1.1 Where Communication attachments are necessary and approved, the requirements of this section shall
be applied in conjunction with the requirements in the Joint Use attachment agreements to ensure that
construction meets Oncor requirements and guidelines generally accepted by the electric utility industry.
1.2 Oncor requirements for third party Supply and Communication attachments are based in part on the
latest revision of the National Electrical Safety Code (NESC). Where Oncor requirements exceed the
NESC, Oncor requirements shall govern.
1.3 The lawful requirements of state or local authorities shall govern where they exceed Oncor and NESC
requirements.
1.4 Installations shall be made in accordance with Oncor Distribution Construction Standards (Standards)
and other Oncor requirements. If specific installations are not covered by the Standards, the latest
revision of the NESC shall apply.
1.5 Existing installations, including maintenance replacements, which comply with the clearance
requirements at the time of their original installation, do not have to be reconstructed or modified to
comply with the current clearance requirements except as required for safety reasons.
1.6 Communication line and equipment attachments shall be designed, constructed, and maintained in
accordance with the NESC, including but not limited to, the clearance and strength/loading
requirements. The following NESC loading requirements shall be evaluated with the loading case that
provides the worst case load governing:
1.6.1 NESC Grade B and C construction as specified, except all Grade C construction shall
comply with the requirements defined for Grade C “at crossing”.
1.6.2 NESC 250B – Heavy loading.
1.6.3 NESC 250C – High wind with basic wind speed of 94 mph, where applicable.
1.6.4 NESC 250D – Extreme Ice with concurrent wind loading, where applicable.
1.6.5 At deadends with spans in each direction from the deadend structure, the unbalanced
pull used to design the structure shall not be the difference in tensions. Rather the
unbalanced pull shall be determined by disregarding the impact of the offsetting
conductor.
1.7 No new poles may be installed in an Oncor easement unless approved in writing by the municipality and
landowner. Such written approval and copy of executed easement document must be submitted to
Oncor with initial permit application.
1.8 Communication lines or equipment shall not be installed on historical, decorative, metal, or fiberglass
street light poles.
1.9 No work shall be initiated in the Supply space, as defined by the NESC and shown on 103-105, without
providing Oncor prior notice and obtaining the approval of Oncor. Any work completed in the Supply
space must be performed by an Oncor employee or an Oncor approved contractor that is qualified to
work in the Supply space.
Page 1 of 2
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
1.10 Attachments (including lines, risers, and equipment) shall be installed in a configuration which
complies with NESC and Oncor requirements for climbing/working space and, in the opinion of Oncor,
preserves the climbability of the pole.
1.11 Oncor will consider, but not necessarily allow, attachments to non-wood distribution poles (i.e.
concrete, steel, and fiberglass). Where such attachments are requested, the attacher shall provide all
information required by Oncor for the completion of a detailed engineering analysis. With Oncor
approval, a maximum of four (4) Communication attachments will be allowed on each non-wood pole.
The pole shall not be replaced to allow for more attachments. The attachment will not be allowed if
adequate information regarding the attachment, the existing facilities, or the pole is not provided or is
unavailable.
1.12 Pole attachments shall be made with galvanized bolted connections in a permanent manner.
Attachments utilizing stainless steel banding may be allowed with prior approval by Oncor.
1.13 Prior to beginning work on a pole the attaching party’s qualified person shall at a minimum:
1.13.1 Survey the work location, having in mind what work is to be done and the dangers that
exist.
1.13.2 Inspect the entire pole to ensure the integrity of the pole.
1.13.3 Ensure the pole is in good condition and supported in such a way that the work can be
completed safely.
1.14 Communication lines, messengers, down guys, equipment (including antennas), and support arms
shall be bonded to the pole ground with #6 soft drawn bare copper wire or copper clad steel on each
pole. In the case where a pole ground is damaged or missing, Oncor or approved contractor shall
restore the pole ground before work can proceed. A minimum 2” clearance of air or wood between all
hardware and ground wires shall be maintained.
Page 2 of 2
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
Supply Space
Notes:
A. The Communication worker safety zone is between facilities located in the Supply space and facilities located in the Communication
space, both at the structure and in the span between structures.
