1. This document contains rainfall data from 1969 to 1990 recorded at the Cisangkuy River station in Pataruman and Kamasan areas, including the number of rainy days and monthly rainfall totals in millimeters. 2. The data is organized by year, month, number of rainy days, and rainfall total in mm/month over the 22 year period. 3. On average there were between 0-750 mm of rainfall recorded each month with peaks in December, January, February and November.

Uploaded by

Andri Sonjaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views29 pages

Debit Andalan Mock

1. This document contains rainfall data from 1969 to 1990 recorded at the Cisangkuy River station in Pataruman and Kamasan areas, including the number of rainy days and monthly rainfall totals in millimeters. 2. The data is organized by year, month, number of rainy days, and rainfall total in mm/month over the 22 year period. 3. On average there were between 0-750 mm of rainfall recorded each month with peaks in December, January, February and November.

Uploaded by

Andri Sonjaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 29

Stasiun Klimatologi : Bandara Husen Sastranegara

Lokasi : Kabupaten Bandung


No Item Jan Feb March Apr May Jun Jul Aug Sep Oct Nov Dec Average
1 Temperature T (° C) 23.120 23.536 24.060 23.440 23.690 22.960 22.780 23.040 23.550 23.830 23.690 23.400 23.425
2 Relative Humidity, Rh (%) 81.429 80.000 80.143 81.571 79.286 76.571 74.857 70.286 68.714 78.571 79.000 77.857 77.357
3 Sunshine, n (hours/day) 3.784 4.088 4.296 4.520 4.952 5.520 5.712 6.352 5.744 4.944 3.840 3.848 4.800
4 Wind Velocity, U2 (km/day) 103.169 92.736 67.620 67.620 67.620 64.529 90.031 96.600 100.464 103.169 85.008 86.940 85.459
5 Max possible sunshine hours, N (hours/day) 12.420 12.340 12.100 11.920 11.780 11.680 11.720 11.860 12.000 12.240 12.420 12.520 12.083
RIVER Cisangkuy
STATION Pataruman 188.02 km2
Kamasan 209.02 km2

