0% found this document useful (0 votes)
96 views1 page

Demand Notice

The document is a demand notice from Gujranwala Electric Power Company for a new domestic electricity connection. It provides details of the customer such as name, address and connection details including load and installation location. It specifies a due date of 29-12-2022 for payment and notes that computer generated demand notices do not require a signature.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views1 page

Demand Notice

The document is a demand notice from Gujranwala Electric Power Company for a new domestic electricity connection. It provides details of the customer such as name, address and connection details including load and installation location. It specifies a due date of 29-12-2022 for payment and notes that computer generated demand notices do not require a signature.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DUE Date: 29-12-2022 Gujranwala Electric Power Company (12473-SAMBRIAL)

25-11-2022 12473018398 202211879725


New Connection New Connection 29-11-2022
Domestic 03422432924 04124730689904

Nill

2 (KW) NBP SAMBRIAL

220 SKT CITY-3

40 M A-1a(01) 0

Muhammad Nasir (S/O) Muhammad Rasheed (Address) Rasoolpura sambrial

30

2440 4000

30

01

Sub-Division Office 12473-SAMBRIAL SDO Wapda


Line Superintendent 12473-SAMBRIAL SDO Wapda

Due Date: 29-12-2022

Muhammad Nasir (S/O) Muhammad Rasheed (Address) Rasoolpura sambrial


25-11-2022 12473018398
4000 29-11-2022 202211202211879725

2440 04124730689904
NBP SAMBRIAL

DUE DATE: 29-12-2022


NBP SAMBRIAL 4000 2440

202211879725 12473018398 202211879725

6440 29-11-2022

NOTE:- Computer generated demand notice, Hence no signature is required.


This subject cited case has been processed in accordance with documents uploded/produced by the owner/applicant. In case any doocument is found false at later stages,
the said connection is likely to be cannceled and as a result of concealment of facts or fraud at any stage and if codal formalities are not follwed and company resrved its
rights to take legal action against owner/applicant.
Date & Time: (30-11-2022 19:25:47)

Powered by TCPDF (www.tcpdf.org)

You might also like