B. Nothing shall be located in the Communication worker safety zone, except for the following:
1. Span wires or brackets carrying luminaires, traffic signals, or trolley wires which are effectively grounded and meet NESC
clearance requirements.
2. A drip loop for a luminaire or traffic signal provided a clearance of not less than 12 inches is maintained between the drip
loop and the Communication cable, through bolt, or other equipment.
3. Vertical risers guarded with suitable conduit.
C. No work shall be initiated in the Supply space without providing Oncor prior notice and obtaining approval from Oncor. Any work
completed in the Supply space must be performed by an Oncor employee or approved contractor that is qualified to work in the
Supply space.
2.2 Any Communication line passing within 36 inches of a pole must be attached to the pole.
2.3 Oncor Construction Standards Section 106 defines span length limitations for NESC Grade B and C
construction. When the addition of a Communication line to a pole causes the span length limitations to
be exceeded, the line attachment will only be allowed if:
2.3.2 An engineering analysis demonstrating structural sufficiency is performed using approved Oncor
analysis methodology. When required, analysis documentation must be submitted with permit
application, reviewed and approved by Oncor prior to attachment, or
2.3.3 The installation of an inter-span pole to reduce the span lengths. Prior to the installation of an
inter-span pole, the location must be reviewed and approved by local Oncor representatives. The
practice of installing inter-span poles should be limited.
2.4 Communication lines shall be arranged vertically and mounted directly to the pole.
2.5 Crossarms, extension arms, and standoff brackets shall not be utilized for Communication line
attachment.
2.6 New Communication line attachments shall be installed on the pole in accordance with the following:
2.6.1 If a pole already has Supply and/or Communication lines installed on opposite sides of the pole
(i.e. the pole is boxed), the new line attachment shall always be made on the street side of the
pole.
2.6.2 If a pole is not already boxed, the new line attachment shall always be made on the same side of
the pole as the existing attachments.
2.7 Emergency attachment of Communication lines on poles with tangent construction can be completed
with the use of a j-hook. Emergency attachments shall be converted to permanent attachments in a
period of time deemed reasonable by Oncor.
2.8 Transitioning attachment height on the same pole should be avoided. All same pole transitions must be
reviewed and approved by Oncor before construction. Unbalanced loads shall be guyed in accordance
with the standards.
2.9 The distance between holes used to mount Communication lines shall not be less than 6 inches, with
the exception of the distance between holes on guy plates.
Page 1 of 5
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
2.10 Each company installing facilities on Oncor poles shall install independent guys and anchors for their
respective facilities. Guying is required in all cases where such facilities add an unbalanced tension
load to a pole.
2.10.1 Guys and anchors shall be placed in accordance with the Standards. Reference Standard
103-245 for an illustration of correct placement.
2.10.4 The top hole of the guy plate shall be 6 inches from the bottom hole of the mounting hardware
supporting the tension load.
2.11 Communication slack span lines shall comply with the following requirements:
2.11.1 Oncor reserves the right to not allow the attachment of slack spans to a pole or to require a
larger ANSI pole classification than required by the Standards. The decision will be based on
project specifics including, but not limited to, pole condition, pole and line and configuration,
size and quantity of existing and proposed Supply Communication lines.
2.11.2 No more than two (2) Communication slack span lines shall be installed on a pole.
2.11.3 Communication slack span lines will only be permitted on Oncor poles which are not leaning or
bowed. In addition, Oncor poles must have the required guys and anchors installed.
2.11.4 The maximum mounting height of a Communication slack span line, without the completion of a
detailed loading analysis, shall not exceed 30 feet above the ground.
2.11.5 The maximum Communication slack span line tension is 250 lbs in accordance with NESC
250B for Heavy District Loading. A CommScope (or equivalent) tension computation report
shall be submitted to verify tension limitation.
2.11.7 Communication slack span line requirements apply to original bundle and over-lashed lines.
Page 2 of 5
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
2.12 Pole requirements for in-line deadend poles with single or three phase Supply lines are as follows.
2.12.1 For three phase Supply lines, the takeoff and slack end pole shall be classified as follows.
2.12.1.1.1 Takeoff poles where the angle is less than 45 degrees shall be classified as ANSI class
3 or larger.