RAIN
NO YEAR MONTH NDAYS MM/M
1 1969 Jan 31 440.0
2 Feb 28 268.5
3 Mar 31 196.3
4 Apr 30 206.0
5 May 31 132.5
6 Jun 30 33.0
7 Jul 31 27.8
8 Aug 31 3.0
9 Sep 30 203.5
10 Oct 31 93.3
11 Nov 30 223.5
12 Dec 31 253.0
13 1970 Jan 31 252.0
14 Feb 28 211.0
15 Mar 31 429.3
16 Apr 30 300.3
17 May 31 209.3
18 Jun 30 125.0
19 Jul 31 95.5
20 Aug 31 0.0
21 Sep 30 99.3
22 Oct 31 219.0
23 Nov 30 288.8
24 Dec 31 378.3
25 1971 Jan 31 359.0
26 Feb 28 242.5
27 Mar 31 272.5
28 Apr 30 123.8
29 May 31 210.8
30 Jun 30 41.8
31 Jul 31 2.5
32 Aug 31 12.0
33 Sep 30 100.0
34 Oct 31 303.3
35 Nov 30 468.5
36 Dec 31 518.3
37 1972 Jan 31 402.8
38 Feb 28 239.5
39 Mar 31 320.3
40 Apr 30 112.3
41 May 31 189.8
42 Jun 30 0.0
43 Jul 31 1.0
44 Aug 31 11.0
45 Sep 30 9.8
46 Oct 31 19.8
47 Nov 30 190.0
48 Dec 31 185.5
49 1973 Jan 31 355.0
50 Feb 28 290.3
51 Mar 31 296.3
52 Apr 30 328.3
53 May 31 346.8
54 Jun 30 119.3
55 Jul 31 92.3
56 Aug 31 95.5
57 Sep 30 177.0
58 Oct 31 157.0
59 Nov 30 242.0
60 Dec 31 392.0
61 1974 Jan 31 215.0
62 Feb 28 346.0
63 Mar 31 111.0
64 Apr 30 385.5
65 May 31 157.5
66 Jun 30 28.5
67 Jul 31 123.3
68 Aug 31 104.5
69 Sep 30 100.0
70 Oct 31 248.0
71 Nov 30 262.5
72 Dec 31 225.0
73 1975 Jan 31 311.8
74 Feb 28 280.0
75 Mar 31 294.5
76 Apr 30 224.8
77 May 31 250.8
78 Jun 30 53.5
79 Jul 31 70.0
80 Aug 31 42.5
81 Sep 30 134.0
82 Oct 31 307.5
83 Nov 30 350.8
84 Dec 31 276.5
85 1976 Jan 31 250.5
86 Feb 28 186.5
87 Mar 31 242.0
88 Apr 30 161.8
89 May 31 30.3
90 Jun 30 43.0
91 Jul 31 22.0
92 Aug 31 57.8
93 Sep 30 34.0
94 Oct 31 275.5
95 Nov 30 367.5
96 Dec 31 289.3
97 1977 Jan 31 311.5
98 Feb 28 412.3
99 Mar 31 369.0
100 Apr 30 192.0
101 May 31 241.8
102 Jun 30 224.5
103 Jul 31 8.5
104 Aug 31 14.0
105 Sep 30 68.5
106 Oct 31 22.0
107 Nov 30 173.8
108 Dec 31 264.8
109 1978 Jan 31 239.0
110 Feb 28 224.8
111 Mar 31 348.8
112 Apr 30 150.5
113 May 31 170.3
114 Jun 30 340.5
115 Jul 31 220.3
116 Aug 31 83.3
117 Sep 30 121.0
118 Oct 31 224.3
119 Nov 30 246.3
120 Dec 31 450.0
121 1979 Jan 31 288.0
122 Feb 28 291.3
123 Mar 31 233.5
124 Apr 30 534.3
125 May 31 245.5
126 Jun 30 97.8
127 Jul 31 16.0
128 Aug 31 77.3
129 Sep 30 124.5
130 Oct 31 108.8
131 Nov 30 311.5
132 Dec 31 374.0
133 1980 Jan 31 263.8
134 Feb 28 219.0
135 Mar 31 210.5
136 Apr 30 326.5
137 May 31 53.5
138 Jun 30 50.8
139 Jul 31 53.3
140 Aug 31 52.5
141 Sep 30 109.3
142 Oct 31 201.3
143 Nov 30 355.8
144 Dec 31 352.0
145 1981 Jan 31 243.3
146 Feb 28 181.3
147 Mar 31 369.8
148 Apr 30 270.3
149 May 31 235.0
150 Jun 30 126.5
151 Jul 31 164.0
152 Aug 31 97.3
153 Sep 30 130.3
154 Oct 31 145.8
155 Nov 30 368.5
156 Dec 31 294.8
157 1982 Jan 31 351.0
158 Feb 28 335.5
159 Mar 31 182.5
160 Apr 30 515.0
161 May 31 36.0
162 Jun 30 30.0
163 Jul 31 58.5
164 Aug 31 2.3
165 Sep 30 65.8
166 Oct 31 54.8
167 Nov 30 80.8
168 Dec 31 414.8
169 1983 Jan 31 407.3
170 Feb 28 341.0
171 Mar 31 236.8
172 Apr 30 286.8
173 May 31 310.3
174 Jun 30 25.5
175 Jul 31 51.3
176 Aug 31 0.0
177 Sep 30 0.0
178 Oct 31 249.8
179 Nov 30 401.3
180 Dec 31 352.8
181 1984 Jan 31 361.3
182 Feb 28 341.5
183 Mar 31 267.0
184 Apr 30 300.8
185 May 31 245.5
186 Jun 30 81.3
187 Jul 31 80.5
188 Aug 31 115.8
189 Sep 30 317.0
190 Oct 31 301.3
191 Nov 30 199.5
192 Dec 31 495.5
193 1985 Jan 31 406.5
194 Feb 28 241.5
195 Mar 31 243.5
196 Apr 30 152.0
197 May 31 198.5
198 Jun 30 142.5
199 Jul 31 85.5
200 Aug 31 36.0
201 Sep 30 71.3
202 Oct 31 369.8
203 Nov 30 273.3
204 Dec 31 241.8
205 1986 Jan 31 357.3
206 Feb 28 253.3
207 Mar 31 443.8
208 Apr 30 379.8
209 May 31 49.3
210 Jun 30 138.0
211 Jul 31 97.3
212 Aug 31 96.3
213 Sep 30 232.5
214 Oct 31 324.3
215 Nov 30 359.5
216 Dec 31 110.0
217 1987 Jan 31 487.5
218 Feb 28 355.5
219 Mar 31 762.8
220 Apr 30 72.0
221 May 31 98.8
222 Jun 30 65.8
223 Jul 31 0.0
224 Aug 31 8.0
225 Sep 30 13.0
226 Oct 31 53.8
227 Nov 30 388.0
228 Dec 31 398.8
229 1988 Jan 31 338.5
230 Feb 28 244.5
231 Mar 31 367.5
232 Apr 30 137.0
233 May 31 242.8
234 Jun 30 20.8
235 Jul 31 14.8
236 Aug 31 25.8
237 Sep 30 37.3
238 Oct 31 256.5
239 Nov 30 255.3
240 Dec 31 169.8
241 1989 Jan 31 472.5
242 Feb 28 465.3
243 Mar 31 252.3
244 Apr 30 191.3
245 May 31 268.0
246 Jun 30 152.8
247 Jul 31 105.5
248 Aug 31 58.3
249 Sep 30 32.5
250 Oct 31 54.0
251 Nov 30 154.8
252 Dec 31 441.0
253 1990 Jan 31 292.8
254 Feb 28 468.8
255 Mar 31 267.3
256 Apr 30 289.8
257 May 31 201.5
258 Jun 30 86.0
259 Jul 31 32.5
260 Aug 31 150.0
261 Sep 30 119.0
262 Oct 31 61.3
263 Nov 30 147.8
264 Dec 31 334.3
265 1991 Jan 31 458.3
266 Feb 28 217.0
267 Mar 31 240.5
268 Apr 30 186.8
269 May 31 79.8
270 Jun 30 98.8
271 Jul 31 6.5
272 Aug 31 43.3
273 Sep 30 42.3
274 Oct 31 97.8
275 Nov 30 427.5
276 Dec 31 291.0
277 1992 Jan 31 342.8
278 Feb 28 305.3
279 Mar 31 375.8
280 Apr 30 438.5
281 May 31 120.0
282 Jun 30 91.8
283 Jul 31 36.5
284 Aug 31 153.3
285 Sep 30 124.5
286 Oct 31 288.5
287 Nov 30 307.3
288 Dec 31 301.5
289 1993 Jan 31 405.0
290 Feb 28 245.3
291 Mar 31 393.8
292 Apr 30 312.8
293 May 31 78.5
294 Jun 30 106.8
295 Jul 31 40.8
296 Aug 31 67.5
297 Sep 30 117.5
298 Oct 31 109.8
299 Nov 30 349.8
300 Dec 31 435.8
301 1994 Jan 31 437.5
302 Feb 28 216.0
303 Mar 31 284.0
304 Apr 30 293.0
305 May 31 133.0
306 Jun 30 15.0
307 Jul 31 79.3
