The document outlines the components of an effective project plan for constructing sleeping garments, including: identifying materials, tools, procedures, objectives, and evaluation criteria. An effective project plan guides the project from start to finish and allows for evaluation of the completed work. The sample project plan template provided includes sections for naming the project, listing objectives, required vocabulary, tools, materials, design specifications, procedures, and evaluation rubrics.

Uploaded by

Rosalie Lazaro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
269 views2 pages

Project Plan

The document outlines the components of an effective project plan for constructing sleeping garments, including: identifying materials, tools, procedures, objectives, and evaluation criteria. An effective project plan guides the project from start to finish and allows for evaluation of the completed work. The sample project plan template provided includes sections for naming the project, listing objectives, required vocabulary, tools, materials, design specifications, procedures, and evaluation rubrics.

Uploaded by

Rosalie Lazaro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project Plan for Sleeping Garments

Construction of sleeping garment is just like cooking a recipe for a party that requires careful
planning. In every task or project you have, it should be accompanied with a project plan. This serves as
a guide in making any kind of project. It contains the materials and tools to be used, design and procedure
in making the project and the criteria for evaluating the finish output coupled with rubrics designed by the
teacher and students.

Components of a Project Plan


1. Project Plan No. – reflects the number of projects
2. Date Begun – date when the construction of the project will start.
3. Date Finished – the exact date when the project will be completed.
4. Name of the Project – a specific description of the job/ project.
5. Objectives - states the purpose why a project should be done. This is usually stated in three
learning domains: the cognitive, psychomotor and affective.
6. Word Study – unlocks the terms used operationally and conceptually.
7. Tools and Equipment – list of tools and equipment in the accomplishment of the job.
8. Materials and Supplies Needed – the itemized list of tools and supplies needed to produce a
project.
a. Quantity suggests the amount needed.
b. Unit is the unit of measure of the quantity.
c. Description refers to the features and characteristics of the materials and supply needed.
d. Unit Cost is the selling price per quantity and unit of the materials.
e. Total Cost is the total amount needed per quantity of supply and material needed.
f. Total is the over-all total cost of all the supplies and materials to be used
9. Design Specifications – the photographic representation of the project in two to five views:
front, back, right, left and top views.
10. Procedure – the chronological steps or operations involved to accomplish the project. This is
divided into two stages:
a. Preparation stage – depicts the preparation to be done before the actual execution or
performance of the operations.
b. Performance stage – the actual procedures involve in the actual making of the project
where all tools, supplies, materials and equipment intended to make the project are
ready.
11. Evaluation – the process of assessing the finished project with its given criteria prepared during
planning and evaluating.

Sample Project Plan

Project Plan No. ___


Name: ______________________________Date Begun: _______________
Year and Section: _____________________ Date Finished: _____________

I. Name of the Project: _______________________________________


II. Objectives:
1. ______________________________________________________
2. ______________________________________________________
3. ______________________________________________________
III. Word Study:
1.
2.
3.
IV. Tools and Equipment:
1.
2.
3.
4.
5.
V. Materials and Supplies Needed:
Quantity Unit Description Unit Cost Total Cost

Total
VI. Design Specifications:

A. Pre-sewing stage
A1.
A2.
A3.
B. Sewing Stage
B1.
B2.
B3.
VIII. Evaluation:

Criteria for Evaluation (Rubrics of Performance)