2.12.1.1.2 Takeoff poles where the angle is equal to or greater than 45 degrees shall be classified
as ANSI class 1.
2.12.1.1.3 The slack end pole shall be classified as ANSI class 3 or larger.
2.12.2 For single phase Supply lines, the takeoff and slack end pole shall be classified as follows.
2.12.2.1.1 Existing takeoff poles where the angle is less than 45 degrees shall be classified as
ANSI class 5 or larger.
2.12.2.1.2 New takeoff poles and existing takeoff poles where the angle is equal to or greater than
45 degrees shall be classified as ANSI class 3 or larger.
2.12.2.1.3 Existing slack end poles shall be classified as ANSI class 5 or larger. New slack end
poles shall be classified as ANSI class 3 or larger.
Page 3 of 5
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
2.13 Pole requirements for main line tap poles with single or three phase Supply lines are as follows. Slack span
lines must be perpendicular or near perpendicular from takeoff pole to slack end pole.
2.13.1 For three phase slack span taps of three phase Supply lines, the takeoff pole shall be classified as
ANSI class 1 or larger. The slack end pole shall be classified as ANSI class 3 or larger.
Takeoff pole
100' Max.
2.13.2 For single phase slack span taps of three phase or single phase Supply lines, the takeoff pole shall
be classified as ANSI class 3 or larger. Existing slack end poles shall be classified as ANSI class 5
or larger. New slack end poles shall be classified as ANSI class 3 or larger.
Takeoff pole
ANSI class 3 or larger
Takeoff pole
ANSI class 3 or larger
100' Max.
Slack end pole
ANSI class 5 or larger (existing)
ANSI class 3 or larger (new)
Page 4 of 5
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
2.14 Pole requirements for mid-span slack poles with single or three phase slack Supply lines are as follows.
2.14.2 For single phase Supply lines, the slack mid-span pole shall be classified as follows:
2.14.2.1 Existing poles where the angle is less than 45 degrees shall be classified as ANSI class 5
or larger.
2.14.2.2 New and existing poles where the angle is equal to or greater than 45 degrees shall be
classified as ANSI class 3 or larger.
2.14.3 For three phase Supply lines, the slack mid-span pole shall be classified as follows:
2.14.3.1 Poles with an angle that is less than 45 degrees shall be classified as ANSI class 3 or
larger.
2.14.3.2 Poles with an angle that is equal to or greater than 45 degrees shall be classified as
ANSI class 1.
Page 5 of 5
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
Bottom of Transformer/Equipment
Neutral
12"
Communications Line
Notes:
A. Clearances shown are minimum values in accordance with Oncor requirements or the NESC. Additional clearance at
the pole may be required to comply with the minimum mid-span clearances defined on 103-210.
B. May be reduced to 3 inches if street light drip loop is entirely covered with a non-metallic covering.
30" Communication
Worker
Safety Zone
Communication Line
Communication Line
4"
Crossing non-TxDOT highways, streets, county or other public roads (Note C). 15’ 6”
Commercial, residential, and apartment driveways; parking lots; alleys; 15’ 6” (Note F)
and other areas subject to truck traffic (Note C).
Other areas traversed by vehicles, such as cultivated, grazing, forest, and 15’ 6”
orchard lands, industrial sites, commercial sites, etc. (Note G).
Within Rights-of-Way but not overhanging highways, streets, or alleys. 15’ 6” (Note J)
Spaces and ways subject to pedestrians or restricted traffic only (Note D). 9’ 6”
Page 1 of 2
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
Notes:
A. Clearances shown are minimum values as defined by the NESC anywhere along the span. Clearances shall
comply with additional requirements defined by local or corporate jurisdictions.
B. Vertical clearances shall be maintained under the following conductor temperature and loading conditions,
whichever produces the largest final sag:
1. 120º F, no wind.
2. The maximum conductor temperature for which the line is designed to operate, if greater than
120º F, no wind.
4. Greater clearances than shown on 103-205 shall be provided where required by local codes and
ordinances or crossing permits issued by other companies or governmental agencies.