308 Aug 31 5.5
309 Sep 30 11.8
310 Oct 31 60.8
311 Nov 30 260.5
312 Dec 31 236.8
313 1995 Jan 31 492.0
314 Feb 28 318.0
315 Mar 31 441.0
316 Apr 30 301.3
317 May 31 111.0
318 Jun 30 275.8
319 Jul 31 9.3
320 Aug 31 0.0
321 Sep 30 173.5
322 Oct 31 231.3
323 Nov 30 521.0
324 Dec 31 430.8
325 1996 Jan 31 449.8
326 Feb 28 362.0
327 Mar 31 327.8
328 Apr 30 279.5
329 May 31 68.5
330 Jun 30 77.3
331 Jul 31 54.0
332 Aug 31 75.5
333 Sep 30 92.8
334 Oct 31 251.5
335 Nov 30 565.8
336 Dec 31 372.5
337 1997 Jan 31 455.8
338 Feb 28 332.3
339 Mar 31 127.3
340 Apr 30 156.8
341 May 31 186.3
342 Jun 30 22.3
343 Jul 31 0.0
344 Aug 31 0.0
345 Sep 30 3.3
346 Oct 31 35.5
347 Nov 30 77.3
348 Dec 31 300.3
349 1998 Jan 31 362.8
350 Feb 28 447.3
351 Mar 31 328.5
352 Apr 30 369.0
353 May 31 182.5
354 Jun 30 244.5
355 Jul 31 165.3
356 Aug 31 42.0
357 Sep 30 151.8
358 Oct 31 476.0
359 Nov 30 400.5
360 Dec 31 489.3
361 1999 Jan 31 736.0
362 Feb 28 659.3
363 Mar 31 568.0
364 Apr 30 493.5
365 May 31 203.5
366 Jun 30 54.0
367 Jul 31 79.8
368 Aug 31 16.5
369 Sep 30 2.3
370 Oct 31 285.3
371 Nov 30 409.0
372 Dec 31 332.0
373 2000 Jan 31 339.5
374 Feb 28 207.0
375 Mar 31 230.5
376 Apr 30 443.0
377 May 31 223.0
378 Jun 30 44.3
379 Jul 31 46.3
380 Aug 31 44.3
381 Sep 30 127.8
382 Oct 31 266.8
383 Nov 30 309.8
384 Dec 31 341.5
385 2001 Jan 31 307.8
386 Feb 28 205.5
387 Mar 31 329.8
388 Apr 30 424.3
389 May 31 97.8
390 Jun 30 56.5
391 Jul 31 33.3
392 Aug 31 35.8
393 Sep 30 10.0
394 Oct 31 52.8
395 Nov 30 471.5
396 Dec 31 172.8
397 2002 Jan 31 363.5
398 Feb 28 265.8
399 Mar 31 412.8
400 Apr 30 355.5
401 May 31 101.8
402 Jun 30 36.8
403 Jul 31 89.3
404 Aug 31 91.5
405 Sep 30 29.0
406 Oct 31 130.0
407 Nov 30 184.3
408 Dec 31 385.3
409 2003 Jan 31 196.0
410 Feb 28 241.3
411 Mar 31 219.5
412 Apr 30 161.5
413 May 31 73.3
414 Jun 30 22.5
415 Jul 31 21.8
416 Aug 31 43.5
417 Sep 30 67.5
418 Oct 31 231.3
419 Nov 30 273.0
420 Dec 31 317.8
421 2004 Jan 31 281.0
422 Feb 28 240.0
423 Mar 31 276.5
424 Apr 30 174.5
425 May 31 159.3
426 Jun 30 29.8
427 Jul 31 43.3
428 Aug 31 2.8
429 Sep 30 52.5
430 Oct 31 22.0
431 Nov 30 245.8
432 Dec 31 334.0
433 2005 Jan 31 197.8
434 Feb 28 309.0
435 Mar 31 309.5
436 Apr 30 313.8
437 May 31 148.3
438 Jun 30 81.8
439 Jul 31 43.3
440 Aug 31 31.3
441 Sep 30 60.8
442 Oct 31 76.8
443 Nov 30 176.8
444 Dec 31 282.3
445 2006 Jan 31 244.5
446 Feb 28 304.8
447 Mar 31 148.5
448 Apr 30 253.3
449 May 31 80.8
450 Jun 30 21.0
451 Jul 31 0.8
452 Aug 31 0.0
453 Sep 30 8.0
454 Oct 31 13.3
455 Nov 30 70.3
456 Dec 31 492.0
457 2007 Jan 31 97.8
458 Feb 28 397.8
459 Mar 31 296.8
460 Apr 30 371.0
461 May 31 128.3
462 Jun 30 95.5
463 Jul 31 4.3
464 Aug 31 4.5
465 Sep 30 13.0
466 Oct 31 205.5
467 Nov 30 215.3
468 Dec 31 403.3
469 2008 Jan 31 203.0
470 Feb 28 145.5
471 Mar 31 411.3
472 Apr 30 308.3
473 May 31 83.8
474 Jun 30 18.5
475 Jul 31 1.8
476 Aug 31 31.0
477 Sep 30 28.5
478 Oct 31 242.5
479 Nov 30 452.8
480 Dec 31 344.5
481 2009 Jan 31 287.8
482 Feb 28 383.8
483 Mar 31 302.8
484 Apr 30 203.0
485 May 31 193.3
486 Jun 30 72.5
487 Jul 31 13.8
488 Aug 31 8.3
489 Sep 30 56.5
490 Oct 31 173.0
491 Nov 30 374.0
492 Dec 31 215.8
#NAME?
DATA HUJAN BULANAN DAN DEBIT OBSERVASI
SUNGAI Cisangkuy
STATION Pataruman 188.02 km2
Hujan (mm) Pataruman
Tahun Bulan
Bulanan Tahunan Q-Obs (m3/s)
2001 January 307.75 11.88
February 205.50 12.23
March 329.75 10.08
April 424.25 18.48
May 97.75 9.95
June 56.50 5.80
July 33.25 3.72
August 35.75 3.99
September 10.00 3.36
October 52.75 10.18
November 471.50 22.53
December 172.75 2197.50 10.39
2002 January 363.50 18.38
February 265.75 15.28
March 412.75 17.79
April 355.50 20.17
May 101.75 7.91
June 36.75 4.32
July 89.25 3.55
August 91.50 3.38
September 29.00 3.40
October 130.00 3.80
November 184.25 3.60
December 385.25 2445.25 7.16
2003 January 196.00 5.78
February 241.25 11.18
March 219.50 12.23
April 161.50 8.65
May 73.25 5.32
June 22.50 3.66
July 21.75 3.18
August 43.50 3.07
September 67.50 3.64
October 231.25 8.43
November 273.00 7.75
December 317.75 1868.75 12.32
DATA HUJAN BULANAN DAN DEBIT OBSERVASI
SUNGAI Cisangkuy
STATION Pataruman 188.02 km2
Hujan (mm) Pataruman
Tahun Bulan
Bulanan Tahunan Q-Obs (m3/s)
2004 January 281.00 18.33
February 240.00 16.63
March 276.50 24.15
April 174.50 16.15
May 159.25 15.32
June 29.75 6.92
July 43.25 7.54
August 2.75 5.42
September 52.50 7.37
October 22.00 5.70
November 245.75 6.69
December 334.00 1861.25 14.77
2005 January 197.75 19.03
February 309.00 23.13
March 309.50 28.80
April 313.75 28.29
May 148.25 17.43
June 81.75 13.71
July 43.25 11.70
August 31.25 6.98
September 60.75 6.29
October 76.75 6.52
November 176.75 8.86
December 282.25 2031.00 14.46
2006 January 244.50 4.43
February 304.75 19.18
March 148.50 8.19
April 253.25 14.45
May 80.75 7.50
June 21.00 2.54
July 0.75 0.93
August 0.00 0.75
September 8.00 0.78
October 13.25 0.93
November 70.25 1.02
December 492.00 1637.00 11.12
2007 January 97.75 3.58
February 397.75 13.03
March 296.75 12.21
April 371.00 20.42
May 128.25 11.01
June 95.50 6.17
July 4.25 3.52
August 4.50 2.78
September 13.00 2.94
October 205.50 4.59
November 215.25 13.82
DATA HUJAN BULANAN DAN DEBIT OBSERVASI
SUNGAI Cisangkuy
STATION Pataruman 188.02 km2
