Normalized productions (per installed kWp): Nominal power 84.5 kWp Performance Ratio PR
7 1.0
Lc : Collection Loss (PV-array losses) 0.93 kWh/kWp/day PR : Performance Ratio (Yf / Yr) : 0.738
0.9
Ls : System Loss (inverter, ...) 0.24 kWh/kWp/day
6
Yf : Produced useful energy (inverter output) 3.3 kWh/kWp/day
0.8
[kWh/kWp/day]
5 0.7
Performance Ratio PR
0.6
4
Energy
0.5
3
0.4
Normalized
2 0.3
0.2
1
0.1
0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Legends: GlobHor Horizontal global irradiation GlobEff Effective Global, corr. for IAM and shadings
DiffHor Horizontal diffuse irradiation EArray Effective energy at the output of the array
T_Amb T amb. E_Grid Energy injected into grid
GlobInc Global incident in coll. plane PR Performance Ratio
500
Values from 01/01 to 31/12
400
Energy injected into grid [kWh/day]
300
200
100
-100
0 2 4 6 8 10
Global incident in coll. plane [kWh/m².day]
3000
Values from 01/01 to 31/12
2500
Energy injected into grid [kWh / Bin]
2000
1500
1000
500
0
0 10 20 30 40 50 60
Power injected into grid [kW]
The probability distribution variance is also depending on some system parameters uncertainties
Specified Deviation PV module modelling/parameters 1.0 %
Inverter efficiency uncertainty 0.5 %
Soiling and mismatch uncertainties 1.0 %
Degradation uncertainty 1.0 %
Global variability (meteo + system) Variance 3.3 % (quadratic sum)
Probability distribution
0.50
0.45
P50 = 101841 kWh
0.40 E_Grid simul = 101841 kWh
0.35
P75 = 99558 kWh
0.30
Probability
0.25
0.20
P90 = 97498 kWh
0.15
0.10
0.05
0.00
92000 94000 96000 98000 100000 102000 104000 106000 108000 110000 112000
E_Grid system production kWh