C. Trucks are defined as any vehicle exceeding 8 feet in height. Areas not subject to truck traffic are areas where
truck traffic is not normally encountered or reasonably anticipated.
D. Spaces and ways subject to pedestrians or restricted traffic only are those areas where riders on horseback or
other large animals, vehicles or other mobile units exceeding 8 feet in height, are prohibited by regulation or
permanent terrain configurations or are otherwise not normally encountered or reasonably anticipated.
E. Where a Supply or Communication line along a road is located relative to fences, ditches, embankments, etc,
so that the ground under the line would not be expected to be traveled except by pedestrians, this clearance
may be reduced to 9.5 feet for insulated Communication lines.
F. Where this construction crosses over or runs along driveways, parking lots or alleys not subject to truck traffic,
this clearance may be reduced to 15 feet.
G. When designing a line to accommodate oversized vehicles, these clearance values shall be increased by the
difference between the known height of the oversized vehicle and 14 feet.
H. See 103-230 for clearance between Supply and Communication service drops.
I. Where the height of a residential building does not permit its service drops to meet these values, the clearance
over residential driveways only may be reduced to 11.5 feet for insulated Communication service drops.
J. Communication lines may have a clearance of 15 feet where poles are back of curbs or other deterrents to
vehicular traffic.
Page 2 of 2
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
Supply Service
Communication
Drop
Worker Safety
Zone (40” Min.)
30” Min.
Note A
Notes:
A. A minimum clearance of 30 inches in any direction shall be maintained from Supply service drops to
Communication lines within the span.
To Neutral To Neutral
To Supply To Supply
Note A Note A
Communication Line
Notes:
A. When a street light bracket is mounted in the Communication worker safety zone, street light Supply conductors shall
be completely covered with a non-metallic covering, beginning a minimum of 40" above the upper Communication
line. The covering shall be schedule 80 PVC conduit.
B. Clearance can be reduced to 3" if street light drip loop is entirely covered with a non-metallic covering (TSN 275232).
C. Reference Standard 213-010 for further information.
To Neutral To Neutral
To Supply To Supply
Note A Note A
Top of Top of
4" Min. Luminaire Bracket 4" Min. Luminaire Bracket
Communication
Line
Notes:
A. When a street light bracket is mounted in the Communication space, street light Supply conductors shall be
completely covered with a non-metallic covering, beginning a minimum of 40" above the upper Communication line.
The covering shall be schedule 80 PVC conduit.
B. Clearance can be reduced to 3" if street light drip loop is entirely covered with a non-metallic covering (TSN 275232).
C. Reference Standard 213-010 for further information.
40" Min.
Communication
Worker Safety Zone
12" Min. Supply Service
Note B Note A Drip Loop
12" Min.
Note A
Notes:
A. Minimum clearance of 12 inches between Supply and Communication service drops at service entrance
and along entire length of the service.
B. Clearance shall be maintained between lowest of drip loop or top of riser and Communication service
drop.
Supply Neutral
Note D
Communication Line
6"
5'
Note B
Notes:
A. Each company (Supply and Communication) shall install independent guys and anchors for their respective facilities.
Auxiliary anchor eyes on Supply anchor rods shall not be utilized. Sidewalk guys are not allowed.
B. The Communication anchor shall be installed 5 feet from the Supply anchor.
C. If agreed to by multiple Communication companies and designed as a system to support the total loads applied, a
common Communication guy and/or anchor can be installed. A shared guy and/or anchor can only be used if the
points of attachment are no more than 12 inches apart on the pole. The company installing the Communication anchor
shall coordinate the design and installation with all parties. The design shall be submitted with the permit application
for Oncor approval prior to construction.
D. Communication messengers and guy wires shall be bonded to the pole ground on every pole. Communication
companies shall furnish the necessary #6 soft drawn bare copper or copper clad steel wire and connectors and shall
complete the bonding to the pole ground.
E. No Communication anchor shall be installed closer than 5 feet from the surface of the pole.
F. Guy markers shall be installed on all down guys.
G. Anchor rods shall extend a minimum of 6 inches above grade.
H. The top hole of the guy plate shall be 6 inches from the bottom hole of the mounting hardware supporting the tension
load.
