0% found this document useful (0 votes)
270 views5 pages

LIFTING PLAN Ofloading Old Containers

This a lifting plan via forklift which helps to give the idea of how to take permit in afactory if you want to use it
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
270 views5 pages

LIFTING PLAN Ofloading Old Containers

This a lifting plan via forklift which helps to give the idea of how to take permit in afactory if you want to use it
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

LIFTING PLAN

Tool Specification: -
5Ton Forklift

* Weight lifting capacity= 5Ton.

Specification for the materials to be lifted: -


Old containers unloading(Qty-5)

Weight =
3 Tons
max.

Working Method:-

1) Forklift reaches the open area where container is situated.


2) Carefully lifts the arms and takes out the materials one by one.
3) The forklift slowly drags the cargo out.
4) After the goods are pulled out, the forklift lifts the goods in the
designated places.
Position of the equipment,container in layout & lifting :-

2nd container
material
Open Area

Shed type area


divider

1st container
material
5th container
material
Drain

Open Area

FST Area
4th
container
3rd container material
material
Picture are attached in the next page in order to justify the layout.
Security measurement taken:-

1) Using walkie-talkies to communicate between operator & helper& also


using sign languages to communicate.
2) Using barricade to secure the area with the help of the safety officer.
3) Taking out or let take help from MBI personal to clear out the area of
Working near bottling area building.
4) Maintaining safe distance, wearing helmets and gloves.
5) Clear out the traffic with communicating with security personal.
6) Need to communicate with packaging manager in order for clearance of
that open area.

Security during work with the crane: -


We will barricade the area along with will keep the bay clear during our work as shown in
the below pictures.
Prepare By Review By Approved By Approved By