CONCRETE POUR CARD

Total Pour No:


Drawing / Specification:
Type of Concrete: 5500psi @ 28days ¾ PCD(7”-9”) 1.0%
Location/Description: CEMENT SILO 5 & 6 IsoFlex, 0.25% IsoRetard 200
Concrete Source: SUPERMIX Total Volume of Concrete:
Date: 23 Nov 2022 (Night Shift)

TIME TIME TIME TIME AIR


TRUCK CONC. QTY IN RUNNING VOL CUMULATIVE
LOAD NO. CONC. CONC. START FINISH TEMP SLUMP POUR LOCATIONS
NO. TEMP. M3 QTY, in M3 QTY, in M3
BATCH ARRIVE POUR POUR .

85 915 1746 1950 2011 2205 23 8.75 8 634.5 1880.5


86 1205 2023 2215 2225 0030 22 9 8 642.5 1888.5
Cement Silo 5
87 1225 2228 2358 0045 0220 23 8.75 8 650.5 1896.5 & 6 ( High
Wall)
88 1208 0117 0245 0253 0450 22 9 8 658.5 1904.5
89 938 0159 0330 0409 0555 23 9 8 666.5 1912.5

Project:

Description: Rev. Date:

Structure:
Element:
ITP Ref. No.: Dwg.: Rev.

Insp. Request No. Dwg.: Rev.

Description CONTRACTOR CONSULTANT COMPANY

Name

Signature

Date

BBPI-OP-QAC-F28 BETONBAU PHIL., INC. Salcedo Building, Severina Avenue, Severina Subdivision
Revision: 0 KM 18 South Superhighway, Parañaque City - 1700, Philippines
Tel: +632 8243321 / 8243593; Fax: +632 8245366 / 8210120
Email: [email protected] / www.betonbauphilinc.co,