Hujan (mm) Pataruman
Tahun Bulan
Bulanan Tahunan Q-Obs (m3/s)
December 403.25 2232.75 14.62
DATA HUJAN BULANAN DAN DEBIT OBSERVASI
SUNGAI Cisangkuy
STATION Pataruman 188.02 km2
Hujan (mm) Pataruman
Tahun Bulan
Bulanan Tahunan Q-Obs (m3/s)
2008 January 203.00 7.01
February 145.50 6.38
March 411.25 24.29
April 308.25 18.28
May 83.75 5.89
June 18.50 4.41
July 1.75 3.14
August 31.00 3.21
September 28.50 2.92
October 242.50 3.81
November 452.75 11.38
December 344.50 2271.25 13.18
2009 January 287.75 13.63
February 383.75 20.60
March 302.75 18.94
April 203.00 18.51
May 193.25 16.80
June 72.50 14.94
July 13.75 12.28
August 8.25 11.04
September 56.50 10.87
October 173.00 12.41
November 374.00 14.29
December 215.75 2284.25 12.37
Rata-rata 174.34 2092.11 10.26
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2001
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 307.75 205.5 329.75 424.25 97.75 56.5 33.25 35.75 10 52.75 471.5 172.75
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) 191.51 92.87 214.48 319.56 -10.88 -40.28 -74.25 -73.98 -105.71 -76.45 355.21 52.73
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 391.51 292.87 414.48 519.56 189.12 159.72 125.75 126.02 94.29 123.55 555.21 252.73
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 10.88 40.28 74.25 73.98 105.71 76.45 0.00 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 191.51 92.87 214.48 319.56 0.00 0.00 0.00 0.00 0.00 0.00 355.21 52.73
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 57.45 37.15 64.34 86.28 0.00 0.00 0.00 0.00 0.00 0.00 124.32 15.82
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 54.58 34.36 56.30 81.10 0.00 0.00 0.00 0.00 0.00 0.00 105.68 14.63
37 K x (Gsom) 155.72 178.76 159.84 190.20 257.74 231.97 173.98 156.58 125.26 115.24 80.67 158.39
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 173.03 210.30 213.12 216.14 271.31 257.74 231.97 173.98 156.58 125.26 115.24 186.34 173.03
39 DGS (mm/bln) = GS - Gsom 37.28 2.82 3.02 55.17 -13.57 -25.77 -57.99 -17.40 -31.32 -10.02 71.10 -13.32
40 Base Flow (mm/bln) = i - DGS 20.18 34.33 61.32 31.11 13.57 25.77 57.99 17.40 31.32 10.02 53.22 29.14
41 Direct Run Off (mm/bln) = Ws - i 171.34 58.54 153.15 288.44 -13.57 -25.77 -57.99 -17.40 -31.32 -10.02 301.99 23.59
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 0 0 9.775 5.65 3.325 3.575 1 5.275 0 17.275
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 191.51 92.87 214.48 319.56 9.78 5.65 3.33 3.58 1.00 5.28 355.21 70.00
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 13.44 7.22 15.06 23.18 0.69 0.41 0.23 0.25 0.07 0.37 25.77 4.91
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2002
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 363.5 265.75 412.75 355.5 101.75 36.75 89.25 91.5 29 130 184.25 385.25
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) 247.26 153.12 297.48 250.81 -6.88 -60.03 -18.25 -18.23 -86.71 0.80 67.96 265.23
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 447.26 353.12 497.48 450.81 193.12 139.97 181.75 181.77 113.29 200.80 267.96 465.23
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 6.88 60.03 18.25 18.23 86.71 0.00 0.00 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 247.26 153.12 297.48 250.81 0.00 0.00 0.00 0.00 0.00 0.80 67.96 265.23
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 74.18 61.25 89.24 67.72 0.00 0.00 0.00 0.00 0.00 0.40 23.79 79.57
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 70.47 56.66 78.09 63.65 0.00 0.00 0.00 0.00 0.00 0.39 20.22 73.60
37 K x (Gsom) 155.72 192.26 186.69 233.00 281.83 253.64 190.23 171.21 136.97 126.01 88.48 92.39
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 173.03 226.19 248.92 264.78 296.66 281.83 253.64 190.23 171.21 136.97 126.40 108.70 165.99
39 DGS (mm/bln) = GS - Gsom 53.17 22.73 15.86 31.88 -14.83 -28.18 -63.41 -19.02 -34.24 -10.57 -17.70 57.30
40 Base Flow (mm/bln) = i - DGS 21.01 38.52 73.39 35.84 14.83 28.18 63.41 19.02 34.24 10.97 41.49 22.27
41 Direct Run Off (mm/bln) = Ws - i 226.25 114.60 224.09 214.97 -14.83 -28.18 -63.41 -19.02 -34.24 -10.17 26.47 242.96
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 0 0 10.175 3.675 8.925 9.15 2.9 13 18.425 0
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 247.26 153.12 297.48 250.81 10.18 3.68 8.93 9.15 2.90 13.80 86.39 265.23
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 17.36 11.90 20.88 18.19 0.71 0.27 0.63 0.64 0.21 0.97 6.27 18.62
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2003
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 196 241.25 219.5 161.5 73.25 22.5 21.75 43.5 67.5 231.25 273 317.75
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) 79.76 128.62 104.23 56.81 -35.38 -74.28 -85.75 -66.23 -48.21 102.05 156.71 197.73
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 279.76 328.62 304.23 256.81 164.62 125.72 114.25 133.77 151.79 302.05 356.71 397.73
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 35.38 74.28 85.75 66.23 48.21 0.00 0.00 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 79.76 128.62 104.23 56.81 0.00 0.00 0.00 0.00 0.00 102.05 156.71 197.73
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 23.93 51.45 31.27 15.34 0.00 0.00 0.00 0.00 0.00 51.03 54.85 59.32