I. The Communication guy shall be installed 6 inches below the Communication line or can be installed using the back
side of the Communication line through bolt.
Supply Neutral
Communication
Worker Safety
Zone (40" Min.)
Note C
Communication Messenger
Communication Line
Pole Ground
Notes:
A. Communication messengers shall be bonded to the pole ground on every pole.
B. Communication companies shall furnish the necessary #6 soft drawn bare copper or copper clad steel wire and
connectors and shall complete the bonding to the pole ground.
C. Minimum clearance of 2” of air or wood between all hardware and ground wire.
3.1 General
3.1.2 Equipment component specifications, assembly configuration, and mounting bracket shall be
approved by Oncor prior to submittal of permit application for attachment.
3.1.3 Equipment should be mounted in-line with Oncor conductors, with the exception of cameras.
Equipment shall not be attached to the field, alley, or road side of a pole.
3.1.4 Equipment shall be installed on poles classified as ANSI class 3 or larger, unless approved by
Oncor.
3.1.5 Strand-mounted wireless small cell equipment is permitted on ANSI class 3 poles.
Strand-mounted Wi-Fi equipment is permitted on ANSI class 5 poles.
3.1.6 Strand-mounted wireless or Wi-Fi equipment shall not be installed on both sides of a pole. If
strand-mounted equipment is already present on the opposite side of the pole, additional
attachments will not be allowed.
3.1.7 A maximum of one (1) pole-mounted wireless antenna assembly is allowed per pole. A maximum
of one (1) strand-mounted wireless assembly is permitted per span.
3.1.8 When equipment is installed on a non-Oncor owned pole, the pole should be installed directly
perpendicular to the Oncor pole at a minimum of 15 feet from the nearest Supply conductor.
3.1.9 Equipment pads and pedestals shall be a minimum of 5 feet from the nearest edge of an Oncor
pole.
3.1.10 Equipment shall not be attached to Oncor equipment or brackets.
3.1.11 Communication risers shall be installed on the same side of the pole as the Communication
equipment.
3.1.12 The overall structure height, including any equipment, shall not exceed 60 feet above the ground.
In cases where an existing pole is replaced to raise Oncor facilities, the poles surrounding the
equipment pole may also need to be replaced at the expense of the equipment owner in an effort
to minimize the impact of uplift.
3.1.13 Antennas shall not be installed within 200 feet of an Oncor AMS router, collector, or Distribution
Automation transceiver.
3.1.14 Pole top extensions are not allowed.
3.1.15 Poles with handholds or footholds shall be arranged so that there is not less than 8 feet between
either:
1. the lowest handhold or foothold and the ground or other accessible surface, or
2. the two lowest handholds or footholds.
Page 1 of 4
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
3.1.16 The bottom of any grounded equipment mounted on a pole shall meet the requirements of NESC
Rule 232B. The following clearances from the bottom of the equipment shall be maintained:
3.1.16.1 Not less than 15 feet above roads, streets, parking lots, or alleys.
3.1.16.2 Not less than 9 feet over areas subject to pedestrians or restricted traffic only.
3.1.17 Cable assemblies attached on the exterior of bracket arms installed on distribution poles shall be
wrapped on the bracket arm and secured using durable cable ties.
3.2.1 On distribution poles served by overhead lines, electric service must be obtained by connecting to an
overhead secondary or single transformer mounted to the pole. Electric service cannot be obtained
from the street light photo cell on distribution poles that have a street light installed. Electric service
must be obtained from the distribution circuit which is attached to the equipment pole and cannot be
obtained from an alternative source.
3.2.2 Electric service will be provided in accordance with Oncor Electric Service Guidelines (ESG).
3.2.3 All installations where the maximum power requirements exceed 80 watts shall be metered.
3.2.4 Attachment of meters and lockable disconnect switches on Oncor poles is prohibited. Meters and
lockable disconnect switches must be installed off-pole on a non-Oncor owned pole, pad, or pedestal.
The lockable disconnect switch must be permanently labeled to identify the equipment it controls and
the equipment owner.
