency Planning

i) Procedures for recovery from failure of the operational HSM containing the RZ ZSK
shall be designed to re-establish the capability to sign the zone within 2 hours.
ii) Procedures for emergency rollover of the RZ ZSK shall be designed to achieve key
rollover within a technically feasible timeframe as mutually agreed among the
Department, VeriSign, and ICANN. These procedures should accommodate the
following scenarios:
(1) The current RZ ZSK has been compromised; and
(2) The current RZ ZSK is unavailable (e.g. destroyed), but is not believed to be
compromised.

d) Root Zone ZSK Rollover

i) The RZ ZSK shall be rolled over every six months at a minimum.18


14
Note that these requirements correspond to those articulated in NIST SP 800-78 for authentication keys.
Since there is no forward security requirement for the DNSSEC signed data, the more stringent requirements
imposed on long term digital signatures do not apply.
15
Note that FIPS 186-3 and FIPS 140-2 are referenced as requirements in sections 8a and 8 b, rather than as
supplemental guidance.
16
Note that FIPS 186-3 and FIPS 140-2 are referenced as requirements in sections 8a and 8 b, rather than as
supplemental guidance.
17
The Department expects backup locations to be within the United States.
18
The timelines specified in this document apply to the operational system. Subsequent test plans may

7
October 29, 2009

ii) DNSSEC users shall be able to authenticate the source and integrity of the new RZ
ZSK using the previously trusted RZ ZSK’s public key.
iii) RZ KSK holder shall be able to authenticate the source and integrity of the new RZ
ZSK.

e) Audit Generation and Review Procedures

i) Designated Audit personnel may not participate in the control for the RZ ZSK or RZ
KSK.
ii) Audit logs shall be backed up offsite at least monthly.
iii) Audit logs (whether onsite or offsite) shall be protected from unauthorized access,
modification, or deletion.
iv) Audit logs shall be made available upon request for NTIA review.

Other Requirements

10) Transition Planning

a) ICANN and VeriSign shall develop plans for transitioning the responsibilities for each
role while maintaining continuity and security of operations. In the event ICANN or
VeriSign are no longer capable of fulfilling their DNSSEC related roles and
responsibilities (due to bankruptcy, permanent loss of facilities, etc.) or in the event the
Department selects a successor, that party shall ensure an orderly transition of their
DNSSEC roles and responsibilities in cooperation with the Department.

11) Personnel Security Requirements

a) Separation of Duties

i) Personnel holding a role in the multi-party access to the RZ KSK may not hold a role
in the multi-party access to the RZ ZSK, or vice versa.
ii) Designated Audit personnel may not participate in the multi-person control for the RZ
ZSK or KSK.
iii) Audit Personnel shall be assigned to audit the RZ KSK Holder or the RZ ZSK
Holder, but not both.

b) Security Training

i) All personnel with access to any cryptographic component used with the Root Zone
Signing process shall have adequate training for all expected duties.

12) Root Zone Maintainer (VeriSign) Basic Requirements

a) Ability to receive NTIA authorized TLD Resource Record Set (RRset) updates from

specify more or less frequent RZ ZSK rollover to ensure adequate testing.

8
October 29, 2009

NTIA and IANA Functions Operator


b) Ability to integrate TLD RRset updates into the final zone file
c) Ability to accept NTIA authorized signed RZ keyset(s)19 and integrate those RRsets into
the final zone file

13) IANA Functions Operator (ICANN) TLD Interface Basic Functionality

a) Ability to accept and process TLD DS records. New functionality includes:

i) Accept TLD DS RRs


(1) Retrieve TLD DNSKEY record from the TLD, and perform parameter checking
for the TLD keys, including verify that the DS RR has been correctly generated
using the specified hash algorithm.
ii) Develop with, and communicate to, TLD operators procedures for:
(1) Scheduled roll over for TLD key material
(2) Supporting emergency key roll over for TLD key material.
(3) Moving TLD from signed to unsigned in the root zone.

b) Ability to submit TLD DS record updates to NTIA for authorization and subsequent
inclusion into the root zone by the Root Zone Maintainer.
c) Ability to submit RZ keyset to NTIA for authorization and subsequent inclusion into the
root zone by the Root Zone Maintainer.

14) Root Zone Management Requirements20

a) Ability and process to store TLD delegations and DS RRs


b) Ability and process to store multiple keys for a delegation with possibly different
algorithms
c) Ability and process to maintain a history of DS records used by each delegation
d) Procedures for managing scheduled roll over for TLD key material
e) Procedures for managing emergency key roll over for TLD key material.21
f) Procedures for managing the movement of TLD from signed to unsigned.22
g) Procedures for DNSSEC revocation at the root zone and returning the root zone to its
pre-signed state.
19
Dependent on how ICANN and VeriSign propose KSK management, the Root Zone Maintainer (VeriSign)
may need to consider the ability to accept the signed RZ key set from an outside party.
20
The Department envisions ICANN and VeriSign jointly deciding and proposing how each of these
requirements are to be designed and implemented, subject to Department approval.
21
To the extent possible, on 24 hour notice under the existing manual system and on 12 hours notice once the
automated system is utilized.
22
To the extent possible, this should be within 48 hours.