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 22.73 47.59 27.36 14.42 0.00 0.00 0.00 0.00 0.00 48.99 46.62 54.87
37 K x (Gsom) 149.39 146.31 145.42 152.05 158.14 142.33 106.75 96.07 76.86 70.71 83.79 110.85
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 165.99 172.13 193.90 172.78 166.47 158.14 142.33 106.75 96.07 76.86 119.69 130.41 165.72
39 DGS (mm/bln) = GS - Gsom 6.13 21.77 -21.12 -6.32 -8.32 -15.81 -35.58 -10.67 -19.21 42.84 10.71 35.31
40 Base Flow (mm/bln) = i - DGS 17.80 29.68 52.38 21.65 8.32 15.81 35.58 10.67 19.21 8.19 44.14 24.01
41 Direct Run Off (mm/bln) = Ws - i 61.97 98.95 51.84 35.15 -8.32 -15.81 -35.58 -10.67 -19.21 93.86 112.58 173.72
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 19.6 0 0 16.15 7.325 2.25 2.175 4.35 6.75 0 0 0
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 99.36 128.62 104.23 72.96 7.33 2.25 2.18 4.35 6.75 102.05 156.71 197.73
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 6.98 10.00 7.32 5.29 0.51 0.16 0.15 0.31 0.49 7.16 11.37 13.88
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2004
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 281 240 276.5 174.5 159.25 29.75 43.25 2.75 52.5 22 245.75 334
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) 164.76 127.37 161.23 69.81 50.62 -67.03 -64.25 -106.98 -63.21 -107.20 129.46 213.98
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 364.76 327.37 361.23 269.81 250.62 132.97 135.75 93.02 136.79 92.80 329.46 413.98
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 0.00 67.03 64.25 106.98 63.21 107.20 0.00 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 164.76 127.37 161.23 69.81 50.62 0.00 0.00 0.00 0.00 0.00 129.46 213.98
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 49.43 50.95 48.37 18.85 15.19 0.00 0.00 0.00 0.00 0.00 45.31 64.19
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 46.96 47.13 42.32 17.72 14.81 0.00 0.00 0.00 0.00 0.00 38.51 59.38
37 K x (Gsom) 149.14 166.69 160.36 178.36 186.27 180.97 135.73 122.16 97.73 89.91 62.94 86.23
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 165.72 196.10 213.82 202.68 196.08 201.08 180.97 135.73 122.16 97.73 89.91 101.45 145.61
39 DGS (mm/bln) = GS - Gsom 30.39 17.71 -11.13 -6.60 5.00 -20.11 -45.24 -13.57 -24.43 -7.82 11.54 44.16
40 Base Flow (mm/bln) = i - DGS 19.04 33.24 59.50 25.45 10.18 20.11 45.24 13.57 24.43 7.82 33.77 20.03
41 Direct Run Off (mm/bln) = Ws - i 145.72 94.14 101.73 44.35 40.44 -20.11 -45.24 -13.57 -24.43 -7.82 95.69 193.95
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 0 17.45 15.925 2.975 4.325 0.275 5.25 2.2 0 0
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 164.76 127.37 161.23 87.26 66.54 2.98 4.33 0.28 5.25 2.20 129.46 213.98
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 11.57 9.90 11.32 6.33 4.67 0.22 0.30 0.02 0.38 0.15 9.39 15.02
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2005
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 197.75 309 309.5 313.75 148.25 81.75 43.25 31.25 60.75 76.75 176.75 282.25
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) 81.51 196.37 194.23 209.06 39.62 -15.03 -64.25 -78.48 -54.96 -52.45 60.46 162.23
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 281.51 396.37 394.23 409.06 239.62 184.97 135.75 121.52 145.04 147.55 260.46 362.23
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 0.00 15.03 64.25 78.48 54.96 52.45 0.00 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 81.51 196.37 194.23 209.06 39.62 0.00 0.00 0.00 0.00 0.00 60.46 162.23
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 24.45 78.55 58.27 56.45 11.89 0.00 0.00 0.00 0.00 0.00 21.16 48.67
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 23.23 72.66 50.98 53.06 11.59 0.00 0.00 0.00 0.00 0.00 17.99 45.02
37 K x (Gsom) 131.05 131.14 152.85 179.37 220.81 209.16 156.87 141.18 112.95 103.91 72.74 77.12
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 145.61 154.28 203.80 203.83 232.43 232.40 209.16 156.87 141.18 112.95 103.91 90.72 122.13
39 DGS (mm/bln) = GS - Gsom 8.67 49.52 0.03 28.60 -0.03 -23.24 -52.29 -15.69 -28.24 -9.04 -13.19 31.41
40 Base Flow (mm/bln) = i - DGS 15.78 29.03 58.23 27.85 11.92 23.24 52.29 15.69 28.24 9.04 34.35 17.26
41 Direct Run Off (mm/bln) = Ws - i 65.73 167.34 135.99 181.21 27.70 -23.24 -52.29 -15.69 -28.24 -9.04 26.11 144.97
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 19.775 0 0 0 14.825 8.175 4.325 3.125 6.075 7.675 17.675 0
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 101.29 196.37 194.23 209.06 54.44 8.18 4.33 3.13 6.08 7.68 78.14 162.23
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 7.11 15.26 13.63 15.16 3.82 0.59 0.30 0.22 0.44 0.54 5.67 11.39
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2006
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 244.5 304.75 148.5 253.25 80.75 21 0.75 0 8 13.25 70.25 492
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) 128.26 192.12 33.23 148.56 -27.88 -75.78 -106.75 -109.73 -107.71 -115.95 -46.04 371.98
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 328.26 392.12 233.23 348.56 172.12 124.22 93.25 90.27 92.29 84.05 153.96 571.98