3.2.5 Communication power conductors shall be insulated with a jacket enclosing the entire cable assembly.
3.2.6 The entire length of the power and antenna cable assemblies mounted on a pole shall be enclosed in
schedule 80 PVC conduit. Conduit diameter should not exceed 2 inches. Conduits of up to 4 inches
may be permitted with approval by Oncor. The conduit shall be attached to the pole every 5 feet.
Conduits larger than 2 inches shall be mounted on a standoff.
3.3.1 As a condition of approval by Oncor, applicants shall provide an evaluation of proposed wireless
equipment to prove compliance with FCC guidelines for human exposure to radiofrequency
fields (RF). Evaluations shall include uncontrolled exposure in the near field and far field regions.
Additional evaluations shall be provided whenever the transmitting power of existing equipment is
increased.
Page 2 of 4
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
3.3.2 Two (2) RF warning signs shall be installed on each pole. One sign shall be installed near the
equipment at the level where the safe approach distance ends for FCC General
Population/Uncontrolled power levels. The second sign shall be installed 4 to 6 feet from the ground
line of the pole. This sign shall read, “Warning: Equipment Approach Distance Is XX Feet”. The sign
shall include the equipment owner’s name and 24 hour phone number.
3.3.3 Equipment will be de-energized by Oncor before work is performed within the area defined by the RF
warning signs.
3.3.4 Directional or omni-directional antennas shall be installed and oriented in a manner that limits RF
energy within the climbing space.
3.4.1 Antennas that comply with Oncor requirements may be mounted in the Communication space, in the
Supply space below the lowest Supply attachment, or on the pole top.
3.4.2 Antennas can be mounted on the top of a pole when the pole top is not being used by Oncor or would
not be in use if the pole were replaced in accordance with Oncor current Standards. Rod type pole top
antennas can be mounted to the side of the pole. Other types of pole top antennas must be mounted
directly over the top of the pole.
3.4.3 When an antenna is mounted in a pole top configuration there shall be a minimum of 5 feet separation
between the bottom of the power drip loop or top of conduit (whichever is lower) and the top Supply
conductor or street light bolt.
3.4.4 Pole top antennas shall be secured to the pole with a minimum of two (2) straps. The straps shall be
fastened with three (3) bolts on 6” centers. Rod type antennas can be side mounted and fastened with
two (2) bolts on 6” centers. The top bolt shall be 6” from the pole top.
3.4.5 Equipment shall only be installed on primary tangent poles, secondary poles, service poles, wood
street light poles, and appropriate span guy poles which do not have Supply equipment installed (i.e.
multiple transformers, capacitors, primary risers, secondary/service risers, switches, sectionalizers,
regulators, AMS routers and collectors, distribution automation transceivers, etc.). Equipment shall not
be installed on poles that support multiple circuits. Equipment may be installed on poles which have a
single transformer installed. Attachment of equipment to secondary or service poles with multiple
service drops is allowed. Equipment shall be installed in a way that preserves the climbability of the
pole.
3.4.6 All equipment on a pole shall be mounted on a single bracket that provides one (1) point of attachment
to the pole. The bracket shall provide a minimum of six (6) inches of separation from the nearest edge
of the Oncor pole to the nearest edge of the equipment. The bracket shall be mounted with a minimum
of two (2) bolts spaced at a minimum of 12 inches center to center.
3.4.7 The equipment, including the single point of attachment mounting bracket, shall not exceed 300 pounds
in weight and shall be no larger than 15 cubic feet. The resulting moment applied at the pole shall not
exceed 300 ft-lbs.
Page 3 of 4
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
3.5.1 Strand-mounted wireless equipment assemblies should be installed on the span beginning no closer
than 4 feet and no further than 6 feet from the pole.
3.5.2 Strand-mounted wireless equipment shall only be installed in the Communication space.
3.5.3 Strand-mounted wireless or Wi-Fi equipment is not permitted on slack spans and shall not be installed
within 200 feet of an Oncor AMS router, collector, or Distribution Automation transceiver.
3.5.4 Strand-mounted wireless small cell equipment assemblies shall not exceed an envelope of 7 feet long
by 2 feet tall, 14 square feet. Equipment and bracket shall not exceed a total of 75 pounds.
