12 Project Management
12 Project Management
12 Project Management
• A Closed Paradigm
• A Random Paradigm
• An Open Paradigm
• A Synchronous Paradigm
The Software Team
Seven project factors when planning the structure of
software engineering team:
• The difficulty of the problem
• The size of the resultant program
• The time
• The degree of problem to be modularized
• The required quality and reliability
• The rigidity of the delivery date
• Degree of sociability (communication)
Coordination and Communication Issues