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 27.88 75.78 106.75 109.73 107.71 115.95 46.04 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 128.26 192.12 33.23 148.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 371.98
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 38.48 76.85 9.97 40.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.59
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 36.56 71.09 8.72 37.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 103.22
37 K x (Gsom) 109.92 124.50 146.69 136.76 165.75 149.17 111.88 100.69 80.55 74.11 51.88 44.09
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 122.13 146.48 195.59 155.41 174.47 165.75 149.17 111.88 100.69 80.55 74.11 51.88 147.32
39 DGS (mm/bln) = GS - Gsom 24.34 49.11 -40.18 19.05 -8.72 -16.57 -37.29 -11.19 -20.14 -6.44 -22.23 95.44
40 Base Flow (mm/bln) = i - DGS 14.14 27.74 50.14 21.06 8.72 16.57 37.29 11.19 20.14 6.44 22.23 16.15
41 Direct Run Off (mm/bln) = Ws - i 114.13 164.39 -16.92 127.50 -8.72 -16.57 -37.29 -11.19 -20.14 -6.44 -22.23 355.83
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 14.85 0 8.075 2.1 0.075 0 0.8 1.325 7.025 0
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 128.26 192.12 48.08 148.56 8.08 2.10 0.08 0.00 0.80 1.33 7.03 371.98
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 9.00 14.93 3.37 10.78 0.57 0.15 0.01 0.00 0.06 0.09 0.51 26.11
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2007
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 97.75 397.75 296.75 371 128.25 95.5 4.25 4.5 13 205.5 215.25 403.25
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) -18.49 285.12 181.48 266.31 19.62 -1.28 -103.25 -105.23 -102.71 76.30 98.96 283.23
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 181.51 485.12 381.48 466.31 219.62 198.72 96.75 94.77 97.29 276.30 298.96 483.23
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 18.49 0.00 0.00 0.00 0.00 1.28 103.25 105.23 102.71 0.00 0.00 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 0.00 285.12 181.48 266.31 19.62 0.00 0.00 0.00 0.00 76.30 98.96 283.23
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 0.00 114.05 54.44 71.90 5.89 0.00 0.00 0.00 0.00 38.15 34.64 84.97
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 0.00 105.50 47.64 67.59 5.74 0.00 0.00 0.00 0.00 36.63 29.44 78.60
37 K x (Gsom) 132.59 112.70 163.65 185.93 240.84 221.92 166.44 149.80 119.84 110.25 102.81 112.42
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 147.32 132.59 218.19 211.28 253.52 246.58 221.92 166.44 149.80 119.84 146.88 132.26 191.01
39 DGS (mm/bln) = GS - Gsom -14.73 85.61 -6.91 42.23 -6.94 -24.66 -55.48 -16.64 -29.96 27.04 -14.62 58.76
40 Base Flow (mm/bln) = i - DGS 14.73 28.44 61.35 29.67 12.82 24.66 55.48 16.64 29.96 11.11 49.26 26.21
41 Direct Run Off (mm/bln) = Ws - i -14.73 256.68 120.12 236.64 6.80 -24.66 -55.48 -16.64 -29.96 65.19 49.70 257.02
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 9.775 0 0 0 12.825 9.55 0.425 0.45 1.3 0 0 0
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 9.78 285.12 181.48 266.31 32.44 9.55 0.43 0.45 1.30 76.30 98.96 283.23
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 0.69 22.16 12.74 19.32 2.28 0.69 0.03 0.03 0.09 5.36 7.18 19.88
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2007
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 203 145.5 411.25 308.25 83.75 18.5 1.75 31 28.5 242.5 452.75 344.5
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) 86.76 32.87 295.98 203.56 -24.88 -78.28 -105.75 -78.73 -87.21 113.30 336.46 224.48
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 286.76 232.87 495.98 403.56 175.12 121.72 94.25 121.27 112.79 313.30 536.46 424.48
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 24.88 78.28 105.75 78.73 87.21 0.00 0.00 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 86.76 32.87 295.98 203.56 0.00 0.00 0.00 0.00 0.00 113.30 336.46 224.48
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 26.03 13.15 88.79 54.96 0.00 0.00 0.00 0.00 0.00 56.65 117.76 67.34
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 24.73 12.16 77.69 51.66 0.00 0.00 0.00 0.00 0.00 54.39 100.10 62.29
37 K x (Gsom) 171.91 167.14 134.48 186.71 226.46 203.81 152.86 137.57 110.06 101.25 108.95 177.69
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 191.01 196.64 179.31 212.17 238.38 226.46 203.81 152.86 137.57 110.06 155.64 209.04 239.98
39 DGS (mm/bln) = GS - Gsom 5.63 -17.33 32.87 26.20 -11.92 -22.65 -50.95 -15.29 -27.51 45.58 53.41 30.94
40 Base Flow (mm/bln) = i - DGS 20.40 30.48 55.93 28.76 11.92 22.65 50.95 15.29 27.51 11.07 64.36 36.41
41 Direct Run Off (mm/bln) = Ws - i 66.36 2.39 240.05 174.80 -11.92 -22.65 -50.95 -15.29 -27.51 102.23 272.11 188.07
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 14.55 0 0 8.375 1.85 0.175 3.1 2.85 0 0 0
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 86.76 47.42 295.98 203.56 8.38 1.85 0.18 3.10 2.85 113.30 336.46 224.48
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 6.09 3.69 20.78 14.77 0.59 0.13 0.01 0.22 0.21 7.95 24.41 15.76
DEBIT ANDALAN SUNGAI CISANGKUY - TAHUN 2007
DI STASIUN AWLR PATARUMAN - A = 188.02 Km²