Strand-mounted wireless equipment may include, but is not limited to, radio, antenna, bracket,
power converter, RF disconnect, and splice case.
3.5.5 Strand-mounted Wi-Fi equipment assemblies shall not exceed an envelope of 2 feet long by 1 foot tall,
2 square feet. Equipment and bracket shall not exceed 25 pounds.
3.5.6 Strand-mounted wireless equipment and mounting bracket shall be bonded to messenger. Messenger
shall be bonded to the pole ground as required.
3.5.7 A disconnect switch shall be identified and clearly marked at each installed location for the purpose of
powering off equipment. The disconnect switch shall be located 4 feet horizontally from the pole on the
strand.
3.5.8 Strand-mounted wireless equipment shall not be installed directly below street light fixtures
mounted on wood poles as this may interfere with the intended illumination pattern.
3.5.9 Additional at-pole clearances may be required to accommodate larger strand-mounted wireless
equipment. Within a span, the clearances above and below the strand-mounted wireless equipment
shall not be less than 4 inches to another Communication line.
3.6.1 Only authorized governmental entities will be allowed to attach a camera to Oncor poles.
3.6.2 Cameras should be mounted in-line with Oncor conductors when possible. Oncor will evaluate
requests to mount cameras on the field, alley, or road side of the pole on a case by case basis.
3.6.3 Cameras shall be mounted in the Communication space unless approved by Oncor.
Page 4 of 4
DocuSign Envelope ID: CFA9320B-133D-4E59-80E6-5A30362AFE6F
Communication
Worker Safety
Zone (40” Min.)
6” Note A
Min.
Note C
12” Min.
Note B
Communication Line
RF Warning Sign
Finished Grade
Notes:
A. Power and antenna cable shall be installed in schedule 80 PVC conduit which should not exceed 2 inches in diameter.
Conduits of up to 4 inches may be permitted with approval by Oncor. Conduit attachment straps should be installed
every five (5) feet. These risers are the only risers allowed on this pole. Conduits larger than 2 inches in diameter shall
be mounted on a standoff.
B. Power cable shall be jacketed multiple conductor. Jacket must enclose entire cable assembly.
C. Antenna and mounting bracket shall be bonded to neutral or pole ground.
D. Maintain minimum of 2” clearance of air or wood between all hardware and ground wires.
E. The clearance to the Communication line shall be measured from the lowest of the antenna drip loop, the top of
antenna conduit, the antenna mounting bracket, or the antenna.
F. Antenna shown in non-inline position for illustration purposes.
G. Two (2) RF warning signs shall be installed on each pole. Reference Standard 103-300 for further information.
6" Min.
6”
Min.
Note C
12” Min.
Communication
RF Warning Sign Worker Safety
Note B Zone (40” Min.)
Communication Line
Note A
RF Warning Sign
Finished Grade
Notes:
A. Power and antenna cable shall be installed in schedule 80 PVC conduit which should not exceed 2 inches in diameter.
Conduits of up to 4 inches may be permitted with approval by Oncor. Conduit attachment straps should be installed every
five (5) feet. These risers are the only risers allowed on this pole. Conduits larger than 2 inches in diameter shall be
mounted on a standoff.
B. Power cable shall be jacketed multiple conductor. Jacket must enclose entire cable assembly.
C. Antenna and mounting bracket shall be bonded to neutral or pole ground on each pole.
D. Maintain minimum of 2” clearance of air or wood between all hardware and ground wires.
E. The Communication Worker Safety Zone shall be measured from the lowest of the antenna drip loop, the top of antenna
conduit, the antenna mounting bracket, or the antenna to the Communication line.
F. Antenna shown in non-inline position for illustration purposes.
G. Two (2) RF warning signs shall be installed on each pole. Reference Standard 103-300 for further information.
Note E
RF Warning Sign TU
Note E
Note A
RF Warning Sign TU
Ground Line
Notes:
A. Power and antenna cable shall be installed in schedule 80 PVC conduit which should not exceed 2 inches in diameter. Conduits of
up to 4 inches may be permitted with approval by Oncor. Conduit attachment straps should be installed every five (5) feet. These
risers are the only risers allowed on this pole. Conduits larger than 2 inches in diameter shall be mounted on a standoff.