No Perhitungan Constanta January February March April May June July August September October November December
A DATA KLIMATOLOGI
1 Hujan Bulanan (P ; mm/bln) 287.75 383.75 302.75 203 193.25 72.5 13.75 8.25 56.5 173 374 215.75
2 Hari Hujan ( n ) 26 25 20 22 23 19 19 10 11 22 25 28
3 Jumlah Hari dalam Bulan (hari) 31 28 31 30 31 30 31 31 30 31 30 31
4 Temperatur Rata-rata (T : C ) 23 24 24 23 24 23 23 23 24 24 24 23
5 Penyinaran Matahari (S : %) 30 33 36 38 42 47 49 54 48 40 31 31
6 Kelembaban Udara (h : %) 81 80 80 82 79 77 75 70 69 79 79 78
7 Kecepatan Angin (W : mile/hari) 64.11 57.62 42.02 42.02 42.02 40.10 55.94 60.02 62.43 64.11 52.82 54.02
B EVAPOTRANSPIRASI POTENSIAL (mm/buln)
8 Radiasi Matahari (R, mm/hr) ® 6°LS 15.80 16.00 15.60 14.70 13.40 12.80 13.10 14.00 15.00 15.70 15.80 15.70
9 A (mm Hg/F) 0.637 0.746 0.746 0.637 0.746 0.637 0.637 0.637 0.746 0.746 0.746 0.637
10 B (mm H2O/hr) 15.6 15.8 15.8 15.6 15.8 15.6 15.6 15.6 15.8 15.8 15.8 15.6
11 ea (mm Hg) 21.1 22.4 22.4 21.1 22.4 21.1 21.1 21.1 22.4 22.4 22.4 21.1
12 ed (mm Hg) = h x ea 17.18 17.92 17.95 17.21 17.76 16.16 15.79 14.83 15.39 17.60 17.70 16.43
13 F1 (T : S) = A x (0.18 + (0.55 x S))/(A+0.27) 0.24 0.27 0.28 0.27 0.30 0.31 0.31 0.33 0.33 0.30 0.26 0.25
14 F2 (T : h) = A x B (0.56 - (0.092 x (ed^0.5)))/(A+0.27) 1.96 1.98 1.97 1.95 2.00 2.08 2.13 2.25 2.31 2.02 2.01 2.05
15 F3 (T : h) = (0.27) (0.35) (ea - ed) / (A+0.27) 0.41 0.42 0.41 0.41 0.43 0.52 0.55 0.65 0.65 0.45 0.44 0.49
16 Koefisien Reflaksi ( r ) 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
17 E1 = F1 x (1-r) x R 3.47 3.83 3.87 3.61 3.64 3.56 3.71 4.20 4.39 4.17 3.65 3.46
18 E2 = F2 x (0.1+(0.9 x S)) 0.73 0.79 0.83 0.86 0.96 1.09 1.15 1.31 1.23 0.94 0.76 0.77
19 E3 = F3 x (k + 0.01 x w) ® k = 1,00 0.67 0.66 0.59 0.58 0.61 0.72 0.86 1.05 1.06 0.73 0.67 0.75
20 Ep (mm/hr) = E1 - E2 + E3 3.41 3.70 3.63 3.32 3.30 3.19 3.42 3.93 4.23 3.97 3.56 3.44
21 Epm (mm/bln) = Hr x Ep 105.67 103.56 112.46 99.71 102.24 95.58 106.17 121.93 126.80 123.04 106.93 106.69
C LIMITED EVAPOTRANSPIRASI (mm/bln)
22 Exposed Surface (m ; %) 25 25 25 25 25 25 25 25 25 25 25 25
23 n (jumlah hari hujan) 26 25 20 22 23 19 19 10 11 22 25 28
24 DE/Epm = ( m/20) (18-n) : (%) -10.00 -8.75 -2.50 -5.00 -6.25 -1.25 -1.25 10.00 8.75 -5.00 -8.75 -12.50
25 DE (mm/bln) -10.57 -9.06 -2.81 -4.99 -6.39 -1.19 -1.33 12.19 11.10 -6.15 -9.36 -13.34
26 E actual (mm/bln) = Epm - DE 116.24 112.63 115.27 104.69 108.63 96.78 107.50 109.73 115.71 129.20 116.29 120.02
D WATER SURPLUS (mm/bulan)
27 P - Ea ; (mm/bulan) 171.51 271.12 187.48 98.31 84.62 -24.28 -93.75 -101.48 -59.21 43.80 257.71 95.73
28 SMS = ISMS + (P - Ea) ; (mm/bulan) 371.51 471.12 387.48 298.31 284.62 175.72 106.25 98.52 140.79 243.80 457.71 295.73
29 Soil Moisture Capacity (mm/bulan) : ISMS 200 200 200 200 200 200 200 200 200 200 200 200 200
30 Soil Storage : (mm/bln) (jika P-Ea ³ 0 , SS = 0 , -(P - Ea) 0.00 0.00 0.00 0.00 0.00 24.28 93.75 101.48 59.21 0.00 0.00 0.00
31 Water Surplus (mm/bulan) = (P - Ea) + SS 171.51 271.12 187.48 98.31 84.62 0.00 0.00 0.00 0.00 43.80 257.71 95.73
E TOTAL RUN OFF (mm/bulan)
32 Koefisien Infiltrasi ( if ) 0.30 0.40 0.30 0.27 0.30 0.40 0.30 0.35 0.25 0.50 0.35 0.30
33 Infiltrasi ( i ) = Ws x if ; (mm/bln) 51.45 108.45 56.24 26.54 25.39 0.00 0.00 0.00 0.00 21.90 90.20 28.72
34 Konstanta Resesi Aliran ( K ) 0.90 0.85 0.75 0.88 0.95 0.90 0.75 0.90 0.80 0.92 0.70 0.85
35 Faktor Prosentase Mock (5% - 10%) (PF) 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
36 (0.5 x (1 + K) x i ) 48.88 100.32 49.21 24.95 24.75 0.00 0.00 0.00 0.00 21.03 76.67 26.56
37 K x (Gsom) 215.98 225.13 244.09 258.10 268.90 264.29 198.22 178.39 142.72 131.30 106.63 155.80
38 GS (mm/bln) = (0.5 x (1 + K) x i ) + K x (Gsom) ® Initial Gsom 239.98 264.86 325.45 293.30 283.05 293.65 264.29 198.22 178.39 142.72 152.32 183.30 182.37
39 DGS (mm/bln) = GS - Gsom 24.88 60.59 -32.15 -10.25 10.60 -29.37 -66.07 -19.82 -35.68 9.61 30.97 -0.93
40 Base Flow (mm/bln) = i - DGS 26.57 47.86 88.39 36.79 14.79 29.37 66.07 19.82 35.68 12.29 59.23 29.65
41 Direct Run Off (mm/bln) = Ws - i 144.94 223.26 99.08 61.52 69.83 -29.37 -66.07 -19.82 -35.68 31.51 198.48 66.08
42 Storm Run Off (mm/bln) : Jika P ³ 200 , SRO = 0 , SRO = P x PF 0 0 0 0 19.325 7.25 1.375 0.825 5.65 17.3 0 0
43 Total Run Off (mm/bln) = Bflow + DRO + SRO 171.51 271.12 187.48 98.31 103.94 7.25 1.38 0.83 5.65 61.10 257.71 95.73
44 Luas Tangkapan Hujan (km²) 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02 188.02
45 Stream Flow (m³/dt) 12.04 21.07 13.16 7.13 7.30 0.53 0.10 0.06 0.41 4.29 18.69 6.72
No Urut Debit P
1 26.11 0.92
2 25.77 1.83
3 24.41 2.75
4 23.18 3.67
5 22.16 4.59
6 21.07 5.50
7 20.88 6.42
8 20.78 7.34
9 19.88 8.26
10 19.32 9.17
11 18.69 10.09
12 18.62 11.01
13 18.19 11.93
14 17.36 12.84
15 15.76 13.76
16 15.26 14.68
17 15.16 15.60
18 15.06 16.51
19 15.02 17.43
20 14.93 18.35
21 14.77 19.27
22 13.88 20.18
23 13.63 21.10
24 13.44 22.02
25 13.16 22.94
26 12.74 23.85
27 12.04 24.77
28 11.90 25.69
29 11.57 26.61
30 11.39 27.52
31 11.37 28.44
32 11.32 29.36
33 10.78 30.28
34 10.00 31.19
35 9.90 32.11
36 9.39 33.03
37 9.00 33.94
38 7.95 34.86
39 7.32 35.78
40 7.30 36.70
41 7.22 37.61
42 7.18 38.53
43 7.16 39.45
44 7.13 40.37
45 7.11 41.28
46 6.98 42.20
47 6.72 43.12
48 6.33 44.04
49 6.27 44.95
50 6.09 45.87
51 5.67 46.79
52 5.36 47.71
53 5.29 48.62
54 4.91 49.54
55 4.67 50.46
56 4.29 51.38
57 3.82 52.29
58 3.69 53.21
59 3.37 54.13
60 2.28 55.05
61 0.97 55.96
62 0.71 56.88
63 0.69 57.80
64 0.69 58.72
65 0.69 59.63
66 0.64 60.55
67 0.63 61.47
68 0.59 62.39
69 0.59 63.30
70 0.57 64.22
71 0.54 65.14
72 0.53 66.06
73 0.51 66.97
74 0.51 67.89
75 0.49 68.81
76 0.44 69.72
77 0.41 70.64
78 0.41 71.56
79 0.38 72.48
80 0.37 73.39
81 0.31 74.31
82 0.30 75.23
83 0.30 76.15
84 0.27 77.06
85 0.25 77.98
86 0.23 78.90
87 0.22 79.82
88 0.22 80.73
89 0.22 81.65
90 0.21 82.57
91 0.21 83.49
92 0.16 84.40
93 0.15 85.32
94 0.15 86.24
95 0.15 87.16
96 0.13 88.07
97 0.10 88.99
98 0.09 89.91
99 0.09 90.83
100 0.07 91.74
101 0.06 92.66
102 0.06 93.58
103 0.03 94.50
104 0.03 95.41
105 0.02 96.33
106 0.01 97.25
107 0.01 98.17
108 0.00 99.08
Total Discharge

Discharge Observation

(m3/det) (m3/det)

(20) (21) R= 0.84

Smp^2 (Qi-Qrata)^2
PERBANDINGAN
13.44 11.88 2.46 141.06

7.22 12.23 25.09 149.49


35.0 Q Mo
15.06 10.08 24.76 101.61

23.18 18.48 22.12 341.39

0.69 9.95 85.76 98.94 30.0


0.41 5.80 29.02 33.60

0.23 3.72 12.18 13.86


25.0
0.25 3.99 13.96 15.89

Debit (m3/detik)
0.07 3.36 10.81 11.29

0.37 10.18 96.23 103.63


20.0
25.77 22.53 10.45 507.75

4.91 10.39 30.02 108.02

17.36 18.38 1.05 337.95 15.0

11.90 15.28 11.44 233.58

20.88 17.79 9.56 316.48


10.0
18.19 20.17 3.91 406.83

0.71 7.91 51.74 62.53

0.27 4.32 16.40 18.63 5.0

0.63 3.55 8.53 12.58

0.64 3.38 7.49 11.42


0.0
0.21 3.40 10.20 11.58 0 12 24 36 4
0.97 3.80 8.00 14.41
Wakt
6.27 3.60 7.09 12.98

18.62 7.16 131.22 51.31

6.98 5.78 1.42 33.45

10.00 11.18 1.41 125.07

7.32 12.23 24.14 149.57

5.29 8.65 11.27 74.82

0.51 5.32 23.13 28.34

0.16 3.66 12.23 13.40

0.15 3.18 9.16 10.11

0.31 3.07 7.66 9.45

0.49 3.64 9.92 13.25

7.16 8.43 1.61 71.12

11.37 7.75 13.06 60.11

13.88 12.32 2.44 151.70

11.57 18.33 45.79 336.11

9.90 16.63 45.25 276.45

11.32 24.15 164.58 583.06


6.33 16.15 96.51 260.93

4.67 15.32 113.47 234.80

0.22 6.92 44.99 47.93

0.30 7.54 52.37 56.85

0.02 5.42 29.13 29.34

0.38 7.37 48.85 54.32

0.15 5.70 30.75 32.49

9.39 6.69 7.28 44.80

15.02 14.77 0.06 218.15

7.11 19.03 142.16 362.27

15.26 23.13 61.90 535.00

13.63 28.80 230.00 829.44

15.16 28.29 172.36 800.51

3.82 17.43 185.09 303.69

0.59 13.71 171.97 187.87

0.30 11.70 129.95 136.97

0.22 6.98 45.75 48.77

0.44 6.29 34.21 39.56

0.54 6.52 35.74 42.47

5.67 8.86 10.19 78.50

11.39 14.46 9.44 209.09

9.00 4.43 20.94 19.61

14.93 19.18 18.05 367.87

3.37 8.19 23.19 67.08

10.78 14.45 13.50 208.80

0.57 7.50 48.07 56.25

0.15 2.54 5.70 6.45

0.01 0.93 0.86 0.86

0.00 0.75 0.56 0.56

0.06 0.78 0.52 0.61

0.09 0.93 0.70 0.86

0.51 1.02 0.26 1.04

26.11 11.12 224.77 123.65

0.69 3.58 8.37 12.82

22.16 13.03 83.35 169.78

12.74 12.21 0.28 149.08

19.32 20.42 1.22 416.98

2.28 11.01 76.26 121.22

0.69 6.17 30.00 38.07

0.03 3.52 12.18 12.39

0.03 2.78 7.55 7.73

0.09 2.94 8.10 8.64

5.36 4.59 0.59 21.07

7.18 13.82 44.11 190.99

19.88 14.62 27.69 213.74


6.09 7.01 0.85 49.14

3.69 6.38 7.26 40.70

20.78 24.29 12.34 590.00

14.77 18.28 12.35 334.16

0.59 5.89 28.11 34.69

0.13 4.41 18.28 19.45

0.01 3.14 9.78 9.86

0.22 3.21 8.95 10.30

0.21 2.92 7.36 8.53

7.95 3.81 17.17 14.52

24.41 11.38 169.69 129.50

15.76 13.18 6.65 173.71

12.04 13.63 2.53 185.78

21.07 20.60 0.22 424.36

13.16 18.94 33.40 358.72

7.13 18.51 129.48 342.62

7.30 16.80 90.31 282.24

0.53 14.94 207.77 223.20

0.10 12.28 148.44 150.80

0.06 11.04 120.61 121.88

0.41 10.87 109.41 118.16

4.29 12.41 65.94 154.01

18.69 14.29 19.40 204.20

6.72 12.37 31.92 153.02

10.26 4569.78 15956.32


PERBANDINGAN DEBIT MOCK DAN DEBIT OBSERVASI

Q Mock Q Obsertasi

Nilai Simpangan - R = 0,84

24 36 48 60 72 84 96 108

Waktu (bulan)

You might also like