B. Power cable shall be jacketed multiple conductor. Jacket must enclose entire cable assembly.
C. Antenna mounting bracket shall be bonded to the neutral or pole ground on each pole.
D. Maintain minimum of 2" clearance of air or wood between all hardware and ground wires.
E. Pole top antennas shall be secured to the pole with a minimum of two (2) straps. The straps shall be fastened with three (3) bolts
on 6" centers. The top bolt shall be 6” from the pole top.
F. Two (2) RF warning signs shall be installed on each pole. Reference Standard 103-300 for further information.
Note C
Note E
RF Warning
6” Sign TU
6”
6” 5' Minimum from
bottom of drip loop
or top of conduit
whichever is
lowest to the top
supply conductor Not to
exceed
60' to
grade
Note A
RF Warning Sign
TU Ground Line
Notes:
A. Power and antenna cable shall be installed in schedule 80 PVC conduit which should not exceed 2 inches in diameter. Conduits of up
to 4 inches may be permitted with approval by Oncor. Conduit attachment straps should be installed every five (5) feet. These risers
are the only risers allowed on this pole. Conduits larger than 2 inches in diameter shall be mounted on a standoff.
B. Power cable shall be jacketed multiple conductor. Jacket must enclose entire cable assembly.
C. Antenna mounting bracket shall be bonded to the neutral or pole ground on each pole.
D. Maintain minimum of 2” clearance of air or wood between all hardware and ground wires.
E. Pole top antennas shall be secured to the pole with a minimum of two (2) straps. The straps shall be fastened with three (3) bolts on
6” centers. The top bolt shall be 6” from the pole top.
F. Two (2) RF warning signs shall be installed on each pole. Reference Standard 103-300 for further information.
Communication Communication
30" Min. in Span 40" 30" Min. in Span 40"
Worker Safety Worker Safety
Zone at Pole Zone at Pole
RF Warning Sign
Notes:
A. Strand-mounted wireless equipment and mounting bracket shall be bonded to messenger. Messenger shall be bonded
to the pole ground as required.
B. Strand-mounted wireless small cell equipment assemblies shall not exceed an envelope of 7 feet long by 2 feet tall, 14
square feet. Equipment and bracket shall not exceed a total of 75 pounds. Strand-mounted wireless equipment may
include, but is not limited to, radio, antenna, bracket, power converter, RF disconnect, and splice case.
C. Strand-mounted Wi-Fi equipment assemblies shall not exceed an envelope of 2 feet long by 1 foot tall, 2 square feet.
Equipment and bracket shall not exceed 25 pounds.
D. For strand-mounted wireless small cell equipment assemblies, a disconnect switch shall be located 4 feet horizontally
from the pole on the strand.
E. Strand-mounted wireless equipment assemblies shall be supplied by DC line power.
F. Strand-mounted wireless or Wi-Fi equipment shall not be installed on both sides of a pole. If strand-mounted equipment
is already present on the opposite side of the pole, additional attachments will not be allowed.
G. Strand-mounted wireless or Wi-Fi equipment is not permitted on slack spans and shall not be installed within 200 feet
of an Oncor AMS router, collector, or Distribution Automation transceiver.
4.1 To facilitate identification of attachments to Oncor poles, tags shall be installed on all
Communication line and equipment attachments at the time of installation. These requirements will
assist in identifying and contacting the attachment owner as needed.
4.2 Each tag shall include the attachment owner's name or generally recognized company logo. The tag
shall also include a contact telephone number.
4.4 Tags must be replaced when the company name and/or contact telephone number are no longer
legible from the ground.
4.5 Tags for Communication lines shall be installed on every pole or attachment point.
4.6 The attaching company may choose the method, color, material (non-metal), construction and
dimensions of the tag as long as the following requirements are met:
4.6.3 The company name and contact number must be easily readable and visible from the ground.
A minimum of 0.5 inch high lettering is required.
4.6.4 Tags should be consistent in appearance for a given company throughout Oncor service